Loading...
HomeMy WebLinkAbout20160903 Ver 1_401 Application_20160916Environmental Consultants, 8412 Fa& of Neuse Road, Suite 104, Raleigh, NC 27615 • Phone: (919) 846-5900 sandec.com To: US Army Corps of Engineers Raleigh Regulatory Field Office Attn: Eric Alsmeyer 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 From. Deborah Edwards Shirley Soil & Environmental Consultants, PA Re Courtyards at Andrews Chapel Durham County, NC September 16, 2016 S&EC Project #12483.W6 NC DWR, 401 & Buffer Permitting Unit Attn. Karen Higgins Archdale Building - 9'" Floor 512 North Salisbury Street Raleigh, NC 27604 On behalf of the applicant, Epcon Andrews Chapel, LLC (Attn: Mark Stiglitz) please find attached a complete application and supplemental information requesting written concurrence from the U.S. Army Corps of Engineers and the N. C. Division of Water Resources that the activities proposed below may proceed under Nationwide Permit 29 and Water Quality Certification 3890. Please contact me at (919) 846-5900 if you have any questions or require additional information. PROJECT SUMMARY Project Name Courtyards at Andrews Chapel Project Type Residential Development Owner / Applicant Epcon Andrews Chapel , LLC County Durham Nearest Town Durham Waterbody Name UT to Little Brier Creek Basin Neuse Basin Index Number & Classification 27-33-4-1 & C, NSW IMPACT SUMMARY Stream Impact (acres): 0.016 Wetland Impact (acres): 0.079 Open Water Impact (acres): 0 Total Impact to Waters of the U.S. (acres) 0.095 Total Stream Impact (linear feet): 241 Total Riparian Buffer Impacts (square feet): Zone 1: 11,140; Zone 2: 10,123 Attachments. Pre -construction Notification (PCN) Application Form Agent Authorization Form USGS Topographic Map & NRCS Soil Survey Map Surface Water Determination letter-NBRRO 15-074 Existing Conditions-EX1 - EX5 Overall Impact Map-IE1 Stream & Welland Impact Exhibits- IE2-IE5 JD Request Package (USAGE only) DWR ONLY: Stormwater Impact Analysis (data CO) Post Development Drainage Area Map App Fee check $570 Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Page 1 of 12 PCN Form - Version 1.3 December 10, 2008 Version Pre -Construction Notification (PCN) Form A. Applicant Information 1. Processing la Type(s) of approval sought from the Corps: ®Section 404 Permit ❑Section 10 Permit 1b. Specify Nationwide Permit (NWP) number 29 or General Permit (GP) number: N/A 1c. Has the NWP or GP number been verified by the Corps? ® Yes ❑ No 1d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification - Regular ❑ Non404 Jurisdictional General Permit ❑ 401 Water Quality Certification - Express ® Riparian Buffer Authorization le. Is this notification solely for the record because written approval is not required? For the record only for DWO 401 Certification. ❑ Yes ®No For the record only for Corps Permit: ❑ Yes ® No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ® No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes ® No 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2. Project Information 2a. Name of project: Courtyards at Andrews Chapel 2b, County: Durham 2c. Nearest municipality / town: Durham 2d. Subdivision name: Courtyards at Andrews Chapel 2e. NCDOT only. T.I.P. or state project no: N/A 3. Owner Information 3a. Name(s) on Recorded Deed: Epcon Andrews Chapel, LLC 3b. Deed Book and Page No. D.B. 7970. 7959. 7878, 7959; Pg. 838. 842, 901, 831. 789, 901. 846 3c. Responsible Party (for LLC if applicable): Mark Sliglifz 3d. Street address: 500 Stonhenge Pkwy 3e. City, state, zip: Dublin Ohio, 43017 3f Telephone no.: 919-630-4139 3g. Fax no.: N/A 31h. Email address: mstiolitz(d)eaconcommunifies.com Page 1 of 12 PCN Form - Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ® Other, specify: Owner-please send correspondence to Agent and Applicant 4b. Name: Mark Stiglitz 4c. Business name (if applicable): Epcon Andrews Chapel, LLC 4d. Street address: 10120 Green Level Church Road, Ste. 208 4e. City, state, zip: Cary. North Carolina 27519 4f. Telephone no.: 919.630-4139 4g. Fax no.: NIA 4h. Email address. rnstiolitzcDepconcommunities.com 5. Agent/Consultant Information (if applicable) 5a. Name: Deborah Edwards Shirley 5b Business name (if applicable): Soil 8 Environmental Consultants. PA 5c. Sheet address: 8412 Falls of Neuse Road, Ste. 104 5d. City, state, zip: Raleigh. NC 27615 5e. Telephone no.: 919-846-5900 5f. Fax no.: 919-846-9467 5g. Email address: DShirlev(a)SandEC.com Page 2 of 12 B. Project Information and Prior Project History t. Property Identification Parcel ID: 0769-02-55-0505, 0769-04-55-3281, 0769 -04 - la. Property identification no. (tax PIN or parcel ID): 64-4709. 0769-04-64-1516. 0769-04-64.5426, 0769-04- 64-1210, 0769-04-64-3142 1b. Site coordinates (in decimal degrees): IMPACT #2 Latitude: 35.9336 Longitude: -78.7768 (DD.DDDDDD) (-DD.DDDDDD) 1c. Property size: t 44.85 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to UT to Little Brier Creek 27-33-4-1 proposed project: 2b. Water Quality Classification of nearest receiving water: C: NSW 2c. River basin: Neuse River Basin; Hydrologic Unit Code 03020201 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Existing conditions consist of an assemblage of properties that are predominantly forested with some areas of maintained grassed yards with residential structures, driveways and outbuildings. There are two intermittent stream features with adjacent jurisdictional wetlands that intersect the assemblage of properties, in addition to a linear wetland system within the southwestern property corner. The general land use in the vicinity of the project is residential. 3b. List the total estimated acreage of all existing wetlands on the property: Approximately 0.096 acres of wetlands 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: Approximately 1, 765 linear feet 3d. Explain the purpose of the proposed project: The purpose of the proposed project is to provide access to the uplands for a proposed residential development. 3e. Describe the overall project in detail, including the type of equipment to be used: The overall project consists of the construction of roadway infrastructure with utilities, single-family lots. stormwater BMP's and an amenity center. Specifically, there are four (4) impact areas associated with road infrastructure and proposed lot fill. Equipment typically used for construction and earthwork such as backhoes, bulldozers, excavators, graders, pavers etc. will be utilized for this project. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ®Yes El No El Unknown project (including all prior phases) in the past? Comments: 4b If the Corps made the jurisdictional determination, what type of determination was made? El Preliminary El Final Comments: A JD request package prepared by Steven Ball is attached. 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: Soil 8 Environmental Name (if known): Steven Ball Consultants, PA Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or Stale determinations and attach documentation. USA E- A portion of the properties were field verified by Eric Alsmeyer on June. 3. 2015; NCDWR- Chem Smith with the NCDWR conducted a Neuse Buffer determination on March, 3, 2015, see attached letter (NBRRO#15-074). Page 3 of 12 PCN Form - Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 5. Project History 5a. Have permits or certifications been requested or obtained for ❑ Yes H No ❑ Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. N/A 6. Future Project Plans 6a. Is this a phased project? H Yes ❑ No 6b. If yes, explain. Per the project engineer, this project will be constructed in 3 phases, however no new phases beyond what is currently shown are anticipated. Page 4 of 12 C. Proposed Impacts Inventory 1. Impacts Summary la. Which sections were completed below for your project (check all that apply): ® Wetlands ® Streams - tributaries ® Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a 2b 2c. 2d. 2e. 2f. Welland impact Type of jurisdiction number - Type of impact Type of Forested (Corps - 404, 10 Area of impact Permanent (P) or wetland DWO - non -404, other) (acres) Temporary T t known W1 (#18) ®P El T Road Culvert -Fill Headwater Forest ® Yes ❑ No ® Corps ❑ DWO 0.039 W2 (#1 B) El P ®T Road -Construction Headwater ® Yes ® Corps 0.005 Corridor Forest [J No El DWO W3 (#3A) ®P [IT Lot Fill Headwater Forest ® Yes [I No ® Corps E) DWO 0.032 W4 (#313) ® P ElT Road Culvert -Fill Headwater Forest ® Yes ElNo ® Corps ElDWQ 0.003 2g. Total wetland impacts 0.079 2h. Comments: Temporary wetland impacts will be brought back to pre -construction contours and allowed to re -vegetate with native wetland species. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number -Permanent (PER) or (Corps - 404, 10 stream length (P) or Temporary (T) intermittent DWO - non -404, width (linear (INT)? other) (feet) feet) S1 (#1B) ❑ P ® T Road Crossing- UT to Little ❑ PER ® Corps 2 10 Construction Corridor Brier Creek ® INT ❑ DWO Road Crossing - S2 (#113) ® P ❑ T Dissipater UT to Little ❑ PER ® Corps 2 8 (Permanent -No Perm Brier Creek ® INT ❑ DWO Loss) S3(#2) ® P ❑ T Road Crossing- UT to Little ❑ PER ® Corps 3 106 Culvert (Stream C) Brier Creek ® INT ❑ DWO S4(#2) ❑ P ® T Road Crossing- Construction Corridor UT to Little Brier Creek ❑ PER ® INT ® Corps ❑ DWO 3 21 (Stream C) Road Crossing - S5(#2) ® P ❑ T Dissipater UT to Little ❑ PER ® Corps 3 20 (Permanent -No Perm Brier Creek ® INT ❑ DWO Loss) Stream C S6(#2) ® P ❑ T Road Crossing -Fill UT to Little ❑ PER ® Corps 3 76 (Stream Z) Brier Creek ® INT ❑ DWO 3h. Total stream and tributary impacts 241 Page 5 of 12 PCN Form - Version 1.3 December 10, 2008 Version 3i. Comments. Permanent loss impacts (i.e, culvert & rill) = 182 LF; Temporary stream impacts for construction = 31 LF (Temporary stream impacts will be brought back to preexisting stream bed elevations and the stream banks stabilized); Permanent -No Permanent Loss = 28 LF (i.e. Dissipater). 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individu Ily list all open water im acts below. 