Loading...
HomeMy WebLinkAboutNC0003417_App D_201609160 m a J r Q a O r z z 0 PROJECT: H. F. Lee Energy Complex WELL / BORING NO: AMW-16BC PROJECT NO: STARTED: 5/24/16 COMPLETED: 6/1/16 DRILLING COMPANY: Parratt -Wolff Inc. NORTHING: 597235.601 EASTING: 2273863.889 DRILLING METHOD: Mud Rotary G.S. ELEV: 113.25 ft MSL M.P. ELEV: 116.30 ft MSL BOREHOLE DIAMETER: 10" and 4.875" IN DEPTH TO WATER: 27.12 ft TOC TOTAL DEPTH: 61.0 ft BGS NOTES: Logged from split spoons and cuttings in mud wash LOGGED BY: J. Gilmer CHECKED BY: J. Mahan w p U = (D Q O C� DESCRIPTION W a < O^ U �v c z m0 _ o E d a WELL CONSTRUCTION SW SAND, medium tan, fine to coarse, damp. 5 63 SP SAND, orangish tan, medium -grained with minor clay, damp and semi -cohesive. Bottom 0.5' dark tan color. , 10 63 SP SAND, tannish -white with few orange and trace black specks, medium to coarse, loose and damp. SP SAND, orangish tan, medium -grained with minor clay, damp and semi -cohesive. 15 2" Sch. 40 threaded PVC 63 riser CH CLAY, light tannish -gray, sand fine stiff, plastic, 9 9 Y, Y (fine), cohesive and damp. SP SC SAND, pale medium tan, fine to medium, medium stiff, medium plasticity, semi -cohesive, damp. SP SAND, dark brownish tan transitioning to orange -tan, 20 CH medium to coarse, loose, damp. 63 5" PVC surface casing CLAY, pinkish pale gray -tan, sandy (fine to medium), Sp stiff, plastic, cohesive and damp. SAND, bright orange to white, coarse, loose and damp. 63 - SW SC SAND, tan -brown, fine to coarse, clayey, loose and wet. Color orange -white at bottom. ,D 25 o' o SPG SAND, white to tan, coarse with some gravel, loose, wet. X1 No split spoon collected 25'-28' bgs. SP SAND, tan brown, medium -grained with minor clay, wet. 30 63 CH CLAY, pinkish pale gray transitioning to white with orange mottling, silty, stiff, plastic, cohesive and moist to damp. No split spoon collected 30'-33' bgs. 63 7 v ° SPG SAND, tan with white, black and orange, coarse with gravel (fine to medium), saturated. 35 No split spoon collected 35'-38' bgs. CLAY, dark brown -red mottled with white and CH yellow -brown, some silt, very stiff, plastic, dense, dry to X 100 damp. I I CLIENT: Duke Progress Energy SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Goldsboro, NC Greenville, South Carolina 29601 Term Phone:864-421-9999 PAGE 1 OF 2 PROJECT: H. F. Lee Energy Complex WELL / BORING NO: AMW-16BC PROJECT NO: STARTED: 5/24/16 COMPLETED: 6/1/16 DRILLING COMPANY: Parratt -Wolff Inc. NORTHING: 597235.601 EASTING: 2273863.889 DRILLING METHOD: Mud Rotary G.S. ELEV: 113.25 ft MSL M.P. ELEV: 116.30 ft MSL BOREHOLE DIAMETER: 10" and 4.875" IN DEPTH TO WATER: 27.12 ft TOC TOTAL DEPTH: 61.0 ft BGS NOTES: Logged from split spoons and cuttings in mud wash LOGGED BY: J. Gilmer CHECKED BY: J. Mahan w p U = (D Q O C� DESCRIPTION W a 2 < O^ U �v c z OJ � m0 _ o E d a WELL CONSTRUCTION Grout No split spoon collected 40'-44' bgs. 45 100 Bentonite CH CLAY, maroon -brown mottled with dark yellow and white, very stiff, very plastic, cohesive, dense and damp. No split spoon collected 46'-49' bgs. 500 100 CH CLAY, maroon -brown mottled with dark yellow and white, very stiff, very plastic, cohesive, dense and damp. No split spoon collected 51'-54' bgs. 55 100 f Filter Pack CH CLAY, maroon -brown mottled with dark yellow and white, very stiff, very plastic, cohesive, dense and damp. 2" pre -packed well screen No split spoon collected 56'-59' bgs. 60 25 SLATE, medium greenish gray, slight metamorphic sheen, weathered, very stiff and dense, slightly indurated. 65 70 75 CLIENT: Duke Progress Energy SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Goldsboro, NC Greenville, South C ling 29601 SynTerra Phone: 864 421 9999 PAGE 2 OF 2 PROJECT: H. F. Lee Energy Complex WELL / BORING NO: /BMW-1 7BC PROJECT NO: STARTED: 6/2/16 COMPLETED: 6/7/16 DRILLING COMPANY: Parratt -Wolff Inc. NORTHING: 598386.231 EASTING: 2276264.435 DRILLING METHOD: Mud Rotary G.S. ELEV: 77.81 ft MSL M.P. ELEV: 80.71 ft MSL BOREHOLE DIAMETER: 10" and 4.875" IN DEPTH TO WATER: 5.72 ft TOC TOTAL DEPTH: 55.0 ft BGS NOTES: Logged from split spoons and cuttings in mud wash LOGGED BY: J. Gilmer CHECKED BY: J. Mahan w p U = (D Q O C� DESCRIPTION W a < O^ U �v c z m0 _ o E d a WELL CONSTRUCTION No