August 18, 2016 U611
(�
Ms. Crystal Amschler v
U.S. Army Corps of Engineers PAUG�2
�._.Asheville Regulatory Field Office D151 Patton Avenue, Room 208
Asheville, North Carolina 28801 3 2016 I
Ms. Karen Higgins
NC Department of Environmental Quality
NC DWR, 401 & Buffer Permitting Branch
512 North Salisbury Street
Raleigh, North Carolina 27604
Subject: Louise Avenue Capital Improvement Project (Action ID: 2011-00366, DWR #: 11-0022)
Request for Re -authorization- Addendum to PCN submitted May 26, 2016
Charlotte -Mecklenburg Storm Water Services
Ms. Amschler and Ms. Higgins,
On May 26, 2016, Charlotte -Mecklenburg Storm Water Services (CMSWS) is requested the re -authorization of the
Louise Avenue capital improvement project (Project). The purpose and need for the Project is to improve the storm
drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to
reduce erosion and improve water quality. This project is located in Charlotte, North Carolina, just east of
downtown along an unnamed tributary to Little Sugar Creek (Project Vicinity Map, enclosed). CMSWS is hereby
submitting an addendum to the aforementioned re -authorization request in an effort to provide more accurate and
complete information.
A Jurisdictional Determination and Nationwide Permit (Action ID 2011-00366) were issued for this project by Ms.
Amanda Jones on March 2, 2011. Ms. Coleen Sullins issued Water Quality Certifications (DWQ No. 11-0022) for
the project on January 13, 2011. The project was delayed in order to allow time to update the plans to meet new
design standards from various agencies and City Departments. This included updated NCDOT standards, updated
and new City of Charlotte storm water and stream restoration details and standards, and new CDOT handicap
accessibility standards. With each update of standards there were delays for negotiating design fees, field surveys,
plan revisions, and subsequent City reviews. Both the jurisdictional determination and the nationwide permits
expired during this lengthy construction plan update process. Proposed impacts remain unchanged from the
originally permitted impacts. Project impacts are proposed to perennial RPW streams and include pipe extension,
placement of plunge pools and rip rap energy dissipaters, longitudinal channel adjustments to accommodate pipe
system upgrades, and stream enhancement activities. Proposed project impacts are illustrated in the newly annotated
Louise Avenue CIP Construction Plans (enclosed) and overall project area map and are summarized in Table 1
below.
As additional clarifying information, the existing culvert under Louise Avenue is shown as buried 1 foot on the
construction plans from that culvert installation; therefore, the extension of this culvert will be constructed to match
the existing elevation of the culvert. If the culvert was originally installed correctly, the extension should also be
buried 1 foot to allow for aquatic life passage. The step -pool sequence described as impact S2 is proposed to have a
maximum drop of 12" to the water surface elevation at any point. This can be seen in the attached permitting plan
set on detail sheet 2R.
To report pollution or drainage problems, call: 311
� http://stormwater.charmeck.org '`l'
CHAMOTTE
Table 1. Louise Avenue CIP Proposed Impacts
Stream Impact
Number o
Location (Plan
� -- . ..Sheet) -
NWP No.
Activity
; _
Permanent
Impacts (LF)
Temporary
Impacts (LF)
S1
Sheet 3
3
Pipe extension and Plunge pool
105
S2
Sheet 6
3
Step -pool sequence
56
S3
Sheets 6 and 7
27
Stream enhancement
177
S4
Sheet 7
3
Rip rap apron
12
--
S5
Sheet 7
3
Plunge pool
39
--
S6
Sheet P and P2
27
Stream enhancement
-
709
Total Perennial RPW Stream Impacts =
156
942
The original pre -construction notification noted that stream enhancements associated with the Louise Avenue CIP
would provide mitigation for cumulative permanent impacts within the watershed; however, it was recently
discovered that easements acquired during the real estate process are inadequate to support a mitigation project. As
such, the revised Louise Avenue CIP mitigation plan consists of purchasing 198 SMUs from the City of Charlotte
Umbrella Mitigation Bank to offset permanent impacts of 198 linear feet (1:1 ratio confirmed by Ms. Amschler on
7/19/16). 42 SMUs will be purchased to offset permanent impacts associated with the Siegle Avenue Culvert
Replacement project (USACE Action ID: 2009-00680) and 156 SMUs will be purchased to offset the permanent
impacts associated with the Louise Avenue CIP.