4a. 4b, 4c. 4d. 4e. Open water impact Name of walerbody number - (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent(P)or Temporary T Ot ❑P❑T 4f. Total open water impacts 4g. Comments: 5. Pond or lake Construction If pond or lake construction proposed, then com lete the chart below. 5a. 5b, 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feel) Upland Pond ID Proposed use or purpose of (acres) number pond Flo ode Filled Excavated Flooded Filled Excavated Flooded d Pi P2 Sf. Total 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: Page 6 of 12 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. ® Neuse ❑Tor -Pamlico El Other: Project is in which protected basin? ❑ Catawba ❑ Randleman 6b, 6c. 6d. 6e. 6f. 6g. Buffer impact number - Reason for impact Buffer Zone 1 impact Zone 2 impact Permanent (P) or Stream name mitigation (square feet) (square feet) Temporary T required? B1(#lA) ® P ❑ T Road Impact UT to Little Brier Creek ® Nos 1.193 2.550 B2 (#1 B)® P ❑ T Road Crossing UT to Little Brier Creek ® Nos 2,085 2.139 B3 (#2) ❑ P ❑ T Road Crossing UT to Little Brier Creek ® Nos es 7.862 5,434 B4 ❑ P ❑T ❑ Yes ❑ No B5 ❑ P ❑T ❑ Yes ❑ No 6h. Total buffer impacts 11,140 10,123 6i. Comments: Page 7 of 12 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. S&EC completed a wetland delineation and Neuse River Buffer evaluation for the entire property in order to identify natural resources so that impacts could be avoided & minimized to the maximum extent practicable. Impact 1A is a proposed road impact to Zones 1 & 2 of the Neuse riparian buffer. This impact is necessary to access the property from an existing stub road from the west. The road alignment has been shifted to the north to avoid stream impacts and minimized the riparian buffer impacts. In addition, a retaining wall has been utilized to minimize the riparian buffer impacts. Impact 1B is proposed fill to a jurisdictional wetland. intermittent stream and riparian buffers for a road crossing. This impact is proposing permanent and temporary wetland impacts (i e. 0. 044), 10 linear feet of temporary stream impact (i.e. construction corridor) and 8linear feet of permanent, no permanent loss impact (i.e. riprap dissipater) for a road crossing at the upper end of a stream system and headwater wetland. This impact is necessary to access the southern portion of the northwestern section of the proposed subdivision. Headwalls have been utilized to minimize wetland, stream and riparian buffer impacts Impact 2 is a proposed road crossing to an intermittent stream system and riparian buffers. Proposed impacts include impacts to two streams, stream C was determined buffered. Impacts to stream C includes 106 linear feet of permanent stream, 21 linear feet of temporary stream (i.e. construction corridor), 20 linear feet of permanent -no permanent loss stream impact (i.e. riprap dissipater) and associated riparian buffer impacts. Stream Z includes 76 linear feet of permanent stream impact (i.e. non -buffered stream). Headwalls and retaining walls have been utilized to minimize stream and riparian buffer impacts. This impact is necessary to access the southern portions of the proposed subdivision. Impact 3 are proposed wetland impacts necessary for a road and lot fill. These impacts are cumulatively proposing 0.035 acres of wetland fill. These impacts are necessary because the City of Durham requires a street stub in this location; therefore wetland impacts for the road are unavoidable. Additionally, this project will require mass grading, which is necessary to control the direction of post -construction stormwater flow. Furthermore, the applicant is aware of the regional conditions associated with the Nationwide Permits 29. With respect to residential development conditions (NWP 29 -Regional Conditions section 4.0) the applicant does not anticipate any impacts to streams or wetlands associated with stormwater facilities, there are no impacts associated with single-family recreation facilities, there are no permanent wetland or stream fills proposed within the floodway/floodplain and the stream classification for this project is C, NSW (i.e. not Outstanding Resource Waters, High Quality Waters, Coastal Wetlands or wetland adjacent to these waters) and riprap stabilization is not anticipated. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. As per the project engineer. Standard Erosion Control measures will be incorporated during construction including but not limited to sediment riser basins, silt fencing and outlets, diversion ditches and storm structure inlet protection. Bypass pumping will be utilized where necessary to maintain construction in the dry (see sheet IE5). 