HomeMy WebLinkAbout20080085 Ver 1_Other Agency Comments_20080311+!?iC+:!Y?aa}dgdM440ih400-}CNPCrip•p.}p9SOCtiO4000-0KW^'.4?'r:?OC+}.: }kQS4tri4?ti/iNG N-}: Y.+?*}Y:-?+i-}P}hY)vPO?};.? ;.a.pp4+r:00P'PO°:-aYN+r}? ??<-?7-0-0O+r60CNt4}?.}G{tis.}?0-}J-}C.?S?}}; W}.?.kC^}C4}0?!Pfr+iprt^7C
Permit Class F p $ _ O D gS Permit Number
NEW 30-08
V 2?p8
PRIG
os?osz -
STATE OF NORTH CAROLINA
Department of Environment and Natural Resources
and
Coastal Resources Commission
LL Mit
for
X Major Development in an Area of Environmental Concern
pursuant to NC GS 113A-118
Excavation and/or filling pursuant to NCGS 113-229
Issued to Davis Cottage, LLC,1915 Rexford Rd., Suite 350, Charlotte, NC 28211
Authorizing development in New Hanover County at adj. to Banks Channel, 205 N. Lumina Ave.,
Wrightsville Beach , as requested in the permittee's application dated 12/14/07, inc. the attached
workplan drawings (4), 1 and 2 of 3 dated 12/14/07, and 2 dated "received DCM Wilmington 12/18/07.
This permit, issued on March 6, 2008 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
Reconfigured Docking Facility
1) Unless specifically altered herein, this permit authorizes only the reconfiguration of the docking facility,
gazebo, and boat lift, all as expressly and specifically set forth in the attached permit application and
workplan drawings. No other structure, whether floating or stationary, shall become a permanent part of
this reconfigured docking facility without permit modification. No non-water dependent uses of
structures shall be conducted on, in or over public trust waters without permit modification.
(See attached sheets for Additional Conditions)
This permit action may be appealed by the permittee or
other qualified persons within twenty (20) days of the issuing
date. An appeal requires resolution prior to work initiation or
continuance as the case may be.
This permit shall be accessible on-site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work shall cease when the permit expires on
December 31, 2011
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority of the Secretary of DENR and the
Chairman of the Coastal Resources Commission.
,.. James, . Gregson, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
Davis Cottage, LLC Permit # 30-08
Page 2 of 3
ADDITIONAL CONDITIONS
2) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the
docking facility. Any sewage discharge at the reconfigured docking facility shall be considered a
violation of this permit for which the permittee is responsible. This prohibition shall be applied and
enforced throughout the entire existence of the permitted structure.
3) The reconfigured portion of the pier and associated structures shall have a minimum setback distance of
15 feet between any parts of the structure and the adjacent property owner's riparian access corridor.
This corridor is determined by drawing a line parallel to the charnel, then drawing a line perpendicular
to the channel line that intersects with the shore at the point where the upland property line meets the
water's edge.
4) No portion of the authorized reconfigured docking facility shall extend past the established Wrightsville
beach pier head line.
5) In order to ensure compliance with Condition Nos. 3 and 4 of this permit, an as-built survey showing the
location and dimensions of the authorized structure, the location of the Wrightsville Beach Pier head
line, the distance to the neighboring riparian corridors, and the location of established pier head line,
shall be performed on the reconfigured docking facility, and copies of the survey shall be provided to the
Division of Coastal Management, within 60 days of completion of construction.
NOTE: Failure to provide the survey required in Condition No. 5 shall result in a violation of this permit.
6) The authorized covered platform shall not be enclosed. Any material used on the sides shall not obstruct
view and shall be permeable to air and water. Screen or wire on the sides along with benches and knee
walls are permitted. Lattice is specifically excluded from being used under this authorization.
7) The roof of the covered platform shall not be designed for second story use.
8) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable
waters at or adjacent to the authorized work.
9) The permittee shall maintain the authorized work in good condition and in conformance with the terms
and conditions of this permit. The permittee is not relieved of this requirement if he abandons the
permitted activity without having it transferred to a third party.
10) This permit does not authorize the interference with any existing or proposed Federal project, and the
permittee shall not be entitled to compensation for damage to the authorized structure or work, or injury
that may be caused from existing or future operations undertaken by the United States in the public
interest.
11) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S.
Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent
reflectors shall be attached to the structure in order to make it more visible during hours of darkness or
inclement weather.
Davis Cottage, LLC
ADDITIONAL CONDITIONS
12) This permit authorizes a maximum of four boat slips.
General
Permit # 30-08
Page 3 of 3
13) The permittee understands and agrees that, if future operations by the United States requires the
removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the
opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause
unreasonable obstruction to free navigation of the navigable waters, the permittee shall be required,
upon due notice from the Corps of Engineers, to remove, relocate or alter the structural work or
obstructions caused thereby, without expense to the United States or the state of North Carolina. No
claim shall be made against the United States or the state of North Carolina on account of any such
removal or alteration.
