Loading...
HomeMy WebLinkAbout20160916 Ver 1_401 Application_20160916CLearWaLer C1earWater Environmental Consults, , www.cwenv.com t a a' September 19, 2016 _ Mr. William Elliott US Army Corps of Engineers Asheville Regulatory Field Office 151 Patton Avenue, Room 208 Asheville, North Carolina 28801-2638 Ms. Karen Higgins NC DWR, 401 Permitting & Buffer Unit 512 N. Salisbury Street, 9t' Floor Raleigh, North Carolina 27604 RE: Lausch Subdivision (+/- 2 acres) Lausch REI, LLC Buncombe County, North Carolina Dear Mr. Elliott and Ms. Higgins, 2 0 1 60 @1 a The attached Pre -Construction Notification (PCN) and Jurisdictional Determination Request are being submitted on behalf of Lausch REI, LLC. represented by Ms. Erin Lausch. The project site is located off Aurora Drive in Buncombe County, North Carolina. Lausch REI, LLC. is seeking a Nationwide Permit 18 and 12 for infrastructural development associated with the construction of a residential subdivision. A copy of this package has been sent to Ms. Andrea Leslie of the NC Wildlife Resources Commission and Mr. Byron Hampstead of the US Fish and Wildlife Service for review. A copy of this application has also been submitted to Mr. Zan Price of the NC Division of Water Resources, Asheville Regional Office. Please do not hesitate to contact me at 828-698-9800 if you have any questions or comments. Respectfully, gR6emaent Riddle, P.W.S Principal Copy Furnished: NC Wildlife Resources Commission — Andrea Leslie US Fish and Wildlife Service — Byron Hampsteaad NC Division of Water Resources, Asheville — Zan Price 32 Clayton Street Asheville, NC 28801 828-698-9800 Tel CLearWaLer i" C1earWater Environmental Consultants, Inc. wvvw.cwenv.com September 19, 2016 Mr. William Elliott US Army Corps of Engineers Asheville Regulatory Field Office 151 Patton Avenue, Room 208 Asheville, North Carolina 28801-2638 Ms. Karen Higgins NC DWR, 401 Permitting & Buffer Unit 512 N. Salisbury Street, 9d' Floor Raleigh, North Carolina 27604 RE: Lausch Subdivision (+/- 2 acres) Lausch REI, LLC Buncombe County, North Carolina Dear Mr. Elliott and Ms. Higgins, The attached Pre -Construction Notification (PCN) and Jurisdictional Determination Request are being submitted on behalf of Lausch REI, LLC. represented by Ms. Erin Lausch. The project site is located off Aurora Drive in Buncombe County, North Carolina. Lausch REI, LLC. is seeking a Nationwide Permit 18 and 12 for infrastructural development associated with the construction of a residential subdivision. A copy of this package has been sent to Ms. Andrea Leslie of the NC Wildlife Resources Commission and Mr. Byron Hampstead of the US Fish and Wildlife Service for review. A copy of this application has also been submitted to Mr. Zan Price of the NC Division of Water Resources, Asheville Regional Office. Please do not hesitate to contact me at 828-698-9800 if you have any questions or comments. Respectfully, RR6ement Riddle, P.W.S Principal Copy Furnished: NC Wildlife Resources Commission — Andrea Leslie US Fish and Wildlife Service — Byron Hampsteaad NC Division of Water Resources, Asheville — Zan Price 32 Clayton Street Asheville, NC 28801 828-698-9800 Tel CLearWater Department of the Army Wilmington District, Corps of Engineers Attn: Scott McLendon, Chief Regulatory Division PO Box 1890 Wilmington, NC 28402-1890 -and- NC DWR, Webscape Unit Attn: Karen Ifiggins 512 North Salisbury Street Raleigh, North Carolina 27604 I, the current landowner/managing partner of the property identified below, hereby authorize CleuWater Environmental Consultants, Inc. (CEC) to act on my behalf as my agent during the processing of permits to impact Wetlands and Water of the US that are regulated by the Clean Water Act and the Rivers and Harbors Act. CHC is authorized to provide supplemental information needed for permit processing at the request of the USACE or DWR. Property Owner of Record: LIMAS j Z 61 LL( - Property Owner Address: S� S a lu r I WI RU Phone Number: Property Location; Owner/Managing partner Signature: Date: q lI 32 Clayton .Street Asheville, IVC 28801 Phone: 828-698-9800 www.cwenv.com Preliminary ORM Data Entry Fields for New Actions SAW — 201 - BEGIN DATE [Received Date]: Prepare file folder M Assign Action ID Number in ORMFI 1. Project Name [PCN Form A2a]: Lausch Subdivision 2. Work Type: Private V1 Institutional El Government El Commercial El 3. Project Description / Purpose [PCN Form B3d and 63e]: Lausch REI, LLC is seeking a Nationwide Permit 18 and 12 for infrastructural development associated with the construction of a residential subdivsion. 4. Property Owner / Applicant [PCN Form A3 or A4]: Lausch REI, LLC 5. Agent / Consultant [PCN Form A5 — or ORM Consultant ID Number]: ClearWater Environmental Consultants 6. Related Action ID Number(s) [PCN Form 65b]: N/A 7. Project Location - Coordinates, Street Address, and/or Location Description [PCN Form Bib]: 35.585530, -82.531697; Site is located off Aurora Drive in Asheville, NC. 8. Project Location -Tax Parcel ID [PCN Form 131a]: 9658-06-1775-00000; 9658-06-0559-00000 9. Project Location — County [PCN Form A2b]: Buncombe 10. Project Location — Nearest Municipality or Town [PCN Form A2c]: Asheville 11. Project Information — Nearest Waterbody [PCN Form 132a]: Ross Creek 12. Watershed / 8 -Digit Hydrologic Unit Code [PCN Form 62c]: French Broad/06010105 Authorization: Section 10 R Section 404 a Section 10 & 404 F1 Regulatory Action Type: Standard Permit ✓ Nationwide Permit # 18, 12 Regional General Permit # Q Jurisdictional Determination Request Pre -Application Request Unauthorized Activity Compliance No Permit Required Revised 20150602 7/11/2016 Buncombe County Tax Lookup - Property Card COUNTY OF BUNCOMBE, NORTH CAROLINA Web Property Record Card 9658-o6-1775-00000 Owner Information Owners: LAUSCH REI LLC Address: Spencer Mull Penrose NC 28766-8 Property Location: 99999 AURORA DR Taxing Districts County: Buncombe County City: ASHEVILLE Date Printed: 7/11/2016 Parcel Information Total Property Value: 38,100 status: Active )eed Date: 6/24/2016 )eed Book/Page: 5439/ o822 'lat Book/Page: 0049 / oo68 ,egal Reference: TRANSFER BY DEED .ocation: 99999 AURORA DR ;lass: RES BLDG LOT Jeighborhood: RES/AV/ASH-o8 Lot: PT B Servation/Easement: N d: Y Ownership History Transfer Date Price Legal Reference Deed Book/Page Qualified Vacant When Sold Seller Names o6/24/16 $54,000 TRANSFER BY 5439/ o822 Pending No LIZ HANG YE 0 38,1oo DEED 0 0 38,1oo 2014 1.05 38,1oo o 0 38,100 MORTEZA 07/1o/o6 $40,000 PLAT 4251/0392 Yes Yes GHASSEMIEH 38,1oo 0 0 38,100 2012 ARGHAVAN B 31,500 0 0 31,500 0 GHASSEMIEH Assessment History Year Acres Land Bldgs Other Impr Assessed Desc Exemptions Deferred Taxable 2015 1.05 38,100 0 0 38,1oo 0 0 38,1oo 2014 1.05 38,1oo o 0 38,100 0 0 38,100 2013 1.05 38,ioo 0 0 38,1oo 0 0 38,100 2012 1.05 31,500 0 0 31,500 0 0 31,500 2011 1.05 31,500 0 0 31,500 0 0 31,500 2010 1.05 31,500 0 0 31,500 0 0 31,500 2009 1.05 31,50010 0 31,500 0 0 31,500 2oo8 1.05 31,500 0 0 31,50.0 0 0 31,500 2007 1.05 31,500 0 0 31,500 0 0 31,500 2oo6 1.05 31,500 0 0 31,500 0 0 31,500 2005 1.05 33,50010 0 33,500 0 0 33,500 2004 1.05 33,500 0 0 33,500 0 0 33,500 2003 1.05 33,500 0 0 33,500 0 0 33,500 2002 1.05 33,500 0 0 33,500 0 0 33,500 2001 1.05 37,000 0 0 37,000 0 0 37,000 Land Data Total Acres: 1.05 Land Value: Other Value: o http://www.buncombetax.org/PropertyCard.aspx 1/2 Mi►rA11 Buncombe County Tax Lookup - Property Card Acreage 38joo Segment# Units Description .o Acreage OT IN AC Improvements Total Building Value: o http://www.buncombetax.orgIPropertyCard.aspx 