HomeMy WebLinkAbout20160894 Ver 1_Application_20160914
Carpenter,Kristi
From:Rivenbark, Chris
Sent:Wednesday, September 14, 2016 7:05 AM
To:Eric Alsmeyer (eric.c.alsmeyer@usace.army.mil)
Cc:Al-Ghandour, Majed N; Chapman, Amy; gary_jordan@fws.gov; Hopkins, Joey; Koch,
Thomas K; Carpenter,Kristi; Lauffer, Matthew S; Mellor, Colin; Murray, Christopher A;
NCDOT Service Account - Roadway Design; Ridings, Rob; Staley, Mark K; Wilson,
Travis W.; Wilkins, Ronald B; Mason, James S; Al-Sharawneh, Ahmad A
Subject:Permit Application for B-5166, Granville County
Follow Up Flag:Follow up
Flag Status:Completed
The permit application for B-5166 has been prepared. The electronic copy can be viewed/downloaded at
https://connect.ncdot.gov/resources/Environmental/
This email serves as our permit application submittal to the U.S. Army Corps of Engineers.
Chris Rivenbark
Project Development & Environmental Analysis
Natural Environment Section
North Carolina Department of Transportation
919-707-6152 office
crivenbark@ncdot.gov
1598 Mail Service Center
Raleigh, NC 27699-1598
1020 Birch Ridge Drive
Raleigh, NC 27610
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.
1
3.a
PAT McCRORY
Covernor
NICHOLAS J. TENNYSON
Secretary
Transportation
September 12, 2016
U. S. Army Corps of Engineers
Regulatory Field Office
3331 Heritage Trade Drive, Suite 105
Wake Forest, NC 27587
ATTN: Mr. Eric Alsmeyer
NCDOT Division 5 Project Coordinator
SUBJECT: Application for Section 404 Nationwicie Permit Nos. 13 and 33 for the
Replacement of Bridge No. 138 over Grassy Creek on SR 1300 (Cornwall
Road), Division 5, Granville County, North Carolina. Federal Aid Project No.
BRSTP — 1300(9), TIP Project No. B-5166.
Dear Sir:
Please find enclosed the Pre-Construction Notification, Stormwater Management Plan, permit
drawings, and roadway plans for the subject project. A Programmatic Categorical Exclusion
(PCE) was completed for this project in October 2015.
The proposed let date for this project is April 18, 2017, with a let review date of February 28,
2017. However, the let date may advance as additional funds become available.
A copy of this permit application will be posted on the NCDOT Website at
https://connect.ncdot.�ov/resources/Environmental/Pages/default.aspx, under Quick Links >
Permit Applications. A copy of the PCE is also available at the above website address under
Quick Links > Environmental Documents. Thank you for your assistance with this project. If you
have any questions or need additional information, please contact Jim Mason at either
jsmason@ncdot.gov or (919) 707-6136.
Sincerely,
p`-.,-.•
--�
.� Philip S. Harris III, P.E., C.P.M.
Natural Environment Section Head
cc:
NCDOT Permit Application Standard Distribution List
�Nothing Compares�_
State of North Carolina � Department of Transportation � PDEA-Natural Environment Section
1020 Birch Ridge Drive, Raleigh, NC 27610 � 1598 Mail Service Center, Raleigh, NC 27699-1598
919 707 6000 T � 919 212 5785 F
o��� W A r�qQ�
� �
� � a �
� , , , � o -c
Office Use Only:
Corps action ID no.
DWQ project no.
Form Version 1.4 January 2009
Pre-Construction Notification (PCN) Form
A. Applicant Information
1. Processing
1 a. Type(s) of approval sought from the
Corps: � Section 404 Permit ❑ Section 10 Permit
1 b. Specify Nationwide Permit (NWP) number: 13 33 or General Permit (GP) number:
1c. Has the NWP or GP number been verified by the Corps? ❑ Yes � No
1d. Type(s) of approval sought from the DWQ (check all that apply):
� 401 Water Quality Certification — Regular ❑ Non-404 Jurisdictional General Permit
❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization
1 e. Is this notification solely for the record For the record only for DWQ 401 For the record only for Corps Permit:
because written approval is not required? Certification:
� Yes ❑ No ❑ Yes � No
1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation � Yes � No
of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu
fee program.
1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h ❑ Yes � No
below.
1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes � No
2. Project Information
2a. Name of project: Replacement of Bridge No. 138 over Grassy Creek on SR 1300 (Cornwall Rd)
2b. County: Granville
2c. Nearest municipality / town: Cornwall
2d. Subdivision name: not applicable
2e. NCDOT only, T.I.P. or state g_5166
project no:
3. Owner Information
3a. Name(s) on Recorded Deed: North Carolina Department of Transportation
3b. Deed Book and Page No. not applicable
3c. Responsible Party (for LLC if not applicable
applicable):
3d. Street address: 1598 Mail Service Center
3e. City, state, zip: Raleigh, NC 27699-1598
3f. Telephone no.: (919) 707-6136
3g. Fax no.: (919) 212-5785
3h. Email address: jsmason@ncdot.gov
4. Applicant Information (if different from owner)
4a. Applicant is: ❑ Agent ❑ Other, specify:
4b. Name: not applicable
4c. Business name
(if applicable):
4d. Street address:
4e. City, state, zip:
4f. Telephone no.:
4g. Fax no.:
4h. Email address:
5. Agent/Consultant Information (if applicable)
5a. Name: not applicable
5b. Business name
(if applicable):
5c. Street address:
5d. City, state, zip:
5e. Telephone no.:
5f. Fax no.:
5g. Email address:
B. Project Information and Prior Project History
1. Property Identification
1a. Property identification no. (tax PIN or parcel ID): not applicable
1 b. Site coordinates (in decimal degrees): Latitude: 36.4725 Longitude: - 78.6642
(DD.DDDDDD) (-DD.DDDDDD)
1 c. Property size: 2.68 acres
2. Surface Waters
2a. Name of nearest body of water (stream, river, etc.) to Grassy Creek
proposed project:
2b. Water Quality Classification of nearest receiving water: C
2c. River basin: Roanoke
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
SR 1300 (Cornwall Rd) is classified as a Rural Minor Collector in the Statewide Functional Classification System and is
not a National Highway System Route. Land use within the vicinity primarily consists of Forested Land, Agriculture, and
Residential.
3b. List the total estimated acreage of all existing wetlands on the property:
0.0 acres
3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:
147 linear feet (Grassy Creek)
3d. Explain the purpose of the proposed project:
To replace a structurally deficient bridge
3e. Describe the overall project in detail, including the type of equipment to be used:
The project consists of replacing the existing 3-span 106-foot long bridge with a 2-span, 122-foot bridge on the existing
alignment. Traffic will be maintained via off-site detour. Standard road building equipment, such as trucks, dozers, and
cranes will be used.
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property / � Yes � No ❑ Unknown
project (including all prior phases) in the past?
Comments:
4b. If the Corps made the jurisdictional determination, what type
of determination was made? ❑ Preliminary ❑ Final
4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: NCDOT
Name (if known): Jim Mason Other:
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
No wetlands on site; only Grassy Creek (perennial) will be impacted.
5. Project History
5a. Have permits or certifications been requested or obtained for � Yes � No ❑ Unknown
this project (including all prior phases) in the past?
5b. If yes, explain in detail according to "help file" instructions.
6. Future Project Plans
6a. Is this a phased project? ❑ Yes � No
6b. If yes, explain.
C. Proposed Impacts Inventory
1. Impacts Summary
1a. Which sections were completed below for yaur project (check all that apply):
❑ Wetlands � Streams - tributaries ❑ Buffers
❑ Open Waters ❑ Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a. 2b. 2c. 2d. 2e. 2f.
Wetland impact
number — Type of impact Type of wetland Forested Type of jurisdiction Area of impact
Permanent (P) or (if known) (acres)
Tem ora T
Site ❑ P❑ T Choose One ❑ Yes ❑ Corps
❑ No ❑ DWQ
Site ❑ P❑ T Choose One ❑ Yes ❑ Corps
❑ No ❑ DWQ
Site ❑ P❑ T Choose One ❑ Yes ❑ Corps
❑ No ❑ DWQ
Site ❑ P❑ T Choose One ❑ Yes ❑ Corps
❑ No ❑ DWQ
Site ❑ P❑ T Choose One ❑ Yes ❑ Corps
❑ No ❑ DWQ
Site ❑ P❑ T Choose One ❑ Yes ❑ Corps
❑ No ❑ DWQ
2g. Total wetland impacts 0 ac Permanent
0 ac Temporary
2h. Comments:
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a. 3b. 3c. 3d. 3e. 3f. 3g.
Stream impact Type of impact Stream name Perennial Type of Average Impact length
number - (PER) or jurisdiction stream (linear feet)
Permanent (P) or intermitte (Corps - width
Temporary (T) nt (INT)? 404, 10 (feet)
DWQ —
non-404,
other)
Site 1� P❑ T Bank Grassy Creek � PER � Corps 35 88
Stabilization ❑ INT ❑ DWQ
Site 1❑ P� T Temp. Fill Grassy Creek � PER � Corps 35 46*
(Causeways) ❑ INT ❑ DWQ
Site ❑ P❑ T ❑ PER ❑ Corps
❑ INT ❑ DWQ
Site ❑ P❑ T ❑ PER ❑ Corps
❑ INT ❑ DWQ
Site ❑ P❑ T ❑ PER ❑ Corps
❑ INT ❑ DWQ
Site ❑ P❑ T ❑ PER ❑ Corps
❑ INT ❑ DWQ
3h. Total stream and tributary impacts 88 ft. Perm.
46 ft Temp.
3i. Comments: * Acreage of temp. causeway impacts is 0.02 acres. 2 causeways will be installed, but not simultaneously.
Temp. channel impacts are concurrent with perm. channel impacts; however, since they extend into the creek beyond the
bank stabilization footprint, it was decided that they should be listed separately.
An additional 21 sq. ft. of perm. impact will occur due to the placement of the interior bent in the creek.
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individuall list all o en water im acts below.
4a. 4b. 4c. 4d. 4e.
Open water Name of
impact number — waterbody Type of impact Waterbody Area of impact (acres)
Permanent (P) or (if applicable) type
Tem ora T
O ❑P❑T
O ❑P❑T
O ❑P❑T
O ❑P❑T
4f. Total open water impacts 0 ac Permanent
0 ac Temporary
4g. Comments:
5. Pond or Lake Construction
If ond or lake construction ro osed, then com lete the chart below.
5a. 5b. 5c. 5d. 5e.
Wetland Impacts (acres) Stream Impacts (feet) Upland
Pond ID Proposed use or (acres)
number purpose of pond Flo
Flooded Filled Excavated ode Filled Excavated Flooded
d
P1
P2
5f. Total
5g. Comments:
5h. Is a dam high hazard permit required?
❑ Yes ❑ No If yes, permit ID no:
5i. Expected pond surFace area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer
impacts below. If an impacts require miti ation, then ou MUST fill out Section D of this form.
6a.
❑ Neuse ❑ Tar-Pamlico ❑ Other:
Project is in which protected basin? ❑ Catawba ❑ Randleman
6b. 6c. 6d. 6e. 6f. 6g.
