Loading...
HomeMy WebLinkAboutNCG030229 DMR SW (15) Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted 06/27/2016 CERTIFICATE OF COVERAGE NO. PAGGti30MSAMPLE COLLECTION YEAR 2016 FACILITY NAME Eaton Corporation—Transmission Division SAMPLE PERIOD X Jan-June n July-Dec COUNTY Cleveland or X Monthly' May (month) PERSON COLLECTING SAMPLES James W Willard II (INENCO, INC.) DISCHARGING TO CLASS ORW nHQW nTrout EIPNA LABORATORY Pace Analytical Services, Inc. Lab Cert.# 40,37712&12,37706 Zero-flow Water Supply EISA LABORATORY ENCO Laboratories Lab Cert.# 442 LABORATORY INENCO, Inc. Lab Cert.# 5540 RECEIVED X Other Class C RECEIVED Comments on sample collection or analysis: AUG It AUG 0 2 2016 — PLEASE REMEMBER TO SIGN ON PAGES 3 AND/OR 3 4 CENTRACENTRAL FILES DWR SEL FILES Part A:Stormwater Benchmarks and Monitoring Results DWR SECTIONC�IQ�) z No discharge this period? 24-hour rainfall Date Sample . Non-Polar O&G/ Outfall No. i amount, pH, Total Toxic CTotal Suspended Solids Copper Lead Zinc Total Petroleum Collected' s Inches Standard units Organics mo/dd/yr Hydrocarbons Benchmarks=_> - - 100 mg/L or 50 mg/L° 6.0—9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L SDO-001 05/17/2016 0.26 <2.5 7.73 0.0060 <0.0050 0.0170 1.61 N/A SDO-002 05/17/2016 0.26 3.0 7.63 0.0195 <0.0050 0.0195 1.59 N/A SDO-004 05/17/2016 0.26 <5.0 7.77 0.0610 <0.0050 0.0261 0.678 N/A SDO-006 05/17/2016 0.26 6.5 7.79 0.0095 <0.0050 0.1040 1.39 N/A 1 Monthly sampling(instead of semi-annual)must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall,you must still submit this discharge monitoring report with a checkmark here 3The total precipitation must be recorded using data from an on-site rain gauge Unattended sites may be eligible for a waiver of the rain gauge requirement °See General Permit,Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations,manufacture semiconductors,manufacture electronic crystals,or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample(for metal finishing use the definition as found in 40 CFR 433.11;for semiconductor manufacture use the definition as found in 40 CFR 469 12,for electronic crystal manufacture use the definition as found in 40 CFR 469.22,and for cathode ray tube manufacture use the definition found in 40 CFR 469 31) Permit Date.11/1/2012-10/31/2017 SWU-245,last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify,and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver,the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO),I certify that to the best of my knowledge and belief,no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan" Name(Print name) Title(Print title) (Signature) (Date) Note:Results must be reported in numerical format. Do not report Below Detection Limit, BDL,<PQL, Non-detect, ND,or other similar non-numerical format. When results are below the applicable limits,they must be reported in the format,"<XX mg/L",where XX is the numerical value of the detection limit, reporting limit,etc. in mg/L Note: If you report a sample value in excess of the benchmark,you must implement Tier 1, Tier 2,or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results:only for facilities averaging>55 gal of new oil per month. No discharge this period?2 Date Sample 24-hour rainfall Collected) amount, Non-polar O&G/TPH by Outfall No. mo/dd/yr Inches3 EPA 1664(SGT-HEM) Total Suspended Solids pH Benchmarks=_> - - 15 mg/L 100 mg/L or 50 mg/L* 6.0—9.0 SU Footnotes from Part A also apply to this Part B *See General Permit text,Table 5,identifying the especially sensitive receiving water classifications where the more protective benchmark applies Permit Date 11/1/2012-10/31/2017 SWU-245,last revised 10/25/2012 Page 2 of 3 Note: If you report a sample value in excess of the benchmark,you must implement Tier 1,Tier 2,or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS. • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES n NO n IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES n NO n REGIONAL OFFICE CONTACT NAME: Zahid S. Khan Mail an original and one copy of this DMR,including all"No Discharge"reports, within 30 days of receipt of the lab results(or at end of monitoring period in the case of"No Discharge"reports)to: Division of Water Quality _ Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (11164 (Signature of Permittee) (Date) Permit Date: 11/1/2012-10/31/2017 SWU-245,last revised 10/25/2012 Page 3 of 3 Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted_07/22/2016 CERTIFICATE OF COVERAGE NO.'