14) No open water areas or vegetated wetlands shall be excavated or filled, even temporarily.
NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits,
approvals or authorizations that may be required.
NOTE: Future development of the permittee's property may require a modification of this permit.
Contact a representative of the Division at (910) 796-7215 prior to the commencement of any
such activity for this determination. The permittee is further advised that many non-water
dependent activities are not authorized within 30 feet of the normal high water level.
NOTE: The N.C. Division of Water Quality ha thorized the proposed project under General Water
Quality Certification No. 3494 (DWQ Prod t No. 061926), which was issued on 1/26/07.
? d.
NOTE: The U.S. Army Corps of Engineers gut rize the proposed project under General Permit No.
197800056 (COE Action Id. No. SAW-2 07-00509-071) which was issued on 12/7107.
1. "Prim " "" A licant/ Landowner Information _
?1! PP
business=Name " Project Name (if applicable) .
Applicant 1: First Name
JI?M1? MI Last Name
D o
Applicant 2: First Name Mt Last Name
If additional applicants, please attach an additional page(s) with names listed.
Mailing Address ?} *?
1 !f J 12d.
f,417[3?,? PO Box City d
C??I?GIO} State
?i?.
ZIP
2Z 06 2/! Country Phone No.
q,a asp 'ps - FAX No.
9-10 - 'tC ja61
Street Address (if different from above) City State ZIP
Email
2. Agent/Contractor Information RECEIVED
Business Name " rq-5M#Ufi DCM WILMINGTON, N
Ardent/ Contractor 1: First Name Mt Last Name /
)
?
L. N A
Agent/ Contractor 2: First Name Mt Last Name
Mailing Address PQ Box_ a
86 C )mM I
('?-// State e,
ZIP " PhoneNo. 1
ID - 51 hone No -2
ext.
FAX No.
11D - 36z' Contractor ft
Street Address (if different from above) City - - State ZIP
Email
G? ? ? /?ss?t . GerM
<Form continues on back>
Major Development Permit
I Project Location
county (can be multiple) Street Address
?-
aos
Lymj State Rd. #
?hrn, ,
o
/YI
Subdivision Name City
(v?1dNs>3v111d?cx1 1 State
44 zip
28 y8b
Phone No. d)! wr Lot No -(s) (if many, attach additional page with fist)
a. In which NC river basin is the project located? b Name of body of water nearest to proposed prgecl
1-
Cr06 Ate- 1
h L
c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site.
Natural ?Manmade ?Unknown Ocb?*"
e. IS oposed work within city limits or planning jurisdiction? f. if applicable, list the planning jurisdiction or city limit the proposed
work falls within.
es ?No
a. Site Description
a. Total length of shoreline on the tract (fl) 1
s° b Sae of entjre tract (sq.ft.)
Sa x/jo $ SaoJyuR:
c. Size of individual lot(s) I d Approximate elevation of tract above NHW (normal high water) or
NWT (normal water level) `
(lfmany lot sizes, please attach additional page with a list) ?NHW or YNWL 'tJ
e. Vegetation on tract
f. Man-made features and uses now on tract
Sri 1? RECEIVED
S DOW WILMINPMN,
g. Identify and describe the existing land uses adiacent to the proposed project site UL--C . 1 8 20th 1
h. Flow does local govemmenl zone the tract?
-? 1
?Ir;?lll?'l i. Is the proposed project consistent with the applicable zoning?
(Al zoning compliance cenificate, if applicable)
les ?No ?NA
j. Is the proposed activity part of an urban waterfront redevelopment proposal') ?Yes ESV40
k. Has a professional archaeological assessment been done for the tract? if yes. attach a copy. ?Yes o ?NA
If yes. by whom?
Is the proposed project located in a National Registered Historic District or does it involve a ?Yes o ONA
1
.
Natjonat Register listed or eligible property?
Dorm continues on next page>
Major Development Permit
l
m. (1) Are there wetlands on the site? yes ?No
L]N
2/
(ii) Are there coastal wetlands on the site? ye s
(lit) If yes to either (6) or fti) above, has a delineation been conducted? Oyes No
(Attach documentation, if available)
n. Describe existing wastewater treatment facilities.
n Om
0. Describe existing drinking water supply source.
el
p. De be existi`storm water management or treatment systems.
15. Activities and Impacts
or private
at
b. Give a brief description of purpose, use, and daily operations of the protect when complete
41
EX101'" Ift& V q 907,14'Ai An, r#'d e0AU4*M rpfth?
tog"
c Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type
of equipment and where it is to be stored. 1111
, s I ?i?.1??-?2?I nIl J1 MJ6-1 I?w t V d??.lt? Rn? b,w!'in5 066A. 444A Q
fa Pit tar im S1 TLs Oikoura r1w 12xr.
d. List all development activities you propose. L
t?k"'1r4?
blo t7?l?d6 I?6-I /nt114a&IL- 0, LYOJrl.Ml? 0#CA l?I ? l47-0rh1 vr
turt-+ Sups.
b
e- Are the proposed activities maintenance of an existing project, •n.ewL work, or both?