2t2 7/11/2016 Buncombe County Tax Lookup - Property Card COUNTY OF BUNCOMBE, NORTH CAROLINA Web Property Record Card go 9658-o6-0559-00000 Date Printed: 7/11/2oi6 Owner Information Parcel Information Total Property Value: o Deed Status: Active Owners: LAUSCH REI LLC Deed Date: 6/24/2o16 Address: Spencer Mull Deed Book/Page: 5439/o818 Penrose NC 28766-8834 Plat Book/Page: 0156/0152 Property Location:99999 AURORA DR Legal Reference: TRANSFER BY DEED Taxing Districts Location: 99999 AURORA DR o6/24/16 Class: RES BLDG LOT County: Buncombe County Neighborhood: RES/AV/ASH-o8 city: ASHEVILLE Subdivision: Fire: Sub Lot: PT B School: _ Conservation/Easement: N Flood: Y Ownership History Transfer Price Legal Deed Qualified Vacant When Seller Names Date Reference Book/Page Sold MILES F o6/24/16 $81,000 TRANSFER BY DEED 5439 / o818 Pending No ARDAMAN HANG YE Assessment History Land Data Total Acres: Land Value: Other Value: o 0 o 1 Improvements Total Building Value: o http://www.buncombetax.org/PropertyCard.aspx 1/1 O� F WATF9OG Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Page 1 of 10 PCN Form — Version 1.3 December 10, 2008 Version Pre -Construction Notification PCN Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ® Section 404 Permit ❑Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: 18, 12 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ❑ Yes ® No 1d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ® No For the record only for Corps Permit: ❑ Yes ® No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ® No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes ® No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2. Project Information 2a. Name of project: Lausch Subdivision 2b. County: Buncombe 2c. Nearest municipality / town: Asheville, North Carolina 2d. Subdivision name: Lausch Subdivision 2e. NCDOT only, T.I.P. or state project no: n/a �O 3. Owner Information S�' 3a. Name(s) on Recorded Deed: Lausch REI, LLC of X16 3b. Deed Book and Page No. 5439/0822; 5439/0818 `t BUFF R RF 3c. Responsible Party (for LLC if applicable): Ms. Erin Lausch FRMiT SFS NG 3d. Street address: 518 Spencer Mull Road 3e. City, state, zip: Penrose, NC 28766 3f. Telephone no.: 864-395-3827 3g. Fax no.: n/a 3h. Email address: n/a Page 1 of 10 PCN Form — Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑ Other 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: Clement Riddle 5b. Business name (if applicable): ClearWater Environmental Consultants, Inc. 5c. Street address: 32 Clayton Street 5d. City, state, zip: Asheville, NC 28801 5e. Telephone no.: 828-698-9800 5f. Fax no.: n/a 5g. Email address: I clement@cwenv.com B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 9658-06-1775-00000; 9658-06-0559-00000 1 b. Site coordinates (in decimal degrees): Latitude: 35.585530 Longitude: -82.531697 (DD.DDDDDD) (-DD.DDDDDD) 1c. Property size: +/- 2 AC 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to proposed project: Ross Creek 2b. Water Quality Classification of nearest receiving water. B 2c. River basin: j French Broad 06010105 Page 2 of 10 PCN Form — Version 1.3 December 10, 2008 Version 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The proposed project site is located on an undeveloped wooded lot. Land use within the surrounding area is primarily residential. 3b. List the total estimated acreage of all existing wetlands on the property: Approximately 0.203 acre. 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: Approximately 622 linear feet. 3d. Explain the purpose of the proposed project: The purpose of the proposed project is to develop a residential subdivision and associated infrastructure. 