Loading...
HomeMy WebLinkAboutAttach. 13, 2016-01-11 GGS Ash Removal Report 2015 YTDVsantee cooper CERTIFIED MAIL January 11, 2016 Jeffrey P. deBessonet, Director South Carolina Department of Health and Environmental Control Water Facilities Permitting Division 2600 Bull Street Columbia, South Carolina 29201 RE: Grainger Generating Station Ash Pond Closure: Ash Removal Report Santee Cooper's annual closure plan states that Santee Cooper will provide status reports to DHEC every six months regarding the amount of ash and underlying soil removed from Grainger Generating Station. Removal of ash for beneficial use began at Grainger on March 17, 2014. The following table provides tons of ash and soil removed for 2015. Year Month Ash (tons) Soil (tons) 2015 January 28,720 0 2015 February 19,922 0 2015 March 1,051 0 2015 Aril 31,784 0 2015 May 22,211 0 2015 June 28,964 0 2015 July 30,106 0 2015 August 12,117 0 2015 September 32,767 0 2015 October 21,676 0 2015 November 33,917 0 2015 December 21,202 0 2015 Total (YTD) 284,438 Sincerely, TL Thomas L. Kiers Vice President Environmental, Property and Water Systems Management TLK: MDM:cgb cc. Frank Holleman One R6er ood Dwe I MonCKS Corner,SC 29401-2901 1 (843) 761-8030 1 P.O. B.. 2946101 1 M=n Corner, SC 294618101