Loading...
HomeMy WebLinkAbout20151031 Ver 2_Maps_20160923'i PROPOSED BM �7\ PROPOSED \ �� MAINTENANCE ACCESS ROAD — \ STORMWATER �L POND \ I I ) II � PROPOSED UNDEROROUN I I PROPOSED STORMWATER STRUCTURE WETLAND IMPACT#1: 3.66 ACPROPOSED WETLAND IMPACT #4: 0.01 AC / JURISDICTIONAL II ETLANDS AREA #1 I I 1 PROPOSE 8 URISDICTIONALN A (400'x 10' IMPACT) WETLANDSAREA #4 PERMANENT STREAM IMPACT #S: SO LF _ 50 LF PERMANENT WETLAND IMPACT #5:0.03 AC STREA _ TEMP STREAM IMPACT#5:20 IF IMPACT JURISDICTIONA TEMP WETLAND IMPACT #5: 0.01 AC E c L + I I WETLANDS AREA #2- / o F ) P I BRIDGE WROPOSED g g„ ,MCROR 1 BOTTOMLESS ^' A sRovs 51,444 SF D( CULVERT E SED.••.• 1 �i•••,x•.�AIRIilf1�''1NNIIIIF _ -- PROPOSED 1 • 1 m �o�:c•' DUAL i CULVERTWETLANDS AREA #5 EJURISDICTIONAL I _ _ PROPOSED - WETLAND IMPAR#2: 0.20 AC PROPOSED �f WETLAND IMPACT#3:0.71AC JUNIOR / / V, ANCHOR 12.aoo sR SIbPS REST REST \ 8,0.30 sF Ass 14.3025 I I OOP \C. LMAC. -- — estern Blvd. — _ — — _ — WETLANDS AREA #3 0 125 250 1" = 250' Q JURISDICTIONAL WETLANDS DATA SF AC JURISDICTIONAL WETLANDS #1 179,114 4.11 AC IMPACTED WETLANDS#1 159,384 3.66 AC JURISDICTIONAL WETLANDS #2 8,823 0.20 AC IMPACTED WETLANDS #2 8,823 0.20 AC JURISDICTIONAL WETLANDS #3 30,875 0.71 AC IMPACTED WETLANDS #3 30,875 0.71 AC JURISDICTIONAL WETLANDS #4 18,280 0.42 AC IMPACTED WETLANDS #4 645 0.01 AC JURISDICTIONAL WETLANDS#5 1,130 0.03 AC IMPACTED WETLANDS #5 1,130 0.03 AC TEMPORARY IMPACTED WETLANDS #5 392 0.01 AC TOTAL JURISDICTIONAL WETLANDS 238,202 5.47 AC TOTALIMPACTED WETLANDS 200,857 4.61 AC TOTAL TEMPORARY IMPACTED WETLANDS 392 0.01 AC LEGEND -� PROPERTY LINE — - - — LIMITS OF OUT PARCELS _ WETLANDS _ IMPACTED WETLANDS _ TEMPORARILY IMPACTED WETLANDS PROPOSED PERVIOUS PAVEMENT CE1'1iE SEP 14 2016 70 60 50 40 35 ���SkY73'i:llif I�fc1�E111����� ■���■■■��� t�1F�LdH':17= ���■a��p9;;i]]ILd:LU7�■ ��rmar.�arev�anuuicu���� �ii� �.iii� �.i�.i■�i■■i� 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 EXIST. GRADE I NW WETLAND - B -B STREAM FLOW LINE PROP. BRIDGE/ BOTTOMLESS 70 M 11 70 70NlKlr10 RrTA60 60 60 60 50 50 50 — ----- --- 50 _ 40 --- ————— — — —— — — JURISDICTIONAL 40 40 _ _ _ _ 40 35 WETLANDS AREA pi 30 30 25 PROP. HEADWALL 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 0+00 0+50 1+00 NW WETLAND - A -A CULVERT SECTION D -D SCALE: 1"=100' HORIZONTAL 1"= 50' VERTICAL SCALE: 1"=100' HORIZONTAL 1"= 50' VERTICAL ���SkY73'i:llif I�fc1�E111����� ■���■■■��� t�1F�LdH':17= ���■a��p9;;i]]ILd:LU7�■ ��rmar.