Loading...
HomeMy WebLinkAbout20061005 Ver 1_More Info Received_20070608C R L S E R TROUTMAN T A N N E R TRANSMITTAL LETTER T0: FROM: JOANNE STEENHUIS Mark T. Arcuri, PE COMPANY: DATE: NCDENR DWQ June 8 2007 ADDRESS: CTT'S PROJECT NUMBER: 127 Cardinal Drive Extension 5580 Wilmington, NC 28405 PHONE NUMBER: CLIENT'S REFERENCE NUMBER: 910-796-7215 R E: Holden Beach Turkey Trap Road Borrow Pit WE TRANSMfT: ^ ATTACHED ^ UNDER SEPARATE COVER ^ HAND CARRIED BY ^ UPS/FEDIX ~~ THE FOLLOWING: ^ TRACINGS ^ PRINTS ^ INSPECTION REPORT ^ SHOP DRAWINGS ^ SPEgFICAT10NS ^ OTHER COPIES DATE SHEET N0. DESCRIPTION REMARKS 7 COPIES FOLDED 6-6-07 CO C1 C2 24 X 36 CONSTRUCTION PLANS Joanne, On September 6, 2006, Steve Wheeler (Town Manager -Holden Beach) and I met at Wilmington DWQ with Noelle Lutheran and Henry Wicker to discuss these plans. Reason is we were in the final stages of plan approval regarding the proposed mining activity and its proximity to the wetlands. They requested that we add monitoring wells to the plans to monitor groundwater elevations during the mining activity. Also, they requested that we provide a 40 foot buffer from wetlands plus a 10 foot maintenance strip around the pits (total 50 foot buffer). Lastly, they asked that we take a second look at the geotechnical borings, grain size, etc, and determine if we definitely wanted to pursue all of the cells shown. We did all of the above. Based on our investigation, we decided not to pursue cells 5 and 7 based on soil characteristics and the limited quantity available in those cells. We still need plan approval. You will need to provide notice to Kristen Hickland at DENR Land Quality Mining in Raleigh of your approval so she can write the mining permit. Please call with any questions. Thanks! Cc: Henry Wicker Cc: Kristen Hickland ~~ -',-,~, n gip- ~~ ~1 r µ ~ , - by: CRISER TROUTMAN TANNER CONSULTING ENGINEERS WILMINGTON. NC ~ RALEIGH, NC P.O. Box 3727 Wibnington, NC 28406 I 3809 Peachtree Ave. Suite 102 Wilmington, NC 28403 p 910.397.2929 1910.397.2971 cftengineering cam C R I S E R TROUTMAN T A N N E R TRANSMITTAL LETTER T0: FROM: HENRY WICKER Mark T. Arcuri, PE COMPANY: DATE: USACE -Wilmington District June 8, 2007 ADDRESS: CTT'S PROJECT NUMBER: Darlington Avenue 5580 Wilmington, NC PHONE NUMBER: CLIENT'S REFERENCE NUMBER: 910-251-4930 R E: Holden Beach Turkey Trap Road Borrow Pit WE TRANSMR: ^ ATTACHED ^ UNDER SEPARATE COVER ^ HAND CARRIED 6Y ^ UPS/FEDEX THE FOLLOWING: ^ TRACINGS ^ PRINTS ^ INSPECTION REPORT ^ SHOPDRAWINGS ^ SPECIFICATIONS ^ OTHER COPIES DATE SHEET NO. DESCRIPTION REMARKS 3 COPIES 6/6/07 CO C1 C2 24 X 36 CONSTRUCTION PLANS 3 COPIES 6/6/07 CO C1 C2 11 X 17 CONSTRUCTION PLANS NOTES/COMMENTS: Henry, we looked at borings and decided that the material in cells 5 and 7 was not good enough to bother with. Therefore, we removed those from the plans and do plan to work in those areas. The remaining cells contained good material and we are still showing them. Also, I added monitoring wells to the plans as requested. at our September 6, 2006. Thanks. Cc: Joanne Steenhuis Cc: Kristen Hickland i` I~4, \ li , ~, .,..~...wr ~+ . CRISER TROUTMAN TANNER CONSULTING ENGINEERS WICMINGTO N, NC ~ ~741E1G H, NC P.0 Box 3727 Wilmington, NC 28406 I 3809 Peachtree Ave. Suite 102 Wilmington, NC 28403 p 910.397.2929 l91D.397.2971 cttengineering.com TRANSMITTAL LETTER C R I S E R TROUTMAN T A N N E R T0: FROM: KRISTEN HICKLAND Mark T. Arcuri, PE COMPANY: DATE: NCDENR Land Quality June 8, 2007 ADDRESS: CTT'S PROJECT NUMBER: 1612 Mail Service Center 5580 Raleigh, NC 27699-1612 PHONE NUMBER: CLIENT'S REFERENCE NUMBER: 919-733-4574 R E: Holden Beach Turkey Trap Road Borrow Pit WE TRANSMIT: ^ ATTACHED ^ UNDER SEPARATE COVER ^ HAND