Loading...
HomeMy WebLinkAbout20160931 Ver 1_Shoreline Stabilization_201609263 CG>iGS State of North Carolina Department of Environment and Natural Resources DWR Division of Water Resources 15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization Division of Water Resources FORM: SSGP 30-2013 Shoreline Stabilization Application Form Three copies of the application (including attachments) and the application fee should be sent to: Division of Water Resources 2 O 60 9 3 401 & Buffer Permitting Unit 1617 Mail Service Center rvk__@�a /I n _Raleigh, NC 27699-1617 I. Applicant Information [15A NCAC 02H .0502(a)] SSP 2 ZO 1. Owner Information 40E-WgTF 16 Name: ,fin ���f X (�- •1 ,�i �1.Q w o e�'`F RRFso Mailing Address: Z2''( IMS c114_ (V\a D��V , k`e i\J L z,Ki ,P Telephone Number: v� I Fax Number: E-mail Address: ctill& a D0,1eVw L�. AP -k c6'"'` 2. Agent/ Contact Person Information A signed and dated copy of the Agent Authorization letter (a form can be downloaded here: http://www.saw.usace.army.mil/Portals/59/docs/regula orregdoclPermitsISAMPLE AGENT AUTH ORIZATION FORM.pdf) must be attached if the Agent has signed this application form. Name: Company Affiliation: Mailing Address: Telephone Number: E-mail Address: Person to receive the Certification Approval: Fax Number: II. Project Information [15A NCAC 02H .0502(a) & (b)] 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, FORM: SSGP 10-2013 Page 1 of 3 etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram provided at the end of this application form. 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) County: �'ZE�'DGLL- Nearest Town: Y*oreSo�1� Subdivision name or site address (include phase/lot number): Lz-T ZZ ytkCt-tr (\ 1Zg0tJe [`[q lC2ek- (_A Moores t', I\e 10& ?Y11-7 Directions to site - please include road names and numbers, landmarks, etc.: c l o 5 V t -A ` t'rC a _-, nn 4c L1t IZP . 1 /1J 1/Z. I ' , [ Q Tart,,. Pi (/ii- C U'\ Latitude (in decimal degrees) 3 S1 y 0'7 Longitude (decimal degrees) �ov. '9'? 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): WS l J04 t 1 6. Property size (acres): s &3 7. Lake/ river/ ocean adjacent to property: Nd rV%'X 6L'% 8. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): (CA re ro S I0 --k 0'f 5_�Wre r 1, k%P SAP 9. Will work be con ucted from land? From water? ❑ 10. Total amount of disturbance (including all excavation, backfill, rip rap, retaining walls, etc.) below the normal pool lake level/ Normal Water Level in square feet or acres: 11. Total amount of disturbance (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) above the normal pool lake level/ Normal Water Level and 50 feet land -ward in square feet or acres: —)'w `- Zw s a f+ 12. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): - G-, , / t eo 5 '�'" ) S -froth, S„ vv'� V L 2 A )L� Own er/Agent`'s�ignature* [15A NCAC 02H .0502(f)] Date -Agent's signature is valid only if an authorization letter from the owner is provided. FORM: SSGP 10-2013 Page 2 of 3 "�unbU!"�J pi lz & 1 Oak In 1L40% . x r C r Full Pond/ Norma SI Lake (At Full Pond/ Normal Water Level) q2 Please approximately sketch the following information on this plan (provide dimensions for each item such as 10 ftx 100 ft)*: Q 1. All proposed vegetation clearing �%G 2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation �U 2t PIC i i0 3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation . 4. Location of any proposed structures such as buildings, retaining walls, docks, etc. 0 ,1 5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation uilIr 6. Location of construction access corridors tjl rA FORM: SSGP 10-2013 Page 3 of 3 si- s IXYl At G„ •;; :* x _ 'e;+ �i .rte .. 4' zRl+:#x