HomeMy WebLinkAboutAttach. 12, 2015-12 SCE&G Wateree Semi-Annual Settlement Report -- Relevant PagesSOUTH CAROLINA ELECTRIC & GAS R<>WE r FUR Livrnr<; WAT E R E E STATION SEMI-ANNUAL STATUS REPORT JULY — DECEMBER 2015 January 2016 Semi -Annual Status Report SCE&G Wateree Station The purpose of this document is to present a status report for the six-month reporting period of July 1, 2015 through December 31, 2015 in accordance with the August 17, 2012, Settlement Agreement and Release ("Agreement") between the Catawba Riverkeeper Foundation, Inc. ("Riverkeeper") and South Carolina Electric & Gas Company ("SCE&G") 2 ASH REMOVED During the six-month reporting period of July 1, 2015 through December 31, 2015, approximately 131,088 dry tons of ash were removed from Pond 1. 3 RESULTS OF GROUNDWATER SAMPLING During the six-month reporting period of July 1, 2015 through December 31, 2015, groundwater sampling for wells monitored pursuant to the Mixing Zone Consent Agreement was performed, with the results presented in the following report: Semi -Annual Water Quality Monitoring Report: October 2015 Monitoring, SCE&G, Wateree Station, Eastover, South Carolina The above report has been submitted to SCDHEC. A copy of the report is attached. 4 ACTIVITIES PERFORMED During the six-month reporting period of July 1, 2015 through December 31, 2015, the following activities were performed in furtherance of the Undertakings described in Paragraph 1 of the Agreement: A. Paragraph 1.2: SCE&G continued to remove ash from Pond 1 for sale, recycling or placement in a Class 3 landfill. From January 1, 2012 to present (December 31, 2015), the cumulative net reduction of ash in Pond 1 is approximately 876,021 dry tons. SCE&G has achieved a net reduction of ash in Pond 1 of at least 240,000 tons from January 1, 2012 to January 1, 2015 as required in Paragraph 1.2 of the Agreement. July — December, 2015 Page 1 of 2 Semi -Annual Status Report SCE&G Wateree Station B. Paragraph 1.5: On December 5, 2015, the emergency ash sluice pipe for Unit #1 was removed by being capped and abandoned in place. Plans are underway for removal of the emergency sluice pipe for Unit #2 in the same manner, which will prevent the deposit of any coal ash into the Ponds and satisfy all requirements of Paragraph 1.5 of the Agreement. C. Paragraph 1.7: The final permit to construct a new synthetically lined wastewater pond to replace Pond 1 was issued by SCDHEC on October 16, 2015 (Permit Number: 19945 -IW). SCE&G issued a notice to proceed for the construction of the new wastewater pond on November 9, 2015. July — December, 2015 Page 2 of 2 Table 1 Historical Summary of Constituent Concentrations in Groundwater Wateree Station South Carolina Electric & Gas Company Eastover, Richland County, South Carolina Well ID Event -T Sample Date Arsenic Cadmium Parameter Chromium Lead Sulfate MW -1 MZCL 50 5 100 50 2,000 1501 4/17/01 <5 <1 <10 <5 2 2501 11/13/01 <5 <1 <10 <5 1.3 1502 4/23/02 <5 <1 <10 <5 2.22 2502 10/23/02 <5 <1 <10 <5 3.88 1503 4/15/03 <5 <1 <10 <5 0.86 2503 10/20/03 <5 <1 <10 <5 2.68 1SO4 3/9/04 <5 <1 <10 <5 1.1 2SO4 9/30/04 <5 <1 <10 <5 1.7 1505 4/13/05 <5 <1 <10 6 3.05 2505 10/18/05 <5 <1 <10 5 5.01 1506 3/15/06 5 <1 23 7 1.35 2506 10/16/06 <5 <1 <10 <5 1.2 1507 4/30/07 <5 <1 <10 <5 0.69 2507 10/16/07 <5 <1 12 <5 8.9 1508 4/16/08 <5 <1 <10 <5 1.4 2508 10/22/08 21.3 <1 80.3 67.5 0.56 2508 (Resample) 11/6/08 <5.0* NS NS NS NS 1509 4/21/09 19 <1 93 40 11.36 1509 (Resample) 5/7/09 24* <1* 86.0* 34.0* NS 2509 11/5/09 <5 <1 <10 <5 136.9 MW -1A 1510 4/20/10 <5 <1 <10 <5 0.75 2510 10/19/10 <5 <1 <10 5.5 <0.50 1511 4/12/11 <5 <1 <5 <5 <0.50 2511 2511 (Resample) 11/1/11 9.3 <1 <5 <5 <0.50 2511 (Resample) 11/22/11 <5* NS NS NS NS 1512 5/15/12 <5 <1 <5 <5 <0.50 2512 11/6/12 <5 <1 <5 <5 <0.50 1513 5/13/13 <5 <1 <5 <5 <0.50 2513 10/21/13 <5 <1 <5 <5 0.7 1514 4/28/14 <5 <1 <5 <5 0.9 2514 10/14/14 <5 <1 <5 <5 <0.5 1515 4/14/15 <5 <1 <5 <5 <0.5 2515 10/13/15 <5 <0.1 <0.5 1.6 <0.5 Page 1 of 9 Well ID Event Sample Date Arsenic Cadmium Parameter Chromium Lead Sulfate MW-2 MZCL 50 5 100 50 2,000 1501 4/17/01 <5 <1 <10 <5 66.9 2501 11/13/01 <5 <1 <10 <5 57.7 1502 4/23/02 <5 <1 <10 <5 52.6 2502 10/23/02 <5 <1 <10 <5 60.3 1503 4/15/03 <5 <1 <10 <5 52.4 2503 10/20/03 <5 <1 <10 <5 54.39 1SO4 3/9/04 <5 <1 <10 <5 52 2SO4 9/30/04 <5 <1 <10 <5 45.8 1505 4/13/05 <5 <1 <10 <5 45.9 2505 10/18/05 <5 <1 <10 <5 44.6 1506 3/15/06 <5 <1 <10 <5 39.56 2506 10/16/06 <5 <1 <10 <5 35.9 1507 4/30/07 <5 <1 <10 <5 32.2 2507 10/16/07 <5 <1 <10 <5 34 1508 4/16/08 <5 <1 <10 <5 38.3 2508 10/22/08 <5 <1 <10 8.4 33.7 1509 4/21/09 <5 <1 <10 8.4 37.7 2509 11/5/09 <5 <1 <10 <5 31.4 1510 4/20/10 <5 <1 <10 <5 35.8 2510 10/19/10 <5 <1 <10 <5 27.9 1511 4/12/11 <5 <1 <5 <5 33.6 2511 11/1/11 <5 <1 <5 <5 34 1512 5/15/12 <5 <1 <5 <5 34.6 2512 11/6/12 5.1 <1 <5 <5 40.7 1513 5/13/13 <5 <1 <5 <5 44.6 2513 10/21/13 <5 <1 <5 <5 40.4 1514 4/28/14 <5 <1 <5 <5 28.8 2514 10/14/14 <5 <1 <5 <5 45.2 1515 4/15/15 <5 <1 <5 <5 44.5 Page 2 of 9 Well ID Event Sample Date Arsenic Cadmium Parameter Chromium Lead Sulfate 2515 10/13/15 2 <0.1 <0.5 <0.5 52.76 MW -3 MZCL 1501 4/17/01 3,000 165 5 <1 100 <10 50 <5 2,000 73.4 2501 11/13/01 231 <1 <10 <5 57.8 1502 4/23/02 <1 <10 <5 64.1 2502 10/23/02 186 <1 <10 <5 57.2 1503 4/15/03 284 <1 <10 <5 63.9 2503 10/20/03 193 <1 <10 <5 56.76 1SO4 3/9/04 432.7 <1 <10 <5 38.8 2SO4 9/30/04 198 <1 <10 22.4 44.8 1505 4/13/05 377 <1 13 6 40.1 2505 10/18/05 201 <1 <10 <5 52.3 1506 3/15/06 305 <1 <10 <5 42.35 2506 10/16/06 209 <1 <10 <5 45.1 1507 4/30/07 232 <1 <10 <5 43.8 2507 10/16/07 179 <1 <10 <5 38.1 1508 4/16/08 402 <1 <10 <5 47.2 2508 10/22/08 189 <1 <10 <5 40.98 2508 11/6/08 208* NS NS NS NS 1509 4/21/09 294 <1 <10 <5 35.8 1509 (Resample) 5/7/09 143* <1* <10* <5* NS 2509 11/5/09 162 <1 <10 <5 29.6 1510 4/20/10 485 <1 <10 <5 36.6 2510 10/19/10 144 <1 <10 <5 28.1 1511 4/12/11 176 1.3 <5 <5 63 2511 11/1/11 202 <1 <5 <5 46.7 1512 5/15/12 164 <1 <5 <5 58.8 2512 11/6/12 162 <1 <5 <5 41.9 1513 5/13/13 103 <1 <5 <5 70.5 2513 10/21/13 153 <1 <5 <5 86.4 1514 4/28/14 82.8 1.2 <5 <5 44.6 2514 10/14/14 122 <1 <5 <5 59.1 1515 4/15/15 52.5 <1 <5 <5 15.6 Page 3 of 9 Well ID Event Sample Date Arsenic Cadmium Parameter Chromium Lead Sulfate 2515 10/12/15 2.9 <0.1 <0.5 <0.5 <0.5 MWA MZCL 1501 4/17/01 3,000 8.1 5 <1 100 <10 50 <5 2,000 4.6 2501 11/13/01 <5 <1 <10 <5 4.4 1502 4/23/02 8.8 <1 <10 <5 4.8 2502 10/23/02 <5 <1 <10 <5 4.1 1503 4/15/03 12.3 <1 <10 <5 5.5 2503 10/20/03 <5 <1 <10 <5 2.91 1SO4 3/9/04 7.6 3.4 <10 <5 2.2 2SO4 9/30/04 7.9 2.2 <10 <5 12.6 1505 4/13/05 <5 <1 <10 <5 3.39 2505 10/18/05 15.1 3.4 <10 <5 6.3 1506 3/15/06 <5 2.2 <10 <5 3.96 2506 10/16/06 <5 <1 <10 <5 4.3 1507 4/30/07 <5 <1 <10 <5 <0.50 2507 10/16/07 <5 <1 <10 <5 <0.50 1508 4/16/08 <5 1.1 <10 <5 <0.5 2508 10/22/08 <5 <1 <10 <5 <0.5 1509 4/21/09 <5 <1 <10 <5 7.02 2509 11/5/09 <5 <1 <10 <5 <0.5 1510 4/20/10 <5 3.2 <10 <5 10.4 2510 10/19/10 <5 <1 <10 <5 <0.5 1511 4/12/11 <5 <1 <5 <5 <0.5 2511 11/1/11 <5 <1 <5 <5 3 1512 5/15/12 <5 1.9 <5 <5 8.7 2512 11/6/12 <5 1.5 <5 <5 <0.5 1513 5/13/13 <5 1.5 <5 <5 1.05 2513 10/21/13 <5 <1 <5 <5 0.9 1514 4/28/14 <5 3.6 <5 <5 6.1 2514 10/14/14 <5 3.7 <5 <5 0.96 1515 4/15/15 <5 <1 <5 <5 1.4 Page 4 of 9 Well ID Event Sample Date Arsenic Cadmium Parameter Chromium Lead Sulfate 2515 10/12/15 2 <0.1 0.5 <0.5 0.71 MW -5 MZCL 50 15 100 50 2,000 1501 4/17/01 <5 2.2 <10 <5 0.7 2501 11/13/01 <5 <1 <10 <5 34.6 1502 4/23/02 5 4.2 18.5 8.5 1.93 2502 10/23/02 <5 <1 <10 <5 2.71 1503 4/15/03 15.4 <1 <10 <5 <0.5 2503 10/20/03 <5 <1 <10 <5 <0.5 1SO4 3/9/04 8 3.1 <10 <5 <0.5 2SO4 9/30/04 7.3 5.8 <10 <5 4 1505 4/13/05 10 <1 15 8 <0.5 2505 10/18/05 5.2 5.4 <10 <5 <0.5 1506 3/15/06 <5 5.5 <10 <5 <0.5 2506 10/16/06 <5 <1 <10 <5 <0.5 1507 4/30/07 <5 <1 <10 <5 <0.50 2507 10/16/07 <5 1.14 <10 <5 <0.50 1508 4/16/08 <5 1.9 <10 <5 <0.5 2508 10/22/08 <5 1.4 <10 6.6 <0.5 1509 4/21/09 <5 <1 <10 <5 <0.5 2509 11/5/09 <5 <1 <10 <5 <0.5 1510 4/20/10 <5 3.4 <10 <5 <0.5 2510 10/19/10 <5 <1 <10 <5 <0.5 1511 4/12/11 6.1 <1 <5 <5 <0.5 2511 11/1/11 9.1 <1 <5 6.1 4 2S11 (Resample) 12/2/11 <5* NS NS NS NS 1512 5/15/12 <5 3.4 <5 7 13.4 2512 11/6/12 <5 2.9 <5 8.8 37.8 1513 5/13/13 5.7 <1 9.5 7.2 <0.5 2513 10/21/13 <5 1.1 <5 6.4 0.9 1514 4/28/14 <5 3.5 5.7 <5 0.9 2514 10/13/14 <5 <1 <5 6.2 <0.5 1515 4/14/15 <5 2.9 <5 <5 <0.5 2515 10/12/15 4.4 <0.1 <0.5 <0.5 <0.5 Page 5 of 9 Well ID Event Sample Date Arsenic Cadmium Parameter Chromium Lead Sulfate MW -6 MZCL 50 5 100 50 2,000 2501 11/13/01 <5 <1 <10 <5 48.4 1502 4/23/02 <5 <1 <10 <5 47.9 2502 10/23/02 <5 <1 <10 <5 39.5 1503 4/15/03 <5 <1 <10 <5 32.4 2503 10/20/03 <5 <1 <10 <5 44.92 1SO4 3/9/04 <5 2.8 <10 <5 2.9 2SO4 9/30/04 <5 <1 <10 <5 32.1 1505 4/13/05 <5 <1 <10 <5 29.6 2505 10/18/05 <5 <1 <10 <5 35.9 1506 3/15/06 <5 <1 <10 <5 34.22 2506 10/16/06 <5 <1 <10 <5 30.4 1507 4/30/07 <5 <1 <10 <5 <0.50 2507 10/16/07 <5 <1 187 11.6 <0.50 1508 4/16/08 6.4 <1 <10 <5 30 2508 10/22/08 <5 <1 29.6 <5 24.5 1509 4/21/09 <5 <1 <10 <5 <0.5 2509 11/5/09 <5 <1 <10 <5 22.5 1510 4/20/10 <5 3.4 <10 <5 1.56 2510 10/19/10 <5 3.7 <10 <5 5.33 1511 4/12/11 <5 1.2 <5 <5 29.9 2511 11/1/11 <5 1.2 <5 <5 29.4 1512 5/16/12 6.7 <1 7.3 <5 35 2512 11/6/12 <5 <1 <5 <5 37.2 1513 5/13/13 5 <1 <5 <5 31.2 2513 10/21/13 <5 <1 <5 <5 34.8 1514 4/28/14 <5 <1 <5 <5 26 2514 10/13/14 <5 <1 <5 <5 26.2 1515 4/14/15 <5 <1 <5 <5 30.8 Page 6 of 9 Well ID Event Sample Date Arsenic Cadmium Parameter Chromium Lead Sulfate 2515 10/12/15 0.8 <0.1 <0.5 <0.5 29.52 MW-8 MZCL 50 15 100 50 2,000 1501 4/17/01 15.1 1 <10 <5 226.8 2501 11/13/01 <5 <1 <10 <5 91.6 1502 4/23/02 7.8 <1 <10 5 158.5 2502 10/23/02 <5 <1 <10 <5 243 1503 4/15/03 <5 4.4 <10 <5 441.3 2503 10/20/03 19.8 3.4 <10 <5 164.9 1SO4 3/9/04 <5 3.9 <10 <5 99.2 2SO4 9/30/04 <5 <1 <10 <5 247.1 1505 4/13/05 <5 <1 <10 <5 290 2505 10/18/05 <5 <1 <10 <5 314 1506 3/15/06 <5 2.8 <10 <5 207.8 2506 10/16/06 <5 <1 <10 <5 170 1507 4/30/07 6 <1 <10 <5 73 2507 10/16/07 <5 <1 <10 <5 13 1508 4/16/08 <5 <1 <10 <5 15.1 2508 10/22/08 <5 <1 <10 <5 3.2 1509 4/21/09 <5 <1 <10 <5 37.1 2509 11/5/09 <5 <1 <10 <5 37.8 1510 4/20/10 <5 3.1 <10 <5 12.08 2510 10/19/10 <5 3.1 <10 <5 1.11 1511 4/12/11 <5 <1 6.5 <5 66.3 2511 11/1/11 <10 2.2 <10 <10 115 1512 5/16/12 <50 <10 <50 <50 195 2512 11/6/12 10.7 2.8 <10 <10 198 1513 5/13/13 <5 <1 5 10.6 129.9 2513 10/21/13 <5 <1 <5 5.6 125 1514 4/28/14 <5 2 <5 <5 119 2514 10/13/14 <5 <1 <5 <5 77.4 1515 4/14/15 <5 <1 <5 5 63.8 2515 10/12/15 1.7 <0.1 2 0.62 49.4 Page 7 of 9 Well ID Event Sample Date Arsenic Cadmium Parameter Chromium Lead Sulfate MW-9 MZCL 50 15 100 50 2,000 1501 4/17/01 <5 5.8 <10 <5 1,040 2501 11/13/01 <5 <1 <10 <5 1,182 1502 4/23/02 <5 7.9 <10 5 1,044 2502 10/23/02 <5 <1 <10 <5 1,603 1503 4/15/03 7.7 8.8 <10 <5 775.6 2503 10/20/03 <5 <1 <10 <5 824.5 1SO4 3/9/04 <5 6.9 <10 <5 962 2SO4 9/30/04 <5 1 <10 <5 775.4 1505 4/13/05 <5 <1 <10 <5 963 2505 10/18/05 <5 4.5 <10 <5 916 1506 3/15/06 <5 <1 <10 <5 957 2506 10/16/06 <5 <1 <10 <5 861 1507 4/30/07 <5 <1 <10 <5 241 2507 10/16/07 <5 <1 <10 <5 1,200 1508 4/16/08 <5 2.4 <10 <5 9,330 2508 10/22/08 <5 2.4 <10 <5 1,247.30 1509 4/21/09 <5 <1 <10 <5 432 2509 11/5/09 <5 <1 <10 <5 1,017 1510 4/20/10 <5 <1 <10 <5 992 2510 10/19/10 <5 <1 <10 <5 1,045 1511 4/12/11 7.4 3.6 <5 8.8 900 2511 11/1/11 9.6 <1 <5 10 992 2511 (Resample) 12/2/11 <5* <1* NS NS NS 1512 5/15/12 <5 2.2 <5 13.4 