split spoon collected 0'-3' bgs. SW SAND, medium tan with fine black specks, fine to coarse, loose and wet. 100 5 No split spoon collected 5'-8' bgs. SP SAND, mottled dark orange, black -brown and tan, fine to SW 10 0o medium, some clay, abundant organic plant matter, minor cohesiveness and wet. 100 2" Sch. 40 threaded PVC SAND, medium tan with some dark brown, fine to coarse, loose and wet. riser No split spoon collected 10'-13' bgs. Grout 100 5" PVC surface casing SP SAND, medium tan with slight orange tint, medium to coarse, loose and saturated with thin interbed of SAND, 15 black -brown, clayey, minor cohesiveness and stickyness, saturated. No split spoon collected 15'-18' bgs. / SP SC CLAY, medium gray, silty, stiff, plastic, cohesive, sticky, wet, grading into SAND, tannish medium gray, medium to coarse, clayey, medium stiff, medium plasticity, semi -cohesive, sticky and wet. X 20 100 �/ No split spoon collected 20'-23' bgs. Ix -0 100 CH CLAY, grayish blue, very stiff and plastic, cohesive and wet. 25 No split spoon collected 25'-33' bgs. �- Benton ite 30 CH CLAY, medium tan gray with slight blue-green tint, very stiff and plastic, sticky and wet with thin (--2 cm) interbed 100 SM 35 of SILT, tannish gray, sand fine and clayey. SAND, whitish gray with thin dark gray laminae, fine, silty, cohesive, semi -plastic and wet. No split spoon collected 35'-38' bgs. Filter Pack 100 2" pre -packed well screen FA CH CLAY, tannish medium gray, sandy (fine to coarse) and gravelly, medium plasticity, cohesive, sticky and wet. NA Underlain b -4 cm GRAVEL bed loose and wet. CLIENT: Duke Progress Energy 10P SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Goldsboro, NC Greenville, South Caroling 29601 SynTerr Phone: 864 421 9999 PAGE 1 OF 2 PROJECT: H. F. Lee Energy Complex WELL / BORING NO: /BMW-1 7BC PROJECT NO: STARTED: 6/2/16 COMPLETED: 6/7/16 DRILLING COMPANY: Parratt -Wolff Inc. NORTHING: 598386.231 EASTING: 2276264.435 DRILLING METHOD: Mud Rotary G.S. ELEV: 77.81 ft MSL M.P. ELEV: 80.71 ft MSL BOREHOLE DIAMETER: 10" and 4.875" IN DEPTH TO WATER: 5.72 ft TOC TOTAL DEPTH: 55.0 ft BGS NOTES: Logged from split spoons and cuttings in mud wash LOGGED BY: J. Gilmer CHECKED BY: J. Mahan w p U = (D Q O C� DESCRIPTION W a 2 < O^ U �v c z OJ � m0 _ o E d a WELL CONSTRUCTION Abrupt transition into CLAY white and darkyellow mottling, silty, slightly indurated and dry. No split spoon collected 40'-43' bgs. 100 CH CLAY, white with tannish orange -brown and dark yellow mottling, few silt, very stiff and plastic when wettened, 45 cohesive and slightly indurated, dry. No split spoon collected 45'48' bgs. CLAY, dark reddish orange with dark orangish red and CH dark yellow mottling, gravelly (phyllite clasts), damp, very 100 50 stiff, sticky and medium plasticity when wettened, faint foliation fabric, metamorphic sheen, dry. No split spoon collected 50'-53' bgs. PHYLLITE, tannish red -brown mottled with yellow and some white, medium plasticity when wettened, very stiff 100 55 and slightly indurated with slight metamorphic sheen, exhibits foliation fabric, contains thin (<1-cm-thick) weathered quartz vein. Borehole terminated 55' bgs. To facilitate well construction, borehole abandoned 55'-43' bgs with sand. 60 65 70 75 CLIENT: Duke Progress Energy SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Goldsboro, NC Greenville, South C ling 29601 SynTerra Phone: 864 421 9999 PAGE 2 OF 2 PROJECT: H. F. Lee Energy Complex WELL / BORING NO: AMW-1 7S PROJECT NO: STARTED: 6/3/16 COMPLETED: 6/3/16 DRILLING COMPANY: Parratt -Wolff Inc. NORTHING: 598386.259 EASTING: 2276267.415 DRILLING METHOD: Hollow Stem Augers G.S. ELEV: 77.68 ft MSL M.P. ELEV: 80.40 ft MSL BOREHOLE DIAMETER: 8 IN DEPTH TO WATER: 5.35 ft TOC TOTAL DEPTH: 17.0 ft BGS NOTES: Logged from cuttings LOGGED BY: J. Gilmer CHECKED BY: J. Mahan w p U = (D Q O C� DESCRIPTION W a < O^ U �v c z m0 _ o E d a WELL CONSTRUCTION No split spoon collected 0'-3' bgs. �U Bentonite SW SAND, medium tan with fine black specks, fine to coarse, loose and wet. 5 No split spoon collected 5'-8' bgs. SP SAND, mottled dark orange, black -brown and tan, fine to SW 10 0o medium, some clay, abundant organic plant matter, minor cohesiveness and wet. SAND, medium tan with some dark brown, fine to coarse, loose and wet. Filter Pack No split spoon collected 10'-13' bgs. 2" pre -packed well screen SAND, medium tan with slight orange tint, medium to SP coarse, loose and saturated with thin interbed of SAND, 15 black -brown, clayey, minor cohesiveness and stickyness, saturated. 