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State ❑ Yes ® No ' Permanent impacts to wetlands are less than 0.10 acre, permanent stream impacts are to 2a. Does the project require Compensatory Mitigation for unimportant. intermittent streams. if however the USACE impacts to Waters of the U.S. or Waters of the State? determines mitigation is required during the review of this application, the applicant would utilize a private mitigation bank or the NCDMS to satisfy any mitigation requirements 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps ❑ Mitigation bank 2c. If yes, which mitigation option will be used for this El Payment to in lieu fee program project? ❑ Permittee Responsible Mitigation Page 8 of 12 PCN Form — Version 1.3 December 10, 2008 Version 3. Complete If Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type: Quantity: 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: 0 linear feet 4c. If using stream mitigation, stream temperature: ❑ warm ❑ cool ❑cold 4d. Buffer mitigation requested (DW O only): 0 square feet 4e. Riparian wetland mitigation requested: 0 acres 411. Non -riparian wetland mitigation requested: 0 acres 4g. Coastal (tidal) wetland mitigation requested: 0 acres 4h. Comments: S. Complete If Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ® No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 9 of 12 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified ® Yes ❑ No within one of the NC Riparian Buffer Protection Rules? lb. If yes, then is a diffuse flow plan included? If no, explain why. Comments: As per the project engineer, Diffused Row will be provided as required by local and state regulations. A combination of level spreaders and wet detention ponds are ® Yes ❑ No incorporated in the Stormwater Management Plan design to meet these requirements. Once approved by the City of Durham, the Applicant will provide a copy of the plan and Approval to the Division for their (les. 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 33.65% 2b. Does this project require a Stormwater Management Plan? ® Yes ❑ No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: Per the project engineer. Several wet detention ponds have been incorporated into the design to achieve both water quantity and water quality treatment. Ponds are designed per the City of Durham and NCDENR standards to achieve 85% TSS reduction and 1 -yr storm detention. The applicant requests that a conditional 401 Approval be considered allowing the SMP and its Approval by the City be submitted to the Division once received from the City of Durham ® Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? City of Durham ® Phase II ® NSW 3b. Which of the following locally -implemented stormwater management programs ❑ USMP apply (check all that apply) ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ® No attached? 4. DWQ Stormwater Program Review ❑ Coastal counties ❑ HQW 4a. Which of the following state -implemented stormwater management programs apply ❑ ORW (check all that apply): ❑ Session Law 2006-246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 10 of 12 PCN Form — Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWO Requirement) la. Does the project involve an expenditure of public (federal/state/local) funds or the ❑ Yes ® No use of public (federal/state) land? 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPAISEPA)? 1c. If you answered 'yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ❑ No letter.) Comments: 2. Violations (DWO Requirement) 2a. Is the site in violation of DWO Welland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H. 1300). DWO Surface Water or Wetland Standards, ❑ Yes ®No or Ripadan Buffer Rules (15A NCAC 28.0200)? 2b. Is this an after -the -fact permit application? ❑ Yes ®No 2c. If you answered 'yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWO Requirement) 3a Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ®No additional development, which could impact nearby downstream water quality? 3b. if you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWO policy. If you answered "no," provide a short narrative description We have reviewed the "Draft Internal Policy. Cumulative impacts and the 401 Water Quality Certification and Isolated Wetlands Programs"document prepared by the NC Division of Water Quality on April 10. 2004, version 2.1. The draft states that many private developments are unlikely to cause cumulative impacts, including projects such as urban in -fill, most residential subdivisions and small commercial developments as well as agricultural and silvicultural operations. The Courtyards at Andrews Chapel project is a residential development. Additionally, the project is located within the City of Durham jurisdiction, therefore the adjacent properties that have potential for development will have the following regulations to protect downstream waters: 1) the Neuse River Basin Riparian Buffer Protection regulations, these regulations require limited development within the riparian buffer area, in addition to "diffuse flow" requirements and Best Management Practices that control nitrogen if diffuse flow cannot be achieved, and 2) the Phase 11 NPDES Stormwater Permit Program, this program includes permitting requirements for Municipal Separate Storm Sewer Systems (MS4s) in addition to post -construction stormwater management requirements. We anticipate that the DWR will advise us if any additional information is needed. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Wastewater will flow to an existing pump station located south of the proposed project. Page 11 of 12 PCN Form - Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑ Yes ® No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ® No impacts? ❑ Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ❑ Asheville 5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? The NC -Natural Heritage Programs Data Explorer Map was used to search for elemental occurrences of federally protected species listed within 1 mile of the project boundaries- It was determined based on the search that there are no elemental occurrences that are listed as federally Threatened/Endangered within 1 mile of the project boundaries References: North Carolina Natural Heritage Program Data Explorer Search [August 10. 2016]. Department of Environment and Natural Resources, Office of Land and Water Stewardship, Raleigh. NC. htta11www.ncnho.ora1 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? The proposed project is in Durham County, which is not near any coastal or tidal habitat that would support EFJ (i.e. salt marshes, oyster reefs etc.). 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? The NC State Historic Preservation Once HPOWEB GIS Service interactive map was referenced on August 10. 2016: there were no listings identified as being on the study list, surveyed, determined eligible, or on the national register within the property boundaries. B. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA -designated 100 -year floodplain? ❑ Yes ® No 8b If yes. explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? Per project engineer B NC Floodplain Mapping Program Deborah E. Shirley I�IYJCV (d (� September Applicant/Agent's Signature 16, 2016 Applicant/Agent's Printed Name (Agent's signature is valid only if an authorization letter from 1 applicant is provided.) Date Page 12 of 12 Soil & Environmental Consultants, PA 8412 Fsh of Neuse Rwd, Suite 1111, Raleigh, NC 27615 • Phmr. (919� 816-5900 • Fxx: (9M 8469467 smdecsom PROPERTY OWNER CERTIFICATION / AGENT AUTHORIZATION Project Name/Description: Courtyards at Andrews Chapel (aka 6314 Leesville Rd Assemblage) S&EC Project #_J.2483 Date: September 6.2016 The Department of the Arany U.S. Army Corps of Engineers, Wilmington District 69 Darlington Avenue Wilmington, NC 28403 Attn: Eric Alsmever Field Office: Raleigh Regulatory Field Office 1, the undersigned, a duly authorized owner of record of the property/properties identified herein, do authorize representatives of the Wilmington District, U.S. Army Corps of Engineers (Corps) and Soil & Environmental Consultants, PA (S&EC) staff, as my agent, to enter upon the property herein described for the purpose of conducting on-site investigations and issuing a determination associated with Waters of the U.S. subject to Federal jurisdiction under Section 404 of the Clean Water Act and/or Section 10 of the Rivers and Harbors Act of 1899. This document also authorizes S&EC, as my agent, to act on my behalf and take all actions necessary for the processing, issuance and acceptance of a permit or certification and any and all associated standard and special conditions. This notification supersedes any previous correspondence concerning the agent for this project. NOTICE: This authorization, for liability and professional courtesy reasons, is valid only for government officials to enter the property when accompanied by S&EC staff. You should call S&EC to arrange a site meeting prior to visiting the site. PARCEL INFORMATION: Parcel Index Number(s) (PIN): 0769 -02 -55 -0505.0769 -04 -55 -3281.0769 -04164-4709.0769-04-64- 1516.0769-04-64-5426.0769-04-64-1210, 0769-04-64-3142 Site Address: 6610 Leesville Rd, 116 & 204 Andrews Chanel Rd City, County, State: Durham. Durham County. NC PROPERTY OWNER INFORMATION: Name: Encon Andrews Chanel, LLC (Attn: Mark Stialitz Mailing Address: 500 Stonehenge Pkwv. Dublin Ohio 43017 Telephone Number: 919-6304139 Email: msti liWa)e concommuniiies coni hDj6iy Owner (pj"se print) Date Property We hereby certify the above information submitted in this application is true and accurate to the best of our knowledge. klo I,I . KE, A Cp - P_^ HDEE R North Carolina Department of Environment and Pat McCrory Governor Noel and Carmen Rodrigues 3038 Clinton St. South Gulfport, FL 33707 John and Sandra Colclough 204 Andrews Chapel Rd. Durham, NC 27703 Rov and Donna Stallings 120 Andrews Chapel Rd. Durham, NC 27703 Robert and Delores Williams 116 Andrews Chapel Rd. Durham, NC 27703 William Nichols P.O. Box 631 Durham, NC 27702-0631 Kailas and Kaushik Gandhi 7 Acropolis Cir. Andover, MA 01810 Determination Type: Buffer Call March 5, 2015 r - I Natural Resources Donald R. MAR 1 1 2015 van der Vaart Secretary Subject- Surface Water Determination Letter NBRROP I "74 Durham County Isolated or EIP Call ® Neuse (15A NCAC 2B .0233) ❑ Tar -Pamlico (15A NCAC 28,0259) ❑ Ephemeral/IntermlttenVPerennlal Determination ❑ Isolated Wetland Determination ❑ Jordan (15A NCAC 2B .0267) Project Name: Location/Dircctions: Subject Stream: 6314 Leesville Road .Assemblage Subject properties are currently a mix of undeveloped land and single family residences. Little Britt Creek Determination Date: March 3, 2015 Staff: Cherri Smith tarkm2iy North Carolina Division of Water Resources 1628 Mail Service Center Ralegh. NC 27699-1628 Phone (919) 791.4200 Internet: www nco aterauality or11 Location: 3800 Barren Drive Raleigh. NC 27609 Fax (919) 788-7159 An Equal Dppori nrylAlfrma7ee Action Empbyer- 50% Regdedrl0% Post Consumer Paper 6314 Leesville Road Durham County March 5, 2015 Page 2 of 2 Stream E/1/P• Not Subject Subject Start@ Stop@ Soil Survey USGS To 0 A X DWQ Flap X H X DWQ Flag X C X DWQ F12 X X D X— throughout project area X •FJ!