Buffer impact
number — Reason for impact Buffer Zone 1 impact Zone 2 impact
Permanent (P) or Stream name mitigation (square feet) (square feet)
Tem ora T re uired?
Site ❑ P ❑ T ❑ Yes
❑ No
Site ❑ P ❑ T ❑ Yes
❑ No
Site ❑ P ❑ T ❑ Yes
❑ No
Site ❑ P ❑ T ❑ Yes
❑ No
Site ❑ P ❑ T ❑ Yes
❑ No
6h. Total buffer impacts
6i. Comments:
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
The proposed bridge is 16 feet longer than the existing bridge; An off-site detour will be employed during construction;
The proposed bridge will provide more hydraulic opening than the exising bridge. Two stormwater outFalls are proposed
which will be placed at a distance to minimize disturbance to adjacent stream. A Rip Rap pad will be utilized to dissipate
the energy. There are also a combination of special cut ditches, standard, 'V' ditches, and berm ditches present on the
project, which are intended to reduce stormwater velocity. No deck drains are required for the proposed bridge.
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
NCDOT Best Management Practices for Construction and Maintenance Activities and Best Management Practices for the
Protection of Surface Waters will be employed.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for ❑ Yes � No
impacts to Waters of the U.S. or Waters of the State? If no, explain: Bank stabilization impacts (which are less than
150 linear ft, do not re uire miti ation.
2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps
❑ Mitigation bank
2c. If yes, which mitigation option will be used for this
project? ❑ Payment to in-lieu fee program
❑ Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank: not applicable
3b. Credits Purchased (attach receipt and letter) Type Quantity
3c. Comments:
4. Complete if Making a Payment to In-lieu Fee Program
4a. Approval letter from in-lieu fee program is attached. ❑ Yes
4b. Stream mitigation requested: 0 linear feet
4c. If using stream mitigation, stream temperature: ❑ warm ❑ cool ❑cold
4d. Buffer mitigation requested (DWQ only): 0 square feet
4e. Riparian wetland mitigation requested: 0 acres
4f. Non-riparian wetland mitigation requested: 0 acres
4g. Coastal (tidal) wetland mitigation requested: 0 acres
4h. Comments:
5. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires ❑ Yes � No
buffer mitigation?
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
6c. 6d. 6e.
Zone Reason for impact Total impact Multiplier Required mitigation
(square feet) (square feet)
Zone 1 3(2 for Catawba)
Zone 2 1.5
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund).
6h. Comments:
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1 a. Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes � No
within one of the NC Riparian Buffer Protection Rules?
1 b. If yes, then is a diffuse flow plan included? If not, explain why.
❑ Yes ❑ No
Comments:
2. Stormwater Mana ement Plan
2a. What is the overall percent imperviousness of this project? N/A
2b. Does this project require a Stormwater Management Plan? � Yes ❑ No
2c. If this project DOES NOT require a Stormwater Management Plan, explain why:
2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
See attached permit drawings.
❑ Certified Local Government
2e. Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program
� DWQ 401 Unit
3. Certified Local Government Stormwater Review
3a. In which local governmenYs jurisdiction is this project? not applicable
❑ Phase II
3b. Which of the following locally-implemented stormwater management programs ❑ NSW
apply (check all that apply): ❑ USMP
❑ Water Supply Watershed
❑ Other:
3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No
attached?
4. DWQ Stormwater Pro ram Review
❑ Coastal counties
❑ HQW
4a. Which of the following state-implemented stormwater management programs apply � ORW
(check all that apply): ❑ Session Law 2006-246
❑ Other:
4b. Has the approved Stormwater Management Plan with proof of approval been
attached? ❑ Yes ❑ No N/A
5. DWQ 401 Unit Stormwater Review
5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No N/A
5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No N/A
F. Supplementary Information
1. Environmental Documentation (DWQ Requirement)
1 a. Does the project involve an expenditure of public (federal/state/local) funds or the � Yes ❑ No
use of public (federal/state) land?
1 b. If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State � Yes ❑ No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1 c. If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
letter.) � Yes ❑ No
Comments:
2. Violations (DWQ Requirement)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes � No
or Riparian Buffer Rules (15A NCAC 26 .0200)?
2b. Is this an after-the-fact permit application? ❑ Yes � No
2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
3. Cumulative Impacts (DWQ Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes
additional development, which could impact nearby downstream water quality? � No
3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered "no," provide a short narrative description.
Due to the minimal transportation impact resulting from this bridge replacement, this project will neither influence nearby
land uses nor stimulate growth. Therefore, a detailed indirect or cumulative effects study will not be necessary.
4. Sewage Disposal (DWQ Requirement)
4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
not applicable
10
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or � Yes ❑ No
habitat?
5b. Have you checked with the USFWS concerning Endangered Species Act � Yes ❑ No
impacts?
� Raleigh
5c. If yes, indicate the USFWS Field Office you have contacted.
❑ Asheville
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
NC Natural Heritage Program data, USFWS website, NCDOT field surveys (harperella and smooth coneflower, habitat
but No Effect, July 10, 2015; dwarf wedgemussel, No Effect due to the project being located in the Roanoke River basin);
The northern long-eared bat (NLEB) is covered by the Programmatic Biological Opinion for Divisions 1 through 8.
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes � No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
NMFS County Index
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation � Yes � No
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
NEPA Documentation
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain? � Yes ❑ No
8b. If yes, explain how project meets FEMA requirements: NCDOT Hydraulics Unit coordination with FEMA
8c. What source(s) did you use to make the floodplain determination? FEMA Maps
Philip �. Harris III, P.E., C.P.M. �_� (1�'-12 —ZD/(,
Applicant/Agent's Printed Name �-"-' T --------" Date
Applicant/Agent's Signature
(AgenYs signature is valid only if an authorization letter from the applicant
is rovided.)
