Loading...
HomeMy WebLinkAbout20060364 Ver 3_Certification of Completion_20071119. ~ D ~~D ti! t.~ Certification of Com letion p `~ ~~~ ~ ~ 2007 utwrx -WATER 4UALITY DWQ Project No.: 06 0364 Ver. 3 County: Pender y+lE~U1ND3:~f1srQ~!uR"~i~TER9RN4CN Applicant: Four County Electric Mc~nbership Corporation Project Name: Bridge Over NC Cape Fear River on NC 210 (Utility Poles ) Date of Issuance of Wetland Permit: 9-26-07 Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Oversight/Express Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, Robert W. Harris ,hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: ~ ~ Date: l f '" 1 ~ O - T- Agent's Certification I, ,hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: If this project was designed by a Certified Professional I, as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Registration No. Date