A" AI
f. What is the approximate total disturbed land area resulting from the proposed project? O ?SQ.Ft or Acres
g. Will the proposed project encroach an any public easement, public accessway or other area QYes No ONA
that the public has established use of?
h. Describe location and type of existing and proposed discharges to waters of the state.
XAi L Will wastewater or stormwaler be discharged Into a wetland? QYes fl?No ?NA
If yes, will this discharged water be of the same salinity as the receiving water? QYes ? o ?NA
j; fs there any r oligatiprr pr6posatl'1 Oyes` ONO EINA
If yes, attach a mitigation proposal.
<Form continues on back> RECEIVED
DCM 11VIGMINGTON, NC
Major Development Permit
6. Additional Information
In addillon to this completed application form, (A4P-1) the follotvmg items below, ft applicable, must be submitted in order for the application
package to be complete. Items (a) - (I) are always applicable to any major development application. Please consult the application
instruction booklet on how to properly prepare the required items befow.
a. A project narrative.
b. An accurate, dated work plat (including plan view and Cross-sectional drawings) drawn to state. Please give the present status of the
proposed project. Is any portion already complete) If previously authorized work, clearly indicate on maps, plats, drawings to distinguish
heb ousel t•9a?drn-cornjrbtehraritrprapos6u.
c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site.
d. A copy or the deed (with state application only) or other instrument under which the applicant claims tote to the affected properties
e. The appropriate application fee. Check or money order made payable to DENR.
f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such
owners have received a copy of the application and plats by certified mail Such landowners must be advised that they have 30 days in
which to submit comments on the proposed project to the Division of Coastal Management.
Name of e2lb aM1 , 1Au1 n Phone No. fD oZ.S
Address L93 d' 771 AIN&Jt Ae, 2J?Y03
Name 'Kitt f Phone No. 9/0-
Address a d tY l Lb t q ? ,t,/,4e6N}3r?11619 ??Al ?•e?6+
Name Phone No
Address
g A list of previous state or federal permits issued for work on the project tract. Include permit numbers. permutes, and issuing dates
h. Signed consultant or agent authorization form, if applicable.
i. Welland delineation, it necessary.
i . A Sinnnd AFr ha7aM nnnrP Or nmtorrt ,n nrannfrger arZri gnlat rrA-0 h K.... ,.._ .., _-
k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G S 113A i-1t)l, it necessary If the project involves expenditure
of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act-
17. Certiftation and Permission to Enter on Land I
I understand that any permit issued in response to this application will allow only the development described in the
The project will be subject to the conditions and restrictions contained in the permit.
I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to
enter on, the aforementioned lands in connection with evaluating information related to this permit application and follow-up .
monitoring of the project.
I further certify that the iinformetion provided in this application is truthful to the best of my knowledge.
Date Print Name Cw&)
Signature /Miew)
Please indicate applicatjon.attachment . pertaining to your proposed project.
QOCM MP-2 Excavation and Fill Information ?0CM MP-5 Bridges and Culverts
VDCM CM MP-3 Upland Development RECEIVED
MP-4 Structures Information n-CM WILMINGTON, NC
FJEC -1 8 2007
Form DCM MP-4
STRUCT
(Construction within Public Trust. Areas)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections e- hp joint
Application that relate to this proposed project. Please include all 9 nor,1<#1G F4C1L1TYIA, AR_tANA CHA.g?.#r!TFr-!t . ^^ ^Ttri ,. _4,_
a. 41 Is the docking facility/marina: .,t? b. (i) Will the facjKy be open to the nPnPr::! n:,hHr)
.;
?Commercial ?PubliclGavernment LtPrtvatele"" ?'te_
k_•
c. (i) Dock(s) and/or pier(s)
(ii) Number
rrn r -0%
(iv) Width l
(v) e=iuaiiny a of , r,.
lU t eo urvv
e. (i) Are Platforms included? CJYes ?No
!r ye
(ii) Number
()$r) Length
(iv) Width L2,-
(v) Floating OYes ®No
Note: Roofed areas are calculated from dripline dimensions.
g. (i) Number of slips proposed
101/ft
(ii) Number of slips existing
d. (i) Are Finger Piers included? ?Yes (INo
If yes:
(ii) Number
(iii) length
I'..\ IAf7./N. -
(v) Floating (]Yes ?No
I. (i) Are Boatlifts included? & (Yes ?No
If vas• •
?-J
(ii) Number CXlst 416 v OWTU
(iii) lenyiir .n/
Jim,
(iv) Width
h. Check all the types of services to be provided.
U cult service, inciudiny hdvei iiii dndivi rail, repair or
maintenance service
t_r vvcnayc. ,uc,. 8. ,.+,,.a'Ird.^..^. °. S:r.r.:...+
? Dockage ("wet slips) only, number of slips:
U Dry storage; number of boats:
C1 Boat ramp(s); number of boat ramps:
Other, please describe:
L Check the proposed type of siting: j. Uescnoe tree typicai boats to be served (e.y.. uNrn \ulla6uut.