11
E Il�;l l�r'fi!�` North Carolina Department of Transportation
`'���y iiy��`;�'��� Highway Stormwater Program I�"f
STORMWATER MANAGEMENT PLAN -
(Version 2.01; Released December 2014) FOR NCDOT PROJECTS
WBS Element: TIP No.: B5166 County(ies): Wake Page 1 of 1
General Project Information
WBS Element: TIP Number: B5166 Project Type: Bridge Replacement Date: 4/29/2016
NCDOT Contact: William Elam Contractor / Designer: Reid Robol, EI - Ecological Engineering
Address: 1000 Birch Ridge Drive Address: 1151 SE Cary Parkway
Raleigh, NC 27610 Suite 101
Cary, NC 27518
Phone: 919-707-6718 Phone: 919-557-0929
Email: belam@ncdot.gov Email: rrobol@ecologicaleng.com
City/Town: Stovall County(ies): W ake
River Basin(s): Roanoke CAMA County? No
Wetlands within Project Limits? No
Project Description
Project Length (lin. miles or feet): 0.17 Miles Surrounding Land Use: Forest, agricultural, and rural residential
Proposed Project Existing Site
Project Built-Upon Area (ac.) 0.6 ac. 0.4 ac.
Typical Cross Section Description: 2@ 11 ft lane, 4.3 ft shoulders, with total bridge width of 33.0 ft and total bridge length of 2@ 10 ft lanes, 2 ft shoulders with total bridge witdh of 24 ft and total bridge length of
120 ft. 105.4 ft.
Annual Avg Daily Traffic (veh/hr/day): Design/Future: 6909 Year: 2037 Existing: 4822 Year: 2017
General Project Narrative: State project B-5166 involves the replacement of the existing NCDOT Bridge #380138 on SR 1300 over Grassy Creek. Bridge #380138 consists of 1@35'-3", 1@35'-0", 1@35'-
(Description of Minimization of Water 3" RC deck on I-beams with RC caps, and timber piles. The existing bridge has horizontal deck drains that allow direct runoff into the surface waters. The proposed crossing is
Quality Impacts) located in Zone AE of FIRM Map number 3720099900J and was studied by Detailed methods. The proposed bridge will provide more hydraulic opening than the exising bridge.
Two stormwater outfalls are proposed which will be placed at a distance to minimize disturbance to adjacent stream. A Rip Rap pad will be utilized to dissipate the energy. No
deck drains are required for the proposed bridge.
Waterbody Information
Surface Water Body (1): Grassy Creek NCDWR Stream Index No.: 23-2-(1)
NCDWR Surface Water Classification for Water Body Primary Classification: Class C
Supplemental Classification: None
Other Stream Classification: None
Impairments: None
Threatened/Endangered Species? No Comments:
NRTR Stream ID: Buffer Rules in Effect: N/A
Project Includes Bridge Spanning Water Body? Yes Deck Drains Discharge Over Buffer? No Dissipator Pads Provided in Buffer? No
Deck Drains Discharge Over Water Body? No (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the
(If yes, provide justification in the General Project Narrative) General Project Narrative)
�
�
;
�
3
�
�
�
•�
�
V
�
�
O
V
See Sheet 9-A For Index of Sheets
See Sheet 9-B For Conventionol Symbols
����� ��� ����� ������ ��
�][�][���� ��� �][������ H�.���
GRA1�l VILLE C4 U1�lTY
LOCATION: BRIDGE 1110.138 OVER GRASSY CREEK
0111 SR I300 (CORNWALL RD.)
TYPE OF WORK GRADIIIIG, DRAIIVAGE, PAVI11lG, A11tD STRUCTURE
WETLAND AND SURFACE WATER IMPACTS PERMIT
BEGIN TlP PROJECT 8-5/66
-�- sra i2+o
--- TO NC 96
��''�As�,.
PERMIT DRAWING
SHEET 1 OF 7
_ �
NAD 83/
NSRS 2007
END TlP PROJECT B-5/66
CLEARING ON THIS PROJECT SHALL BE TO LIMITS ESTABLISHED USING METHOD III.
THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES.
ro
VA
STATE LINE �
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
GRAPHIC SCALES DESIGN DATA PROJECT LENGTH Prepared �n the o�ces of• HyDRAULICS ENGINEER
2017 ADT = 1,146 VPD LENGTH ROADWAY TIP PROJECT B-5166 = 0.147 mi. S T E V V A R T � aY ��^����
50 25 0 5o i00 2037 ADT = 1,762 VPD �� ��ECOLOGICAL �� �����
DHV = 12% LENGTH STRUCTURES TIP PROJECT B-5166 — 0.023 mi. =y�� �`°'' `"°""` ENGINEER[NG �,�� �`�q�
a
PLAN$ D= 65% TOTAL LENGTH TIP PROJECT 6-5166 = 0.170 mi. znr2 sran•naHu srFcrFrcarroxs y� :� �
50 25 0 50 100 T=$% 'k ANDY YOUNG. PE srcNnzo,�: � �
RIGHT OF WAY DATE: � �
rao�Ecz Excrn�Esx ROADWAY DESIGN ENGINEER �, �
PROFILE (HORIZONTAL) *(TTST 4 o+DUAL�4H) APRIL 15, 2016 �� ��
° ° MICHAEL BURNS, EI ��� �.��
RURAL MINOR LETTING DATE: rno�scr nEs�cN sxciNssn �� pW����
10 5 0 l0 2� FUNC. CLASS.= COLLECTOR TONY HOUSER, P.E.