978 2512 11/6/12 <5 8.2 <5 13.6 945 1513 5/13/13 <5 2.2 <5 13.9 710 2513 10/21/13 <5 3.4 <5 12 926 1514 4/28/14 <5 <1 <5 9.1 425 2514 10/13/14 <5 <1 <5 11.5 973 1515 4/14/15 <5 <1 <5 11.1 761 2515 10/13/15 3.9 0.5 0.6 <0.5 707.9 Page 8 of 9 Well ID Event Sample Date Arsenic Cadmium Parameter Chromium Lead Sulfate MW-11 MZCL 3,000 5 100 50 2,000 1501 4/17/01 565 <1 <10 <5 59.2 2501 11/13/01 1,150 <1 <10 <5 60.3 1502 4/23/02 1,143 <1 <10 <5 63.8 2502 10/23/02 774 <1 <10 <5 68.2 1503 4/15/03 322 <1 <10 <5 57.7 2503 10/20/03 1,345 <1 <10 <5 63.9 1SO4 3/9/04 337 <1 19.2 7.9 54.3 2SO4 9/30/04 563 <1 18.7 9.7 40.7 1505 4/13/05 891 <1 73 39 53.9 2505 10/18/05 1,512 <1 31.4 13.7 54.2 1506 3/15/06 5,100 <1 40 14 36.82 1506 (Resample) 6/1/06 968* NS NS NS NS 2506 10/16/06 1,492 <1 <10 <5 68.2 1507 4/30/07 4,051 <1 10 7 27.5 1507 (Resample) 5/7/07 252* NS NS NS NS 2507 10/16/07 2,452 <1 <10 5.2 26.8 1508 4/16/08 310 <1 <10 <5 35.4 2508 10/22/08 2,149 <1 13.2 8 32.04 2508 (Resample) 11/6/08 424* NS NS NS NS 1509 4/21/09 567 <1 <10 <5 41.9 1509 (Resample) 5/7/09 932* <1* <10* <5* NS 2509 11/5/09 576 <1 <10 <5 27.6 1510 4/20/10 796 <1 31.7 10.9 60.8 2510 10/19/10 696 <1 <10 <5 55.7 1511 4/12/11 380 <1 8.7 <5 44.5 1511 (Resample) 6/15/11 1,100* <1* <5* <5* 102.4* 2511 11/1/11 318 <1 <5 <5 107 1512 5/15/12 690 <1 <5 <5 85.8 2512 11/6/12 460 <1 <5 <5 43 1513 5/13/13 94.5 <1 <5 <5 24.7 2513 10/22/13 355 <1 <5 <5 42.4 1514 4/28/14 97 <1 <5 <5 25.9 2514 10/13/14 101 <1 <5 <5 22.2 1515 4/14/15 93.8 <1 <5 <5 15.5 2515 10/13/15 58.6 <0.1 1.8 0.61 19.35 MW-12 1515 4/14/15 <5.0 <1.0 <5.0 <5.0 24.6 2515 10/13/15 1.9 <0.1 0.5 <0.5 30.12 Notes: 1) All concentrations for total metals and are provided in micrograms per liter (µg/I). 2) Sulfate concentrations are provided in milligrams per liter (mg/L). 3) MZCL = Mixing Zone Contaminant Level. 4) MZCL for arsenic for wells MW -1A, MW -2, MW -5, MW -6, MW -8, and MW -9 is 50 ug/l. 5) MZCL for arsenic for wells MW -3, MW -4, and MW -11 is 3,000 ug/l. 6) MZCL for cadmium for wells MW -1, MW -2, MW -3, MW -4, MW -6, and MW -11 is 5.0 ug/I. 7) MZCL for cadmium for wells MW -5, MW -8, and MW -9 is 15.0 ug/I. 8) NS = Not analyzed. 9) Bold type indicates concentration above MZCL. 10) * = Results of resampling Page 9 of 9