Loading...
HomeMy WebLinkAboutNC0003417_App E_20160916I -Al 1VICCKOKY Govemor DONALD R. VAN DER VAART Water Resources E. VIRORMENTAL OUAL17Y May 2, 2U 16 Mr. Ryan Czop Duke Energy Progress; LLC 526 South Church Street Mail Code EL;-13K Charlotte, North Carolina SUBJECT: Well Con3ts uctiou Pus m;t No. NM0700820 H. V. Lee Energy Complex -- rormer Lee Steam Station Wayne County, North Carolina Dear Mr. Clop: S—�, ter..,—y S. jAY ZIMMERMAN Director In accordance with your application received April zu, zu 16; we are forwarding herewith Well Construction Permit No. WR0700820, dated May 2, 2016, issued to Duke Energy Progress, LLC (DEP), for the construction of 1 recovery well located at on property owned by ijtF as indicated on the figures accompanying the application, in Wayne County, North Carolina. Thin Pe111r11 will be etfecdve trom the date of its issuance until May z, 2U17, and shall be subject to the conditions and limitations as specived therein. It any pans, requirements, or limitations contained in this Permit are unacceptable to you, you have the right to an adjudicatory hearing before a healing office, upolr written demand to the Director within 30 days following receipt of this Permit, identifying the specitied issues to be contended. unless such demand is made, this Permit shall be final and binding. A well Construction xecord (uw-1) must be filled out by the driller and submitted to Divijivlr of Water Quality, Arm: Lrfo11ua1iou Management, 1617 Mail Service Center, Raleigh, NC 27699-1617 within 3U days upon completion of the well construction. It additional intormation or clarification is required, please contact will Hart at 252-948-3918. Sincerely, Robert Ta11ka1d, Assisian Regional Supervisor Water Quality Regional uperations Section Division of Water Resources, NCDEQ cc: Cascade Drillurg, LLC 1393 CU1uWbia Hwy N, A1KCu, Sl; LYSU1 Duke Energy Progress, LLC 410 S. Wilmington St., Raleigh, NC 27601 wdRuS — Central uffice WQROS - WaRO State of North Carolina I Environmental tlualsy Water KoSOZ7—S war- Vcaacty K,.o.-.at 0t,.rax.ons-Wasmngton Regtonat C]mce 943 Wasn.ngto-. Sgz—mr i, w. Win.-gto.-., LNC Ztaay 252-946-6481 — NORTH UAKULINA DEPARTMEx1' ur' ENVIRONMEIv i, AND NATURAL RESuujKuES DIVISION OF WAXER QUALITY —AQuwta PROTECTION Sl UTIUN .PERMIT FOR TnE UUNSTRUCTION Or' A F mcuVERY WELL in accordan.,c with the provisions of Arti�lc 7, Chapter 87, North Caiulina General Statutes, aiid other applii,ablc Laws, Rules and Regulations. PERMnSluly 1S HEREBY GxAlv'1'Eju '1'O Duke Energy Progress, LLC (DEr) FOR l tth CONSTRUCTION ur A xhC;U VERY WELL S Y S I hNl consisting of mane well owned by DEF located at the Fortner Lee Steam Station, ill Goldsboro, North Caiulilla. 1 fie well will be located on the property owned by DEP lu%ated at 1 199 black Jack Church Road, in cioldsburu, NC in Wayne County. This Permit is issued in accordance with the application received on April 2U, 2016 in conformity with specifications and supporting data, aai of whi.;h are filed with the Department of Envirotttnent and Natural Rz;soulucs aitd are considered integral parts of this Permit. 1 his -Permit is for w ell cunstruetiun only, and does not waive any provision or requiictnent of any other applicable law of regulation. C;onstru.,tion of any well under this Pcltnit shall be in strict ,umpliaancu with the North Carolina Wcll Construction Regulations and Standards (15A NCAC 02C .uIuu), and other State and Leal Laws and regulations pertaining to well construction. If any requirements or limitations speclfled in this Permit are unacceptable, you have a right to an adj udicatory hcaiing upon written request within 3u days of receipt of this Permit. l he request must be in the full,, of a written petition %,unfurming to Chapter 150B of the North Carolina General Statutes and filed with the Offic;c of Administrative Hearings, 6714 mail Service Center, Raleigh, North Carolina 27699-6714. Unless such a demand is trade, this -Permit is final Gild binding. This Peltnit will be effective fur one year from the date of its issuance and shall be subject to other spccifled conditions, limitations, or exceptions as follows: 1. Issuance of this Permit does not obligate reimbulsemcnt from State trust funds, ifthcse wells are being installed as part of an investigation for contamination from an utldcrground storage tank or dry cleaner incident. 2. lssuaill,c of this Permit does not superscdc any other agreameut, puiluit, or requirement issued by another agency. J. The well(s) shall be located and joust, uctcd as shown on the attachments submitted as part of the Permit application. 4. Each well shNh have a Well Contractor ldentitication Plate in accordance with 15A NCAC 02C .0 I u8(o). ttcvised July 2011 S. Well construction records ((iW-1) tor each well shall be submitted to the Division or Water Quality's Infurrnatiun Processing Unit within 30 daps uf the wall c;umpletiun. 6. When the well is discontinued or abandoned. it shall be abandoned in accordance with 1 SA NCAC 02C .0113 mda well abandonment reVord (GW-30) shall be submitted tu thu Division or Water QuN ity7s infurinatlun Yruuessing Umt within iu days of the well abandonment. 7. Groundwater extracted dming the test shall be played into the Active Ash Basin, as &sciibcd in the application. Permit issued the Jeuond day or May, lu 15 FUR THE NUKI'H UAKULINA EN VIKUNAMNTAL MANAGEMENT UUMM1aalUN Kober l ankard, Assistant egional Supervisor Division of Water RGSVU1cGS Water Quality Kegiunei Uperations Sectiun Washington Regional Office By Authority or the hnvironmentNI Management Commission Permit No. # WR0700820 KLv6ed jury 2ui i