HomeMy WebLinkAboutAttach. 13, 2016-01-11 GGS Ash Removal Report 2015 YTDVsantee cooper
CERTIFIED MAIL
January 11, 2016
Jeffrey P. deBessonet, Director
South Carolina Department of Health
and Environmental Control
Water Facilities Permitting Division
2600 Bull Street
Columbia, South Carolina 29201
RE: Grainger Generating Station
Ash Pond Closure: Ash Removal Report
Santee Cooper's annual closure plan states that Santee Cooper will provide status reports to DHEC
every six months regarding the amount of ash and underlying soil removed from Grainger Generating
Station.
Removal of ash for beneficial use began at Grainger on March 17, 2014. The following table provides
tons of ash and soil removed for 2015.
Year
Month
Ash (tons)
Soil (tons)
2015
January
28,720
0
2015
February
19,922
0
2015
March
1,051
0
2015
Aril
31,784
0
2015
May
22,211
0
2015
June
28,964
0
2015
July
30,106
0
2015
August
12,117
0
2015
September
32,767
0
2015
October
21,676
0
2015
November
33,917
0
2015
December
21,202
0
2015
Total (YTD)
284,438
Sincerely,
TL
Thomas L. Kiers
Vice President
Environmental, Property and Water Systems Management
TLK: MDM:cgb
cc. Frank Holleman
One R6er ood Dwe I MonCKS Corner,SC 29401-2901 1 (843) 761-8030 1 P.O. B.. 2946101 1 M=n Corner, SC 294618101