HomeMy WebLinkAbout20160905 Ver 1_Bridge 600061 MItchell PJD Form_20160921ATTACHMENTA
PRELIMINARY JURISDICTIONAL DETERMINATION FORM
BACKGROUNDINFORMATION
A. REPORT COMPLETION DATE FOR PRELIMINARY JURISDICTIONAL
DETERMINATION (JD):
B. NAME AND ADDRESS OF PERSON REQUESTING PRELIMINARY JD:
NC Department of Transportation, 55 Orange Street, P.O. Box 3279
Asheville, NC 28802
C. DISTRICT OFFICE, FILE NAME, AND NUMBER:
D. PROJECT LOCATION(S) AND BACKGROUND INFORMATION:
Bridge replacement with bottomless culvert for Bridge 600067. SR 7172, Mitchell Counry, NC
(USE THE ATTACHED TABLE TO DOCUMENT MULTIPLE WATERBODIES AT DIFFERENT
SITES)
State: NC County/parish/borough: M�«neii Cjty; Wing/Ledger
Center coordinates of site (IaUlong in degree decimal format):
Lat. as.sa3a� °N; Long. -az.,a�,a °W.
Universal Transverse Mercator:
Name of nearest waterbody: s�oW c�eek
Identify (estimate) amount of waters in the review area:
Non-wetland waters:
zoo linear feet: zo width (ft) and/or acres.
Cowardin Class: ���e���e
Stf@8f1'1 FIOW: Perennial
Wetlands:
Cowardin Class:
Name of any water bodies on the site that have been identified as Section 10
waters:
Tidal:
Non-Tidal:
1
E. REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT
APPLY):
❑ Office (Desk) Determination. Date:
� Field Determination. Date(s): ensizo�s
SUPPORTING DATA. Data reviewed for preliminary JD
(check all that apply - checked items should be included in case file and,
where checked and requested, appropriately reference sources below):
� Maps, plans, plots or plat submitted by or on behalf of the
applica nUconsu Itant:
❑ Data sheets prepared/submitted by or on behalf of the
app�nUconsultant.
Office concurs with data sheets/delineation report.
Office does not concur with data sheets/delineation report.
❑ Data sheets prepared by the Corps:
❑ Corps navigable waters' stuc
❑ U.S. Geological Survey Hydrologic
❑ USGS NHD data
� USGS 8 and 12 digit HUC maps
❑✓ U.S. Geological Survey map(s). Cite scale & quad name: � Za000, Mi�a��ue
❑ USDA Natural Resources Conservation Service Soil Survey.
❑ National wetlands inventory map(s). Cite
❑ State/Local wetland inventory map(s):_
❑ FEMA/FIRM maps:
� 100-year Floodplain Elevation is:
(National Geodectic Vertical Datum of 1929)
❑ Photographs: ❑ Aerial (Name & Date): or
� �ther �Name & �ate�. Pholosofsireamwithinpermitapplication,9/21/2016
� Previous determination(s). File no. and date of response letter:
� Other information (please specify):
1. The Corps of Engineers believes that there may be jurisdictional waters of the
United States on the subject site, and the permit applicant or other affected party
who requested this preliminary JD is hereby advised of his or her option to
request and obtain an approved jurisdictional determination (JD) for that site.
Nevertheless, the permit applicant or other person who requested this
preliminary JD has declined to exercise the option to obtain an approved JD in
this instance and at this time.
2. In any circumstance where a permit applicant obtains an individual permit, or
a Nationwide General Permit (NWP) or other general permit verification requiring
"pre-construction notification" (PCN), or requests verification for a non-reporting
NWP or other general permit, and the permit applicant has not requested an
approved JD for the activity, the permit applicant is hereby made aware of the
following: (1) the permit applicant has elected to seek a permit authorization
based on a preliminary JD, which does not make an official determination of
jurisdictional waters; (2) that the applicant has the option to request an approved
JD before accepting the terms and conditions of the permit authorization, and
that basing a permit authorization on an approved JD could possibly result in less
compensatory mitigation being required or different special conditions; (3) that
the applicant has the right to request an individual permit rather than accepting
the terms and conditions of the NWP or other general permit authorization; (4)
that the applicant can accept a permit authorization and thereby agree to comply
with ail the terms and conditions of that permit, including whatever mitigation
requirements the Corps has determined to be necessary; (5) that undertaking
any activity in reliance upon the subject permit authorization without requesting
an approved JD constitutes the applicanYs acceptance of the use of the
preliminary JD, but that either form of JD will be processed as soon as is
practicabie; (6) accepting a permit authorization (e.g., signing a proffered
individual permit) or undertaking any activity in reliance on any form of Corps
permit authorization based on a preliminary JD constitutes agreement that all
wetlands and other water bodies on the site affected in any way by that activity
are jurisdictional waters of the United States, and precludes any challenge to
such jurisdiction in any administrative orjudicial compliance or enforcement
action, or in any administrative appeal or in any Federal court; and (7) whether
the applicant elects to use either an approved JD or a preliminary JD, that JD
will be processed as soon as is practicable. Further, an approved JD, a proffered
individual permit (and all terms and conditions contained therein), or individual
permit denial can be administratively appealed pursuant to 33 C.F.R. Part 331,
and that in any administrative appeal, jurisdictional issues can be raised (see 33
C.F.R. 331.5(a)(2)). If, during that administrative appeal, it becomes necessary
to make an official determination whether CWA jurisdiction exists over a site, or
to provide an official delineation of jurisdictional waters on the site, the Corps will
provide an approved JD to accomplish that result, as soon as is practicable.
This preliminary JD finds that there "may be" waters of the United States on the
subject project site, and identifies all aquatic features on the site that could be
affected by the proposed activity, based on the foilowing information:
IMPORTANT NOTE: The information recorded on this form has not
necessarily been verified bv the Corps and should not be relied uuon for
later�urisdictional determinations.
Signature and date of
Regulatory Project Manager
(REQUIRED)
Q N `? 2 I 1 /�
Si ature an late of
person requesting preliminary JD
(REQUIRED, unless obtaining
the signature is impracticable)