? Land cut and access channel charter boats, sail boats, mixed types).
[] en water, dredging. for basin and/or channel
5600enwater,.no dredging required
-
00-then: please describe:
k. 0/ Tvoical boat lenath: I. (i) Will the faci{it a open to the general public?
-- UYes la/NO
m. (i) Will the faPlity have tie pilings? RECEIVED
OYes MNo DCM WILMINGTON, NC
(it) If yes number of tie pilings?
D C 2007
2. DOCKING FACILIMMARINA OPERATIONS 19Ms section not applicable
a. Check each of the following sanitary facilities that will be included lr(tha proposed projecl.
? Office Toilets
? Toilets for patrons; Number: ; Location:
? Showers
[3 Boatholding tank pumpout; Give type and location:
b. Describe treatment type and disposal location for all sanitary wastewater.
c. Describe the disposal of solid waste, fish offal and trash.
d. How will overboard discharge of sewage from boats be controlled?
e. (t) Give the location and number of Wo Sewage Discharge' signs proposed
(ii) Give the location and number Of'Pumpoul Available" signs proposed.
I Describe the special design, it applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products
g. Where will residue from vessel maintenance be disposed of7
h. Give the number of channel markers and "No Wake" signs proposed
i. Give the location of fuel-handling facilities, and describe the safety measures planned to protect area water quality.
?. What will be the marina policy an overnight and live-aboard dockago7
k. Describe design measures that promote boat basin flushing?
I It this project is an expansion of an existing manna, what types of services are currently providers?
RECEIVED
DCM WILMINGTON, NG
DEC 1 8 2007
in. IS•Ult; IIdrirldluuldUrla JOWIiiy jJ#IJPJJCU WIUIU7 a P,iriidiy ur secondary nursery area
L1 :.77 a itY:. - - - .
n. IS this
!(:^.y f$vilitl lnmYn°ur?} within nr ?r.1?8r.Erlf fv^.°.^.} °~.°.:!fi.°ah tSSr:.°.°,t.'^^J area?
- e5 is :.2.:a ?i:Cl::.:LSit eU iCLii/CLtJf 4i7t,:.1G?'.Ytia:L::: 3:%i,=: ::..T __ __ _ _ - -.___. .?-. .. •.
- . - - ._!£L3 Y-'nr nlhcr asintl.evl.lc IIAII A). !f nwv f+r.:,n? ?se..wM... "-! •• -
p 1s,4* novd lJY-d rn-arina/decking facility Iocate-d within br'withfinzlwse preximR, to any ?tte!!S sh.JeaceS? Wyss into
.0. W N"J" lI1W V+,76. (lrrLllJUlllv 4VVClGU 1lII41 //? t'rrL/i5 5c%iivn irui appii?aur`e ?
i !
rte r S^iErCi$I OPubl'iclGovernment
f„! IV( tmrlPr
iia
(IVi VViO[ri
J.l:Flfi- Rnl:iglJ rRaC +itA t':.71:1t7R1A17 lr: itTi :7nn71nP nitTisn Gann: -
4. ur. v:rv le.g.r wooa, sneeipiie, eic. it a rock groin, use M-2, Excavation and t-111.1 ' •? (A r his section not appiicaoie
J
(lil) -Y4 iHU l1 -
t = .a17FdKWATPO ...,,,r ?i .ter :t.? ! t J sisrr?r l; r I; -hr. 1
V• of .r. rlr a.?I-f f !?f ,V.y., •fVV•J, J'!GGLyfi G. Gitr.f J i •? 1lJ ! ";S V1J V{1 , U0, (1/J!!,I•JVYJIG I
Leno h
c. !L'Iaxii-nura disiance bevond I1JHVil. NVVL. nr WP.ilands
b. Aver3Ge dislance from NNIAl. MAIL. or ,.vet!ands
i
, ! r
i h RRl31-?Diieif_ sill iesir.4Z n-4 sit er-4vi ?.= If
S7Ti.:.. .r....t:.... ^..? .....r r:....l.J.. I
A i%tnwcirswitiraici• •r; n:.. n^.
OCommercial OPublic/Government ?Private/Community
vlSt]!is @ to ti8 placed beyond Si vi B!Illd :,. vcSCnl3 w. • 0 y av7 t? c.
- 1YVl C: !J!!J Al1VWV VC 711CGSUI CV Il Vrlt fl7Cl.`:71 CUUC- 11 UlCJCflf. -
RECEIVED
DCM WILMINGTON, NC
HC 1 Q7
7. GENERAL
a. Proximity of structure(s) to adjacent riparian property lines
/5'
(vote: For buoy or mooring piling, use arc of swing including length
of vessel.
b. Proximity of structure(s) to adjacent docking facilities.
10/ _
c. .W?iddtthh of Water body
r-06
e. (i) Will naviga nal aids be required as a result of the project?
?Yes IS(No ?NA
(ii) if yes, explain what type and how they will be implemented,
d. Water depth t waterward and of structure at NLW or NWL
8. OTHER [I This section not applicable
a. Give complete description
P,. Tex Kd? /.?_'`l?s'Gm?a? ?'x ya?nS De?h,
19 0496.q CAS' 1111VW ;cli om iu awg a2i6i &Ad A MIE:_ 71ke 1010L 0140L 7D ft9WrfiYH:e
/S' siDt?%? 1crf
N dom. ?V6?
Date
Obis
Project Name
.Ad rcrV?
Appl'///aaa?nt Name
Z V-5 I 1.410wi
Applicant slgribture
CEIVED
DCM WILMINGTON, NC
DEC 1 8 2007
?. ?I/ntiiwl0/Q+?
I as A 6V*" i0 AL I 4 w, per" rf'
;w b (Owd L1C of d
It m
X9514160%44,11 Ad
WaLimy& bm A(
Z
9.?a
N?
l"1l?siIN6
i
I
409
fZ'
? oSig
G'f u?
I J?
q0 ;I
F$S Marine Contractors, Inc.
Complete Marine Construction Services
For Over 32 years!
CAPT. ED FLYNN DURWOOD SYKES
Piers, Floating Docks, Pilings, Bulkheads,
Boat Lifts, House Pilings, Repairs
P.O. Box 868 Phone/Fax: (910) 256-3062
Wrightsville Beach, NC 28480 email: etly@msn.com
LInE
i
L
RECEIVED
OCM WILMINGTON, NC
DEC 1 8 2007
Met. ?W7
L1?
/rr? 3
u5
} CO
00
U '
CO
W
U)
a? O
O o®
Z 19
_
-
f? J
Lo
v
m as
o
?..
m
_ ?
Q c'1
Ch CL
cm
e
c?Um
`
o m >
z C O O =
O C) mss
.?
cc 0
LL a
:- J
U
m ?« Z
4?. C
a
z LL
m
U
-?
O Z
J m
d n
co m
U
U.
0
w m 7
w Qa o
?
v a3
0111'NOiONIMIM WOCI
o?cZ33
cif s
tr811tlQC ealrow.r?tmrmviHefK Ywa9lemffiwowrWONuloQ W91rmRn4 /
aeas[GIr0"A0110tIM10/TIMNAT;FAWOF A5CAC111101Rrmynna
? It10JJOdt UW IFR OM o+M KOF 7gRVE11A AfE'JIOV.M 1W OM tlI!l AtMI MM
RD07MR!0: S1NTnRSf W o'b AQUA «AC?lptl? W111t ?1tRNDMpd rY
IRALTJ;E 1GR 1AID?UlIRM16 D M?Sl1 fJlt? IAIM'J? 6 M?dtl6iilL?IMS1iM1:11C'Ar71JEE
flllilEllCA10-3ALfiB? IJ1 ORYOV MM Aa 201D. Y
rAMIXC. SWIM
?
M?R1Na441W1 C CA, UXATION MAP
1
SEAL I
?LA
IftCIVING WY IN D!!D BOOK 60 PAGE. Gll
DOM OS!•D 0= 360 Mae 061
BANKS CHANNEL
I ruled
PICK W= IND IOS d IOdTM
me WIF Am SIDD SU&ft ttaz MADE AI 71Cee u RttV I q
rat GwweWe a 711E ?Al7W. n5M tDNAlA51Y t•*u?
rDClO?ID,Tilt aOR DISHY MA?tlt9 N/ THE 037536P -31" -J
empicAT10N 1910m. 3W GOVVrA 1011 0ARD. *rm.% 1005
OOES N4S edm O TRAIGM TO ANY
000WO MOM, MISONS. OR ENSDY
W"MIT AM QFlDJ IM4ZKn C0W
D/ The:INgV %A WASwr'' YIP n5=K
reftm.OR a111tY.
I ? wA
I ?1
1 ( = """EAD sogoa'mq iM mm 1MIS WT 16 a{ASl m TO Ni 1RWW
I WWMIXf'J RG7II5CIIOID. OR
I I e0vS1AN13 051?LO.m.
' RCH
+STORY
I +
I + ? I? ?? + I
10 9
il X.
I i=
P f ?I I
to
rmc. W"
9TRA0005 UNE
mm - 0.5
IND KW
t-s+ 99.9'980Q1N 950
NORTH LUMINA AVENUE
wwfum
LOCATION 5URVEY FOR
JAME5 H. M. THORP, JR 4 ALI5ON D. THORP
J. HOLMES DAVI5, IV ? CAMERON W. DAMS
JOHN M. BURUNGAME t ASHLEY D. BURLINGAME
LQT 76 5ECTION I WRIGHT5VILLF- BEACH t= TENVON
WRIGrIT5VIUJ-* BPACH TOWN$Wr NEW rIANOVrK COUNTY. N.C.