.`410770 Q 9 SAMPLE COLLECTION YEAR 2016 FACILITY NAME Eaton Corporation—Transmission Division SAMPLE PERIOD ❑Jan-June ❑July-Dec COUNTY Cleveland or X Monthly1 June 2016 (month) PERSON COLLECTING SAMPLES DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA LABORATORY Lab Cert.# X Zero-flow ❑Water Supply EISA Comments on sample collection or analysis: �'_` ❑Other AUG Yl)Ib PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 9 CENTRAL FILES Part A: Stormwater Benchmarks and Monitoring Results DWR SECTION X No discharge this period?2 Non-Polar O&G/ Date Sample 24-hour,rainfall pH, Total-Toxic Outfall No. Collected1 amount, Total Suspended Solids Standard units Copper Lead Zinc Total Petroleum Organics5 (mo/dd/yr) Inches3 Hydrocarbons Benchmarks==_> - - 100 mg/L or 50 mg/1.4 6.0—9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L, 1 Monthly sampling(instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall,you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on-site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit,Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling'is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12;for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2012-10/31/2017 _ SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver,the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief,no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Name (Print name) Title(Print title) (Signature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL,<PQL, Non-detect, ND, or other similar non-numerical format. When results are below the applicable limits,they must be reported in the format, "<XX mg/L",where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark,you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. E No discharge this period?2 Outfall No. Date Sample '24-hour rainfall Collected) amount, `Non-polar O&G/TPH by Total Suspended Solids pH (mb/dd/yr) Inches3 EPA 1664(SGT-HEM) Benchmarks===> - - 15 mg/L 100 mg/L or 50 mg/L* 6.0—9.0 SU Footnotes from Part A also apply to this Part B i .. *See General Permit text,Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date. 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 (' -,JL Note: If you report a sample value in excess of the benchmark,you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PARTAAND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES X NO❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES X NO❑ REGIONAL OFFICE CONTACT NAME• Ryan Kormanik Mail an original and one copy of this DMR,including all"No Discharge"reports, within 30 days of receipt of the lab results(or at end of monitoring period in the case of"No Discharge"reports)to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." cycPaiheici---- 0 /22-//c4` (Signature of Permittee) (Date) Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 3 of 3 May 19, 2016 Division of Water Quality RECEIVED Attn: DWQ Central Files MAY 2 4 2016 1617 Mail Service Center Raleigh, NC 27699 - 1617 CENTRAL FILES DWR SECTION Re: Stormwater Discharge Outfall Monitoring Report (DMR) Year 4, Period 1, April Monthly 2016 Eaton Corporation—Transmission Division (Cleveland County) General Permit NCG030000; Certificate of Coverage Numbe, ;CSG+O2 �it9. Dear Stormwater Permitting Unit; We respectfully submit the enclosed original and one copy of the Stormwater Discharge Outfall Monitoring Report for Eaton Corporation—Transmission Division under General Permit Number NCG030000, Certificate of Coverage NCG030229. This submission is for stormwater discharge sampling for Year 4, Period 1, April Monthly Monitoring for 2016 as outlined in Part II, Section B of our stormwater discharge permit. If you have any questions or comments regarding this Stormwater Discharge Outfall Monitoring Report (DMR), please contact us at your convenience. Sincerely, ,f946tilkj Georgie Talbert, EHS Manager Eaton Corporation—Transmission Division Kings Mountain, North Carolina Enclosures: Stormwater Discharge Outfall Monitoring Report (DMR), 1 original & 1 copy