Loading...
HomeMy WebLinkAbout20060138 Ver 2_More Info Letter_20080326O~O~ W A T ~9QG ~ ~_~_r-i Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality March 26, 2008 DWQ# 06-0138 ver 2 Guilford County CERTIFIED MAIL: 7007 3020 0000 2315 1137 RETURN RECEIPT REQUESTED Mr. Thomas Cordell City of Greennboro PO Box 3136 Greensboro, NC 27401-3136 Re: Section 401 Water Quality Certification application General Major Variance request for Randleman Buffer Dear Mr. Cordell: On February 26, 2008, the North Carolina Division of Water Quality (DWQ) received your application for a 401 General Water Quality Certification to impact 220 feet of stream, 0.043 acres of wetlands, 21,258 square feet of Zone 1 of protected buffer and 23,082 square feet of Zone 2 of protected buffer to construct an extension to Hornaday Road in Greensboro, NC in Guilford County. Additional information is required in order that we may determine your project's compliance with 15A NCAC 2H .0500. The DWQ will require this information in order to process your application to impact protected wetlands and/or streams on the subject property. Therefore, we will place this project on hold as incomplete until we receive this additional information, and if we do not receive the additional information requested below, we will have to move toward denial of your application as required by 15A NCAC 2H .0506. Please provide the following information so that we may continue to review your project. Per the requirements of the Randleman Watershed Protection Rules 15A NCAC 2B .0250, this project must provide for sheet flow of all stormwater runoff, prior to the stormwater entering Zone 2 of the protected buffer. Please provide plans, details, specifications and calculations for the each level spreader to be utilized on this project (as noted in the application documentation). Please note that the level spreaders must be designed in accordance with the most recent version of the NC Division of Water Quality BMP Manual. For each proposed BMP, please provide a completed BMP Supplement Form, with all the required items. The BMP Manual and Supplement Forms are available at the following web site: http://h2o.enr.state.nc.us/su/bmp forms.htm. No~° Carolina ~turally North Carolina Division of Water Quality 585 Waughtown Street Phone (336) 771-5000 Customer Service Winston-Salem Regional Office Winston-Salem, NC 27107 Fax (336) 771-4630 1-877-623-6748 Internet: www.ncwaterquality.org An Equal Opportunity/Affirmative Action Employer- 50% Recycled/10% Post Consumer Paper Mr. Thomas Cordell Hornaday Road Extension March 26, 2008 Page 2 2. Please provide documentation that the NC EEP program has accepted mitigation credits for the buffer impacts. Please note that the documentation provided by EEP with your application acknowledges acceptance of stream mitigation only and that protected Randleman buffer credits are to be acknowledged separately from stream mitigation credits. Please note that buffer mitigation is only required for areas that are approved under the General Major Variance (parallel impacts). Buffers impacted for the stream crossing are considered allowable under the Randleman Rules provided there are no practical alternatives that would minimize the buffer impacts further. 3. Please provide a profile view and cross section of the proposed stream culvert. Please also submit detailed drawings indicating pipe burial and pipe alignment. 4. Per the requirements of GC 3705, please enumerate all (if any) temporary impacts (in addition to permanent impacts already indicated) to the stream channel and any wetland areas. Temporary impacts include areas of disturbance necessary for proper pipe installation, as well as any impacts from temporary erosion control measures expected to be installed within any jurisdictional areas. Please note that temporary impacts should be minimized to the maximum extent practical. Please respond in writing within 30 calendar days of the date of this letter by sending a copy of this information to Sue Homewood at the address on this letterhead, and a copy to Ian McMillan N. C. Division of Water Quality, Wetlands/401 Certification Unit, 1650 Mail Service Center, Raleigh, NC 27699-1650. If you will not be able to provide the requested information within that timeframe, please provide written confirmation that you intend to provide the requested information, and include a specific timetable delineating when the requested materials will be provided. If we do not hear from you in 30 calendar days, we will assume that you no longer want to pursue this project and we will consider the project as returned. This letter only addresses the application review and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application are not authorized (at this time) by the DWQ. If you have any questions, please contact Sue Homewood, DWQ, Winston-Salem Regional Office, at 336-771-4964 or sue.homewood@ncmail.net. Sincerely, << r ~i-- Steve W. Tedder Regional Supervisor DWQ Winston-Salem Regional Office cc: Andy Williams, U. S. Army Corps of Engineers, Raleigh Regulatory Field Office DWQ Winston-Salem Regional Office DWQ Wetlands/401 Unit DWQ Central Files