LEOND MAY 31, 2007 01.25 AC.-+
D"FORD ANIVI EPaWA 5AVEM p-etaTStanoNnrE
& @RISTOW •••'"•"••"`A" 40 0 20 40 W
® '
.11.1..x.«..«? g .
«?5
tA5CMM1v!?INA vc. FAIT am eae ,K
d - MONUMENT I INCH . 40 rM
x . Y OUT IN CONCRETE O CA,150 - a 5A1llo w Law aunt". sc mW 50w7 R
EI'VE®
IIINGTON, NC
F) F C 1, 8 200
POPOSL1,9 i- I
.. LTA?G(?IG1Sf?M1111T11wIfnl?IfU113?lA?lIIONOYMr01fiM111?RW9I0?7W:
S?[IdlA6Sf10rllCll9l19Ll? 1l?fW:p110vA?1111dttall?N?Ua
t3 t.t?Sl;1NR 1K?OOl?! Mnty?twraowrOTOWia3110RmfS?1
11 lwlili? t1D+lrblRt'r? wM1?111M M ltllloYY??
1AACIQtOgW05111eRynCi110MhtiMOMr:1NR?6Mn0?wl?oWlC ImE?R
ammos Ii11l6JMM7, Mw?SG. 1w.
4-3
4-+?w.SC - n.r?trfr?l ?1?
NOGG wn1a1 ?
Ilznstldl?S ?(iJ??'J??`rcrr
?S{rr
0 _
?LAW I i
IS?
5MK5
1
.
NilD
h?
7tIM?i1?MICl1!!D'illllYllf? NNC
??
101701D.OHlMlIR1GR ORIRt IUtlO
1Mt?LlMD mO?KA110M I
"mw'* room$= ra AM
1
y?„? ttw?L 0?lti? Ot X111
YAIT101R Ail tf?AiCM
tMMANNIG ttlblaa' dt,
.-
?
_ 1
.?c
s
LO 'PON W
lowsm
UAP Y,? pmla r
r tYfaetues 1tl16T t1/
MOBS MIS Wr 6 U)CATM
4 AN 00 0 14
Zvim mm
0Mul •sloo-t
CY1 m Am s. >IOOC
I C? i ?t 41
1
MAKWAD M3332'3 71
50 ov tmt 1 f SSIMM CK
! i MAW" up wam.
RME
i atoms
60
f i$ 7 i i
i s ! i
i ?nt?wo?es t ; ;zi me - o.s 1 1
WKW
...-J L_ ._. ?v _ J I
i R NORTH LUMINA AVENUE
LOCATION 5uKvEy FOR
JAMES H. M. THORP, JR 4 AL15ON D. THORP
J. HOLMES DAVIS, IV t CAMERON W. DAVIS
JOMN M. BURLINGAME 4 A5M& D. BURLINGAME
LOT 76 5CCTION I WRIGHTSVILLE BEACH E'3CTLNSION
WRJGMTSMUZ DeAC H TOWNSHIP NEW MANCUM C UN7Y. N.C.
DMr ORD
~
asnurrm
uuls?orws?ort,tt t? twMtrtw
LEGM MAY 31. 2007 0.28 AC.*
0. ?MIO tlpr lvt 40 0 20 40 00
9-wrollme
? • tie
O • ?tou?otr t ff" w 4o rm
x .scurMaoMOlslt O e»r?le..?I?lle¦,ueaAran.s tcw.?oer
FIVE
DCM WILMINGTON, NG
DEC 1. 8 2007
2 o
z
HIGGINS PORT _ Z a
AN MOUNT SITE ~ NEW UERNO, HOLLAN JNT VE~NpN ? ~ ~ ~ W
DRR ~ / B ToP pF ED ~~R BED ~9~~ ~ o 0 0
~ HI BANK/ ,2 GH WATER MARK
SR 1136 .,~xw ' •
ti0 2. 1•• ~ ~ o 0 0 0
a0 N tfi N r O N O
132 s ~ Gj • . 5R x w x 30,00 i ' • Q~ p p I I
ii nix o ¢ x`Ui C~ O
Q~ TOP OF BANK ~
VICINITY MAP x~ ti ~ ' •
3 0 ¢3 x ~ • ~ ,gb . , . . . ~ ~
NOT. TO SCALE ~ --(NSD) ¢S ~
2 E~~-5,26. 5~6 ,3~~ .
Q~ ~ 6, ¢g
3~0' ~ ~F. 0 R - _ _ PE WOOD DOCK ¢9 x lw • ii ti0 ~G ~F`~ ~ ~ RMITTEp 7 50 v • E~ CANAL Q
EXI TIN BULKH AD 0~ Q ~ ~ (NSD) POA r ~P PR / 0~ 0 F.
