HomeMy WebLinkAbout20031338 Ver 1_Triage Check List_20031030Triage Check List
17,[[ ?'
r, ? _,, rg
Date:, 'd3 Project Name: di esid • S D
DWQ#: a? • 1338
County: 1,Ua,
n ,. P
To: ? ARO Mike Parker ?' WaRO Tom Steffens
? FRO Ken Averitte ? WiRO Noelle Lutheran
? MRO Alan Johnson ? WSRO Daryl Lamb
RRO Steve Mitchell
From: i?tA ( Ot- Telephone : (919)
The file attached is being forwarded to your for your evaluation.
Please call if you need assistance.
Stream length impacted
stream determination
-Wetland determination and distance to blue-line surface waters on USFW topo maps
Minimization/avoidance issues
? Buffer Rules (Meuse, Tar-Pamlico, Catawba, Randleman)
? Pond fill
? Mitigation Ratios
? Ditching
? Are the stream and or wetland mitigation sites available and viable?
? Check drawings for accuracy
? Is the application consistent with pre-application meetings?
Cumulative impact concern
Comments: