Loading...
HomeMy WebLinkAbout20160268 Ver 1_401 Application_20160816VICINITY MAP NOT TO 5CM SHEET INDEX SHEET NO. DESCRMION I TITLE SHEET IA Sm PLAN 2 TYPICAL SECTIONS 3 DETAILS 4-5 PLAN AND PROFILE Pl PLANTTNG DETAES P2 PLAN GPLAN X&1 CROSS SECTIONS 20 30 fi0 1I k EMMET. I... - SREE,9 k-5 R V&RTIC. MITE RESOURCE INSTITUTE, INC[I — � -F- NC, 1083—Pcov 1 POPLAR COVE CREEK (CORPENING)a- RE STREAMRESTORATIONPROZECT POPLAR COVE CREEK MACON COUNTY, NORTH CAROLINA PROJECT LENGTHS PROPOS20 RE9TORpT10N� COPIER COVE CREEK= 591 P! II WZ�� � FINAL PLANS P1Rpa�re1d ffy/or�r: U.5(IC'NVE INSIII'UPh DAN McCLURE PROIPCPMA AGM F 7Plow y�e Af } NAN+.Y S1WNTER PIN 8555449081 s /s 9NDA NENN 'IL 'IN 6 EAmuG ui117 POLE--` AND GuY MPP 3 A, *x t. • h 'A PIN: 6553437881 ': •'q' \ NENN CMPENING SVIE OI Rfl _ -En 1003 IA �IAUROHe/ EUlILTG CRERHE: OKRHEM Il➢OiY EAUNG POPLAR COVE MEEK � �� � ��� LOCATION KEY PROPOSED \ LEGEND ( CLASS 11 MARAS \\ PROPOSED STREAM RStORNDON Zr� PROPOSED f✓� PWIAR WK GREEK WW i� PILL MSTNG PROPERTY BOUNDARY # A BEGIN PBPLA4 QrvL REEK " eousr{uenDN ,e AP 102,1AI + 9 * _ N +R LNNAk „ i41B iA \� A� 2 -FT BAS' B ALI CN lIE NARmA r a-111 IIAWC - �S NN 5`.3:{ 53 •j 20 2p 5) SVIE OI Rfl i d )! A N r , r. f r R� A C � q E � L � \ E FIN d,L34855 ' FIV. E5535'A865 NOTE: PROPEM BOUNDARIES, FENCES AND UTILITIES NOT APPROXIMATE LOCATIONS ONLY. BANK LANK SECTION 1 TYPICAL RIFFLE END i0 SCALE E I SAM, SECTION 1 TYPICAL POOL NOT TO SCALE s 3 GONffiGL TABLE 2: S(IDPLEMENTAL BED MATERIAL (WITH HARVESTED GRAVEL) TABLE 1: SECTION DIMENSIONS ;DMNICEAREABDI)ABLE B REACH TNCAL CECTpN STATION RIFFLE DIMEN'"' 8 3 DEPTH OF POOLDMENSpN3 WMW W%s H'naL VM�1 dxr dFoz YIP WUIT d� gppftOX. P) Ito IPJ AB (h (ro IRI POOL DEPTH (M (W NO POPLARCOVE CREEK 1 iDNi9 TO 10]+50 09.6 1]D 5.t 10 L80 iSt 10.1E 1LBp 3.OT LO TABLE 2: S(IDPLEMENTAL BED MATERIAL (WITH HARVESTED GRAVEL) PERCENT OF TOTAL MIX ;DMNICEAREABDI)ABLE B .71 3.0 3 DEPTH OF REACH CINESCEE 12 YIP YSTONE BEFORE iSSTONE BED 1Pm HARVEST STONE STONE 1.03 NCDOT WOOD MATERIAL 1b MATERIAL MO. DR) ALIS) (SURGE ) (CLASSA) (CLASSW (FT) POPLAR COVE CREEK I TOGAS 1.0 ]TIL, ANU IINI NO OUARRY STONE WILL BE REQUIRED FOR USE AS BED MATERIAL. THE DI OF INSTALLED BED MATERIAL SHALL BE APPROXIMATELY ADM. (MIN). FIXE CONTRACTOR SHALL Fd LPX THE SEQUENCE OF CONSTRUCTED IN BENCHMARKS AW WE PIANS ONO AN NNECTED BY WE ENdNEER. ME COMEDOWN SHALL CONDUCT STREAM WORK, INCLUDING INSTPAIAipN OF IN-SEEAM STRUCTURES GRADING, VARIEGATION MEASURES. AND AMONG ME MULCRING, ON A SECTION OF STREAM nui CAN BE ENTIRELY COMPLEIEL IN A SINGLE MY. THE CONTESTER SHALL IDENTIFY THE ANSI BECAME, LIKES OF OSNRBWEE, SHEENS ARRAS. STAGING ANDS, AND CONSTRUCTION ENTRANCES WOH EE ENGINEER. 