20 25 30 35 CLIENT: Duke Progress Energy SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Goldsboro, NC Greenville, South C ling 29601 SynTerra Phone: 864 421 9999 PAGE 1 OF 1 PROJECT: H. F. Lee Energy Complex WELL / BORING NO: AMW-1 $BC PROJECT NO: STARTED: 6/22/16 COMPLETED: 6/27/16 DRILLING COMPANY: Parratt -Wolff Inc. NORTHING: 595276.268 EASTING: 2278031.273 DRILLING METHOD: Mud Rotary G.S. ELEV: 73.38 ft MSL M.P. ELEV: 77.54 ft MSL BOREHOLE DIAMETER: 10" and 4.875" IN DEPTH TO WATER: 59.98 ft TOC TOTAL DEPTH: 66.0 ft BGS NOTES: Logged from split spoons and cuttings in mud wash. LOGGED BY: J. Gilmer CHECKED BY: J. Mahan w p U = (D Q O C� DESCRIPTION W a < O^ U �v c z m0 _ o E d a WELL CONSTRUCTION No split spoon collected 0'-3' bgs.< 100 CH SP CLAY, tannish medium brown, sandy (medium), some black organic matter, stiff, plastic. 5 CH SAND, light and medium tan -brown, medium -grained, cla a with minor organic matter, SP 83 =Q�LAYmedium gray, sandy, stiff, plastic, cohesive and s black woody debris, damp. SAND, tannish light brown, medium, some clay, some stickiness and cohesion, medium soft and wet. N/ SW SC SAND, tannish light brown, fine to coarse, clayey, sticky with some plasticity,cohesive, very soft and wet. 67 SPG SAND, light gray, coarse with gravel (fine), loose and wet 10 100 2" Sch. 40 threaded PVC riser p O SPG SAND, tannish white and light gray, medium to coarse, gravelly (fine to medium), loose and wet. 100 a 15 o SPG SAND, light grayish white, medium to coarse with gravel (fine), loose and wet. Contains black woody material 14'-18' bgs. 100 o 0 100 oo:Z+ SW SAND, medium to dark gray to tannish light gray, medium to coarse with some gravel (fine), very stiff with thin -1-mm-thick claylaminae, wet. 20 100 0 C o SPG SAND, light tannish white to light gray, medium -grained, loose, very soft and wet. 5" PVC surface casing Grout oO' 25 SP SAND, light medium gray, medium -grained, few black lignite fragments, loose and wet. 100 100 SP SAND, medium to dark gray, medium -grained with intercalated carbonaceous (black) sands (-4-cm-thick). 100 o 0 SPG SAND, light to medium gray, medium -grained, few gravel (fine) with some clay, loose, wet. Contains 8-mm-thick zone of black woody fragments. 30 100 100 Sp SC SAND, medium to dark gray, medium -grained, few gravel (fine) with clay nodules (-4-cm diameter), very stiff and wet. 0 35 0 0 75 SAND, light gray, medium, some gravel (fine to 1 0 0 SPG medium), loose, soft and saturated. 36'-38' becomes very stiff and tightly packed. 100 100 SynTerra CLIENT: Duke Progress Energy 148 River Street, Suite 220 PROJECT LOCATION: Goldsboro, NC Greenville, South Carolina 29601 s)mTerra Phone: 864 421 9999 PAGE 1 OF 2 PROJECT: H. F. Lee Energy Complex WELL / BORING NO: AMW-1 $BC PROJECT NO: STARTED: 6/22/16 COMPLETED: 6/27/16 DRILLING COMPANY: Parratt -Wolff Inc. NORTHING: 595276.268 EASTING: 2278031.273 DRILLING METHOD: Mud Rotary G.S. ELEV: 73.38 ft MSL M.P. ELEV: 77.54 ft MSL BOREHOLE DIAMETER: 10" and 4.875" IN DEPTH TO WATER: 59.98 ft TOC TOTAL DEPTH: 66.0 ft BGS NOTES: Logged from split spoons and cuttings in mud wash. LOGGED BY: J. Gilmer CHECKED BY: J. Mahan W p U = (D Q O W 0 n DESCRIPTION W a 2 < O^ W o �v c z OJ � m0 _ o E d a WELL CONSTRUCTION _=_7 SPG 0 SPG SAND, medium tan gray and dark blackish gray, fine to medium, contains betryoidal pyrite gravel (medium to coarse), loose, organic woody matter at very bottom, wet. 45 100 X CH CLAY, very dark gray with slight brownish tint, silty, abundant black lignite fragments, very stiff and plastic, moist. Y/ 2" Sch. 40 threaded PVC riser 50 CH CLAY (saprolite), bluish medium green, silty and sandy, very stiff and plastic, dry to damp. Color becomes more 100 Benton ite green -53' bgs. Color becomes mint green -55' bgs. 100 55 CH CLAY (saprolite), mottled tan -white and olive green, silty with sand, very stiff and plastic, moist, color shifts to mint 95 green towards bottom. 