/P = Ephemerall/niermiaenUPerermia! Explanation: The feature(s) listed above has or have been located on the Soil Survey of Durham County, North Carolina or the most recent copy of the USGS Topographic map at a 1:24,000 scale. Each feature that is checked "Not Subject" has been determined not to be a stream or is not present on the property. Features that are checked "Subject' have been located on the property and possess characteristics that qualify it to be a stream. There may be other streams located on your property that do not show up on the maps referenced above but, still may be considered jurisdictional according to the US Army Corps of Engineers and/or to the Division of Water Resources (DWR). This on-site determination shall expire five (5) years from the date of this letter. Landowners or affected parties that dispute a determination made by the DWR or Delegated Local Authorih- may request a determination by the Director. An appeal request must be made within sixty (60) days of date of this letter or from the date the affected party (including downstream and/or adjacent owners) is notified of this letter. A request for a determination by the Director shall be referred to the Director in writing c/o Karen Higgins, DWR 401 & Buffer Permitting Unit, 1617 Mail Service Center, Raleigh, NC 27699. This determination is final and binding unless, as detailed above, you ask for a hearing or appeal within sixty (60) days. The owner/future owners should notify the Division of Water Resources (including any other Local, State, and Federal Agencies) of this decision concerning any future correspondences regarding the subject property (stated above). This project may require a Section 404/401 Permit for the proposed activity. Any inquiries should be directed to the Division of Water Resources (Central Office) at (919)-807-6300. and the US Army Corp of Engineers (Raleigh Regulatory Field Office) at (919)-554-4884. If you have questions regarding this determination, please feel free to contact Cherri Smith at (919) 7914251. Sincerel Danny Smith Supervisor, Water Quality Regional Operations Center cc: RRO DWR File Copy Steven Ball; Soil & Environmental Consultants: 8412 Falls of Neuse Rd., Ste. 104: Raleigh, NC 27615 ,?e' v Ai • J,: 'k, 'k, . i"'k, ' ,0&� � 1a�.r ja+ i 4 1 S& EC THE COURTYARDS AT ANDREWS CHAPEL STREAM & WETLAN D I M PACTS 6300, 6314, 6610 LEESVILLE ROAD & 116, 120, 204, 208 ANDREWS CHAPEL ROAD DURHAM, NORTH CAROLINA SEPTEMBER 13, 2016 SITE VICINITY MAP NCDENR DWR. STREAM IMPACTS O"EIVAPPLIC ANT SHEET INDEX IE.YI I.UVP.R ICX LS ELX Iti11 NG CONDI'EION.i h DI'.MO NAN 11?I� SIRIUMI MPACY IAIIIBEP ENGINEERING l .v..trr.RNY"l SURVEYING PIML NwRY Nn. nr\lu:. \. MMMT YMn Y Mn'.RA M1I)•..vi E. EdensLand PARCEL INFORMATION •Ra w,l VM 1'I. ..•,i...iM l\Iq l'IIi IAM\ NN �Me.wafORlR> IA1M RC�.OIY IID 1 N\ .nNew.114L\RLFn IMY\I GF YF0.Ft •.OAFS nu:MW\RR eYUY�Fv IlDlnnaYF1F•lIDF4oiY P11.IW: n. LL.aRwM WnMUMYNY R. YV1nFv aT.,<r{lq(Y\Rw Wa W'IL.YYnIY..RIIM.. W lYwltbR YAM4\R MLL.ARv(..VL Ill/IMi�'RIiYYY.iDl.Zv1F\®1Y\n. rllwq\taMR Tw VMLrT.YWt�'NL V'.vl �"�rwr.a.vlva.f W,LL u,wrw uw:➢nan.r.®ouw.r�a. uaw.m nvRuw,.n wnalr.minx..lu.mR.ua+mRUY�I\F r.l�wlxuuY®ui!\ rri\e mmir'rmiuiauaiavm�.iamwruwniv.�`ml .� .,. n:e�w w� �; m. nW ! r.\nr m nr,nwlYF,.iRluwuge l.rrr\nfA.Yun..Z.elYvlY..l \ IDv I..w.\mZ...Yw.ellmwl mlu4 \.v\. u,R.w o.i.ne n.u.ilA+.+F eDn !InlY..:w1Y.w+\ RrFRRvwn.wnelwn�uFaw.t r.NR n,,.wwu..o YY-Rn,wn Ref n•nr r us �. Wi •Ymvmmmf.Yo F n uw.YRa YI ua.. ilw\ImR»ill.. u Ygp,w MIR.W A.DR ull\DW2n111Y4T MDOiYRPpW n WD.,@ ap M1V A il! Y Va A,m,IYAMigeiev[n�lY1YT UR l4\9iMwTMtl ul.i. iRµ.6 nen\IIF'IRITCM �.1,1R1nwu11pFl, n,YL'TY.YM>una\RD VTUL.]Y ,a �.,aRett,�uv �u,TpiN.F®e.WrfdlwL6 ...DrFIlW n.I.VFF:aYi '.Ya Yn uuuF: Y.\lu+; ®neon ra.e.Ylucn.Im.oaf..Ya.. ne U[\.L.vNi RY I,Y'd,.tmar Y�YR Y..D.\m1YRati�R.Mlu.vf �. nrw4 M"i . .\enlw [.inl m'. Haul avnnannwwewvm ,• Yml ne..wRr.r. \w nr wYn\e aR YY. vwuY\M1 v.:WauttwZ.W lly W.\..m �:\.l w.q\,v..ei.\ i i m i AOAYYnMA'..:, ggYYpq rMr.. 4MMMOMv.RxlnWo.R.wm.a.x a.0 •:MnlatYYM ���•��, •. •, _� mr.Y MWYYw WWIYr.M V �.rvxn nal\W rTlrallY.L M+.rRx' ren MtYY.t6 W I» �iwli.m wu'.\w.u: v�W.Tranon�mvYeY R.�ar rW ■ eI�TM IICtM1M Mt Yn iir( WT)+M rQVJI (.Ilrr6tNll �)R'Itlx ■ / R.q ■ niYI IRW lVi V xMY.Zf.ItLT.r111 W�RNnl4art ■ M ul,l.. I.I • +•Y Y rtlew r nw.aw:Y+.Wrrvx rvn+v.R.mrYowWm4r\.rx �w .Vasal wrw i s+mr. „w+mr.'vi wwrR�waeN•r�wa�l\ wnn\:+ o am\rxa ve.Yramuq eA tlYra anweleraw... nwa:u • YYuuvYv rYr.nm.r[wm.: rrm w.. mrn:.e,m�u.e u.w nnwl) Fn�4umn ■ Y:�]n1 m:M ■ ® ■ uaaYr.xu ■ rwnR ■ ■ I ■ .