Loading...
HomeMy WebLinkAbout20141169 Ver 4_R-2514B mod impact summary sheet_20160926WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 22+67 TO 28+77 -L- RT. 0.27 0.13 2 24+60 TO 27+00 -L- 0.19 3 56+35 TO 57+13 -L- RT. < 0.01 4 16+26 TO 17+40 -Y1- LT. 0.01 5 71 +09 TO 77+39 -L- 2.06 0.25 6 27+46 TO 32+33 -Y2A- 60" P I P E 0.22 0.09 0.02 < 0.01 155 6 6 98+20 TO 101 +64 -L- 72" P I P E 0.80 0.09 0.07 < 0.01 356 14 6 33+61 LT. -Y2A- BANK STABILIZATION < 0.01 < 0.01 25 10 6 100+97 RT. -L- BANK STABILIZATION < 0.01 < 0.01 25 10 7 128+50 TO 129+44 -L- RT. 0.08 0.04 0.02 8 131 +13 TO 132+38 -L- RT. 0.05 0.02 9 139+81 TO 140+61 -L- 48" P I P E 0.03 < 0.01 10 140+57 TO 162+27 -L- 160' BRIDGE 3.32 0.06 0.38 0.43 11 162+g3 TO 164+07 -L- RT. 0.17 0.02 12 168+10 TO 179+18 -L- 1160' BRIDGE 0.01 0.01 4.02 13 206+10 TO 223+71 -L- 84" PIPE 0.60 0.04 1151 60 13 23+74 RT. -Y3A- BANK STABILIZATION 0.01 < 0.01 27 7 13 11+50 RT. -Y3E- BANK STABILIZATION 0.01 < 0.01 29 7 13 214+74 LT. -L- BANK STABILIZATION 0.05 87 14 13+65 TO 14+27 -Y3D- 18" PIPE 0.02 0.04 < 0.01 15 228+39 TO 231 +42 -L- 1.08 0.14 16 29+23 TO 32+00 -Y2- RT. < 0.01 0.03 0.03 0.04 0.01 120 25 TOTALS': 8.29 0.07 0.11 1.21 4.45 0.81 0.06 1974 139 0 'Rounded totals are sum of actual impacts NOTES: Site 10: Permanent Impacts due to bents in wetlands: <0.01 Acres--These impacts are not included in the total impacts above. Site 10: Temporary Impacts due to Temporary Work Bridge bents in wetlands: <0.01 Acres--These impacts are not included in the total impacts above. Site 12: Permanent Impacts due to bents in wetlands: 0.01 Acres--These impacts are not included in the total impacts above. Site 12: Temporary Impacts due to Temporary Work Bridge bents in wetlands: 0.03 Acres--These impacts are not included in the total impacts above. Site 13: 386 LF of Permanent Stream Impacts due to Relocation. 20131024