APRIL 18, 2017
PROFILE (VERTICAL) SUBREGIONAL TIER �-cDor coNracr f,E
SIGNATURE:
Z
0
>
�
PERMIT DRAWING
SHEET � OF 7
50� �� ����
SCALE
NOTE: ONLY ONE TEMPORARY CAUSEWAY IS
PERMITTED IN THE STREAM AT ANY TIME
BEGIN TlP PROJECT B-5/66
—L— POT STA12+00.00
:
\'S\ SITE 1
\J \�\�S . � RSPAY RTEM)
� ��`=J�� ,,
��\ \
m
CLA55 B RIP RAP—
-L- +45AC7 Esi l iON
$O'CT & EST 5 SY GEOTEXTILE
aa cr
R 15" WiEL80W5
F.-----------------����
� � —L— I Te
TB
�.___--_
F. —_----___—___`
NOTE�. NO DECK DRAINS REQUIRED
� PUE � PUE
-L- +45.00 �
65' RT &
sa Rr
O
� REMOVE EXISTING
CONCRETE SLOPE
(INCIDENTAL TO '.
aEMovg�) . ..
..., ��J;��
l5" W/J /
ELBOWS /
CLASS B RIP RAP
EST 1 TON 5
EST 5 SY GEOTEXTILE
TEMPORARY CAUSEWAY
SEE DETAIL 7 . - ,.S`/
S�
� /
O O Oo O
� � + �
� � C �
+48.00
PAVEMENT—BRIDGE RELATIONSHIP SKETCH
(NOT TO SCALE)
RIP RAP AT EMBANKMENT
EST 145 TONS
EST 165 SY GEOTEXTILE
SEE DETAIL 2
��� — -g
—__--
PUE
� i �
NAD 83
NSRS 2007
as�:L
��
w000s
TOE PROTECTION
SEE DETAIL 5
CLASS B RIP RAP
E5T 23 TONS
EST 58 SY GEOTEXTILE
c C
77;
� 1
�
���---- - �
./ LRIP RAP AT EMBANKMENT / BERM DITCH J
/ EST 95 TONS SEE,DETAIL 3
EST 105 SY GEOTEXTILE CLA55 B RIP RAP
SEE DETAIL 2 E5�'�t9 TONS
BERM DITCH ESi,-146 SY GEOTEXTILE
SEE DETAIL 6
4��� CLASS I RIP RAP '� STANDARD 'V' DITCH
EST 90 TON SEE DETAIL 4
EST 183 SY GEOTEXTILE .� EST 1 TON
FILL IN WITH CL4S5 II RIP RAP EST 5 SY GEOTEXTILE
AFTER REMOVAL OF EXISTING E5T DDE =14 CY
INTERIOR BENT rF2 SLOPE = 0.3%
(STR.PAY ITEM�
DETAIL 1 DETAIL 2
SPECIAL CUT DITCH RIP RAP AT EMBANKMENT
� H ��o s�oiel I Noi �o s<am�
F,o�r to�m��,.-�
p� o� Di�ch
Ground z:l F\ �e SIoPe Dif<h 1.0'min.
D Grode �� �'�
d
Gao�e.nle Min. D- 1.0 Ft. GEOTEJRILE
Type alLiner= CLA55 B RIP RAP Mox. d- 1.0 Ft.
FROM STA. 18+55 TO STA.21+00 -L- LT Tvae aft��er= CuSs iixir wnP
FROM STA. 17 +00 TO STA. 21 -i- 00 -L- RT FROM STA. 16 i� 40 TO STA. 17 i 00 -L- LT
�ROM $TA. 16+50 TO $TA.17+00 -L- RT
DETAIL 4 DETAIL 5
STANDARD 'V' DITCH TOE PROTECTION
fNarro s�oial In �m s�io7
No��rol Na�ural O�� fii�
Gro�nd z.� D 1.� Gro�nd GROUN� F�� SLOPE
d d �
cEolExmE
ceo�e.nle Min. D=1.5 F. d= 1 Ft.
Type of Liner= CLqSS I RIP RpP MaH. d� �1.0 Fi.
Type of Li�er= C1A55 B RIP RAP
STA.19-00 -L- RT FROM STA.18+00 TO STA.78+55 -L- LT
STA. 19 - 63 -�- RT
�
N
y .._ S�".i� _
��'
� / .,
��/
��ys`/ sa tr �a'�
`"'���/ 80' LT
SPECIAL CUT DITCH
SEE DETAIL 1
CLASS 13 RIP RAP
CLA55 I RIP RAP EST 720 TONS
EST 23 TONS EST 356 SY GEOTE%TILE
EST 50 SY GEOTEXTILE
U
R
_____� � /
PROIECT REFERENCE NO. SHEET NO.
B-5/66 4
:OADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
INC�M�LE E FLr1NS
DO NOT USE FOA d W ACQUISITION
��
STEWARI J �EN�INOEEIRNG
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
END TlP PROJECT B-5/66
-�- Por sra 2i+oo.00
� m
i
i
�� . .�-h - y�� . � .
/
— � . , �r+'�Ee. .�... . ..
/ — R �
� �"''
� � - �
DUE , _ � =��r� �
- . . . . ^U"Lr� � _ .
BERM DITCH ���''-r'?LM � ��- � i,��; `
SEE DETAIL 3 � �. ���Z.f
�,'
CLASS B RIP RAP SPECIAL CUT DITCH �� �
EST 20 TONS SEE DETAIL 1 _
EST 59 SY GEOTE%TILE\ CLASS B RIP R.4P �� '
�.EST 195 TONS
STANDARD 'V' DITCH E�T 582 SY GEOTEXTILE +...
SEE DETAIL 4 � �
E5T 10 TONS
EST 25 SY GEOTEXTILE .