3e. Describe the overall project in detail, including the type of equipment to be used: The proposed project involves the construction of a residential development. The development is comprised of four residential lots and associated infrastructure, including one entrance road, four driveways, and a new utility connection with an existing sewer line. Impacts include the placement of a culvert within a stream and fill material placed within a portion of wetland for the purpose of road construction. The residential development and associated infrastructure would be constructed using typical construction and earth moving equipment. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ❑ Yes ® No ❑ Unknown project (including all prior phases) in the past? Comments: 4b. If the Corps made the jurisdictional determination, what type ❑ preliminary ❑ Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: Name (if known): Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for ❑ Yes ® No ❑ Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ® No 6b. If yes, explain. C. Proposed Impacts Inventory 1. Impacts Summary 1a. Which sections were completed below for your project (check all that apply): ® Wetlands ® Streams - tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction Page 3 of 10 PCN Form — Version 1.3 December 10, 2008 Version 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Weiland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non -404, other) (acres) Temporary T W1 ®P ❑ T Impact #1 - Herbaceous El Yes ® Corps 0.097 (4,230 Fill Material ® No ® DWQ SF) W2 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W3 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W4 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W5 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W6 ❑ P ❑ T ❑Yes ❑ Corps ❑ No ❑ DWQ 2g. Total wetland impacts 0.097 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ — non -404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 ®P ❑ T Impact #2 - UT Ross Creek ® PER ® Corps 3 35 Culvert (Si) ❑ INT ® DWQ S2 []POT Impact #3 - Utility Line Ross Creek (S2) ® PER ❑ INT ® Corps ® DWQ 10 20 Installation S3 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S4 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S5 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S6 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h. Total stream and tributary impacts 55 3i. Comments: Page 4 of 10 PCN Form — Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number — (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T 01 ❑P❑T 02 ❑P❑T 03 ❑P❑T 04 ❑P❑T 4E Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) Flooded Filled Excavated Flooded Filled Excavated Flooded number of pond P1 P2 5E Total 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. ❑ Neuse ❑Tar -Pamlico ❑Other: Project is in which protected basin? ❑ Catawba ❑ Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number — Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T impact re uired? 131 ❑P❑T ❑Yes ❑ No 62 ❑P❑T ❑Yes ❑ No 63 ❑P❑T El Yes ❑ No 6h. Total buffer impacts 6i. Comments: Page 5 of 10 PCN Form — Version 1.3 December 10, 2008 Version D. Impact Justification and Mitigation 1. Avoidance and Minimization la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The project site is bisected by a stream. A stream crossing would be needed to access high ground. The proposed culvert is the minimum length necessary to access the site. Additionally, headwalls would be utilized to further minimize stream impacts. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Equipment would be operated from high ground during construction. Sediment and erosion controls and BMPs would be utilized to prevent sediment from leaving the site. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑ Yes ® No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank ❑ Payment to in4leu fee program ❑ Permittee Responsible Mitigation 3. Complete If Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in4ieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: 4c. If using stream mitigation, stream temperature: ❑ warm ❑ cool ❑cold 4d. Buffer mitigation requested (DWQ only): 0 square feet 4e. Riparian wetland mitigation requested: 0 acres 4f. Non -riparian wetland mitigation requested: 0 acres 4g. Coastal (tidal) wetland mitigation requested: 0 acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form - Version 1.3 December 10, 2008 Version 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ® No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? ❑ Yes ® No 1b. If yes, then is a diffuse flow plan included? If no, explain why. Comments: ❑ Yes ❑ No Page 7 of 10 PCN Form - Version 1.3 December 10, 2008 Version 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 17% 2b. Does this project require a Stormwater Management Plan? ❑ Yes ® No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: The proposed project would be less than 24% impervious. The proposed project is within City of Asheville jurisdiction for Phase II stormwater. If a Stormwater Management Plan is required for the site, the plan would be submitted to the City of Asheville for review and approval. ® Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ❑ DWO Stormwater Program ❑ DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? City of Asheville ® Phase II ❑ NSW 3b. Which of the following locally -implemented stormwater management programs ❑ USMP apply (check all that apply): ❑ Water Supply Watershed ❑ Other. 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ® No attached? 4. DWQ Stormwater Program Review ❑ Coastal counties ❑ HOW 4a. Which of the following state -implemented stormwater management programs apply ❑ ORW (check all that apply): ❑ Session Law 2006-246 ❑ Other. 4b. Has the approved Stormwater Management Plan with proof of approval been ❑Yes ❑ No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? Page 8 of 10 PCN Form — Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the El Yes ® No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑Yes ❑ No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after -the -fact permit application? ❑ Yes ® No 2c. If you answered 'yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. The proposed project is located in a previously established residential and commercial corridor. Goods and services can be provided by the City of Asheville. The proposed project would not result in additional development that could impact nearby downstream water quality. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. The project would connect with an existing municipal line. Page 9 of 10 PCN Form - Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑ Yes ® No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ® No impacts? ❑ Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ❑ Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? FWS County data and the Natural Heritage Program GIS data. CEC consulted the FWS's "Northern Long -Eared Bat Consultation Areas" map for Buncombe County. Buncombe County has no known occurrences of hibemacula or maternity sites. It is the opinion of CEC that the project would have "no effect" on the northern long-eared bat. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? South Atlantic Habitat and Ecosystem IMS. Impact will not occur in a marine system. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? National Register of Historic Places records maintained by the NC State Historic Preservation Office (SHPO) and available on SHPO's HPOWEB GIS Service. There are multiple known occurrences of historic or archaeological resources located near downtown Asheville and within approximately 2 miles of the project site; however, the closest site is located approximately 1 mile from the project site. It is the opinion of CEC that the proposed project would have no negative effect on the integrity of cultural resources. 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA -designated 100 -year floodplain? ® Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: The proposed project must comply with the City of Asheville's Floodplain Development Ordinance (Sec. 7-5-12). 8c. What source(s) did you use to make the floodplain determination? NC Floodplain Mapping Program. FEMA map numbers 3700964800J (effective January 6, 2010) and 3700965800J (effective January 6, 2010). R. Clement Riddle 09-19-16 Applicant/Agent s Printed Name Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant isprovided.) Page 10 of 10 PCN Form — Version 1.3 December 10, 2008 Version Lausch Subdivision (+/- 2 AC) we 9I ey,pr Norti+st ^0ew Annandale Ave 0 Nerra? Jy Hillside St p+r�r 9a Eagles, Q o�o^t3t St s H rY2 ° ,naet Dr a Aston St y y� 5 eeo y.° 4+ g� Qt Ave OrnQ 11p0r In o� o o cJr 23 J 9 � C 33 fi hOnelAr %alnbrook 0'l6°�i �! 2 0 P x deo SairdSt ,\6 C a a0n°t,a E Chestnut St, ° M Yd Batu AilXa^det afro Md� 0`gt; e SM gt Q r 14ii Clayton St Orange 5r� of y o F m ts3 c y ? Vlore ane St Etv1 ' D 4 7 e c �! © U m c G Jtn y e s� �°'stag Asheville t� �- '� ` �'¢r 694 ... v � ° .a Bo W0odlin St St Tonna r" AutOta Dr., Asheville ; 4 C0096nta�^st Mau r' h f r NC�enrmonsy U q ' � ® © 01, o Patton Ave Eagles, Q o�o^t3t St Aston St y y� 5 eeo y.° 4+ g� Qt � c o .° 4+ �� tb to Hilliard Ave a 1 O �! Aston v y Q 0 h n LUtbet Dt C 0 9cP Park c 0 o` Batu AilXa^det afro 0 ° Rd 4 prod/ M°4y 5r� of y o F m Carroll Ave w a P� c p E 1!�lleo ' D 4 w a 0 Q �e Ardmt°cIF Cdr! °t1 0 a r v 93 O.A AutOta Dr., Buckston. X PhilerSt h 205tL H o Bartlett St A �a oa Project Boundary St o eb JLd �� Q % b N°� !$D 0 ° AQe e u s1 St a h `0C yya sh tlAn lid 7� m n o St 1� u O PSI e I Rd 7 °� ngston Vlyominp Rtl Dtg6e �e wuwlckRd LakewootlOr 0, m` ScottSty Walton St VV �° G n forest Hill Dr nadl Chiles y dye W al tvi, et O� 0p0 a i r d y 1 cPa 1m eft Doct� Packard ♦�d VOtl d°n G e h1' 0Q4or +pRN it �tSe r Ot^ JQ��1 y Finales P u Legend 0 -------� ° 0 0.25 0.5 1 Project Boundary L --- ----� — �d —,�. _._} • - + .�� "' Miles Drawn hy: KAY 9.6.16; CE:------j EP \ r CLearWater Buncombe County, Site Vicinity North Carolina 32 Clayton Street Figure 1 Asheville, North Carolina 28801 Lausch Subdivision (+/- 2 AC) PROJECT INFO 1. PIN: 9658-06-1775 AND 9658-D6-0559 2. SIZE: 1.85 ACRES 3. ZONING: RM6 4. ADDRESS: 149 AURORA DRIVE 5. DEVELOPER: LAUSCH REI, LLC CONTACT: ERIN LAUSCH PHONE: 864-395-3827 ADDRESS: 518 SPENCER MULL ROAD. PENROSE. NC 28766 6. SURVEYOR: BROOKS ENGINEERING ASSOCIATES 7. ENGINEER: JOHN KINNIARD. PE - BROOKS ENGINEERING ASSOCIATES NOTES, NO CONSTRUCTION IN STREAM OR WETLAND UNTIL IMPACT PERMIT HAS BEEN OBTAINED. PERMITTING BEING COMPLETED BY CLEAR WATER ENVIRONMENTAL INC. SITE INFO PINS: 9658-06-1775 AND 9658-06-0559 TOTAL ACREAGE: 1.85 ZONING: RMS SETBACKS FRONT: 15 FEET SIDE: 6 FEET REAR: 15 FEET MAXIMUM BUILDING HEIGHT: 27 FEET (2 STORIES) PARKING REWIRED: NA OPEN SPACE REWIRED: NA SEE L-100 FOR TREE SAVE PLANTINGS IMPERVIOUS AREA: 0.307 AC. ELECTRICITY PROVIDED BY DUKE POWER Jurisdictional Waters of the US Streams 657 linear feet Wetlands 0.30 acres Open Water 0 acres Jurisdictional Impacts Streams 35 linear fat (pemMnent) 20 linear feet (temporary) Wetlands 0.097 acres Open Water n/a Avoidence/M itimiiation Streams 622 linear fat Wetlands 0.203 acres Open Water n/a acres %�QUATIC LIFE PASSAGE CONDITIONS in r,S �Rw11�rW s�r.f Br ['GI• f�tlLa. 1:.: CJi Au rrR sat. u[Rr w.M AA rx w. dLMvr. n;[ i 1 Srrdr+.: fOf RKI. SrJIKrR A�IiOMµLdi1PQ[MAM.w- tri dM�l 6E.0.. F -1 tlwl MApG .LU]B wM 8AW SURrALL - - ur• OYCR (Mm�RFui,NGW Llnl.::CaY�. I �]" BOEl� S�ARr HKSO n 'I --I_ roc dAKcwu RArcRR 1I- - �eR�s'.vi 1m,VJi�v nrcw[ Aunr, u. .rn ,- yAl IMG AKCw�q[p � r89M VARtS �' 0• BRMAw BFO ' BEIM tl[._AN BEO — aaorosen unu. r on Mr IM� a.. MM.Mw f^'r,,ru.Mn can M'4M8 n TRENCH UTILITY CREEK CROSSING NT1 Impact #1 Wetland Fill - 0.097 AC LOT #3 -- - 18.185 sf 1 FFE: 2076.0' es s \ �iS .i E- C -SS f.y TMw. 78'h�. �"VV YYE r_55 i • E-oRo I i 48' PIPE WITH f HEADWALL INV.: 2066.60' / LOT#4 `�\` J �1•.r:a%.. :.. / 22,744 sf 2076.0'. � fY a • . a . ' +• • 48' PIPE WITH, , a a a a a PROP. SILT \ a s . . . PENCE (TYP.) - /. . a . . a , . . . H , INV.! 2066. LL o66.ar P,ta. uN1Ts of �i a a a LOT #3A DISTURBWIf (TYP.) . . . . . a . . . . • a . . a •I 5,632 sf / \ ' 553 I I I. /ice 13, ���((( FFE: Impact #2 Culvert - 35 LF 48' RCP buried 12• in the stream bed. Pipe @ 3% slope. JESSICA ROBERTS &LUCAS KING $ i OB. 5325, PG 236 PB. 10, PG. 5 6 PIN: 9658-06-2929 J T � � / LOT #1 I F -F431 5. 11 FFE: 55,3 / Impact #3 55'3 Utility Crossing - 20 LF Temporary Impact 0 20 40 60 iii SCALE: 1',2(Y M g z S� Z =< Z= p E Z_ 7 • oti ' D � w 1D�� Q go LL O U m 0 W� J F Z t1 zQ 1� S� S p g 7 U w Q go LL U0 m W� J F x to Q t1 zQ 1� m N U 0 ^ ' � CD cw 7. Z & E Wo Q u Ci 10 CRz_ O m 2 d W A 0 6-1 --z S� Q p a U w Q go U0 J J (n 0 x to Q zQ 0 ^ ' Z Q z m Ci m a v A 0 Lausch Subdivision (+/- 2 AC) Legend �� ,- N Project Boundary Soils CuD - Clifton -Urban Land Complex loA- lotla Loam 0 50 100 200 TmB; TmC - Tate -Urban Land Complex I iFeet Drawn by: KAY 9.6.16; CEC Projects! 866 Buncombe County, CLearWater USDA Soils Map North Carolina 32 Clayton Street Asheville, North Carolina 28801 Figure 4 Lausch Subdivision (+/- 2 AC) VOW Project Boundary r v eta' §, orf �✓a'Y I l = =�" / / I /.f�/ Legend Project Boundary 100 -YR Floodplain Drawn by KAY 9 R 1R• .F(. PmiwMD NRR ""'N X N +- 0 125 250 500 Feet CLearWater FEMA Floodplain Map Buncombe County, FEMA Map Service Center North Carolina 32 Clayton Street Map Panel 9648J & 9658J Asheville, North Carolina 28801 Figure 6 Laubluri ouuuivision kv/- z /-\u) Jurisdictional wetlands and waters identified on this map have been located i' l within sub -meter accuracy utilizing a Trimble mapping grade Global Positioning System (GPS) and the subsequent differential correction of that data. points may demonstrate uncorrectable errors due to topography, vegetative cover, and/or multipath signal error. Note: The illustrated wetland and stream locations are approximate. These areas have been flagged in the field however, they have not been surveyed. Although Clearwater Environmental Consultants, Inc. (CEC) is confident in our assessment, the US Army Corps of Engineers (Corps) is the only agency that can make final decisions regarding jurisdictional wetland and waters of the US delineations. Therefore, all preliminary determinations are subject to change until written verification is obtained. CEC strongly recommends that written verification be obtained from the Corps prior to closing on the property, beginning any site work, or making any legal reliance on this determination. This map was prepared by CEC using the best information available to CEC at the time of production. This map is for informational purposes only and should not be used to determine precise boundaries, roadways, property boundary lines, nor legal descriptions This map shall not be construed to be an official survey of any data depicted. Source Data: Topo is from Buncombe County. Project boundary is from Brooks Engineering. W* Potentially Jurisdictional W.W; Wetland (AC) Stream (LF) 14 ai­�-W1 0.30 i 11%6- A S1 285 S2 (Ross (reek) 372 Total 0.30 Total Project Boundary 077