CMSWS respectfully requests re -authorization of the project under the USACE Wilmington District's nationwide
permit program. Potential adverse water quality impacts associated with construction storm water runoff will be
managed in accordance with NCDENR NPDES General Construction Storm water Permit, NCGO1000, and the
City's PCCO requirements. I appreciate your prompt attention to this request. If you have any questions regarding
this request please do not hesitate to contact me at (704) 336-3927 or erin.tumer@ci.charlotte.nc.us.
Sincerely,
Erin Turner
Wetland Specialist
Charlotte -Mecklenburg Storm Water Services
encl: Revised Project Area Map
Annotated Construction Plans for Permitting
Preliminary Jurisdictional Determination Request
0 t
1 a° F tBt 9th St a _ MunOsa Av
W E Sf i nth o Cochran Pl
St J� m
�` tsth ° d Qa
F� St Belve o�
dere
fhS nnon St Av
c
Qz qj
a�
• �
'54a
��'•
�� Sr Q° sths'f o E Ile Terre Av
Belle T rre
S3IMPACTS j Av
eP/ Plan Sheets 6 & 7 Ha cod ct N°
i
'oo
, c
%
�
% s S2 IMPACTS i 00d P
S6 IMPACTS Plan Sheet 6 i , �hestnutAv
Plan Sheets P1 & P2 S5 IMPACTS y ,
Plan Sheet 7 Co r
N ke Q
S4 IMPACTS Kensin ton pr ens' 2 S'�fo
`•. �'' Plan Sheet 7 n9ton Dr q D
�• �•,Kensin
: D
,,.•••"�
S3 IMPACTS Legend
Plan Sheets 6 & 7 Permanent Impact
�. Temporary Impact o
School St a
S6 IMPACTS Q' — — Channel Centerline v
�aG SO t Plan Sheets P1 $ P2
S1 IMPACTS Q Q)
i Railroad <
Plan Sheet 3 m 4 Street Centerline
Louise Avenue Project Area
G ira U Hamorton PI
Z c o'. n
N
LOUISE AVENUE CIP
STORKWATER o 300 600 ,,Zoo PROJECT AREA
�.�„/ssyla" Feet AND IMPACT SITES
INDEX OF SHEETS
CoverSheet.............................................»........................................... I
General Notes ._ ................................ »....„...._....__.._......„»___ 2A
General Details ... _.................................. ..»............. 211-2D, 2W
Structure Details .--- ------ ..._.___........_.__..___..„„„»........__„ 2E -2P
Stream Details _..»__..„........_.__.._»....»».__ ...... ............... 2Q -2S
Tree Protection Details .............. ... ...... .... ... _..... _... „.......... __.._„. 2T
Storm Drainage Summary _..... »............ ..............................». 2U -2V
Plan & Profile ........................... ......... ....» ........ _.................. _._. 3-18
Erosion Control Plans ...........»..»_.._.,.„........__..„„....___.. EC1-EC9
Traffic Control Plans and Details ............ ....... ....„»_.. TC1-TC4
Pavement Marking Plan .____„......_....__ .............. _....... „_.»„„ PMI
Curb Ramp Plan ....__..».„....._..__.......... _....... .............. ____ CR1
Charlotte Mecklenburg Utilities Plana ... ........................ ..__.._„. 1-3
Stream Mitigation
Conventional Symbols ...... ............... ......... ......_..»...... _r CSI
Details ............ _.._...... _........ »...._. ...... ....... D1 -D9
Channel Sections .......................... „„_..... ................ _. XS1