100 60 SILT (saprolite), mottled mint green and white, clayey 100 Filter Pack with some sand, heavily stained yellow -dark brown, maroon -brown, and dark brown, hard, indurated in places, 2" pre -packed well screen breaks along weathered fracture planes, exhibits faint 100 foliation fabric. Color transitions to dark green with minor blue tint mottled with white. 100 65 70 75 CLIENT: Duke Progress Energy SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Goldsboro, NC Greenville, South C ling 29601 s mTerra Phone: 864 421 9999 PAGE 2 OF 2 PROJECT: H. F. Lee Energy Complex WELL / BORING NO: AMW-18S PROJECT NO: STARTED: 5/25/16 COMPLETED: 5/25/16 DRILLING COMPANY: Parratt -Wolff Inc. NORTHING: 595279.879 EASTING: 2278028.258 DRILLING METHOD: Hollow Stem Augers G.S. ELEV: 74.14 ft MSL M.P. ELEV: 78.28 ft MSL BOREHOLE DIAMETER: 8 IN DEPTH TO WATER: 10.62 ft TOC TOTAL DEPTH: 31.0 ft BGS NOTES: Logged from cuttings LOGGED BY: J. Gilmer CHECKED BY: J. Mahan w p U = (D Q O C� DESCRIPTION W a < O^ U �v c z m0 _ o E d a WELL CONSTRUCTION No split spoon collected 0'-3' bgs. Grout CH SP CLAY, tannish medium brown, sandy (medium), some black organic matter, stiff, plastic. 5 CH SAND, light and medium tan -brown, medium -grained, cla a with minor or anic matter, CLAY, medium gray, sandy, stiff, plastic, cohesive and - moist, contains black woody debris, damp. SP SAND, tannish light brown, medium, some clay, some stickiness and cohesion, medium soft and wet. SW SC SAND, tannish light brown, fine to coarse, clayey, sticky with some plasticity, cohesive, very soft and wet. SPG SAND, light gray, coarse with gravel (fine), loose and wet. 10 0 SAND, tannish white and light gray, medium to coarse, SPG O gravelly (fine to medium), loose and wet. Benton ite o 15 o SPG SAND, light grayish white, medium to coarse with gravel (fine), loose and wet. Contains black woody material 14'-18' bgs. 20 ° SW SAND, medium to dark gray to tannish light gray, medium to coarse with some gravel (fine), very stiff with thin -1-mm-thick claylaminae, wet. 0 �\ o l� o SPG SAND, light tannish white to light gray, medium -grained, loose, very soft and wet. off' SP SAND, light medium gray, medium -grained, few black lignite fragments, loose and wet. 25 t Filter Pack 2" pre -packed well screen SP SAND, medium to dark gray, medium -grained with intercalated carbonaceous (black) sands (-4-cm-thick). SPG SAND, light to medium gray, medium -grained, few gravel (fine) with some clay, loose, wet. Contains 8-mm-thick 30 zone of black woody fragments. 35 CLIENT: Duke Progress Energy SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Goldsboro, NC Greenville, South C ling 29601 SynTerra Phone: 864 421 9999 PAGE 1 OF 1 0 m J r a a O N z 0 PROJECT: H. F. Lee Energy Complex WELL / BORING NO: CCR-100S PROJECT NO: STARTED: 5/25/16 COMPLETED: 5/25/16 DRILLING COMPANY: Parratt -Wolff Inc. NORTHING: 597237.756 EASTING: 2273888.843 DRILLING METHOD: Hollow Stem Augers G.S. ELEV: 113.29 ft MSL M.P. ELEV: 116.51 ft MSL BOREHOLE DIAMETER: 8 IN DEPTH TO WATER: 26.44 ft TOC TOTAL DEPTH: 37.0 ft BGS NOTES: Logged from cuttings LOGGED BY: J. Gilmer CHECKED BY: J. Mahan w p U = (D Q O C� DESCRIPTION W a < O^ U �v c z m0 _ o E d a WELL CONSTRUCTION SW SAND, medium tan, fine to coarse, damp. 5 SP SAND, orangish tan, medium -grained with minor clay, damp and semi -cohesive. Bottom 0.5' dark tan color. 10 K —Grout SP SAND, tannish -white with few orange and trace black specks, medium to coarse, loose and damp. SP SAND, orangish tan, medium -grained with minor clay, damp and semi -cohesive. 15 2" Sch. 40 threaded PVC riser CH CLAY, light tannish -gray, sandy (fine), stiff, plastic, cohesive and damp. SP SC SAND, pale medium tan, fine to medium, medium stiff, medium plasticity, semi -cohesive, damp. SP SAND, dark brownish tan transitioning to orange -tan, 20 CH medium to coarse, loose, damp. CLAY, pinkish pale gray -tan, sandy (fine to medium), Sp stiff, plastic, cohesive and damp. SAND, bright orange to white, coarse, loose and damp. - Benton ite SW - SAND, tan -brown, fine to coarse, clayey, loose and wet. Color orange -white at bottom. oL'sci 25 o' o SPG SAND, white to tan, coarse with some gravel, loose, wet. No split spoon collected 25'-28' bgs. SP SAND, tan brown, medium -grained with minor clay, wet. CH CLAY, pinkish pale gray transitioning to white with orange mottling, silty, stiff, plastic, cohesive and moist to 30 damp. Filter Pack No split spoon collected 30'-33' bgs. 2" pre -packed well screen � v ° SPG SAND, tan with white, black and orange, coarse with gravel (fine to medium), saturated. 