Loading...
HomeMy WebLinkAbout20031338 Ver 1_Triage Check List_20031030Triage Check List 17,[[ ?' r, ? _,, rg Date:, 'd3 Project Name: di esid • S D DWQ#: a? • 1338 County: 1,Ua, n ,. P To: ? ARO Mike Parker ?' WaRO Tom Steffens ? FRO Ken Averitte ? WiRO Noelle Lutheran ? MRO Alan Johnson ? WSRO Daryl Lamb RRO Steve Mitchell From: i?tA ( Ot- Telephone : (919) The file attached is being forwarded to your for your evaluation. Please call if you need assistance. Stream length impacted stream determination -Wetland determination and distance to blue-line surface waters on USFW topo maps Minimization/avoidance issues ? Buffer Rules (Meuse, Tar-Pamlico, Catawba, Randleman) ? Pond fill ? Mitigation Ratios ? Ditching ? Are the stream and or wetland mitigation sites available and viable? ? Check drawings for accuracy ? Is the application consistent with pre-application meetings? Cumulative impact concern Comments: