HomeMy WebLinkAboutNCS000546 DMR SW (13)STORMWATER DISCHARGE OUTFALL (SDO)
MONITORING REPORT
Permit Number NCS" 000546 SAMPLES COLLECTED DURING CALENDAR YEAR: 2016
��7 ° e } (This monitoring report shall be received by the Division no later than 30 days from
the date the facility receives the sampling results from thel.�atyox���
" iii p ff��
FACILITY NAME Allen Steam Station AP9, 5 COUNTY Gaston
PERSON COLLECTING SAMPLE(S) StaffNendor „.•: , ,,; r,i j PHONE NO. (704) 829-2350 APR 2 5 2016
CERTIFIED LABORATORY(S) DukeEner�y,•gl rthe`C�i olit � l 1 ab #248
Shealv Environmental Services, NC Lab #329 IAIr ,,,_ vdn ')L-wrrl'rfn
S
IGNATURE
ON PAGE 2. NATURE OF PERMITTEE OR DESIdNHROCESAIG UNIT
Part A: Specific Monitoring Requirements
Outfall
No.
Date
Sample
50050
Total
Collected
Flow if a
mo/dd/ r
MG
SWOOIA
NA
N/A
NO FLOW AT THIS OUTFALL DURING THE YEAR 1 PERIOD 3, January 1, 2016 THROUGH
March 31, 2016 TIMEFRAME.
SWO05
NA
NA
NO FLOW AT THIS OUTFALL DURING THE YEAR 1 PERIOD 3, January 1, 2016 THROUGH
March 31, 2016 TIMEFRAME.
SWO07
NA
NA
NO FLOW AT THIS OUTFALL DURING THE YEAR 1 PERIOD 3, January 1, 2016 THROUGH
March 31, 2016 TIMEFRAME.
SWO13-1
NA
NA
NO FLOW AT THIS OUTFALL DURING THE YEAR I PERIOD 3, January 1, 2016 THROUGH
March 31, 2016 TIMEFRAME.
SWO13-2
NA
NA
NO FLOW AT THIS OUTFALL DURING THE YEAR 1 PERIOD 3, January 1, 2016 THROUGH
March 31, 2016 TIMEFRAME.
SWO13-3
NA
NA
NO FLOW AT THIS OUTFALL DURING THE YEAR 1 PERIOD 3, January 1, 2016 THROUGH
March 31, 2016 TIMEFRAME.
SWO13-4
NA
NA
NO FLOW AT THIS OUTFALL DURING THE YEAR 1 PERIOD 3, January 1, 2016 THROUGH
March 31,2 16 TIMEFRAME.
SWO13-5
NA
NA
NO FLOW AT THIS OUTFALL DURING THE YEAR 1 PERIOD 3, January 1, 2016 THROUGH
March 31, 2016 TIMEFRAME.
SWO13-6
NA
NA
NO FLOW AT THIS OUTFALL DURING THE YEAR 1 PERIOD 3, January 1, 2016 THROUGH
March 31,2 16 TIMEFRAME.
SWO13-7
NA
NA
NO FLOW AT THIS OUTFALL DURING THE YEAR 1 PERIOD 3, January 1, 2016 THROUGH
March 31, 2016 TIMEFRAME.
SWO13-8
NA
NA
NO FLOW AT THIS OUTFALL DURING THE YEAR 1 PERIOD 3, January 1, 2016 THROUGH
March 31, 2016 TIMEFRAME.
SWO13-9
NA
NA
NO FLOW AT THIS OUTFALL DURING THE YEAR 1 PERIOD 3, January 1, 2016 THROUGH
March 31, 2016 TIMEFRAME.
Form SWU-247, last revised 212/2012
Paje 1 of 4
SW013-10
NA
NA
NO FLOW AT THIS OUTFALL DURING THE YEAR 1 PERIOD 3, January 1, 2016 THROUGH
00530
00400
March 31, 2016 TIMEFRAME.
SW013-11
NA
NA
NO FLOW AT THIS OUTFALL DURING THE YEAR 1 PERIOD 3, January 1, 2016 THROUGH
Total
Suspended
Solids
pH
New Motor
Oil Usage
March 31, 2016 TIMEFRAME.
SW013-12
NA
NA
NO FLOW AT THIS OUTFALL DURING THE YEAR 1 PERIOD 3, January 1, 2016 THROUGH
m /l
unit
gal/mo
March 31, 2016 TIMEFRAME.
SW013-13
NA
NA
NO FLOW AT THIS OUTFALL DURING THE YEAR 1 PERIOD 3, January 1, 2016 THROUGH
-
March 31, 2016 TIMEFRAME.
SW013-14
NA
NA
NO FLOW AT THIS OUTFALL DURING THE YEAR 1 PERIOD 3, January 1, 2016 THROUGH
March 31, 2016 TIMEFRAME.
SW013-15
NA
NA
NO FLOW AT THIS OUTFALL DURING THE YEAR 1 PERIOD 3, January 1, 2016 THROUGH
March 31, 2016 TIMEFRAME.
SW015
NA
NA
NO FLOW AT THIS OUTFALL DURING THE YEAR 1 PERIOD 3, January 1, 2016 THROUGH
March 31, 2016 TIMEFRAME.
Does this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? _ yes x no
(if yes, complete Part B)
Part B: Vehicle Maintenance Activity Monitorin Requirements
Outfall Date
No. Sample
Collected
50050
00556
00530
00400
Total Flow
(if applicable)
Total
Rainfall
Oil & Grease
(if appl.)
Non -polar
O&G/TPH
(Method 1664
SGT -HEM), if
appl.
Total
Suspended
Solids
pH
New Motor
Oil Usage
mo/dd/ r
MG
inches
mg/1
m /l
unit
gal/mo
STORM EVENT CHARACTERISTICS:
Date N/A
Total Event Precipitation (inches): N/A
Event Duration (hours): N/A (only if applicable — see permit.)
(if more than one stonn event was sampled)
Date
Total Event Precipitation (inches):
Event Duration (hours): (only if applicable — see permit.)
Mail Original and one copy to:
Division of Water Quality
Attn. Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
Form SWU-247, last revised 212/2012
Page 2 of 4
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a
system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person
or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the
best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information,
including the possibility of fines and imprisonment for knowing violations."
(Signature of Permittee)
61--�C
(Date)
Form SWU-247, last revised 2/2/2012
Page 3 of 4
STORMWATER DISCHARGE OUTFALL (SDO)
MONITORING REPORT
---1
Permit Number NCS 000546'}
FACILITY NAME Allen Steam Station
PERSON COLLECTING SAMPLE(S) StaffNendor
CERTIFIED LABORATORY(S) Duke Energy of the Carolinas, LLC Lab #248
Shealy Environmental Services, NC Lab #329
Part A: Specific Monitoring Requirements
SAMPLES COLLECTED DURING CALENDAR YEAR: 2016
(This monitoring report shall be received by the Division no later than 30 days from
the date the facility receives the sampling results from the laboratory.)
COUNTY Gaston
PHONE NO. (704) 829-2350
SIGNATURE OF PERMITTEE OR DESIGNEE
REQUIRED ON PAGE 2.
Outfall Date
50050
50050
00556
00530
00400
No. Sample
Collected
Total
Flow if a
Total Flow
Total
Oil & Grease
Non -polar
Total
pH
New Motor
mo/dd/ r
MG
(if applicable)
Rainfall
(if appl.)
O&G/TPH
Suspended
Oil Usage
SW018 * N/A
SW020 * N/A
N/A
N/A
"NO FLOW" AT THIS OUTFALL DURING THE MONTH OF MARCH, 2016.
"NO FLOW" AT THIS OUTFALL DURING THE MONTH OF MARCH, 2016.
(Method 1664
* THESE OUTFALLS HAVE ELEVATED TO THE TIER 2 STATUS FOR TSS AND MUST BE SAMPLED ON A MONTHLY BASIS PNI� THREE � CONSECUTIVE
SAMPLE RESULTS ARE BELOW THE BENCHMARK VALUE OR WITHIN BENCHMARK RANGE. i9 LTJ1
Does this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? _ yes x no
(if yes, complete Part B)
Part B: Vehicle Maintenance Activity Monitoring Requirements
1�'�ORNttifjPIIOCEO S1NG UlV1 i
Outfall
Date
50050
00556
00530
00400
No.
Sample
Total Flow
Total
Oil & Grease
Non -polar
Total
pH
New Motor
Collected
(if applicable)
Rainfall
(if appl.)
O&G/TPH
Suspended
Oil Usage
(Method 1664
Solids
SGT -HEM), if
appl.
mo/dd/ r
MG
inches
mg/1
mg/1
unit
al/mo
Form SWU-247, last revised 2/2/2012
Page 1 of 4
STORM EVENT CHARACTERISTICS:
Date N/A
Total Event Precipitation (inches): N/A
Event Duration (hours): N/A (only if applicable — see permit.)
(if more than one storm event was sampled)
Date
Total Event Precipitation (inches):
Event Duration (hours): (only if applicable — see permit.)
Mail Original and one copy to:
Division of Water Quality
Attn: Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a
system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person
or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the
best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information,
including the possibility of fines and imprisonment for knowing violations."
(Signature of Permittee)
(Date)
Form SWU-247, last revised 2/2/2012
Page 2 of 4