35 No split spoon collected 35'-38' bgs. CLIENT: Duke Progress Energy SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Goldsboro, NC Greenville, South Caroling 29601 SynTerr Phone: 864 421 9999 PAGE 1 OF 1 PROJECT: H. F. Lee Energy Complex PROJECT NO: DRILLING COMPANY: Parratt -Wolff Inc. DRILLING METHOD: Mud Rotary BOREHOLE DIAMETER: 10" and 4.875" IN NOTES: Logged from split spoons and cuttings in mud wash = o 0 O j DESCRIPTION C� SP SAND, dark brown, contains organic material, dr CL CLAY, gray and orange mottling, sandy, dry. WELL / BORING NO: IMW-04BC STARTED: 7/5/16 COMPLETED: 7/20/16 NORTHING: 591672.278 EASTING: 2265270.102 G.S. ELEV: 74.50 ft MSL M.P. ELEV: 77.34 ft MSL DEPTH TO WATER: 5.93 ft TOC TOTAL DEPTH: 33.0 ft BGS LOGGED BY: J. Mahan CHECKED BY: J. Gilmer a O- z OJ 0 E WELL U v u � m0 a CONSTRUCTION < Y. 100 100 - 5 100 2" Sch. 40 threaded PVC riser SP SAND, coarse, well sorted. Wet -5.5' bgs. Zone of 100 subangular quartz gravel -8' bgs. 100 10 CL CLAY, gray and sandy. � v SPG SAND, gray to light brown, coarse, well sorted wi subangular gravel. 15- CL CLAY, gray to tan, silty, loose 14'-15' bgs and co 15'-17' bgs. 20 No split spoons collected 17'-24' bgs. \ X 100 5" PVC surface casing th minor 100 Benton ite hesive 100 X 50 ML SILT (saprolite), tan to light gray, clayey, micaceous with 25 mm-scale blebs of white material within tan to gray matrix. Apparent mm-scale sub -vertical foliation. / SLATE, light gray, weathered, saprolitic, cut by cm -scale lavers of red, plastic clav with sand (medium to c oarse). 30 SLATE, resistance in drilling -28' bgs, mud wash contained chips of competent slate. tc�7 Borehole terminated 35' bgs. To facilitate well construction, borehole abandoned 33'-35' bgs with sand. 100 Filter Pack 2" pre -packed well screen CLIENT: Duke Progress Energy SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Goldsboro, NC s)mTerra Phone: 864 421 9999 ling 29601 PAGE 1 OF 1 PROJECT: H. F. Lee Energy Complex WELL / BORING NO: BMW-04S PROJECT NO: STARTED: 7/21/16 COMPLETED: 7/21/16 DRILLING COMPANY: Parratt -Wolff Inc. NORTHING: 591664.946 EASTING: 2265264.206 DRILLING METHOD: Hollow Stem Augers G.S. ELEV: 73.62 ft MSL M.P. ELEV: 76.46 ft MSL BOREHOLE DIAMETER: 8 IN DEPTH TO WATER: 5.11 ft TOC TOTAL DEPTH: 17.6 ft BGS NOTES: Logged from split spoons LOGGED BY: J. Mahan CHECKED BY: J. Gilmer i�'Q U = (D W a O^ c z _ o E WELL w O DESCRIPTION U d a CONSTRUCTION p W co < �v m0 SP SAND, dark brown, contains organic material, dry. - Bentonite CL CLAY, gray and orange mottling, sandy, dry. 2" Sch. 40 threaded PVC 5 riser SP SAND, coarse, well sorted. Wet -5.5' bgs. Zone of subangular quartz gravel -8' bgs. 10 CL CLAY, gray and sandy. Filter Pack v SPG SAND, gray to light brown, coarse, well sorted with minor 2" pre -packed well screen subangular gravel. CL CLAY, gray to tan, silty, loose 14'-15' bgs and cohesive 15 15'-17' bgs. No s lit s cons collected 17'-24' b s. 20 25 30 35 CLIENT: Duke Progress Energy SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Goldsboro, NC Greenville, South Caroling 29601 s)mTerr Phone: 864 421 9999 PAGE 1 OF 1 PROJECT: H. F. Lee Energy Complex WELL / BORING NO: BMW-0 jBC PROJECT NO: STARTED: 6/24/16 COMPLETED: 6/29/16 DRILLING COMPANY: Parratt -Wolff Inc. NORTHING: 591694.542 EASTING: 2266936.351 DRILLING METHOD: Mud Rotary G.S. ELEV: 76.48 ft MSL M.P. ELEV: 79.57 ft MSL BOREHOLE DIAMETER: 10" and 4.875" IN DEPTH TO WATER: 12.78 ft TOC TOTAL DEPTH: 55.0 ft BGS NOTES: Logged from split spoons and cuttings in mud wash LOGGED BY: W. Wimberley CHECKED BY: J. Gilmer w p U = (D Q O C� DESCRIPTION W a < O^ U �v c z m0 _ o E d a WELL CONSTRUCTION No split spoon collected 0'-4' bgs. SP SAND, reddish brown, silty dry. 5 -SW CL CLAY, reddish brown, sandy, semi -cohesive and dry. 50 / No split spoon collected 6'-9' bgs. 10 38 2" Sch. 40 threaded PVC riser SP SC SAND, reddish brown, clayey with lenses of reddish brown sandy clay. No split spoon collected 11'-14' bgs. 0 0 e SPG SAND, orange -brown, coarse, clayey and gravelly, saturated. 