EST DDE -22 CY
$LOPE _ +/-19.0°o O
3
DETAIL 3
BERM DRCH
1����� s<oie)
oa �E
vAR 5.0' V
7.� D�P&.
lo.o'v.C. d
ceo�e.uie
Min. �-1.0 Ft.
Type of Liner= CL45S B RIP RAP MoK. d=1.0 FI.
FROM STA.76+00 TO STA.19+40 -L- RT
DETAIL 6
BERM DITCH
�H ��o s�oial �
O a w F
y 5.0' S.0' V
io.a'vc. �� pJP d
Geo�e�tllv
Min. D=1.0 Ft.
DETAIL 7
TEMPORARY CAUSEWAY
ino. ro scai �
ELEV=36I.d
CIASS B RIP RAP
NG �' i
__ NG__
GEOTE%TILE CLASS II RIP RAP
�DENOTES IMPACTS IN
SURFACE WATER
�DENOTES TEMPORARY
IMPACTS IN SURFACE WATER
END BENT EXCAVATION
SEE STRUCTURE P(ANS
(57RUCTURE PAY /rEM!
FOR -L- PROFILE.SEE SH£ET 5
� PROPoSED PAVED SHIXI[DER
ALL ORNEWAY RADIIARE SUNLESS OrHEAWISE NOTED ON PUWS
FOR STRUCfURE PLWS.SEE SHEETS S-ITHRII S-7
O
�
�.
PERMIT DRAWING
SHEET 3 OF 7
50� �� ����
SCALE
NOTE: ONLY ONE TEMPORARY CAUSEWAY IS
PERMITTED IN THE STREAM AT ANY TIME
BEGIN TlP PROJECT B-5/66
-L- POT STA12+00.00
1 ��
` �v . .
�J I ..
�ps '
�
� ' \
. ..�"" ,-_�.r� � .
__ .�_�� . I3iihcni�,.
i '
��� � �
,� �
�/ I�/,
��/
� �" /
:
� , \ SITE 1 -
- :j�_.. ��\ �'1 \ -`..CLA55 II RIP RAP_
,
` �� -- - � ' �„ �STR. PAY ITEM)
..., ����r� � �.;.- � .,, .,,
\ \ �
\ �
\ � � WDO��
..\ � _ .. ' �. ,.
�� .. � CL.4S5 B RIP RAP .
�� -L- +45.00 Esi 1 iON
SO'LT & EST 5 SY.GEOTEX7ILE - =.�
80' LT
y�, U
_ l\ � � 15" W/ELBOWS� � .
F _ v _-�'�/- �
/ � � -L- I TR
TB
�____-_
F ^ ------------- \ �'.,
r��; '
\\\ \.� NOTE: NO DECK DRAINS REQ}JIR�D
.. �- ___ - _ - _ - !
�� PUE � PUE -�`
U PE-
-L- +45.00
65' RT &
sa Rr
O 15" W/
2 ELBOWS
�.�- CLASS B RIP RAP
EST 1 TON �
� EST 5 SY GEOTEXTILE
TEMPORARY CAUSEWAY
- � SEE DETAIL 7
5�
L=�" �`'��.�
/
O O Oo O
� � + �
� � C �
+48.00
PAVEMENT-BRIDGE RELATIONSHIP SKETCH
(NOT TO SCALE)
m
� i �
NAD 83
NSRS 2007
PROIECT REFERENCE NO. SHEET NO.
B-5/66 4
:OADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
NC�M�LE�'E FLr1NS
DO NOT USE FOA d W ACQUISITION
��
STEWARI J �EN�INOEEIRNG
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
t = - _/; i i'!1������-/ ��� _-
�, �
� - � �` -
- - �- � �in ��� ���
_� -. �� ` - �/" � / /- ��� �
/
. . -__ `�.�-�5�-� . - � � � ��. ����
. . - � / �SS'F�_ �� / S � � �+�
- REMOVE EXISTING � - , �` r ,�
CONCRETE SLOPE PROTECTION/ � _� +
(INCIDENTAL TO STRUCTURf �/�� . � - �� ��
ftEMOVA/L) '� ', .__ �lIlODS .
/ �f� {'
�'� / �
RIP RAP AT EMBANKMENT -- � -- �
EST 145 TONS .. ����.-t a[P RAP
EST 165 SY GEO ILE EST 23 TONS
SEE DETi�L 2� ... � -- - $p SY GEOTEXTILE
�- _ -:. -'� � ---
\- - � TOE�PROTECTION � �- -
` SEE DETAIL 5 UE
�f � CLASS B RIP RAP
E E5T 23 TONS �
EST 58 SY GEOTEXTILE
� �� i _ _ - - - .C..
: / �- - - � F _-.,-.,,. _ -� ._ - ._
�, �r � f `---�
m � i . -. F � �= '�
� �
� /I/ m%
�UE�� :
.r `,� � ///� PUE ni �.-
` j '-RIP RAP AT EMBANKMENT
esr qs rqNs /
EST�105 5Y GEOT£XTILE �
SEE DETALL 2
�� ' � � � B M DITCH 1
% SEE DEfAIL6
� � ' CLASS I RIP RP.P
_� � � EST 9R/40N
EST� y83 SY GE(
FILL IN WITH CL4S5 II RIY RAP
� AFTER REMOVAL OF. EXISTING
INTERIOR BENT 32
(STR.PAY ITEM�
_ � /
-L- +15.00 - � � ��/ -
50' LT & /
80' LT � _ � � .. - -- �� �///
SPECIAL CUT DLL�FL _`� -�� � / ' �
SEE DETAIL 1 l
/
CLASS B R�Y RAP - j
esr izo y6Ns � � END TlP PROJECT B-5/66 �
E5T 35NSY GEOTE%TILE
� -L- POT STA2/+00.00 �
�/ m
. _ _ .. .-�1 .
-� ."
��--"J -%
LBERM DITCH �'-r!
SEE DETAIL 3 � � ��r /
H / . '
CLA55 B RIP RAP SEECDET IL � DITG, � //
BERM DITCH - -- EST 20 TONS � - � ' _
SEE,DETAIL 3 -� . 59 SY GEOTEI(TILE��`. ���SS 8 RIP R.4P ' �
C1A55 B RIP RAP � f EST 195 TONS � /
ESf"qi9 TONS - ------ STANDARD 'V' DITLH 2 SY GEO LE - . 5 '
ESfrl46 SY EOTEXTILE� - SEE.pETA1L 4 .� i -�
� .-� . ES7 70 TONS - - � \ ��� / � / �
��-SfANDARD 'V' DITCH - EST 25 SY GEOTEXTILE ' _ � � . � - -
SEE DETAIL 4 �� . EST BDE =�22� CY �
��
- {-�- � E5T 1 TON SLOPE _ +/-19.0"0
EST 5 SY GEOTEXTILE O
E5T DDE =14 CY 3
SLOPE = 0.3%
DETAIL 1 DETAIL 2
SPECIAL CUT DITCH RIP RAP AT EMBANKMENT
� H ��o s�oiel I Noi �o s<am�
F,o�r to�m��,.-�
p� o� Di�ch
Ground z:l F\ �e SIoPe Dif<h 1.0'min.
D Grode �� �'�
d
Gao�e.nle Min. D- 1.0 Ft. GEOTEJRILE
Type alLiner= CLA55 B RIP RAP Mox. d- 1.0 Ft.
FROM STA. 18+55 TO STA.21+00 -L- LT Tvae aft��er= CuSs iixir wnP
FROM STA. 17 +00 TO STA. 21 -i- 00 -L- RT FROM STA. 16 i� 40 TO STA. 17 i 00 -L- LT
�ROM $TA. 16+50 TO $TA.17+00 -L- RT
DETAIL 4 DETAIL 5
STANDARD 'V' DITCH TOE PROTECTION
fNarro s�oial In �m s�io7
No��rol Na�ural O�� fii�
Gro�nd z.� D 1.� Gro�nd GROUN� F�� SLOPE
d d �
cEolExmE
ceo�e.nle Min. D=1.5 F. d= 1 Ft.
Type of Liner= CLqSS I RIP RpP MaH. d� �1.0 Fi.
Type of Li�er= C1A55 B RIP RAP
STA.19-00 -L- RT FROM STA.18+00 TO STA.78+55 -L- LT
STA. 19 - 63 -�- RT
DETAIL 3
BERM DRCH
1����� s<oie)
oa �E
vAR 5.0' V
7.� D�P&.
lo.o'v.C. d
ceo�e.uie
Min. �-1.0 Ft.
Type of Liner= CL45S B RIP RAP MoK. d=1.0 FI.
FROM STA.76+00 TO STA.19+40 -L- RT
DETAIL 6
BERM DITCH
�H ��o s�oial �
O a w F
y 5.0' S.0' V
io.a'vc. �� pJP d
Geo�e�tllv
Min. D=1.0 Ft.
DETAIL 7
TEMPORARY CAUSEWAY
ino. ro scai �
ELEV=36I.d
CIASS B RIP RAP
NG �' i
__ NG__
GEOTE%TILE CLASS II RIP RAP
�DENOTES IMPACTS IN
SURFACE WATER
�DENOTES TEMPORARY
IMPACTS IN SURFACE WATER
END BENT EXCAVATION
SEE STRUCTURE P(ANS
(57RUCTURE PAY /rEM!
FOR -L- PROFILE.SEE SH£ET 5
� PROPoSED PAVED SHIXI[DER
ALL ORNEWAY RADIIARE SUNLESS OrHEAWISE NOTED ON PUWS
FOR STRUCfURE PLWS.SEE SHEETS S-ITHRII S-7
PERMIT DRAWING
SHEET 4 OF 7
�� 25�
SCALE
Z
O
>
�
SITE 1
PROIECT REFERENCE NO. SHEET NO.
B-5/66 4
:OADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
INC�M�LE E FLr1NS
DO NOT USE FOA d W ACQUISITION
��
STEWARI J �EN�INOEEIRNG
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
�DENOTES IMPACTS IN
SURFACE WATER
�DENOTES TEMPORARY
IMPACTS IN SURFACE WATER
PERMIT DRAWING
SHEET 5 OF 7
�� 25�
SCALE
Z
O
>
�
SITE 1
PROIECT REFERENCE NO. SHEET NO.
B-5/66 4
:OADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
INC�M�LE E FLr1NS
DO NOT USE FOA d W ACQUISITION
��
STEWARI J �EN�INOEEIRNG
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
�DENOTES IMPACTS IN
SURFACE WATER
�DENOTES TEMPORARY
IMPACTS IN SURFACE WATER
WETLAND PERMIT IMPACT SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
Hand Existing Existing
Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural
Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream
No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design
(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)
1 16+17/16+53 -L- Temporary Causeway 0.02 46
1 16+17/16+53 -L- Bank Stabilization < 0.01 88
TOTALS*: < 0.01 0.02 88 46 0
*Rounded totals are sum of actual impacts
NOTES:
Temporary Channel Impacts are concurrent with Permanent Channel Impacts
Permanent surface water impacts due to interior bent = 21 sq. ft.