�Y:wlwa4 • ■ AOAYYnMA'..:, ggYYpq rMr.. 4MMMOMv.RxlnWo.R.wm.a.x a.0 •:MnlatYYM ���•��, •. •, _� mr.Y MWYYw WWIYr.M V �.rvxn nal\W rTlrallY.L M+.rRx' ren MtYY.t6 W I» �iwli.m wu'.\w.u: v�W.Tranon�mvYeY R.�ar rW 4xeF eI�TM IICtM1M Mt Yn iir( WT)+M rQVJI (.Ilrr6tNll �)R'Itlx M Ruw YWl A9V61 ..ROrt m ne .T+iM1x n T\ IwmwY w. vxal.Tx MexRY,Afw) n[r\u.:.rYN+r \T rt!) w,e / R.q niYI IRW lVi V xMY.Zf.ItLT.r111 W�RNnl4art IaY \.. •I v!w Tex gmn-n.mun .vx rt m na .mlYRx n ntl wnwa. rn Y rtlew r nw.aw:Y+.Wrrvx rvn+v.R.mrYowWm4r\.rx �w .Vasal wrw i s+mr. „w+mr.'vi wwrR�waeN•r�wa�l\ wnn\:+ o am\rxa ve.Yramuq eA tlYra anweleraw... nwa:u • YYuuvYv rYr.nm.r[wm.: rrm w.. mrn:.e,m�u.e u.w nnwl) Fn�4umn r� Y:�]n1 m:M rre+Rw ® m4l wwxe uaaYr.xu IIW rwnR ' YlYtvlY, nn rw'vtn a .�Y:wlwa4 • MYR v.1n..MVrr uYlr,YpMrNnrl vw •! tl w+legnfa\ � AnYDInIn M, VIl Y1 .. .. 5,.,.. d Wwl V)A' t[r,[N nW ..yA\r]InIn MRN:rm s tl ■e RW.YnYlA��.r14Vrrll\AYwxNwaq MlrR®tlf eY .rrrr.. ■Y ..rm lwor x.r_ ■e rrRw »IAVLLn. rYY\wV11» 0 nxmw +1wN»yi YlYnf+N4e T\ rw Q7elY _ l 4 RYw alAn maw YR :!.\a .wry»'.> Y »^nw MV y /RywY rpaW, VAVtwr.lylr r..a• tlfYON Yn .Ry»w Y ■ v rR11w .xyr•w+ Mw tl Rrtlq'weq ■e .wyrow rtwn,n'AY,�a uxvl tl ■w .RyY9' •v tl r_rynm:M nrp[rnmwfx ■v •r ■ 4 v\q.w ■e vrr.4 • 4 veer a Y ■! rev ■Ifi OWN" Y• ■■ rw AOAYYnMA'..:, ggYYpq rMr.. 4MMMOMv.RxlnWo.R.wm.a.x a.0 •:MnlatYYM ���•��, •. •, _� mr.Y MWYYw WWIYr.M V �.rvxn nal\W rTlrallY.L M+.rRx' ren MtYY.t6 W I» �iwli.m wu'.\w.u: v�W.Tranon�mvYeY R.�ar rW 4xeF eI�TM IICtM1M Mt Yn iir( WT)+M rQVJI (.Ilrr6tNll �)R'Itlx M Ruw YWl A9V61 ..ROrt m ne .T+iM1x n T\ IwmwY w. vxal.Tx MexRY,Afw) n[r\u.:.rYN+r \T rt!) w,e niYI IRW lVi V xMY.Zf.ItLT.r111 W�RNnl4art IaY \.. l:oaa v!w Tex gmn-n.mun .vx rt m na .mlYRx n ntl wnwa. rn Y .m,.Yr r nw.aw:Y+.Wrrvx rvn+v.R.mrYowWm4r\.rx In \r .Vasal Mq)vn :rrwmtlr.. r.rww..�Iwlrm.l\RIW i ' - „w+mr.'vi wwrR�waeN•r�wa�l\ wnn\:+ o am\rxa ve.Yramuq eA tlYra anweleraw... nwa:u • YYuuvYv rYr.nm.r[wm.: rrm w.. mrn:.e,m�u.e u.w nnwl) Fn�4umn r� Y:�]n1 m:M rre+Rw ® m4l wwxe uaaYr.xu rwnR ' YlYtvlY, nn rw'vtn a .�Y:wlwa4 • MYR v.1n..MVrr uYlr,YpMrNnrl .. -. . rIBlatl R�ryelx['.6Y.m V\n tl.'q.[aMnC VR(.m4.r..rn tl w+legnfa\ � AnYDInIn M, VIl I .. .. 5,.,.. d Wwl V)A' t[r,[N nW ..yA\r]InIn MRN:rm s tl lweYl xYy yYlw RW.YnYlA��.r14Vrrll\AYwxNwaq MlrR®tlf .rrrr.. m...»Ru nr. u\nnw.anwrt .ma�W ..rm lwor rY3 rW 4xeF r1 waa+4weuv IaY \.. l:oaa Y .m,.Yr namav re In \r .Vasal Yauxr �O''{ Y ' - rnYlla.al[anxnYraw tl am\rxa w•\�r_ • YYuuvYv tlwllgif]Rtin WDlN Y Y:�]n1 m:M rre+Rw ® m4l wwxe uaaYr.xu rwnR ' u�e..rm a .�Y:wlwa4 uK .. -. oa\Yvawo tl w+legnfa\ I .. .. 5,.,.. d Mam+, wvr4 nnlRfr)LVR rnI wwYrrltlan s tl lweYl xYy yYlw Yr. .rrrr.. nTwro\[Yar.Wawmr ..rm lwor x.r_ -wrw+P »IAVLLn. rYY\wV11» anwwOR .vr. +1wN»yi YlYnf+N4e T\ Q7elY .Yryerw 4 RYw alAn maw YR :!.\a .wry»'.> wrTUY2 Y WNfOY y /RywY rpaW, VAVtwr.lylr tl tlfYON .Ry»w Y rn rrx.+aV .xyr•w+ \ra)n)..aw•mrYYYrae tl Rrtlq'weq .wyrow rtwn,n'AY,�a uxvl tl wfwox .RyY9' Vblt)a Ya»p[V\!r�'M1x tl r_rynm:M nrp[rnmwfx )lay —w— YuruxT.x .. .m,.Yr .mlw Yauxr �O''{ Y MMnvf . •nRlrir) • YYuuvYv • rre+Rw ® m4l wwxe r_ Y ..wlnxwl ," YMYdMLn F rnM I Ar- LU � �y J W W \ Ln uI \ LA IL ui ' I 1 m� I / , 1 g \ O � � I 1 , LLJ 03 ol .a.rmn i«uu %\ I •\ OO{n�N IMO •... i`urw»�wln� / , / I —w— YYr4xmm�• _, IJIJ Q^ r fpmm / t / ' �• ,. moi,_ ` � rR'w' +^"� � ------- 6 I t I l S I 1 I re�su --J ry.N. wAv,e N � c YrMNn. n LU �` L V Armo�iumN Q 6, i • F 1' 0 I Z Z Q ZO a&o ' j I l7 � Z Ln u � A�drYA 1 A�.YIw•q _ c.ro JwN a✓w�..• w.w.•r L �.. mra - ---won" 'o MfIIV IAI. -A� YMYaMa.• I:.. ..ATP Y• .a• -A- YM�3wTA• w.._AN .. ..a H E; Ynu.N y4 mYAm...v W i„ • ..mYM1Y'V. • rYowry � �� KY. ��® aVOfVfNY. YWF.I 1•.tlI } AdIRw.A1�N.YN �• •_ .Anwvw YT'.W'1111Y. eal vu Ir Ir I�OitNw� Iowa wnr e•.eJ EX4 r i Fn. 4.Al _ w ca N Z yVyF � ruu C Z & i / N p p S ;i EXISTING IFGFND —A� waraw'n+. Q moon V mneo- t.MVLL.L . Mwwv ti ,!YInl4. e mwlLLuw., •AMYw �. •_ X•Manvl /— — — — — ---_- iIMMI YAC'I LfGFUD �.. EM VAT I ff=LMND owr cnQ in nleini M NINIfI� IE1 #MAO WWMY IWASTS11tl1AMT 1•Y IIR•u Mp6YY N N �Y 11iU11 N r z bars mne 'a" �^' an...o liv iell� 4 Yn 211. f Y { l Y V IY 31� 'J� Y M Y•1 S 1 t Y S 4W Y TAY IIY Y.Ib \.T S iIMMI YAC'I LfGFUD �.. EM VAT I ff=LMND owr cnQ in nleini M NINIfI� IE1 #MAO WWMY 1•Y IIR•u Mp6YY N N �Y 11iU11 N 4 Y Y y n . • y b 9 Ot • S i Y TrY f W iIMMI YAC'I LfGFUD �.. EM VAT I ff=LMND owr cnQ in nleini M NINIfI� IE1 \ i 18 STREAM IMPACT / LEGEND IIIVP\cl- 17 115 °o°o°o %ANI:? IMP.\CI' i 116 SfRF_%m vvvvvv impUPd(:IS vvvvvv DOUNG r vvvevv (AN1lAL' .11()N PFA4S�F_N7/ No PER.\LULNI 11'1,VpR .iBUR1 IASL = PNP R� 111 / I LLLLLLL PE i' %MI P LLLLLLL YIAI-UII\II!i(fl' \ LILLLLL ° J BC19VR%A)SE I RIGHT 111 A1�EA I �� i /� \ OF BcrrPRz°sP.a / IA / _ \ AY ( I RETAININGJ / ZO 2 \ '—I !' ! L //� � / 20NE 1 x(25139 S.F. WALL. I I!/ / (2,085 S.F.) I 1 \\ RIP RAP APRON ' \ (32"L X 36"W X 22^1 TEMP. STREAM B� IMPAC fr S, PNP><-REM16 _SND A\ / )3 za /IIIIIII�II I I TEMPORARY WETLAND IMPACT 227 (S.F.) EXISTING WETLANDS WETLANDS IMPACP (1,685 S.F.) 111 110 109 l/.