Loading...
HomeMy WebLinkAbout20150621 Ver 2_More Info Received_20160929C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑X Wetlands Strea X — tributaries Buffers Open \Qters PQd Construction X❑ 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary T 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 T Excavation Non -Tidal Freshwater Marsh No Corps 0.004 W2 P Excavation Non -Tidal Freshwater Marsh No Corps 0.05 W3 - Choose one Choose one Yes/No W4 - Choose one Choose one Yes/No W5 - Choose one Choose one Yes/No W6 - Choose one Choose one Yes/No 2g. Total Wetland Impacts: 0.054 2h. Comments: Temporary impacts from utilities installation. Permanent impacts to W2 resulting from pond construction. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 P Culvert UT to Ross Creek (S01) PER Corps 3 20 S2 P Culvert UT to Ross Creek (S01) PER Corps 3 22 S3 T Cofferdam UT to Ross Creek (S01) PER Corps 3 15 S4 - Choose one S5 - Choose one - S6 - Choose one 3h. Total stream and tributary impacts 57 3i. Comments: Page 4 of 10 PCN Form — Version 1.4 January 2009