CARRIED BY ^ UP5/FEDEX THE FOLLOWING: ^ TRACINGS ^ PRINTS ^ INSPECTION REPORT ^ SHOP DRAWINGS ^ SPECIFICATIONS ^ OTHER COPIES GATE SHEET N0. DESCRIPTION REMARKS 1 6-8-07 TRANSMITTAL TO HENRY WICKER 1 6-8-07 TRANSMITTAL TO JOANNE STEENHUIS 2 6-8-07 C1 & C2 MINING AND EROSION CONTROL PLANS NOTES/COMMENTS: Kristen, we are still pursuing this mining permit. We are working towards wetland approval with DWQ as you can see from attached transmittals. Also we wanted you to have an up-to~ate set of plans. Please call with any questions you have. Thanks. Cc: CTT File ;" CitISER TROUTMAN TANNER CONSULTING ENGINEERS WILMINGTON, NC RALEIGH, NC P 0. Box 3727 Wilmington. NC 28406 ~ 3809 Peachtree Ave. Suite 102 Wilminyton, NC 28403 p 910.397.2929 f 910.397.2971 cttenyineering com The Town of Holden Beach Incorporated 1969 Mayor: 2007 November 20 Norman Meares , Mayor Pro-Tem: GaryStaley . commies)°nera: Joanne SteeI111uis Mrs Charlie Boyle . John Heimlich NC Division of Water Quality Patricia Sandrfer Sandy Miller 401 Water Quality Certification Program Town Manager: 110 Rothschild Street Holden Beach, North Carolina 28462 Phone: 910.842.6488 Fax: 910.842.9315 y'_-~/~ N(~ ~~ 2 9 REC'U stave Wheeler 127 Cardinal Drive Extension Wilmington, NC 28405 Re: Town of Holden Beach Renourishment Project DWQ Project # 001836 MOD Mrs. Mueller: F3Y": This correspondence serves as a follow up to DWQ Project # 011836 MOD, which is tied to the CAMA Major Permit #14-02 for the above referenced project. The latest modification to this CAMA Major Permit allowed for the use of a new borrow site, referred to as the "Kirby Walter Borrow Site". This modification was issued on October 24, 2005. Approval of 401 Water Quality was granted under General Water Quality Certification #3400 on February 7, 2006. Since that time, concerns have been raised by DWQ regarding the existing wetlands on this borrow site. To address these concerns, the Town of Holden Beach offers the following: • The Town of Holden Beach and/or their contractors will cross the wetlands only at the approved locations as per the construction plans. • Filter fabric will be placed over existing wetlands at these locations. Construction material such as wood planks or gravel will be placed on top of the filter fabric as necessary to provide sufficient stabilization during the excavation process. • Upon completion of construction activities within the borrow site, any construction materials will be removed along with the filter fabric, allowing all wetlands to return to pre-project conditions. Any incidental grade change will be brought back to original grade. • Monitoring wells will be installed in accordance with the approved construction plans. Groundwater elevation ofpre-project conditions will be recorded. Upon project completion, groundwater elevation will be recorded and submitted to the addresses listed below. In the month of January of every year for a period of five (5) years, the wells will be checked and groundwater elevation will be submitted. to the addresses listed below. If conditions revert back to pre-project conditions prior to the monitoring period of five (5) years, the monitoring can cease by authorization from the NC Division of Water Quality. We understand that the conditions outlined above will be incorporated into a modification to the existing DWQ 401 Certification. Thank you for your time and consideration in regard to this matter. Should you have any questions or concerns, please do not hesitate to contact me. pectfully submitted, Steve Wheeler Town of Holden Beach Cc: Amanda Mueller, NC Division of Water Quality Dave Timpy, US Army Corps of Engineers Debra Wilson, NC Division of Coastal Management Visit www.hbtownhall.com 2