Plan& Profile _.._...... »...... ».... _......„........ _................ __ PI -P3
Landscape Plan ....».._..__....».._................ ............... LP1-LP5
Seigle Avenue Culvert Repair_.......»_..__.„.»_._..._...„„»„...._...... SAI
TOTAL SHEETS 78
VICINITY MAP
NTS
or
SURVEY PREPARED BY:
CITY OF CHARLOTTE SURVEY -MAPPING -GIS FROM THE
LOCALIZED COORDINATE SYSTEM DEVELOPED FOR THIS
PROJECT IS BASED ON STATE PLANE COORDINATES
ESTABLISHED BY: NCGS MONUMENT "SEIGLE” WITH
NAD 93(2001) STATE PLANE COORDINATES OF
NORTHING: 542522.89 EASTING: 145541437
ELEVATION NAVD: NOT ESTABLISHED
THE AVERAGE COMBINED GRID FACTOR USED ON THIS
PROJECT (GROUND TO GRID) IS: 0.9998442
VERTICAL DATUM: NAVD 98
ALL LINEAR DIMENSIONS ARE LOCALIZED HORIZONTAL
DISTANCES. DATE RANGE OF SURVEY: 08/15/2005 TO 07282015
PLANS PREI'ARED BY:
w
OUSIUSINFIZMTRUCTURE
l�
OF CAROLINA, INC.
AUIR
E. MOREHEAO SUrTE 203
1CHAALOTTENNORTHCAROLI 2820/
■NA
- - Services - v
,
NC UCENSE I C4950
600 EAST FOURTH STREET
CHARLOTTE.NC 26202
40
PHONE 704-336-2158
Hort Profile ......
- •
X
FA70/-3364554
- �+
PERMITTING PACKAGE
L .
cClh
CtLWLOTn-
ENGINEERING & PROPERTY
MANAGEMENT
Construction Plans of Proposed
Louise Avenue CIP
Project No. 671-06-008
Proiect Features:
Precast Reinforced Concrete Box Culverts
Reinforced Concrete Pipe
Sanitary Sewer
Curb and Gutter and Sidewalk
Asphalt Paving
Channel Improvements
o LOCATION MAP
NTS
2012 STANDARD SPECIFICATIONS
GRAPHIC SCALES
FOR CONSTRUCTION
Contract Administration 1\
Storm Water Construction
-*1-
Storm Water Quality e6 . t ['IIARIIIYI"I'F
Landscape Management
CDOT - Design
CDOT - Implementation
CLTWster
Storm Water ProjeM Manager
_._...MANAGEMENT
Bid Set No.
APPROVED /' -'i '
CITY ENGINEER DATE
a
20
40
60
Plan View ......... _......
Proposed Property Line ...... ................. ........ — - - -
..
�cn0 ,''.�
Existing Property Line ..........................
20
40
60
Hort Profile ......
15903 j 1OE27/2015
Existing Structures _....................._. ....._........ -- -- -----
'
4
8
12
Vert. Profile........„_
�-
Railroad Railroad Ri hto(--We,
5
10
IS
Cross Section
Proposed Edge of Pavement .._..................
...,:
FOR CONSTRUCTION
Contract Administration 1\
Storm Water Construction
-*1-
Storm Water Quality e6 . t ['IIARIIIYI"I'F
Landscape Management
CDOT - Design
CDOT - Implementation
CLTWster
Storm Water ProjeM Manager
_._...MANAGEMENT
Bid Set No.
APPROVED /' -'i '
CITY ENGINEER DATE
a
PE SEAL
CO.NI-'ENTIONAL SIGNS
Proposed Property Line ...... ................. ........ — - - -
..
�cn0 ,''.�
Existing Property Line ..........................
= I .*
Maintained as R/W Line ...... „.... _............ - --
15903 j 1OE27/2015
Existing Structures _....................._. ....._........ -- -- -----
'
Railroad Tracks._ ........................... --
'�R7
ow”,
Railroad Railroad Ri hto(--We,
CML
Proposed Edge of Pavement .._..................