15 100 5" PVC surface casing No split spoon collected 16'-19' bgs. Grout 20 90 ° SPG SAND, orange -brown, coarse, clayey and gravelly, saturated. o SPG SAND, tan, medium, gravelly, saturated. —X No split spoon collected 21'-24' bgs. 25 SAND, orange -brown, coarse, gravelly, saturated. 100 CH CLAY, light grayish white, very silty, stiff, medium plasticity, non -cohesive and dry. Faint linear fabric resent. No split spoon collected 26'-29' bgs. Ix 30 42 / CLAY (saprolite), light tan, light reddish tan and white, sandy with some gravel, faint banded (gneissic) fabric, cohesive and moist. No split spoon collected 31'-34' bgs. 35 25 CLAY (saprolite), grayish pink to taupe with red mottling, silty and sandy, visible foliation fabric and minor fine -scale folding, contains weathered quartz veins, stiff, slightly cohesive, moist. Bentonite No split spoon collected 38'-41' bgs. CLIENT: Duke Progress Energy SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Goldsboro, NC Greenville, South C ling 29601 nTerra Phone: 864 421 9999 SyPAGE 1 OF 2 PROJECT: H. F. Lee Energy Complex WELL / BORING NO: BMW-0 jBC PROJECT NO: STARTED: 6/24/16 COMPLETED: 6/29/16 DRILLING COMPANY: Parratt -Wolff Inc. NORTHING: 591694.542 EASTING: 2266936.351 DRILLING METHOD: Mud Rotary G.S. ELEV: 76.48 ft MSL M.P. ELEV: 79.57 ft MSL BOREHOLE DIAMETER: 10" and 4.875" IN DEPTH TO WATER: 12.78 ft TOC TOTAL DEPTH: 55.0 ft BGS NOTES: Logged from split spoons and cuttings in mud wash LOGGED BY: W. Wimberley CHECKED BY: J. Gilmer U = (D Lu a O^ c z OJ _ o E WELL w Q O DESCRIPTION 2 U � d a CONSTRUCTION p C� < �v m0 No split spoon collected 38'41' bgs. (continued) SAPROLITE, light gray to tan with lense of dark gray and pink, relic foliation, gneissic fabric (thin banding) and 60 small-scale folding resent, cohesive and moist. No split spoon collected 43'46' bgs. 45 SAPROLITE, medium tan to dark orangish red with white, strong foliation and gneissic fabric, stiff, moderately 60 indurated, cohesive and moist. Filter Pack 50 2" pre packed well screen No split spoon collected 48'-55' bgs. 55 4 60 65 70 75 CLIENT: Duke Progress Energy SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Goldsboro, NC Greenville, South C ling 29601 SynTerra Phone: 864 421 9999 PAGE 2 OF 2 PROJECT: H. F. Lee Energy Complex WELL / BORING NO: BMW-05S PROJECT NO: STARTED: 6/30/16 COMPLETED: 6/30/16 DRILLING COMPANY: Parratt -Wolff Inc. NORTHING: 591698.208 EASTING: 2266939.299 DRILLING METHOD: Hollow Stem Augers G.S. ELEV: 76.21 ft MSL M.P. ELEV: 79.19 ft MSL BOREHOLE DIAMETER: 8 IN DEPTH TO WATER: 11.89 ft TOC TOTAL DEPTH: 25.0 ft BGS NOTES: Logged from cuttings LOGGED BY: W. Wimberley CHECKED BY: J. Gilmer w p U = (D Q O C� DESCRIPTION W a 2 < O^ U �v c z OJ � m0 _ o E a WELL CONSTRUCTION locking cap No split spoon collected 0'-4' bgs. 2" Sch. 40 threaded PVC riser 5 Grout SP SM CL SAND, reddish brown, silt dry. CLAY, reddish brown, sandy, semi -cohesive and dry. No split spoon collected 6'-9' bgs. SC SAND, reddish brown, clayey with lenses of reddish brown sandy clay. 10 Bentonite No split spoon collected 11'-14' bgs. 15 0 0 o SPG SAND, orange -brown, coarse, clayey and gravelly, saturated. No split spoon collected 16'-19' bgs. Filter Pack 20 2" pre -packed well screen ° SPG SAND, orange -brown, coarse, clayey and gravelly, saturated. o SPG SAND, tan, medium, gravelly, saturated. No split spoon collected 21'-24' bgs. 25 SAND, orange -brown, coarse, gravelly, saturated. 30 35 CLIENT: Duke Progress Energy SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Goldsboro, NC Greenville, South Caroling 29601 SynTerr Phone: 864 421 9999 PAGE 1 OF 1 PROJECT: H. F. Lee Energy Complex WELL / BORING NO: PTW-01 PROJECT NO: 1026.04.20 STARTED: 7/14/16 COMPLETED: 7/14/16 DRILLING COMPANY: Parratt -Wolff Inc. NORTHING: 595688.044 EASTING: 2277368.622 DRILLING METHOD: Hollow Stem Augers G.S. ELEV: 73.188 ft MSL M.P. ELEV: 76.249 ft MSL BOREHOLE DIAMETER: 12 IN DEPTH TO WATER: 7.07 ft TOC TOTAL DEPTH: 20.0 ft BGS NOTES: Logged from 5' DPT sleeves. LOGGED BY: J. Mahan CHECKED BY: J. Gilmer w p U = (D Q O C� 0 DESCRIPTION W a < O^ U �v c z m0 _ o E d a WELL CONSTRUCTION 6" Sch. 40 threaded PVC riser CL CLAY, tan with orange mottling, sandy and silty, damp. Upper 4" dark brown topsoil. 