Loading...
HomeMy WebLinkAbout20110022 Ver 3_More Info Received_20160823 (2)Charlotte Mecklenburg STORM WATER I'll, W11111 -_' Services %w 600 E. Fourth Street Charlotte, NC 28202 Fax 704.336.6586 V August 18, 2016 U611 (� Ms. Crystal Amschler v U.S. Army Corps of Engineers PAUG�2 �._.Asheville Regulatory Field Office D151 Patton Avenue, Room 208 Asheville, North Carolina 28801 3 2016 I Ms. Karen Higgins NC Department of Environmental Quality NC DWR, 401 & Buffer Permitting Branch 512 North Salisbury Street Raleigh, North Carolina 27604 Subject: Louise Avenue Capital Improvement Project (Action ID: 2011-00366, DWR #: 11-0022) Request for Re -authorization- Addendum to PCN submitted May 26, 2016 Charlotte -Mecklenburg Storm Water Services Ms. Amschler and Ms. Higgins, On May 26, 2016, Charlotte -Mecklenburg Storm Water Services (CMSWS) is requested the re -authorization of the Louise Avenue capital improvement project (Project). The purpose and need for the Project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is located in Charlotte, North Carolina, just east of downtown along an unnamed tributary to Little Sugar Creek (Project Vicinity Map, enclosed). CMSWS is hereby submitting an addendum to the aforementioned re -authorization request in an effort to provide more accurate and complete information. A Jurisdictional Determination and Nationwide Permit (Action ID 2011-00366) were issued for this project by Ms. Amanda Jones on March 2, 2011. Ms. Coleen Sullins issued Water Quality Certifications (DWQ No. 11-0022) for the project on January 13, 2011. The project was delayed in order to allow time to update the plans to meet new design standards from various agencies and City Departments. This included updated NCDOT standards, updated and new City of Charlotte storm water and stream restoration details and standards, and new CDOT handicap accessibility standards. With each update of standards there were delays for negotiating design fees, field surveys, plan revisions, and subsequent City reviews. Both the jurisdictional determination and the nationwide permits expired during this lengthy construction plan update process. Proposed impacts remain unchanged from the originally permitted impacts. Project impacts are proposed to perennial RPW streams and include pipe extension, placement of plunge pools and rip rap energy dissipaters, longitudinal channel adjustments to accommodate pipe system upgrades, and stream enhancement activities. Proposed project impacts are illustrated in the newly annotated Louise Avenue CIP Construction Plans (enclosed) and overall project area map and are summarized in Table 1 below. As additional clarifying information, the existing culvert under Louise Avenue is shown as buried 1 foot on the construction plans from that culvert installation; therefore, the extension of this culvert will be constructed to match the existing elevation of the culvert. If the culvert was originally installed correctly, the extension should also be buried 1 foot to allow for aquatic life passage. The step -pool sequence described as impact S2 is proposed to have a maximum drop of 12" to the water surface elevation at any point. This can be seen in the attached permitting plan set on detail sheet 2R. To report pollution or drainage problems, call: 311 � http://stormwater.charmeck.org '`l' CHAMOTTE Table 1. Louise Avenue CIP Proposed Impacts Stream Impact Number o Location (Plan � -- . ..Sheet) - NWP No. Activity ; _ Permanent Impacts (LF) Temporary Impacts (LF) S1 Sheet 3 3 Pipe extension and Plunge pool 105 S2 Sheet 6 3 Step -pool sequence 