2. THE CpNEACIOR $RM.I RELEASE STABILIZED WADDINGTON ENTRANCE. 5, THE CONTRACTOR SHALL WBIUZE ACCIDENT MATERIALS, PREPARE STAGING ARFIS, µ0 STOCKPILE MEALS. 4 CONSTRUCTION TRAFFIC TO BE UMNEO TO 11" OF DISIUWBgNCF AS INDICTED ON THE COHSEUCTEN PIANS OR M DIRECTED Bl RIE ENGINEER. 5. THE DISMEMBER SMALL INSTALL ALL TWPoRA4Y ROCK CHECK 0.4NS, SITE EDGE. AND MULCHING AROUND All CONSTRUCTION ARDS INCLUDING STAGING AND SMONTAIIF ARE6 AS INDICATED ON THE CONSTRUCTION PLANS OR AS DIRECTED BY WE ENGINEER. IF THE CONTRACTOR SMALL MSIALL ALL WSPORMY STREND CRECEIR . OUCHES AND STREAM REACHES WELP BE Ilii OPEN DURING INITIALC PHA RUBBERES OF CONSTRRON TO ALLOW FOR DRAINAGE ANG TO KEEP SITE ACCESSIBLE. THE CONTRACTOR SMALL BEGIN CLEARING I FLEUUPLNN ESTIMATING, AND GAMING WORK TO DESIGN WAGES AT THE UPSTREAM ENO OF ME CHANNEL AS (ABOARD ON ME CONSTRUCTION PIANS. ME COMMODORE SHALL NOT DISTURB MY MORE FIDCOPWN AREA LARGER ANO STREW REACH LONGER WIN CAN STABW2ED IN ONE CO, B. OKE A NEEDED OF SEGN ME HQODPUIN NAVE BEEN CALIBRATED TO DESIGN GRADES. IH -STREAM STRUCTURES. WRING. AMC TRARSPGMS SHALL BE INSTALLED IN THAT SECTION. EXISTING AM MATERIALSMA RBE FAUCHER AND iPLACED IN ME CCNSRUCRD CHANNEL. 9. THE CONTRACTOR mceu 10. ONCE A SEEM 1PoRN IAL A LMPINAND NOCK CHECK MM AND BE MAINTAINED ON A REGULAR AND BY THE GONEACNR WILL APPLY TEMPORARY SEEDING, ARFIS DSNRRD OWING CWSTRUCIgN. YELL BE APPLLED AS SNDAN ON TIE HEADER ALL AREAS SUSCEPTIBLE TO EROSION INCE MR. MYS FOLLEMANG COMILENON OF AM A BE ESTABLISHED FOR ALL DISBURSED AREAS M CONEEUCTON. ;DBEFORE LEAVING THE ERO.IECT WE ALONG PIKS AND TEMPORARY CHEEK DAMS. EL ALL SHPUNT ALL BUGGY VEGRATEN ANO ANTNG CRATES AND SPECBIFAMtxs, .1 MIDDLE WALING EE APPROPRIATE TIME OF IS FRE£ OF TRASH AND CUTLASS MATERIALS E NATE. 2 ALL MECHANIZED EQUIPMENT OPERATED W OR NEAR THE SPREAD OR OS TRIBUTARIES WELL RE INSPECTED REGULARLY AND RETAINED EN UE. S ALL EQUIPMENT MMNIFNANCE SEAL M PERFORMED AT ELECT 50 FF FROM EE sEUM ON US THIBMARIE,. 4, CLEARING ME MUGGING SHALL K LIDDED TO TNT WHICH Is NECESSARY FOR CONSTRUCUON OF THE PROPOSED CHANNEL AND SMALL BE ALTERNATE BY ME ENGINEER, E CONIRACLOR IS MSPONSIGIE FEE 1.111NG SAE (EDGE. ANO EGRESS FROM WE CUR ME STEELED INCLUDING, BUT NOT ENDED M. WALES ON GAMETE PUBUC RSDS AFFECTED BY CONSTRUCTION TRADED 6, CDRACTOR SHALL DEPOSE OF ALL WASTE MTERAS GENERATED BY CONSLRUCEION ACTIVITIES IN ACCORDANCE WITH ALL FEDERAL , STATE AND LORAL REGULATIONS. THE CONTRACTOR SMALL BE RESPONSIBLE FOR WEARS i0 EXISTING FACILITIES FROM DAMAGES OCCURRING AS A RESULT OF CONSTR UCTION ArnvmE2. e. THE INSTALLATION OF EROSION GENWEL MEASURES AND PRAMCBM SHALL OCNR PRIOR TO END DISTURBING ACTMTES. IM EARY EE COORDINATE BOSTON! 5 THE NAI NORTH GRONNA STATE WE GRID, THE VNTCAL MEN IS MADS . CHANNEL CONSTRUMM SHALL O IBEGINT ME UPSTREAM ENO OF EACH CHANNEL REACH AND PROCEEDEOWNSIRGM UNLESS APPEARED OTHERWISE BY WE ENGINEER, Z BED LATERAL W ROOM SECTIONS SHALL CONSIST OF BED W2RWL EXCAVATED FROM DODGE GBARMEL WHERE INSUFFICIENT BED LATERAL IS PRESENT IT SHALL BE OPPLEMEMED WITH MATERIAL ACCORDING TO TABES 2 AND AS DIRECTED BY ME ENGINEER. ]. ME CHEMISE BANKS SMALL BE STABILIZED ACCORDING TO THE BANK PROTECTION DETAILS ON WEBB 3. 4. GAMBIA MURKINESS SHALL BE AS FOLLOWS: WIDTH +/- os FB OEPRO.I f ./- FT RIFFLE ELEVATONS. +/- 0.1 FT IDOL EMBODIED + 0.1 Er, - E S R STRUCTURE ELEVATIONS: +/- EL R RING CHANNEL (ACCESS M BE FILLED ON PIANS SHALL BE SNUFFLES WITH 1 -FOOT EES AND CONDEMN TO IN -SW SOIL BEROWDY CHANNEL SHALL BE TREE FROM BRUSH AND ORGANIC ADDIS PRIOR TO NICKELLING. 6. PUMP MOUND OPERATION SMALL BE USED TO OVERT ROW OUMNG CONSTRUCTION WHEN PRALTIGL IEEE SURVEY/INNIEST/PRORPIpN MC 1, WOODY MATERIAL AGE BE HERCULES CN -SIZE HER USE WE IN -STREAM STRUCTURES Fdt STiICARRE( MANUEL, GRADE GOMENOL AND ATLANTIC HABITAT ENHA4CEAHEM/RESNPACON. W➢OVY NATURAL INCLUDES BOTH URGE AND SMALL SI2E DAMETER FEES INCLUDING STEM AND ROOT MUSS. IDFES WILL BE HARVESTED FROM UPLAND AREAS AS WELL AS ALONG REGONSEUCRD STREAM BMKS DURING ME RESIOPATGN CONERKHON PROCESS. 2. PREFERRED MARVEST FEES To BE DETECTED FOR NOMINATION PURPOSES SHALL FIRST INCLUDE ALL SWEET, FINANCE, WVMD. ANF UNDESIRABLE FELE SPECIES UNTIL THE MAGNUM NEEDED FOR SEGS RESONATED ARE MEI. ARDS PELECRD FOR RAWEST SHALL OCCUR WeNIH ME UMNS OF DISTURBANCE AND DELINEATED BY A POWDER ARBORIST OR LAMER PROFESSIOWI ECOLOGIST/BIOLOGIST. J. T4NSPLANTS WILL BE SELECTED AND RELOCATED E DIRECTED DY THE ENGINEER, 4 ALL WOODY MATERIALS WILL BE STOCKPILER IN ME APPROVED STAGING AND SIOCEPILE AREAS, 5, IN ALL AREAS WHERE TREES ARE HARIESTED PROPER BNP AND ERWUN AND SEDIMENT CONTROL WILL BE IMPLEMENTED AND THE AREA IMMEDIATELY STABILISE WITH TEMPORARY ANG PERMWEM SEEDING/MUIEH AS HMYESONC OCCURS LAR VE EEK ;DMNICEAREABDI)ABLE B .71 3.0 3 i31.0 SWAR Mltl DOE? SVAun 110n O.DG? VADRATp 1Pm I SAUDI DENT. 21 BMIWIIT 1.03 POOI-POOL MTp 3A -EB M1£ANOER WDTi M1p 1b IAL A LMPINAND NOCK CHECK MM AND BE MAINTAINED ON A REGULAR AND BY THE GONEACNR WILL APPLY TEMPORARY SEEDING, ARFIS DSNRRD OWING CWSTRUCIgN. YELL BE APPLLED AS SNDAN ON TIE HEADER ALL AREAS SUSCEPTIBLE TO EROSION INCE MR. MYS FOLLEMANG COMILENON OF AM A BE ESTABLISHED FOR ALL DISBURSED AREAS M CONEEUCTON. ;DBEFORE LEAVING THE ERO.IECT WE ALONG PIKS AND TEMPORARY CHEEK DAMS. EL ALL SHPUNT ALL BUGGY VEGRATEN ANO ANTNG CRATES AND SPECBIFAMtxs, .1 MIDDLE WALING EE APPROPRIATE TIME OF IS FRE£ OF TRASH AND CUTLASS MATERIALS E NATE. 2 ALL MECHANIZED EQUIPMENT OPERATED W OR NEAR THE SPREAD OR OS TRIBUTARIES WELL RE INSPECTED REGULARLY AND RETAINED EN UE. S ALL EQUIPMENT MMNIFNANCE SEAL M PERFORMED AT ELECT 50 FF FROM EE sEUM ON US THIBMARIE,. 4, CLEARING ME MUGGING SHALL K LIDDED TO TNT WHICH Is NECESSARY FOR CONSTRUCUON OF THE PROPOSED CHANNEL AND SMALL BE ALTERNATE BY ME ENGINEER, E CONIRACLOR IS MSPONSIGIE FEE 1.111NG SAE (EDGE. ANO EGRESS FROM WE CUR ME STEELED INCLUDING, BUT NOT ENDED M. WALES ON GAMETE PUBUC RSDS AFFECTED BY CONSTRUCTION TRADED 6, CDRACTOR SHALL DEPOSE OF ALL WASTE MTERAS GENERATED BY CONSLRUCEION ACTIVITIES IN ACCORDANCE WITH ALL FEDERAL , STATE AND LORAL REGULATIONS. THE CONTRACTOR SMALL BE RESPONSIBLE FOR WEARS i0 EXISTING FACILITIES FROM DAMAGES OCCURRING AS A RESULT OF CONSTR UCTION ArnvmE2. e. THE INSTALLATION OF EROSION GENWEL MEASURES AND PRAMCBM SHALL OCNR PRIOR TO END DISTURBING ACTMTES. IM EARY EE COORDINATE BOSTON! 5 THE NAI NORTH GRONNA STATE WE GRID, THE VNTCAL MEN IS MADS . CHANNEL CONSTRUMM SHALL O IBEGINT ME UPSTREAM ENO OF EACH CHANNEL REACH AND PROCEEDEOWNSIRGM UNLESS APPEARED OTHERWISE BY WE ENGINEER, Z BED LATERAL W ROOM SECTIONS SHALL CONSIST OF BED W2RWL EXCAVATED FROM DODGE GBARMEL WHERE INSUFFICIENT BED LATERAL IS PRESENT IT SHALL BE OPPLEMEMED WITH MATERIAL ACCORDING TO TABES 2 AND AS DIRECTED BY ME ENGINEER. ]. ME CHEMISE BANKS SMALL BE STABILIZED ACCORDING TO THE BANK PROTECTION DETAILS ON WEBB 3. 4. GAMBIA MURKINESS SHALL BE AS FOLLOWS: WIDTH +/- os FB OEPRO.I f ./- FT RIFFLE ELEVATONS. +/- 0.1 FT IDOL EMBODIED + 0.1 Er, - E S R STRUCTURE ELEVATIONS: +/- EL R RING CHANNEL (ACCESS M BE FILLED ON PIANS SHALL BE SNUFFLES WITH 1 -FOOT EES AND CONDEMN TO IN -SW SOIL BEROWDY CHANNEL SHALL BE TREE FROM BRUSH AND ORGANIC ADDIS PRIOR TO NICKELLING. 6. PUMP MOUND OPERATION SMALL BE USED TO OVERT ROW OUMNG CONSTRUCTION WHEN PRALTIGL IEEE SURVEY/INNIEST/PRORPIpN MC 1, WOODY MATERIAL AGE BE HERCULES CN -SIZE HER USE WE IN -STREAM STRUCTURES Fdt STiICARRE( MANUEL, GRADE GOMENOL AND ATLANTIC HABITAT ENHA4CEAHEM/RESNPACON. W➢OVY NATURAL INCLUDES BOTH URGE AND SMALL SI2E DAMETER FEES INCLUDING STEM AND ROOT MUSS. IDFES WILL BE HARVESTED FROM UPLAND AREAS AS WELL AS ALONG REGONSEUCRD STREAM BMKS DURING ME RESIOPATGN CONERKHON PROCESS. 2. PREFERRED MARVEST FEES To BE DETECTED FOR NOMINATION PURPOSES SHALL FIRST INCLUDE ALL SWEET, FINANCE, WVMD. ANF UNDESIRABLE FELE SPECIES UNTIL THE MAGNUM NEEDED FOR SEGS RESONATED ARE MEI. ARDS PELECRD FOR RAWEST SHALL OCCUR WeNIH ME UMNS OF DISTURBANCE AND DELINEATED BY A POWDER ARBORIST OR LAMER PROFESSIOWI ECOLOGIST/BIOLOGIST. J. T4NSPLANTS WILL BE SELECTED AND RELOCATED E DIRECTED DY THE ENGINEER, 4 ALL WOODY MATERIALS WILL BE STOCKPILER IN ME APPROVED STAGING AND SIOCEPILE AREAS, 5, IN ALL AREAS WHERE TREES ARE HARIESTED PROPER BNP AND ERWUN AND SEDIMENT CONTROL WILL BE IMPLEMENTED AND THE AREA IMMEDIATELY STABILISE WITH TEMPORARY ANG PERMWEM SEEDING/MUIEH AS HMYESONC OCCURS , /////UEEi RI7SDSLLXEEWORUWTUION BWNRANNi H. IDE, BENCX LOCATION N__ C.L. _L EMISPNG LINNNp BED MAINTAIN EXISTING CHANNEL BANK NDi TO SCALE 'D P REPRESENTATION SPE BANK A BANK PROMMETTON _\ -CONSIItRCE MANN AND &HE'LLU BENCX - SEE MHEEF C. TABLE 1 FOR SEEDS', EIMG TOE LOCATION EMISTNCRISLLUNNEL BED CONSTRUCT BANK AND BANKFULL BENCH (MAINTAIN EXISTING(MAINTAIN EXISTING BED) um To SCALE RLMV, END SEE BANK p BANK OPERA BANK PROTECTION SOD AND MAT NOT TO SCALE MONTI MOUTH CWS II NOW \ 1V LXwxxa efD L4R FABRIC CA (MIN) 2,F (NLN) BANK PROTECTION CLASS II RIPRAP ..I. s1RUVT N.. RANK AND NANKIN. GINS. - SEE SHEET 1, TABLE 1 FOR ONfxswxs `­E..AS MIWJxfL BN CONSTRUCT BED BANK AND UANKFULL BENCH (ABANDON EXISTING BANK FEATURE) BUT IS LE N06S I. 9RUCNXE BMNEILL WICRA. SHALL MIST OF ONSTOPML COMPARED TO IN-SITU DdSM. 2 STRUCTURE &CXXLL CW SWc N JL ASI OF ONCTIE TONF/CRAKL AS APPROVED Bf THE END(. 3. ALL WIDE AND CAPS SPAIN BWWQ6 AND 01 SWLL BE CHMNTS H MORE PROF TO INSRWnON OF MOM FABRIC. DEEP ADAL eAUD LouTlou A - \ � NDICATEo ax n PIAX SXFEK \_SHALLOW POOL q LOG—ENHANCED RIFFLE ti DffP Pool PROFILE 'UP msLALL ' 1 NATURAL CNI NATURAL GRouxD f•E OSS (MIN) S'N P. f' CCIR FEAR MAnINC TO BE PIACfO PRIOR TO INSTALLATION ON -SNE BAD CI Bf0 MARRIM. I— E, �I MATERIAL 2' BASE DFFCH W/ ON—SITE BED MATERIAL NOT TC SE.E PERMANfN! NSE ANCHOR &YIlDERS MVLCH i0 SELVRE LOC � � n ' ' awLM POOL ) e LW N'INVERT SEfq RIfRE GRgOE '$ Lcc BANDE SEL wHH No BgCkER OR PUTAFABRIC (➢T) (NOTE: LOOS SHALL NAVE A Mw MMILOG—ENHANCED RIFFLE M W AND A MIN LENGTH OF 25' PLAN NOT TTO 1. Nd k IDc caeMLf 0R GOVLDER CLo4ER ��FCCKfT PSI s1RUVT N.. RANK AND NANKIN. GINS. - SEE SHEET 1, TABLE 1 FOR ONfxswxs `­E..AS MIWJxfL BN CONSTRUCT BED BANK AND UANKFULL BENCH (ABANDON EXISTING BANK FEATURE) BUT IS LE N06S I. 9RUCNXE BMNEILL WICRA. SHALL MIST OF ONSTOPML COMPARED TO IN-SITU DdSM. 2 STRUCTURE &CXXLL CW SWc N JL ASI OF ONCTIE TONF/CRAKL AS APPROVED Bf THE END(. 