3/4"X10" ~~Q , ti ~~~G JFF HOT DIPPED ti~ 00 QP~ ~ ~ - - _ ~ ~ k 1 Q
2"X6" DECKING GALV. BOLTS ~ ti0 ~1 i ~ ~ T S~ SS S6 • S~ ~ ~ FC, ~ \\~,1 ~ Q
0 Sg ~ ,p9
2 Z x ~ °a _ _ (NSD) Q (PDA) /
,W PROPOSED ~ ~
Q a N FINGER PIER U x w ~
o ~ ~ ' ~ ~ . 75 AE ~ ~ LINE (NSD) j /
~ ~CgMq
z ~ ~ ~ roR ~ ~ _ J
2"X12" ~ ~ ` 1 TREATED Q ~ ~ - ~ .
z GIRDERS m ~ srA,as ~
z ° ° ~ ~
o_ / 4 4 rL ~ p
w HOT DIPPED a ~ ~ b, p ' \ ~qr~ a GALV, BOLTS ~ xw \
w 8" TIE-UP PILING x wv t ~
U L Srgias z ~ ~ ¢ ~ .~01 \ \ ~ ~ w0 I ~ ~ l
~ k \ \ \r` / 1 1 0``~~0 0 2 ~ v/
FINGER' PIER DETAIL E \ F A NTS ~ 2, ~ ~Aroa
2 ~ ~ \ ~ ~ ~ ~
. ii \ srgia • ~ \ 5 RS / ~ o `'~o / ~ ~
\ qEc , I ~ ~ z ~zI ~ ~
~ ~ ~~~e ~ ~ ~ I '
~ ~ \ (cq ~ BULKHEAD PERMITTED #75-07 (POA ~ MA ~qr~ / ,
8 TIE-UP PILING ) \ ~ ELEV, = 2.0' (TYP) i'~ (NSD) \
70P OF DOCK ~ - \ \ \ • ELEV. - 3.17 \ \ \ ~ ` ~ I .I ,
\ ~ \ S14tgs J \ \ lVe I ' ~ V ' .a
• \ \ ~ ~ I L~ _
3~ \ \ 3~ • \ \ \ ~ ~ , , ~I
36 s' \ \ \
• 3 p WOO p \ \ S ERMrrT pock \
• 0 07 \
qC + • 33 q• \ \ SITE NOTES: FOR CONSTRUCTION AREA NOT MAINTENANC ~ FING 32 m \ \
( E) q~~ fR pl E~„ 3~ \ \ AREA OF TOTAL TRACT: 101145.18 SF/12.57 AC Tl f PI fRS S ~ ~ • • \ \ IIN~s NO WN 4 3D
AREA OF PUBLIC TRUST WATER ON PROPERTY: 218185 SF/5,01 AC SHQ qRf p ~ 29 POA \ \ WN A, ROP 150 , • ( ) \
AREA OF PROPOSED SLIP IMPACT - 27,093.44 SF / 0.62 AC Rf PR OSfD 0 • x 28 (NSD) \ opo .rf A ~a~, ~\v ~ J~~~
seD • ~ 2> \ • • ~
•
EL=-7,z7 - 2g ~ ~ / / \ \ 4 ~ ~ V 1 W ~
2S r o0 ~ • 2¢ o • \ \ / ~ \ T'~pER ~ f~OC CURQ ~ I ~ ~ ~ - J ~ ~ Z ~
~ • i • 23 2 •
w 2 0 2 ~ b 2 g o \ ~ ~ ~ ~Z ~ ~ ~ Vj ~ ~ Z z N
C 1 j o qN E~, a
• . ~ q( ~s r • t V ~ ~ I ~m'~ ~ ZzW Nz
• ~ • lg / (cl Q Q I ~ 41 1u H ~
' ~ lg • 15,00, 7¢ W WWI ~Q> U1
• • 1 \ , • • 3 / oQ~Z ~ o~~o ZJ~ - ~ 0 ~2 ~ ~o c~ m.~ s~~u 2 a Z W ~ ~ ~ Q
N W ~2 ~ C. ~ • • 0 ll oW acv I ~ 3
~ 00 , • • ~ W W ~
~ 0 0 + . • ~ ~ti EL. +EL--6~(POA ~ ~V ~ \ ~ ~ ~ 2 JO 2 ~ ~
~i 1 1 ) ~ f ~ ~ (NSD) ~ / Q
30,00' x w • a i
' o ~ ~0 ~ 3~ • b PERMITTED BULKHEAD x'~ • x ~ ~ ROC /~V \ `Fpk
b' ° ¢ • ELEV. = 2.0' (TYP) 97.0 ~i x lvv ~ $ • ~ • ~ Re 1 ~ 1
30,0' x w v • 9 a ~ ~ OO • , / / ERRS Q
• x !v 6 0o S
5z,0' 3 • TOP OF BOARDWALK 15,0 CHANNEL 15,0 TOP OF BOARDWALK NSD ~ ~ 8
3.17 TYPICAL 3.1 T TYP ( ) ICAL • (POA) ~O oo / ~o ~ ~ a~= ~ z V ~ Q
FINGER PIER • • \
• ~ (~,Q' A
O~GOF NWL 0.00' , J~ ~ ~ 0 • ~ ~ ' ~ W U zQ