56 S3 Sheets 6 and 7 27 Stream enhancement 177 S4 Sheet 7 3 Rip rap apron 12 -- S5 Sheet 7 3 Plunge pool 39 -- S6 Sheet P and P2 27 Stream enhancement - 709 Total Perennial RPW Stream Impacts = 156 942 The original pre -construction notification noted that stream enhancements associated with the Louise Avenue CIP would provide mitigation for cumulative permanent impacts within the watershed; however, it was recently discovered that easements acquired during the real estate process are inadequate to support a mitigation project. As such, the revised Louise Avenue CIP mitigation plan consists of purchasing 198 SMUs from the City of Charlotte Umbrella Mitigation Bank to offset permanent impacts of 198 linear feet (1:1 ratio confirmed by Ms. Amschler on 7/19/16). 42 SMUs will be purchased to offset permanent impacts associated with the Siegle Avenue Culvert Replacement project (USACE Action ID: 2009-00680) and 156 SMUs will be purchased to offset the permanent impacts associated with the Louise Avenue CIP. CMSWS respectfully requests re -authorization of the project under the USACE Wilmington District's nationwide permit program. Potential adverse water quality impacts associated with construction storm water runoff will be managed in accordance with NCDENR NPDES General Construction Storm water Permit, NCGO1000, and the City's PCCO requirements. I appreciate your prompt attention to this request. If you have any questions regarding this request please do not hesitate to contact me at (704) 336-3927 or erin.tumer@ci.charlotte.nc.us. Sincerely, Erin Turner Wetland Specialist Charlotte -Mecklenburg Storm Water Services encl: Revised Project Area Map Annotated Construction Plans for Permitting Preliminary Jurisdictional Determination Request 0 t 1 a° F tBt 9th St a _ MunOsa Av W E Sf i nth o Cochran Pl St J� m �` tsth ° d Qa F� St Belve o� dere fhS nnon St Av c Qz qj a� • � '54a ��'• �� Sr Q° sths'f o E Ile Terre Av Belle T rre S3IMPACTS j Av eP/ Plan Sheets 6 & 7 Ha cod ct N° i 'oo , c % � % s S2 IMPACTS i 00d P S6 IMPACTS Plan Sheet 6 i , �hestnutAv Plan Sheets P1 & P2 S5 IMPACTS y , Plan Sheet 7 Co r N ke Q S4 IMPACTS Kensin ton pr ens' 2 S'�fo `•. �'' Plan Sheet 7 n9ton Dr q D �• �•,Kensin : D ,,.•••"� S3 IMPACTS Legend Plan Sheets 6 & 7 Permanent Impact �. Temporary Impact o School St a S6 IMPACTS Q' — — Channel Centerline v �aG SO t Plan Sheets P1 $ P2 S1 IMPACTS Q Q) i Railroad < Plan Sheet 3 m 4 Street Centerline Louise Avenue Project Area G ira U Hamorton PI Z c o'. n N LOUISE AVENUE CIP STORKWATER o 300 600 ,,Zoo PROJECT AREA �.�„/ssyla" Feet AND IMPACT SITES INDEX OF SHEETS CoverSheet.............................................»........................................... I General Notes ._ ................................ »....„...._....__.._......„»___ 2A General Details ... _.................................. ..»............. 211-2D, 2W Structure Details .--- ------ ..._.___........_.__..___..„„„»........__„ 2E -2P Stream Details _..»__..„........_.__.._»....»».__ ...... ............... 2Q -2S Tree Protection Details .............. ... ...... .... ... _..... _... „.......... __.._„. 2T Storm Drainage Summary _..... »............ ..............................». 2U -2V Plan & Profile ........................... ......... ....» ........ _.................. _._. 3-18 Erosion Control Plans ...........»..»_.._.,.„........__..„„....___.. EC1-EC9 Traffic Control Plans and Details ............ ....... ....„»_.. TC1-TC4 Pavement Marking Plan .____„......_....__ .............. _....... „_.»„„ PMI Curb Ramp Plan ....__..».„....._..__.......... _....... .............. ____ CR1 Charlotte Mecklenburg Utilities Plana ... ........................ ..__.._„. 1-3 Stream Mitigation Conventional Symbols ...... ............... ......... ......_..»...... _r CSI Details ............ _.._...... _........ »...._. ...... ....... D1 -D9 Channel Sections .......................... „„_..... ................ _. XS1 Plan& Profile _.._...... »...... ».... _......„........ _................ __ PI -P3 Landscape Plan ....».._..__....».._................ ............... LP1-LP5 Seigle Avenue Culvert Repair_.......»_..__.„.»_._..._...„„»„...._...... SAI TOTAL SHEETS 78 VICINITY MAP NTS or SURVEY PREPARED BY: CITY OF CHARLOTTE SURVEY -MAPPING -GIS FROM THE LOCALIZED COORDINATE SYSTEM DEVELOPED FOR THIS PROJECT IS BASED ON STATE PLANE COORDINATES ESTABLISHED BY: NCGS MONUMENT "SEIGLE” WITH NAD 93(2001) STATE PLANE COORDINATES OF NORTHING: 542522.89 EASTING: 145541437 ELEVATION NAVD: NOT ESTABLISHED THE AVERAGE COMBINED GRID FACTOR USED ON THIS PROJECT (GROUND TO GRID) IS: 0.9998442 VERTICAL DATUM: NAVD 98 ALL LINEAR DIMENSIONS ARE LOCALIZED HORIZONTAL DISTANCES. DATE RANGE OF SURVEY: 08/15/2005 TO 07282015 PLANS PREI'ARED BY: w OUSIUSINFIZMTRUCTURE l� OF CAROLINA, INC. AUIR E. MOREHEAO SUrTE 203 1CHAALOTTENNORTHCAROLI 2820/ ■NA - - Services - v , NC UCENSE I C4950 600 EAST FOURTH STREET CHARLOTTE.NC 26202 40 PHONE 704-336-2158 Hort Profile ...... - • X FA70/-3364554 - �+ PERMITTING PACKAGE L . cClh CtLWLOTn- ENGINEERING & PROPERTY MANAGEMENT Construction Plans of Proposed Louise Avenue CIP Project No. 671-06-008 Proiect Features: Precast Reinforced Concrete Box Culverts Reinforced Concrete Pipe Sanitary Sewer Curb and Gutter and Sidewalk Asphalt Paving Channel Improvements o LOCATION MAP NTS 2012 STANDARD SPECIFICATIONS GRAPHIC SCALES FOR CONSTRUCTION Contract Administration 1\ Storm Water Construction -*1- Storm Water Quality e6 . t ['IIARIIIYI"I'F Landscape Management CDOT - Design CDOT - Implementation CLTWster Storm Water ProjeM Manager _._...MANAGEMENT Bid Set No. APPROVED /' -'i ' CITY ENGINEER DATE a 20 40 60 Plan View ......... _...... Proposed Property Line ...... ................. ........ — - - - .. �cn0 ,''.� Existing Property Line .......................... 20 40 60 Hort Profile ...... 15903 j 1OE27/2015 Existing Structures _....................._. ....._........ -- -- ----- ' 4 8 12 Vert. Profile........„_ �- Railroad Railroad Ri hto(--We, 5 10 IS Cross Section Proposed Edge of Pavement .._.................. ...,: FOR CONSTRUCTION Contract Administration 1\ Storm Water Construction -*1- Storm Water Quality e6 . t ['IIARIIIYI"I'F Landscape Management CDOT - Design CDOT - Implementation CLTWster Storm Water ProjeM Manager _._...MANAGEMENT Bid Set No. APPROVED /' -'i ' CITY ENGINEER DATE a PE SEAL CO.NI-'ENTIONAL SIGNS Proposed Property Line ...... ................. ........ — - - - .. �cn0 ,''.� Existing Property Line .......................... = I .* Maintained as R/W Line ...... „.... _............ - -- 15903 j 1OE27/2015 Existing Structures _....................._. ....._........ -- -- ----- ' Railroad Tracks._ ........................... -- '�R7 ow”, Railroad Railroad Ri hto(--We, CML Proposed Edge of Pavement .._.................. ...,: Fence .... .»... __... .............. _._.................... _.. „ Record Drawings Temporary Construction Easement ........... Existing Utility Easement __.._»...._»....„__.. —. UTE UTE — Proposed Utility Easement ...__-..__.....»....... — UTE UTE — Storm Drainage Easement .._... _„_............... —SDESDE— Sanitary Sewer Easement...„..„ .................... SSE Existing Gas Line ........ ...... ........ ............. c G — Existing Water Line._..._._.__„....».»»._.._ w w — Existing Water Service Lina ....... ............ .... ws ws Existing Sanitary Sewer .... _..................»..... ss ss — Existing Underground Telecommunications UT Existing Overhead Traffic Signal .............. uu Existing Underground UE Existing Underground Fiber Optic..__... ro Existing Storm Drainage ............................- Proposed Storm Drainage ......... _.................. Proposed Drainage Swale Centerline _......... - 1 Pipe Plug and FW ..___...._..__»..».......__._ �.>:. ° , Existing Tree .... ........... _.......... _............................ ... .._..._.„._..„_ wN Existing Water Meter ........................... .»......... ........... ..... ...._........._. ❑ Existing Water Valve ..... ....................... ....»........_.... ._....__._...__....... Existing Gas Valve ._._........ »............. _......... „.......... .......... .... __._.. �oa Existing Sanitary Sewer Manhole ._......_......„....»....._......_.._...._..... Proposed Sanitary Sewer Manhole ....... ......... ........................ .... .... Existing Storm Drain Manhole _ ........... ......... ......... ................... __@ Proposed Storm Drain Manhole --------- ....»......... .... .............. - 0 Existing Telephone Manhole _......___. OT Proposed Telephone Manhole _..»......_.._.._ ................. ................. QT Existing Electric Manhole ..»......................._....„.........__._.._..»..»._... O Proposed Electric Manhole ............ ..... ......... __.._..».._.._......»......„ Q Existing Catch Basin ...... B Proposed Catch Basin ...._..._....._.............. .._....„.»...».._.._..........„ M SExisting Light Pole ............ __............................................ ._._.....__ * ZProposed Light Pole ........................... ............»„................. Existing Utility Pole .... .......................... ........................ _... ___ ... — YJ. GuyWire ._....„..____ . ................ _.„..._.._..................................... . _< CONVENTIONAL SIGNS, CONT'D Proposed Utility Pole ._ ................. ».......... _............................... „ TR Iron Pin „».» ... _.._.......... „..».......... »......_...._.. ... ............... ......... O Proposed Curb & Gutter, Cone, Drive, Sidewalk Existing Existing Fire Hydrant ».„....__..»»..._....__. Proposed Asphalt Pavement ..._..._„.„...____»..._., -.- ... Proposed 1%” Muting and Overlay ..................... lam.__....::. Proposed Fire Hydrant __ .... ...._.„._....„....___..........__..»..»........».» Existing Drop LokL.__..._.___......„..._»__._.._............................... � Proposed Rip Rap Ditch ..... .......... „ ........ ........... Proposed DropInlet ..„»_............ _...... _.......... _...................................... Proposed Gravel ................ .... ....... __.._....». _ -----_1 Accessible Ramp_ .............. _.................. .... ................... _............. ...® Existing Buildin Tree_ Protection.„.._....„..„._„....__...._..»......._._.._.__......._... �� Proposed FW (Profile View) ........ ................. I--7 Proposed Guardrail ..__....__...... _...................................... . _---�- Silt Fence ......................................... - RECOMMENDE6 FOR CONSTRUCTION Contract Administration 1\ Storm Water Construction -*1- Storm Water Quality e6 . t ['IIARIIIYI"I'F Landscape Management CDOT - Design CDOT - Implementation CLTWster Storm Water ProjeM Manager _._...MANAGEMENT Bid Set No. APPROVED /' -'i ' CITY ENGINEER DATE a