Loading...
HomeMy WebLinkAboutNCG030130 DMR SW (17) SHIELD ENGINEERING, INC. RECEIVED August 11, 2016 AUG 17 2016 Mr. Ryan Pennington AL t"ILES Daimler Trucks North America, LLC - Gastonia Components and Logistics DWR SECTION 1400 Tulip Drive Gastonia, NC 28052 Subject: Monthly Sampling—401*2.0iI6 NPDES General Permit No. NCG030000/CoC No. Ng0 t Daimler Trucks, Gastonia Components and Logistics, LLC 1400 Tulip Drive, Gastonia,North Carolina Shield Project No. 1140099-04 Dear Mr. Pennington: Shield Engineering, Inc, (Shield) was unable to collect stormwater samples for Stormwater Discharge Outfall (SDO) #001 at the Gastonia facility for the month of July 2016. According to rainfall data collected for the month, qualifying storm events occurred on July 5th and July 16th measuring 0.34 inches and 1.09 inches, respectively. An additional 0.43 inches of rain was measured on July 7th. However, each of these events took place on a weekend day, after normal business hours, or did not occur greater than 72 hours since the last qualifying storm event. As the seasonal type of storm event has now changed to high intensity, short duration events, usually commencing in late afternoon through early evening with little to no notice for preparation, Shield will continue to monitor daily weather conditions and attempt to continue coordination of appropriate staff and resources to facilitate adequate sample collection. Therefore, per Section 2 Part IV of General Permit No. NCG030000 Shield will attempt to collect a substitute sample or perform a visual assessment during the next qualifying storm event. A partially completed DMR form is attached to this cover letter for your signature and submittal to the State. Daimler's Gastonia facility remains in Tier Three of the NPDES General Permit No. NCG030000 at SDO #001. Shield will continue to perform monthly sampling at SDO #001 per Tier 3 requirements until instructed to halt by Daimler. Shield greatly appreciates the opportunity to provide environmental services to Daimler Trucks of North America. If you have any questions in reference to this document or require further information, please feel free to contact either of the undersigned at(704) 394-6913. Respectfully, I SHIELD-ENGINEERING,INC. 01, Melind 1M. Greene M.rk C. Boland, P.E. Senior Engineer Principal Engineer Attachment: Stormwater Discharge Monitoring Report(DMR) 4301 Taggart Creek Road Telephone 704 394.6913 Charlotte,NC 28208 www.shieldenghneering corn Fax 704 394.6968 Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted 8/11/16 CERTIFICATE OF COVERAGE NO. NGG033O SAMPLE COLLECTION YEAR 2016 FACILITY NAME Daimler Trucks—Gastonia Components&Logistics SAMPLE PERIOD ®Jan-June ❑July-Dec PERSON COLLECTING SAMPLES N/A or ®Monthly' July (month, LABORATORY: N/A Lab Cert.# DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA Comments on sample collection or analysis: Samples at SDO#001 note pD ❑Zero-flow ❑Water Supply OSA collected due to no rainfall/discharge during normal business 1 It ®Other hours AUG ,ulo PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 -> CENTRAL FILES Part A:Stormwater Benchmarks and Monitoring Results DWR SECTION ❑No discharge this period?, Date Sample 24-hour rainfall pH, Non-Polar O&G/ Total Toxic Outfall No. Collected' amount, Total Suspended Solids Standard units Copper Lead Zinc Total Petroleum Organicss (mo/dd/yr) Inches3 Hydrocarbons Benchmarks===> _ - 100 mg/L or 50 mg/L4 6.0—9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L SDO#001 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall,you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on-site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. R See General Permit,Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals,or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample(for metal finishing use the definition as found in 40 CFR 433.11;for semiconductor manufacture use the definition as found in 40 CFR 469.12;for electronic crystal manufacture use the definition as found in 40 CFR 469.22;and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date:11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver,the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Arpad Lukacs Name(Print name) Plant Manager TTte(Print title) 7-1124/, (Sign ure) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL,<PQL, Non-detect, ND,or other similar non-numerical format. When results are below the applicable limits,they must be reported in the format, "<XX mg/L",where XX is the numerical value of the detection limit, reporting limit,etc. in mg/L. Note: If you report a sample value in excess of the benchmark,you must implement Tier 1, Tier 2,or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results:only for facilities averaging> 55 gal of new oil per month. n No discharge this period?2 Outfall No. Date Sample 24-hour rainfall Collected' amount, Non-polar O&G/TPH by (mo/dd/yr) Inches3 EPA 1664(SGT-HEM) Total Suspended Solids pH Benchmarks=__> - - 15 mg/L 100 mg/L or 50 mg/L* 6.0—9.0 SU Footnotes from Part A also apply to this Part B *See General Permit text,Table 5,identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 Note: If you report a sample value in excess of the benchmark,you must implement Tier 1, Tier 2,or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: e A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION 8. e TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑NO❑ IF YES,HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑NO❑ REGIONAL OFFICE CONTACT NAME: Mail-an orb•final and one co.. o this DMR including all"No Dischar'e"re'orts within 30 da s a recei•t o the lab results or at endo monitorin g geriod in the case of"No Discharge"reports)to: Division of Water Quality Attn:DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify,under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete. I am awar that there a e si nificant penalties for submitting false information,including the possibility of fines and imprisonment for knowing violations." 9(1 241 (Signature of rmittee) (Date) Permit Date:11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 3 of 3