Loading...
HomeMy WebLinkAbout20160891 Ver 1_Shoreline Stabilization_20160913State of North Carolina 2 0 1 6 0 S 9 Department of Environment and Natural Resources DWR Division of Water Resources Division of Water Resources 15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization FORM: SSGP 10-2013 Shoreline Stabilization Application Form Four copies of the application (including attachments) and the application fee should be sent to: Division of Water Resources 401 & Buffer Permitting Unit 1617 Mail Service Center Raleigh, NC 27699-1617 1. Applicant Information [15A NCAC 02H .0502(a)] 1. Owner Information Name: A / AV- Appc.-sa�/ Mailing Address: 343 / 5LE SGpn ol` ' /ve- d2 73 Y_? Telephone Number: all �Fax Number: E-mail Address: Wet Son Q M411 2. Agent/ Contact Person Information A signed and dated copy of the Agent Authorization letter (a form can be downloaded here: http://www.saw.usace.army.miI/Portals/59/docs/regulatory/regdocs/Permits/SAMPLE AGENT AUTH ORIZATION FORM.pdf) must be attached if the Agent has signed this application form. Name: lbky/D P'041n"r— Peq/n�.c✓L Sc lrlT Company Affiliation: bu_rm I --- Mailing Address: K. o -"e- 6 %lm JXr1 We_,r ivy Telephone Number:J'/ -770-580 Fax Number: E-mail Address: O4fn e 2teZ.�__ fid• �d Person to receive the Certification Approval: 11. Project Information [15A NCAC 02H .0502(a) & (b)] 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, FORM: SSGP 10-2013 Page 1 of 4 etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram provided at the end of this application form. 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of tf e property (where work is to be conducted) County: 6� 0 /V,- Nearest Town: 561? D/ -4 - Subdivision name or site address (include phase/lot number): 35l' &0!7 cal -pt -e- ILL 273Y3 Directions to site - please include road names and numbers, landmarks, etc.: 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): 6. Property size (acres): 7. Lake/ river/ ocean adjacent to property:j�C 8. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it its necessary): 44& 17,tS Atlee—,, 9. Will work be conducted from land? t From water? ❑ 10. Total amount of disturbance (including all excavation, backfill, rip rap, retaining walls, etc.) below the normal pool lake level/ Normal Water Level in square feet or acres: loo 0 -r -r- 11. Total amount of disturbance (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) above the normal pool lake level/ Normal Water Level and 50 feet land -ward in square feet or acres: ">L ? r/ 12. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): 16 /`c� 7'SP4// f �j 91-663 �*-.mit- %�w� /4"— AD' Pk �CG/I.�' -rp o, Owner/Agent's Signature*er -Agent's signature is valid only APAP Date letter from the owner is provided. FORM: SSGP 10-2013 Page 2 of 3 R Normi S Lake (At Full Pond/ Normal Water Level) Please approximately sketch the following information on this plan (provide dimensions for each item, such as 10 ft x 100 ft) *: 1. All proposed vegetation clearing 2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation 3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation 4. Location of any proposed structures such as buildings, retaining walls, docks, etc. S. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation 6. Location of construction access corridors FORM: SSGP 10-2013 Page 3 of 3 rf- j4, °� } /. .. tƒ \ � °� } /. .. � ' .''� ►�,, 1 ►���' �fi �'�i; 1� ��,� .` 1