�arev�anuuicu���� �ii� �.iii� �.i�.i■�i■■i� 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 NW WETLAND - B -B 70 60 50 40 25 SCALE: V=100' HORIZONTAL 1"= 50' VERTICAL EXIST. GRADE / INTERMITTENT PROP'BRIDGE I STREAM FLOW LINE DOUBLE BARREL CULVERT 70 60 60 60 50 50 50 40 40 40 35 PROP. 0+00 0+50 1+00 HEADWALL CULVERT SECTION E -E SCALE: i"=100' HORIZONTAL 1"= 50' VERTICAL PROP. RETAIL PROP. FOUNDATION BUILDING WALL 60 60 50 50 40 — _ 40 30 30 25 JURISDICTIONAL WETLANDS AREA #4 0+00 0+50 1+00 1+50 WETLAND #4 - FT SCALE: 1"= 100' HORIZONTAL 1"= 50' VERTICAL );��■■■■T.�■■■■■■■■��_�_�9:U7wwJa:lUTHy47Y1C!_7_�_�_WH ■■ ■■� NORT ����C�I■ • • 17336371[.3: 11■•������■��YI���■�� WETLANDS mmmm i �mmimm 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 9+50 10+00 WETLANDS CROSSINGS - PROFILE C -C SCALE: 1"=100' HORIZONTAL 1"= 50' VERTICAL 70 60 50 40 30 SEP 14 2 1 , . - ��.:w�_ �:: C♦,I L..SS�S�SQ�S% Jas is'�0 ��,%' i�•���i ��i ��i �r gas � � �♦i ---.� -: --_ '� C S - �� - � � = = = , WA All y MORRIS WESTERN BUD. JACKSONVILLE, NC M BOHLER 60 50 40 30 25 0+00 0+50 our vTZRT cwCTION E -E (STREAM IMPACT 60 50 40 30 PERMANENT STREAM PROP. ROADWAY PERMANENTSTREAMIMPACT LIMIT IMPACT LIMIT 5' UPSTREAM L 5' DOWNSTREAM OF PIPE OUTLETS 1"=10' VERTICAL OF PIPE INLETS PROP. 60'HEADWALL CURB & GUTTER PROP. 55HEADWALL AND 8' WING WALLS RETAINING WALL JURISDICTIONAL WETLAND AREA 95-±24' LIMIT OF WETLANDS IMPACT AND 8' WING WALLS TEMPORARY STREAM 10' , e TEMPORARY STREAM IMPACT LIMIT IMPACT LIMIT 15' F ' PERVIOUS SUBS 15' DOWNSTREAM OF PIPE OUTLETS UPSTREAM OF PIPE INLETS PROPOSED GRADE o z PERFORATED EXIST. STREAM BED OF _ UNDERORAIN INTERMITTENT STREAM 409 FLOW 40.0 - - 400 41.8 4 8 40.0 EXIST. STREAM BED OF EXISTING GRADE,, 402 INTERMITTENT STREAM PROP. 48" CMP, 40' LONG, -/PROP. 48" CMP , 42' LONG LOW FLOW PIPE FLOOD FLOW PIPE DOWNSTREAM PIPE INVERT 39.0 UPSTREAM PIPE INVERT = 39.9 DOWNSTREAM STREAM BED ELEVATION = 40.0 UPSTREAM STREAM BED ELEVATION = 40.9 INFILTRATION SWALE PROP. STREAM BED FLOW LINE RIP RAP TYPICAL INFILTRATION SWALE SECTION 0+00 0+50 our vTZRT cwCTION E -E (STREAM IMPACT 60 50 40 30 NOT TO SCALE 70 60 50 40 30 25 PROP. 48" CMP, 40' LONG, FLOOD FLOW PIPE UPSTREAM PIPE INVERT = 39.9 UPSTREAM STREAM BED ELEVATION = 40.9 ..Y._- SCALE:1"= 20' HORIZONTAL PROP. DOUBLE 48" CMP CULVERT W1 55' HEADWALL AND 8' WING WALLS PROP. 48" CMP, 42' LONG, LOW FLOW PIPE UPSTREAM PIPE INVERT = 39.9 UPSTREAM STREAM BED ELEVATION =40.9 1"=10' VERTICAL DOWNSTREAM PIPE INVERT 39.0 DOWNSTREAM STREAM BED ELEVATION = 40.0 ................ ................ .. ................ CURB & GUTTER PERVIOUS PAVEMENT STREAM BED MATERIAL RETAINING WALL JURISDICTIONAL WETLAND AREA 95-±24' LIMIT OF WETLANDS IMPACT UNDISTURBED WETLANDS 10' , e F ' PERVIOUS SUBS PROPOSED GRADE o z PERFORATED UNDERORAIN EXISTING GRADE,, F3 LEVEL SPREADER INFILTRATION SWALE RIP RAP TYPICAL INFILTRATION SWALE SECTION NOT TO SCALE 70 60 50 40 30 25 PROP. 48" CMP, 40' LONG, FLOOD FLOW PIPE UPSTREAM PIPE INVERT = 39.9 UPSTREAM STREAM BED ELEVATION = 40.9 DOWNSTREAM PIPE INVERT 39.0 DOWNSTREAM STREAM BED ELEVATION = 40.0 PROP. DOUBLE 48" CMP CULVERT W1 55' HEADWALL AND 8' WING WALLS PROP. 48" CMP, 42' LONG, LOW FLOW PIPE UPSTREAM PIPE INVERT = 39.9 UPSTREAM STREAM BED ELEVATION =40.9 DOWNSTREAM PIPE INVERT 39.0 DOWNSTREAM STREAM BED ELEVATION = 40.0 ................ ................ .. ................ PROP. SILL INSTALLED 12" ABOVE STREAM BED AT UPSTREAM END OF FLOOD FLOW PIPE STREAM BED MATERIAL EXIST. STREAM BED FLOW LINE JURISDICTIONAL WETLAND AREA 95-±24' 8+50 WETLANDS CROSSINGS e CROSS SECTION SCALE: 1"= 20' HORIZONTAL 1"=10' VERTICAL 70 60 50 40 30 ecel V BY: 60 TEMPORARY STONE DAM W/— CLASS I RIP RAP AND 8 MIL. POLYETHYLENE FABRIC LINER ON UPSTREAM FACE 50 40 30 25 TEMPORARY STREAM IMPACT LIMIT 15' UPSTREAM OF PIPE INLET PROP. ROADWAY PROR CULVERT FROM PIPES PUMP 5' TEMPORARY STREAM IMPACT LIMIT TO PUMP 1' 15' DOWNSTREAM OF PIPE OUTLET FLOW 1 ,,,_______________ --------------- ____ 5' DEWATERING SILT BAG --- EXIST. STREAM BED OF INTERMITTENT STREAM TEMPORARY STONE CHECK DAM EXIST. STREAM BED OF CLASS I RIP RAP WITH 6" NCDOT INTERMITTENT STREAM 1157 WASHED STONE ON UPSTREAM FACE 0+00 0+50 1+00 CULVERT DEWATERING DETAIL SCALE: 1"= 20' HORIZONTAL 1"= 10'VERTICAL • INSTALL PUMP AND LINE TO PUMP. REDIRECT FLOW FROM UPSTREAM OF TEMPORARY DAM TO AREA DOWNSTREAM OF WORK AREA. BEGIN PUMPING. PUMPING TO BE CONTINUOUS WHILE WORK WITHIN THE STREAM IS ONGOING. • PUMP TO DISCHARGE INTO A DEWATERING SILT BAG INSTALLED ON THE STREAM BANK DOWNSTREAM OF THE DOWNSTREAM TEMPORARY CHECK DAM. (. ` 1*4� • INSTALL THE UPSTREAM TEMPORARY DAM USING CLASS I RIP RAP, WITH 8 MIL POLYETHYLENE FABRIC LINING TH GGA UPSTREAM FACE TO CAPTURE THE STREAM FLOW. a 6r 1 ry�18 • INSTALL THE DOWNSTREAM TEMPORARY CHECK DAM USING CLASS I RIP RAP AND A 6' THICK LAYER OF NCDOT N57 JG 1 L WASHED STONE ON THE UPSTREAM FACE OF THE DAM. • UPON COMPLETION OF THE CULVERT INSTALLATION AND STABILIZATION OF THE DISTURBED AREAS, REMOVE TEMPORARY DAMS AND ASSOCIATED APPURTENANCES AND RESTORE THE STREAM BANKS AND BOTTOMS. • REMOVE PUMP, PIPES AND DEWATERING SILT BAG. 60 50 40 30