`]1twi[:o1 II r, X8111 LEGEND IMPACT ID AREA ZONE 1 2,085 S.F. ZONE 2 2,139 S.F. TEMP. STREAM 17 S.F. PNP STREAM 18 S.F. WETLAND 1,685 S.F. Prx\u�l-.�r 227 S.F. IMPACT ID LENGTH TEMP. STREAM vvuvu STREAM PNP N[O.\\UI\IPb I M PACT TOTALS 1 A IMPACT ID AREA ZONE 1 1,193 S.F. ZONE 2 2,550 S.F. I M PACT TOTALS 1 B IMPACT ID AREA ZONE 1 2,085 S.F. ZONE 2 2,139 S.F. TEMP. STREAM 17 S.F. PNP STREAM 18 S.F. WETLAND 1,685 S.F. TEMP WETLAND 227 S.F. IMPACT ID LENGTH TEMP. STREAM 10 L.F. STREAM PNP 8 L.F. i IE2 -"t--Mjjjj1 owiffol ZONE 2 RIP RAP APRON 083 �lil SII HMP. STREAM B IMPACT- - 10 LF./17 S.F.) PVP t\ kF:B ENDWA (s t_r.) (18 S-'.) / ME. 430 z /L PROPOSED � { GRADE I ALONG u CULVERT 2 �(Q J 20 q�j' Al 41i RIP RAP APRON 32"L X 36••W X 22"D TEMPORARY IMPACT 227 (S.F.) III Mf I rISTOENDWALL T EASEMENT I�,\� EXISTING WETLANDS 1111 STREAM IMPACT LEGEND AINEIMPACr /ANI- S IMP.1Cr vvvvvv _IliMl.)R.\R1"SI-RE -\MIMP\CIS Evvvvvvvvvvv vDURI\G CD¢SIRE17110N � Cu Existing Grade Along Culvert 10+00 11+00 PROFILE VIEW - CULVERT ON ROAD A 11+33 NO PERM \\P_\T LOIS = PNP LLLLLLL Y LLLLLLL III __ atI T T Hirl-R u1\1. 10+00 11+00 PROFILE VIEW - CULVERT ON ROAD A 11+33 NO PERM \\P_\T LOIS = PNP i E UJ J d O 0 2 v CL � o w JH w v gOa1!1 Q 1i-Fo EE E J i �c E W I'=YI SIR \IBFA I X 31 _ IrIR i IE2A LLLLLLL PI!RM.1NF'_NT SIRF'_UI 1\IPACJ' LLLLLLL LLLLLLL BCI -}PA Amp. I Hirl-R u1\1. WETLAND IMPACT LEGEND ... .. .. 1.: RII\D \ III M\I 1\I \I I I:mm )R %Rl% I.I I- \\D I MI• N T 0 20 401 i E UJ J d O 0 2 v CL � o w JH w v gOa1!1 Q 1i-Fo EE E J i �c E W I'=YI SIR \IBFA I X 31 _ IrIR i IE2A i PERMANENT STREAM Z IMPACT (76 4F.) (216 S.F.) \ TOP OF BANK iMP. 1 STREAM IMPACT LEGEND mWN1i11NIPMA* 7.ONF? INIP.If.T I M PACT 2 TOTALS IMPACT ID o v v v v v vvvavv n.4POb\R\SIRE_%m LNPA'15 v v e v e v DL'RISG f.OSSTRCTOS 5,434 S.F. PFA%l 1,NF\T/ 335 S.F. SO I'FA\ISSI.\T Ix ISS = PSP 50 S.F. PNP STREAM C LLLLL PERM. STREAM Z ITRfUGC ST SIRVIIIIIIPUT LLLLLLLLL IMPACT ID LLLLLLL PERM. STREAM C 106 L.F. TEMP. STREAM C flt'hPItN LI I\I':I PNP STREAM C IICI'I'1'.N /.Uqt? I M PACT 2 TOTALS IMPACT ID AREA ZONE 1 7,862 S.F. ZONE 2 5,434 S.F. PERM. STREAM C 335 S.F. TEMP. STREAM C 50 S.F. PNP STREAM C 60 S.F. PERM. STREAM Z 236 S.F. IMPACT ID LENGTH PERM. STREAM C 106 L.F. TEMP. STREAM C 21 L.F. PNP STREAM C 20 L.F. PERM. STREAM Z 76 L.F. 0 30' 60' i N a W V c N C 3 w C V Z `o Q Q O � dog <Z w i O o i CC V w Ln = n o RETAINING WALL PNP TI REICM C 7� TFi\ty /STREAIN C (20 LF./60 S.F.) IMPACT my IMPACT LF./20 S.F.) RMANENT STREAM C ACT (106 LF.) S.F.) RIP RAP APRR�NTrrL ICM"W RIGIFF— // X 22"D) OF WA ' PLAN VIEW . CULVERT ON ROAD C I %I I I' 4l Y Itn _ v i RIP RAP APRON J41S 14"L X IS"W X 22"D r � T Y Y PERMANENT STREAM Z \ \ . 1 ' IMPACT TOP OF BANK \ (236 S. F.)1 r \\ OIL PROPOSED GRADE ALONG CULVERT 420 Existing Grade Along Culven 415 1 I0+0011Hsi 11+21 PROFILE VIEW . CULVERT ON ROAD C v:]II. P }111.1'=YN' RETAINING \V TEMP. STREAM C IMPACT ZONE 1 (10 LF. (7,862 S.F.) 34 -ILL) _ STREAM IMPACT LEGEND PERAXN -Nr/ NO PI(R.\I.]%f%T II IN = I']I' LLLLLLL 1'PAMANPN r"1P.\M IMP W-1 LLLLLLL LLLLLLL 11t'19itR /uNP.I urrrrx it tNr.: 0 20' 10' IIM]J}II ms 1E3A O�ODOO z0%1.I I]IP. M)1' ASP. ± INIP.]rr vvvvvv vvvvvv .n'_ul()R%R]'SIiP_]]11]IPACIS vvvvvv nl'RIN(: f.ONSnII'CnON PERAXN -Nr/ NO PI(R.\I.]%f%T II IN = I']I' LLLLLLL 1'PAMANPN r"1P.\M IMP W-1 LLLLLLL LLLLLLL 11t'19itR /uNP.I urrrrx it tNr.: 0 20' 10' IIM]J}II ms 1E3A I WETLAND IMPACT LEGEND 11 1 1. 1 1 II I I'1 R\1\11 11 I M PACT 3 TOTALS IMPACT ID AREA WETLANDS 3A 1,386 S.F. WETLANDS 3B 148 S.F. TOTAL 1,534 S.F. 0 30' 60' J M n Q a W = � V Q 3 H o v a Ca ao L N 6 z �€ 7 x LU I• W a PII \MLN I1, I�Mti�i1 IF4 MANAGING THE WATERCOURSE: BYPASS PUMPING E NERGY p.SS'PATION - IMPERVIOUS DIKE I DEWATERtNO OEVICE NOTE ENSURE TO ANCHOR ALL MUMPS AND PIPES SECURELY DISCHARGE NOSE SUCTIOFA NOSE TOP OF BANK IMPERVIOUS DIKE WORK MEA NORTH CAROLINA DEPARTMENT OF TRANSPORTATION BMP% FOR CONSTRUCTION AND MAINTENANCE ACTIVITIES AUGUST 2003 MAINTENANCE • ROUTINELY INSPECT BYPASS PUMP AND TEMPORARY PIPING TO ENSURE PROPER OPERATION. • INSPECT IMPERVIOUS DIKE FOR LEAKS AND REPAIR ANY „ DAMAGE. 0 • INSPECT DISCHARGE POINT FOR EROSION. • ENSURE FLOW IS ADEQUATELY DIVERTED THROUGH PIPE. FROM'BEST MANAGEMENT PRACTICES FOR CONSTRUCTION AND MAINTENANCE ACTIVITIES", NORTH CAROLINA DEPARTMENT OF TRANSPORTATION, AUGUST 2003. FLOW DIVERSION - BYPASS PUMPING SEQUENCE rA 1. SET UP BYPASS PUMP AND TEMPORARY PIPING, PLACE OUTLET OF TEMPORARY PIPE TO MINIMIZE EROSION AT 1 DISCHARGE SITE OF PROVIDE TEMPORARY ENERGY s DISSIPATION MEASURES. FIRMLY ANCHOR PUMP AND PIPING. s 2. CONSTRUCT OUTLET PROTECTION, IF NEEDED. a 3. CONSTRUCT IMPERVIOUS DIKE UPSTREAM OF WORK AREA TO IMPOUND WATER FOR BYPASS PUMP INTAKE. USE A FLOATING INTAKE FOR PUMPS WHERE POSSIBLE. 4. CONSTRUCT AN IMPERVIOUS DIKE DOWNSTREAM, IF NECESSARY, TO ISOLATE WORK AREA. 5. CHECK OPERATION OF PUMP AND PIPING SYSTEM. 6. UPON COMPLETION OF CONSTRUCTION, REMOVE IMPERVIOUS DIKE, BYPASS PUMP, AND TEMPORARY PIPE. I16L1.,) IE5