3. ALL WIDE AND CAPS SPAIN BWWQ6 AND 01 SWLL BE CHMNTS H MORE PROF TO INSRWnON OF MOM FABRIC. DEEP ADAL eAUD LouTlou A - \ � NDICATEo ax n PIAX SXFEK \_SHALLOW POOL q LOG—ENHANCED RIFFLE ti DffP Pool PROFILE 'UP msLALL ' 1 NATURAL CNI NATURAL GRouxD f•E OSS (MIN) S'N P. f' CCIR FEAR MAnINC TO BE PIACfO PRIOR TO INSTALLATION ON -SNE BAD CI Bf0 MARRIM. I— E, �I MATERIAL 2' BASE DFFCH W/ ON—SITE BED MATERIAL NOT TC SE.E o o OO O EXISTING O CDO ± N GNY MRS + o o / IJ EXISTIGO UBLRY PONE / i BEGIN POPIAR COVE CREEK- —�'CON/ %7A 10UCRON STA ID2+18.9 CREEK FENCE YU 0 ]0 w Sw£ w iFfT -t 2230 100+00 101+00 102+DO 10 FULL SIZE PLAN - HORIZONTAL SCALE: 1” = 20' VERTICAL SCALE: 1" = 2' O ? eeuiie: h1 u6noao o = _-^eoruR coos cveaK m +�' _ % M e/aaape um — - EXISTING BED _ ROPOSED BANKFULL RADE 2245 vROPOSEDBED 1 - _._ 2240 a TI 2235 3+00 104+00 2230 105+00 HALF SIZE PLAN - HORIZONTAL: 1" = 40' VERTICALI" = 4' POPLAR COVE CREEK LOCATION KEY LEGEND PROPOSED ®STREAM RESTORATION O� 'le ® MEE EXST X FENCENG EXISTING l \ oo. PROPERTY BOUNDARY EX STING TREE EXISTING TREE TO SAVE 2240 - - -- EXISTING TERRACE — - EXISTING BED _ ROPOSED BANKFULL RADE 2245 vROPOSEDBED 1 - _._ 2240 a TI 2235 3+00 104+00 2230 105+00 HALF SIZE PLAN - HORIZONTAL: 1" = 40' VERTICALI" = 4' POPLAR COVE CREEK Wo Creek EE"�gineeriog4 \ R6BTOMTIOH PBOl9 �P6pOIBCE (p n � es xwm ' 1089 W a/m/m m 5 \ / PROPOSED DPIAR COP I m — — '-- i ENDPOPIAR COVE CREEK , ' / CONSTRUCTION ' STA 107+49.5 \ CP X—X_x — _ 1--- \ / � LEGEND o / \ /\ PROPOSED _ _ ® STREAM RESTORATION AM UNNEO TRIBUTARY (PROPOSED 2—FT BASE DITCH \ RADE BACK ® FILL WITH ON—SITE BED MATERIAL) ,AND AT 31 \ GRADE BACK BANK AT 3:1 \ X EXISTING FENCE EXISTING — PROPERTY o �I BOUNOARI' EXISTING unmi:\\ TREE m EXISTING TREE j xa o m m TO SAVE SLLLE IN iFEi 2243 IT_ 2243 alai 11 EXISTING TERRACE _ — — EXISTING BED PR POSED BANKNLL 2240 POSED GRADE - 2240 _ _ _l. _ _ - PROPOSED BEo. L 2235 --- �-�-- __ _ - - - - --- - ��. 2235 on - t"- - w ory 2230-- -_ 2230 RL + + 2225 2225 105 00+ 106 0 0 N + 107 00 108+00 109+00 110+00 FULL SIZE PLAN HORIZONTAL SCALE: 1" = 20' VERTICAL SCALE: 1" = 2' HALF SIZE PLAN - HORIZONTAL: 1" = 4 0 VERTICAL:1" - 4' - POPLAR COVE CREEK or•♦-"mss troo- pti BUDS fACINCUMARD SULAME CUT TOP uu Ku DG wwTE CUT US - A5 DEGNEE LRE ROAD MAL NUMBER OF LIVE STAKE ROWS CHNPTH IN SDE OUTSIDE oE➢IX W SFND TANGENT DF BEND cm D-15 2 5-35 2 2 ] 25-].5 ] RL IST TM 1. RDW SIWL BE Ai LEl4T LE FTpU TOE OF RIFFLE SECTION ENANN 1 pR AT IDP DP .1,MOT TO SCALE CXFhR D6IANCE 6 IN IFR ROW J InNTVb -AL ICRN A. TO SCALE "AND, NOTES, TEMPOPAR(AND PERMANENT SEED 1. ALL OUTLASTED MEAS WILL BE STARTIZED LEAN MULCH PND TEMPORARY SEED TO PROVµIDE ACEDUAIE GROUND COAST D CDNDIIbN THE II 2. MULCH MUST BE ROW M ACHIEVE M% COVERAGE (ROUGHLY 2 TENS/KRE FDO WHEAL STMW) 3. A FERT " SUL LEST SHALL BE USED TO DETERMINE FFRTHAER AMI OR. IF RO SOIL TEST IS AMNIAHI£, A SIMI MIME, SHALL BE APOLLO OF 2 TONS CF UK PER WERE AND ]DS -LOUD LBS OP 10 -10 -Ip FERfl. PER ACR,. UM TIME ROOT SHRUBS AND VOTES IN AREAS AS UNCROSS ON THE PUNS. 2, PRpNDE THREE ROWS OF PLANTINGS AT A 12SPAPNG TO YIELD P ]S -FT -WAR %ANRR BUFFER ON FA CX SLOE DF CHANNEL 3, LOOSEN IS.. SqL ANO 1. IN HOLES FURMFII WITH A SPACING NI TRUE W OR EDIAL <. PROVIDE PUNTING HOLE SUFFCIENT IN SIZE .WD DEPTH TO PREVENT CRMDING OF ROOTS Wll KE 5. ROOTS SBE PT MT DURRIG TRANSPORATION. DIsDERLUIDN, MD INSTu LATERAL B. I.S SHALL BE HERE0.IN INTO MOIST SOIL V NOT PROMPTLY PLANTED PREM ORWHO TO THE PROJECT SITE. SNE SMEs FLARES SHOO. BE CUT AND INSTALLED ON THE SAME Mr. 2. STARES TMT ME SPLIT SINLL NOT BE INSTALLED. 3. STME SINLL BE INSTALLED OFTHOWALUT TO THE DARK AND WBH Blas PORTING UPWARDS. a. STUFF SHALL BE .i TO 2 INCHES IN DNMEIER AND 2 i0 ] FE ET IN LENGTH. 5. AFIEP INStgL4ilOR THE LOP PORTION OF STAKES SHALL BE LOOMED WIN A RELATED M LFANNO NO LESS THAN 1 INCXES AND NO MORE THAN 8 INCHES AiOAD ME SWORD. WFAMAN ITHET PLANT CPECWS TO BE INSTALLED SPALL Al DEPUT NI ON SPFB16 MIUBATY. SE.,NAY N0.'MTY EUI ON AS APPFWED BY dBINEER. "I EM 1. MY SET AT CUP 0' Is wE ST4E Bpl wAnR ox WTADE SR 11 RO M NE OR HND ON INBH OF BEND POOL SECTION NOT M SV1E "AND, NOTES, TEMPOPAR(AND PERMANENT SEED 1. ALL OUTLASTED MEAS WILL BE STARTIZED LEAN MULCH PND TEMPORARY SEED TO PROVµIDE ACEDUAIE GROUND COAST D CDNDIIbN THE II 2. MULCH MUST BE ROW M ACHIEVE M% COVERAGE (ROUGHLY 2 TENS/KRE FDO WHEAL STMW) 3. A FERT " SUL LEST SHALL BE USED TO DETERMINE FFRTHAER AMI OR. IF RO SOIL TEST IS AMNIAHI£, A SIMI MIME, SHALL BE APOLLO OF 2 TONS CF UK PER WERE AND ]DS -LOUD LBS OP 10 -10 -Ip FERfl. PER ACR,. UM TIME ROOT SHRUBS AND VOTES IN AREAS AS UNCROSS ON THE PUNS. 2, PRpNDE THREE ROWS OF PLANTINGS AT A 12SPAPNG TO YIELD P ]S -FT -WAR %ANRR BUFFER ON FA CX SLOE DF CHANNEL 3, LOOSEN IS.. SqL ANO 1. IN HOLES FURMFII WITH A SPACING NI TRUE W OR EDIAL <. PROVIDE PUNTING HOLE SUFFCIENT IN SIZE .WD DEPTH TO PREVENT CRMDING OF ROOTS Wll KE 5. ROOTS SBE PT MT DURRIG TRANSPORATION. DIsDERLUIDN, MD INSTu LATERAL B. I.S SHALL BE HERE0.IN INTO MOIST SOIL V NOT PROMPTLY PLANTED PREM ORWHO TO THE PROJECT SITE. SNE SMEs FLARES SHOO. BE CUT AND INSTALLED ON THE SAME Mr. 2. STARES TMT ME SPLIT SINLL NOT BE INSTALLED. 