90 Grout 5 SP SAND, light gray, clayey and wet. SC Bentonite SP SM SAND, light gray, fine to medium with dm-scale bedding, wet. Varies from clean to clayey and silty. Contains layers of sand (coarse) with angular to subangular quartz gravel 60 (fine). 10 SP SAND, light gray, medium to coarse, clean. Coarsens with depth. 50 Sand Pack 15 6" stainless steel well SP SAND, light gray, gravelly (quartzose and angular to rounded) with clay/ silt. screen SAND, tan to light gray, predominantly medium to coarse with varying silt/ clay and gravel content. Contains cm -bedding 17.5'-20' bgs. SP SM 90 20 CH CLAY containing mm-scale lignite fragments. 25 30 35 CLIENT: Duke Progress Energy SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Goldsboro, NC Greenville, South C ling 29601 SynTerra Phone: 864 421 9999 PAGE 1 OF 1 PROJECT: H. F. Lee Energy Complex WELL / BORING NO: PTW-02 PROJECT NO: 1026.04.20 STARTED: 7/14/16 COMPLETED: 7/14/16 DRILLING COMPANY: Parratt -Wolff Inc. NORTHING: 595681.105 EASTING: 2277355.488 DRILLING METHOD: Hollow Stem Augers G.S. ELEV: 73.312 ft MSL M.P. ELEV: 76.37 ft MSL BOREHOLE DIAMETER: 12 IN DEPTH TO WATER: 7.18 ft TOC TOTAL DEPTH: 20.0 ft BGS NOTES: Logged from 5' DPT sleeves. LOGGED BY: J. Mahan CHECKED BY: J. Gilmer w i�'Q p U = (D O W Co DESCRIPTION W a < O^ U �v c z m0 _ o E d a WELL CONSTRUCTION -01 2" Sch. 40 threaded PVC riser CL CLAY, tan with orange mottling, sandy and silty, damp. Upper 4" dark brown topsoil. Bentonite 5 SP SAND, light gray, clayey and wet. SC SP SAND, light gray, fine to medium with dm-scale bedding, wet. Varies from clean to clayey and silty. Contains layers SM of sand (coarse) with angular to subangular quartz gravel (fine). 10 SP SAND, light gray, medium to coarse, clean. Coarsens with depth. -Sand Pack 15 2" pre -packed well screen SP SAND, light gray, gravelly (quartzose and angular to rounded) with clay/ silt. SAND, tan to light gray, predominantly medium to coarse with varying silt/ clay and gravel content. Contains cm -bedding 17.5'-20' bgs. SP SM 20 CH CLAY containing mm-scale lignite fragments. 25 30 35 CLIENT: Duke Progress Energy SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Goldsboro, NC Greenville, South C ling 29601 SynTerra Phone: 864 421 9999 PAGE 1 OF 1 PROJECT: H. F. Lee Energy Complex WELL / BORING NO: PTW-03 PROJECT NO: 1026.04.20 STARTED: 7/13/16 COMPLETED: 7/13/16 DRILLING COMPANY: Parratt -Wolff Inc. NORTHING: 595718.876 EASTING: 2277358.902 DRILLING METHOD: Hollow Stem Augers G.S. ELEV: 73.021 ft MSL M.P. ELEV: 76.14 ft MSL BOREHOLE DIAMETER: 12 IN DEPTH TO WATER: 6.93 ft TOC TOTAL DEPTH: 20.0 ft BGS NOTES: Logged from 5' DPT sleeves. LOGGED BY: J. Mahan CHECKED BY: J. Gilmer w i�'Q p U = (D O W Co DESCRIPTION W a < O^ U �v c z m0 _ o E d a WELL CONSTRUCTION -01 2" Sch. 40 threaded PVC riser CL CLAY, tan with orange mottling, sandy and silty, damp. Upper 4" dark brown topsoil. Bentonite 5 SP SAND, light gray, clayey and wet. SC SP SAND, light gray, fine to medium with dm-scale bedding, wet. Varies from clean to clayey and silty. Contains layers SM of sand (coarse) with angular to subangular quartz gravel (fine). 10 SP SAND, light gray, medium to coarse, clean. Coarsens with depth. -Sand Pack 15 2" pre -packed well screen SP SAND, light gray, gravelly (quartzose and angular to rounded) with clay/ silt. SAND, tan to light gray, predominantly medium to coarse with varying silt/ clay and gravel content. Contains cm -bedding 17.5'-20' bgs. SP SM 20 CH CLAY containing mm-scale lignite fragments. 25 30 35 CLIENT: Duke Progress Energy SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Goldsboro, NC Greenville, South C ling 29601 SynTerra Phone: 864 421 9999 PAGE 1 OF 1 PROJECT: H. F. Lee Energy Complex WELL / BORING NO: PTW-04 PROJECT NO: 1026.04.20 STARTED: 7/13/16 COMPLETED: 7/13/16 DRILLING COMPANY: Parratt -Wolff Inc. NORTHING: 595727.013 EASTING: 2277445.308 DRILLING METHOD: Hollow Stem Augers G.S. ELEV: 72.711 ft MSL M.P. ELEV: 75.962 ft MSL BOREHOLE DIAMETER: 8 IN DEPTH TO WATER: 6.79 ft TOC TOTAL DEPTH: 25.0 ft BGS NOTES: Logged from 5' DPT sleeves. LOGGED BY: J. Mahan CHECKED BY: J. Gilmer U = (D W a O^ c z _ o E WELL w Q O 0 DESCRIPTION U d a CONSTRUCTION p C� < �v m0 CLS CLAY, light gray to tan with orange mottling, sandy, 50 damp. Upper 6" rooted topsoil. = Bentonite 5 2" Sch. 40 threaded PVC riser SP SAND, light gray, medium to coarse. 