...,:
Fence .... .»... __... .............. _._.................... _.. „
Record Drawings
Temporary Construction Easement ...........
Existing Utility Easement __.._»...._»....„__.. —. UTE UTE —
Proposed Utility Easement ...__-..__.....»....... — UTE UTE —
Storm Drainage Easement .._... _„_............... —SDESDE—
Sanitary Sewer Easement...„..„ .................... SSE
Existing Gas Line ........ ...... ........ ............. c G —
Existing Water Line._..._._.__„....».»»._.._ w w —
Existing Water Service Lina ....... ............ .... ws ws
Existing Sanitary Sewer .... _..................»..... ss ss —
Existing Underground Telecommunications UT
Existing Overhead Traffic Signal .............. uu
Existing Underground UE
Existing Underground Fiber Optic..__... ro
Existing Storm Drainage ............................-
Proposed Storm Drainage ......... _..................
Proposed Drainage Swale Centerline _......... - 1
Pipe Plug and FW ..___...._..__»..».......__._ �.>:. ° ,
Existing Tree .... ........... _.......... _............................ ... .._..._.„._..„_
wN
Existing Water Meter ........................... .»......... ........... ..... ...._........._. ❑
Existing Water Valve ..... ....................... ....»........_.... ._....__._...__.......
Existing Gas Valve ._._........ »............. _......... „.......... .......... .... __._..
�oa
Existing Sanitary Sewer Manhole ._......_......„....»....._......_.._...._.....
Proposed Sanitary Sewer Manhole ....... ......... ........................ .... ....
Existing Storm Drain Manhole _ ........... ......... ......... ................... __@
Proposed Storm Drain Manhole --------- ....»......... .... .............. - 0
Existing Telephone Manhole _......___. OT
Proposed Telephone Manhole _..»......_.._.._ ................. ................. QT
Existing Electric Manhole ..»......................._....„.........__._.._..»..»._... O
Proposed Electric Manhole ............ ..... ......... __.._..».._.._......»......„ Q
Existing Catch Basin ...... B
Proposed Catch Basin ...._..._....._.............. .._....„.»...».._.._..........„ M
SExisting
Light Pole ............ __............................................ ._._.....__ *
ZProposed
Light Pole ........................... ............»„.................
Existing Utility Pole .... .......................... ........................ _... ___ ... — YJ.
GuyWire ._....„..____ . ................ _.„..._.._..................................... . _<
CONVENTIONAL SIGNS, CONT'D
Proposed Utility Pole ._ ................. ».......... _............................... „ TR
Iron Pin „».» ... _.._.......... „..».......... »......_...._.. ... ............... ......... O
Proposed Curb & Gutter, Cone, Drive, Sidewalk
Existing Existing Fire Hydrant ».„....__..»»..._....__.
Proposed Asphalt Pavement ..._..._„.„...____»..._.,
-.- ...
Proposed 1%” Muting and Overlay ..................... lam.__....::.
Proposed Fire Hydrant __ .... ...._.„._....„....___..........__..»..»........».»
Existing Drop LokL.__..._.___......„..._»__._.._............................... �
Proposed Rip Rap Ditch ..... .......... „ ........ ...........
Proposed DropInlet ..„»_............ _...... _.......... _......................................
Proposed Gravel ................ .... ....... __.._....». _
-----_1
Accessible Ramp_ .............. _.................. .... ................... _............. ...®
Existing Buildin
Tree_ Protection.„.._....„..„._„....__...._..»......._._.._.__......._... ��
Proposed FW (Profile View) ........ ................. I--7
Proposed Guardrail ..__....__...... _...................................... . _---�-
Silt Fence ......................................... -
RECOMMENDE6
FOR CONSTRUCTION
Contract Administration 1\
Storm Water Construction
-*1-
Storm Water Quality e6 . t ['IIARIIIYI"I'F
Landscape Management
CDOT - Design
CDOT - Implementation
CLTWster
Storm Water ProjeM Manager
_._...MANAGEMENT
Bid Set No.
APPROVED /' -'i '
CITY ENGINEER DATE
a