3. STME SINLL BE INSTALLED OFTHOWALUT TO THE DARK AND WBH Blas PORTING UPWARDS. a. STUFF SHALL BE .i TO 2 INCHES IN DNMEIER AND 2 i0 ] FE ET IN LENGTH. 5. AFIEP INStgL4ilOR THE LOP PORTION OF STAKES SHALL BE LOOMED WIN A RELATED M LFANNO NO LESS THAN 1 INCXES AND NO MORE THAN 8 INCHES AiOAD ME SWORD. WFAMAN �' "'Gx611NG VOPIgR '� y -0OYE CREEK ��. + + + + t } + + + + + + + + + + } + + + + + • t + + + ♦ + + + + +} + } + + + } + + + + + LEGEND + r + } } + } + PROPOSED STREAM } } + + + + + RESTORADON ++++ -t �� + + + + } + \4 F + + + + + + f } +\+ + + + t UPLAND PIANTIN6 AREA — 35' +>} + + } + + + OFFSET FROM PROPOSED TOP + + + OF BANK (0.4+ AC) jF i + + STFAMSDE PI NTING - } Y '- i (WF STAKtS) Ipi p V �� � � + . 1 Y � ,If -IK } + + / \\ w ++ + + \\ _� v+ + +±. v; - NNNNE IN SRY� } FF r r + ' •ntx + ��. +�h + I 0 40 SfME IN Rf! wWol�fCree4 IA °'� R6ROVRC¢ 49PRVt6 PL4 G PLAN �' "'Gx611NG VOPIgR '� y -0OYE CREEK ��. + + + + t } + + + + + + + + + + } + + + + + • t + + + ♦ + + + + +} + } + + + } + + + + + LEGEND + r + } } + } + PROPOSED STREAM } } + + + + + RESTORADON ++++ -t �� + + + + } + \4 F + + + + + + f } +\+ + + + t UPLAND PIANTIN6 AREA — 35' +>} + + } + + + OFFSET FROM PROPOSED TOP + + + OF BANK (0.4+ AC) jF i + + STFAMSDE PI NTING - } Y '- i (WF STAKtS) Ipi p V �� � � + . 1 Y � ,If -IK } + + / \\ w ++ + + \\ _� v+ + +±. v; - NNNNE IN SRY� } FF r r + ' •ntx + ��. +�h + I 0 40 SfME IN Rf! - i 4`NOIEti N SNEET N0. _ zzso 2250 2240 - 2zac 2230 , 2230 - - 0 0 o -- o o c o o sa 0 0 0 no - 'i ma -50 2250 _ _. z'sc_ 2250 1250 i zzao -- izzao zzao -_ 22o `"-Y— 223a '223c I zzeo 2230 2220 2_220 2220 —_ 2220 o o o o o o 20 0 to zD o o 5'0E 0 To 60 a o o 0 1 102-00. G' G c '0 q0 0 0 @so. 2250 3250 L.: L_ - _. _.� � resp zzao __.. - �; �y. � Izzae zzno '. I : zzao - zzao 2230 .2230 ..I ',. 2z3a 2220E_ 2217 2220. - 7c o so ao 0 i i c o Coo fi 101� so c o -o o o i naso ip ac #o . o 4u eTo , -_. 2250 2250 2250 2251 zzao 2240 zzao 22ao 2230 2230 2230 pplo __ 2zzo m] 00 2220 2220 I- _.. o o 0 o t i o ao o-. _.... Sp1,C110 - � _ '. jos 00 zzso� --o so. 0 0 o io c e � o �zzso 2zgo_ � - zzao 2zac 2240 '- —_ y—.._ _ _2240 _._.. -_. 2230 2230 2zac _?230 222 _ - 2220 212o `jc ao0 0 10 0 0 o o zo t --1 0 10 o- o o a c - i-- o o n�c o so0 goo so POPLAR eoV_ CREEK