4" zone near 50 bottom of interval dominated by coarse grains. 10 0000��o�o o o°off o SW SAND, tan to light gray and poorly sorted with angular to 50 boo°° subangular quartz gravel (fine) -12.5' bgs. —Sand Pack 15 2" pre -packed well screen Sp SAND, medium to coarse and clean. Bottom 2" 50 subangular quartz gravel (fine). 20 SP SM SAND, medium to coarse with fines. 60 CLAY, dark to light gray, plastic with disseminated pyrite CH often occurring as sub -vertical stringers at mm-scale thickness. 25 30 35 CLIENT: Duke Progress Energy SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Goldsboro, NC Greenville, South C ling 29601 SynTerra Phone: 864 421 9999 PAGE 1 OF 1 PROJECT: H. F. Lee Energy Complex WELL / BORING NO: PTW-0 j PROJECT NO: 1026.04.20 STARTED: 7/13/16 COMPLETED: 7/13/16 DRILLING COMPANY: Parratt -Wolff Inc. NORTHING: 595706.473 EASTING: 2277280.518 DRILLING METHOD: Hollow Stem Augers G.S. ELEV: 73.233 ft MSL M.P. ELEV: 76.411 ft MSL BOREHOLE DIAMETER: 8 IN DEPTH TO WATER: 7.06 ft TOC TOTAL DEPTH: 20.0 ft BGS NOTES: Logged from 5' DPT sleeves. LOGGED BY: J. Mahan CHECKED BY: J. Gilmer U = (D W a O^ c z _ o E WELL w Q O 0 DESCRIPTION U d a CONSTRUCTION p C� < �v m0 CLAY, tan with yellow -orange mottling, silty and sandy CL (fine to coarse). Grades into sand -4' bgs. Upper 4" dark 90 brown organic rich soil. Bentonite 5 ° v 2" Sch. 40 threaded PVC o ( riser SPG SAND, gray to tan, medium with some subrounded 30 quartz gravel (fine), wet. Fining to 10' bgs. 0 10 0 o SPG SAND, light gray with gravel (coarse). 50 Sand Pack 0 2" pre -packed well screen 15 SP SAND, light gray, fine, graded. SP SAND, light gray, clayey, poorly sorted with 4" zone of SC clean sand (fine to medium). 100 CL CLAY, silty, contains lignite fragments (<10 mm) and ML CH sand coarse . 20 CLAY, thinly bedded (mm-scale) with minor lenses of light gray sand (fine). 25 30 35 CLIENT: Duke Progress Energy SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Goldsboro, NC Greenville, South Caroling 29601 SynTerr Phone: 864 421 9999 PAGE 1 OF 1 PROJECT: H. F. Lee Energy Complex WELL / BORING NO: PTW-06 PROJECT NO: 1026.04.20 STARTED: 7/12/16 COMPLETED: 7/12/16 DRILLING COMPANY: Parratt -Wolff Inc. NORTHING: 595526.558 EASTING: 2277386.3 DRILLING METHOD: Hollow Stem Augers G.S. ELEV: 75.315 ft MSL M.P. ELEV: 78.439 ft MSL BOREHOLE DIAMETER: 8 IN DEPTH TO WATER: 9.33 ft TOC TOTAL DEPTH: 30.0 ft BGS NOTES: Logged from 5' DPT sleeves. LOGGED BY: J. Mahan CHECKED BY: J. Gilmer U _ (� W a O^ c z _ o f WELL w Q O DESCRIPTION U d a CONSTRUCTION p C� < �v m0 ML SILT, yellow -orange, clayey. Upper portion of interval 100 Bentonite rooted. 5 2" Sch. 40 threaded PVC SAND, yellow -orange, fine to medium, contains cm -scale riser 0o SW lenses of sand (medium to coarse) mid -interval. Sand 100 coarsens towards 10' bgs with gravel (fine) in matrix of sand (medium). Wet -8' bgs. 10 0 —Sand Pack SPG SAND, light gray, medium -grained with sand (coarse) 30 and gravel (fine), wet. 2" pre -packed well screen 15 0 °o o O SAND, light gray, medium -grained and wet. Contains o SWG cm -scale repeating succession of sand (coarse) to gravel 50 �o (fine) to silty, clayey sand (fine). a� 20 1 ° SAND, light gray, clayey with dm-scale interbeds of sand (medium)/ silts to olive gray clay, wet. cm -scale mud SP nodules occur in light gray sand (fine) matrix. Mud 100 SC contains dark brown to black lignitic material. Transitions to sand (coarse) in mud/ clay matrix with mud nodules -24, bgs. 25 CLAY, olive gray, minor silt, plastic and wet. Contains occasional mm-scale light gray sand (fine) lenses, CH mm-scale fragments of dark organic material, and very 100 fine dissemenated pyrite(?) grains. Bedding massive to lenticular. 30 35 CLIENT: Duke Progress Energy SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Goldsboro, NC Greenville, South C ling 29601 SynTerra Phone: 864 421 9999 PAGE 1 OF 1