HomeMy WebLinkAboutAttach. 20, 2009-11-11 Newell to Weickle emailFrom: Newell, Jeff W <Jeff. Newell @duke -energy. com> Sent: Wednesday, November 11, 2009 4:32 PM To: David Weikle <dweikle@shieldengineering.com> Subject: FW: Buck Ash Qty. Graph I just commented on deer loss. Bummer... Nob did lower stop logs by 2 or 18 inches. T55 risk is low with next test in first week of Dec (but bug flush today). This is to alleviate water from pond area where the north exit ramp from the pond collapsed due to over saturation/seepage. This occurred on Tues and stopped trucks on a sunny day, which we can't afford. This is why I wanted to mentioned challenges in my note because although we have caught volume up, we still have major challenges. From: David Weikle[mailto:dweikle@shieldengineering.com] Sent: Wednesday, November 11, 2009 4:18 PM To: Newell, Jeff W Subject: RE: Buck Ash Qty. Graph Jeff, What's with the 5th comment?...Deer sank in pond. Is Nob actually going to lower the pond by two logs? From: Newell, Jeff W [ma ilto:Jeff.Newel l@duke-energy.com] Sent: Wednesday, November 11, 2009 4:15 PM To: Zalme, Nob J Cc: Roberts, Greg; David Weikle; Keith Anthony Subject: FW: Buck Ash Qty. Graph See attached file. You are also aware of challenges: RAIN recovery • Sweaty ash and bridging in placement area. • Bridging out of pond. Lowering of 2 stop logs should help. Thanks. • Excavating ash from center strip of discharge channel. • beer sank in pond. See you soon. -Jeff ............................................................................................................................................................................................................................................ From: Mathis, Tony R Sent: Tuesday, November 10, 2009 4:51 PM To: Townsend, Steve; Whitehead, Robert J Cc: Newell, Jeff W Subject: FW: Buck Ash Qty. Graph Reference latest excavation update. Good progress has been made over the past week to make up for the rain delays, but unfortunately, the rains from Tropical Storm Ida may again force more delays in the excavation work. We'll keep you posted. From: Newell, Jeff W Sent: Tuesday, November 10, 2009 12:39 PM To: Mathis, Tony R Cc: Ussery, Chris L; Horne, Jacob A EXHISfT 213 Duke -SEA -heck -00324057 Subject: Fw: Buck Ash Qty. Graph See attached file update for Buck Ash Project. 96,230 cy (nearly 50 percent complete) and 1.45 percent ahead of production schedule... until the rains that are starting. Go, whoa, recover and go...! -Jeff From: Jamie Lineberger <Jamie@earnhardtgrading.com> To: Newell, Jeff W Sent: Mon Nov 09 18:47:17 2009 Subject: Buck Ash Qty. Graph Jeff, I have updated the qty. graph with today load count. Duke -SEA -heck -00324058