O QP ~ \ 3 ~ J ~ , 0Q'~
0• P ~ ~ v ~ ~ c Q- ~P~~ ~ 0~~ \ Q ~ QP ~ ti0 \0 JF \ ~ ~ ~ N m ~ xu Ov~~ A
3.00 NOTE -3.00' ~ \ MIN. SLOPE a 1'/100' = 1~0% Q' 2 0 ~ ~ \ ~ ~ ~ ~ ~~Q ~ ~~~Q~ O Q ~ ~ ~
1.0% (209 = 0.2' NEEDED TO MEET ~ Q QP ~ / ~ \ \ SLOPE RERUIREMENTS PER 1 \P \
Q` ~ Z 15A NCAC 07H1^c05(c7 ~ ~P P m \ m - Z `c
o -6.50' -6.50' ? v` CV \Q ~ m w o Q ~ ~ m ~ ~ ~ / f l ~ z , ~ ~ ~ H ~ ~
a ~C/ ~ _ w / ~ Y , S ~ Q'
- ~Y v G m s.oo ~ ~ ~ • ii
m ~ o e^ X~, ~ ~ ~ 3 Q
o°• o ° i
0 0~^ 0 m ,
ao TYPICAL CANAL CROSS-S CTIEN ~ ~ ~ ~ • E o~~
ISO , m SECTION A A o ~ ~
Nrs Q \ ~ ~ z f ~ ~ ~ ~
LEGEND \ ~Q
0 EIP XI TIN IR N P / ~ E S G 0 PIE. ~ ~ ~ ~ ,
~ NIP NEW IRON PIPE ~ ~2 OERB EXISTING REBAR ' . ~2 ~ ' \ ~ ~ ~ ISSUE DATF~o-25-07
•RBS REBAR SET ~ P OPOSED x v X ~ ~ ~ ~ ~
REFERENCE: ~ F ? CM CONC. MONUMENT ~ ~ UMP OUT / / k ~ ~ 2 AVAILABLE SIGN (POA) R e0,q ' ONPS NO POINT SET ~Q~ h qM T ~ ~ ~ DRAWN BY,: RBD
/ p x <ui oEPK EXISTING PK NAIL DB. 191, PG. 686 ~ w~ PROPOSED/ ~ x~~ o ~~~6 Q CHK'D BY. Rs~
• NPK NEW PK NAIL SET DB: 171; PG: 754 0 oQ FNS NO SEWAGE DISOHARG Q ~ a a CAMA PERMIT OFFICER CERTIFICATION ~ ~ J t JAB N~, 06158
o ERRS EXISTING RAILROAD SPIKE D 171 • P °Q Q~ x wv OF SIGN (N D) ' • RRSS RAILROAD SPIKE SET B , G. 757 9G ~ 1 O' DWG, NAMES SITE THE AREA DESIGNATED HEREON (IS IN PART LOCATED WITHIN), (IS ~ ~
o N&C EXISTING NAIL & CAP DB: 101; PG: 903. PROPOSED ~kh F NOT LOCATED WITHIN), AN AREA OF ENVIRONMENTAL CONCERN AND dd. ~°J; ~ ' SCALE+ 1"= 30~
®CC CONTROL CORNER DB: 101; PG: 900 NO WAKE SIGN qp ~'fPP POWER POLE DB: 96' PG: 382 '1`O APPROPRIATE PERMITS (HAVE) (HAVE NOT) BEEN ACQUIRED BY THE ~ ~ ~ ~Q
ALP LIGHT POLE tit L ~ ~ ' • b. SUBDIVIDER. ~ ~
f ~SMP METER POLE DB: 95; PG: 220 ~ ' ~ ~ 3q~ HGRIZ~ N/A V
u ? TEL TELEPHONE PEDESTAL DB: 92; PG: 691 x w u 15' BOAT RAMP Q ~ R/W RIGHT OF WAY x<v PERMITTED 75-07 ~ 1G ' DATE CAMA PERMIT OFFICER ' ~ ~ VERTU N/A
CENTERLINE DB: 92; PG: 49 # c, ~ DB: P o ~ ~
DB: 89; PG: 306 / - / '-4 , I llWU. IVLJ
DB: 88; PG. 334 BEGINNING BULKHEAD PERMITTED X75-07 e PROPERTY OWNERS:
30 0 30 D8: 87; PG: 212 CONTACT: DON G. FAULKNER JR. 'Aic
DB: 77 PG: 11 PROPOSED NO WAKE SIGN ALSO TO BE 1G o LOCATED AT POINT OF PROPERTY ' SWAN QUARTER LANDING, LLC. P.O. BOX 1322
Scale 1u = 30' Q ON FODREY CREEK CANAL o HENDERSON NC 27536
3' PHONE (252) 438-0982~s ' SHEET 4 EF 8