2013 10 24
�
V
W
0
�
�
�
�
�
�
V
�
�
0
V
See Sl�et 9-A For Index af Sl�ets
See Sl�et 9-B For Conventfono! Sym6ols
BEGIN TIP PROJECT B-5lSS
-L- STA12fG
-- ro Nc s�
����� �� ���� ��������
������� �� ��������
GRA11tVILLE CQU11tTY
LOCATION: BRIDGE N0.138 OVER GRASSY CREEK
011t SR 1300 (CORNWALL RD.}
TYPE OF WORK: GRADING, DRAINAGE, PAVING, AND STRUCTURE
�
N�w sy
NSRS 2007
END TIP PRQJECT B-5166
CLEARING 4N THIS PRQJECT SHALL BE TD LIMITS ESTABLISHED USING METHOD III.
THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES.
ro
va
srarF uNE �
GOGYMEN7 NOT GONSI�ERm FINAL
uN�ss ui sie�u►TURea eoM��ereo
� "' �1f �"" � HI'DRAULICS ENGINBER
GRAPHIC SCALES DESIG11i DATA PROJECT LENGTH
2017 ADT = 1,14G VPD �ENGTH ROADWAY TIP PROJECT �51ei6 = 0.147 mi. S T EWART �a��°F�1�
50 25 0 50 lo0 2037 ADT = 1,762 VPD �(�GI��, 04 �oRry
DHV = 1296 LENGTH STRUCTURES TIP PROJECT �51G6 = 0.023 mi. �`�"' ��m'� mm GINEERING e�� cAo
PLANS p= 650,�, TOTAL LENGTH TIP PROJECT �51fi6 = D.170 mi. ~
T812 S75l11�4RL 3PBCCiFICA970NS p� + f=
FI
50 25 0 50 l00 T= B% * RIGI�T OF WAY DATIs: ANDY YOUNG. PE 9 �
rxcuacr � ROADWAY DBSIGII� BNGIIYE&R � a
V= 60 MPH APRIL 15. 2016 " "
PROFILE [HORIZONTAL] �k (TTST 4%+DUAL 4%) MICHAEL BUR�Nr�S,�EI ���r o a�° F
� � � �w��
RURAL MINOR LBTTIXG D.4T&
ia s o io zo FUNC. CLASS. = COLLECTOR APRIL 18. 2017 TONY HOUSER, P.E.
PROFILE (VERTICAL) SUBREGIONAL TIER �°Or �`'� pg
srcwx�n�
BDUNDARIES �1ND PROPERTY
State Line ----- -----
County Lina ---- ----
Township Line --- ---
il� �I11B -- --
Reservation Lina — � — � —
Properly Line
Existing Iron Pin �
Properly Comer —K
Properly Monumeni �
Parcel/Sequence Number iz3
Existing Fence Line -x—x—x-
Proposed Woven Wire Fence �
Proposed Chain Link Fance �
Proposed Barbed �re Fence �
6cisting Wetland Boundary - - - -nB- - - -
Proposed Wetland Boundary �B
6cisting Endangered Animal Boundary E^�
6cisting Endangered Plani Boundary �
6cisFing Hisioric Properly Boundary �
Known Confaminafion Area: 5oil � �
Pafanfial Confaminafion Area: 5oil - � �
Known Contamination Arsa: Water - � -- �
Potsntial Contamination Area: Water - ,�? -- �
Contaminated Sita: Known or Potantial 'r �%
BUILDINGS AND OTHER CULTURE.•
Gas Pump Vent or WG Tank Cap o
Sign �
Wel I °
Small Mine 'Sz
Foundation �
Area Outline 0
Cemetary 0
Building �
School �
Church �
Da m
HYDROLOGY.•
5fream or Body of Wafer ---- ----
Hydro� Pool or Reservoir r----,
Jurisdictional Str9sam —�S —
Buffer Zone 1 ez i
BuFfer Zone 2 ez s
Flow ,4rrow �--- ----
Disappearing Sfream �--- ----
5pring pr --•`_1-� -
Wefland �
Proposed Laferal, Tail, Head Difch �
� �.
False Sump �;_�,r�
�����^ �� ����� ��������, �������� �� ���s�����
coNVENTioNA� PLAN SHEET SYIVIBOLS
Noxe: Not to Scale *S. U.E. = SuBsurface Uaility Engi�reering
R.4rr.noans•
Srondard Gauqe
RR Siqnal Milepost
Switch
RR Abpndoned
RR dismantled
RIGHT OF W1�Y.•
Baseline Control Point
Existing Right of Way Marker
Existing Right of Way Line
Proposed Right of Way Line
Proposed Right of Way Line with _
Iron Pin and Cap Marker
Proposed Right of Way Line with
Cancrete or Granite RrW Mprker
Proposed Control of Aacess Line with
Concrete C/A Marker
Existing Control of Access
Proposed Control of Aacess
Existing Easement Line
Proposed Temporary Construction Easemeni -
Proposed Temporary Drainage Easement—
Proposed Permonent Drainage Easemeni —
Proposed Permanent Droinpqe /Utiliiy Easement
Proposed Permonenf Ufilify Easemenf
Proposed Temporary Utiliiy Easement
Proposed Aerial Utility Easement
� Orchard
CSX 7R/WSPrylTiVfpM
y,rF��.sr .0 �neyard
0 EXISTING STRUCTURES.•
� � � � MAJOR:
Bridge, Tunnal or Box CulverF
Bridge �ng Wall, Head Wall and End Wall -
� MINOR:
0 Head and End Woll
Pipe Culvert
� Footbridge
lr:a'�
�;L'/i1
E
7DE
PDE
PUE
7UE
AUE
Proposed Permanent Easement with O
Iron Pin pnd Cap Marker �
ROADS �4ND REIAT�'D FF4TURES.•
Existing Edge of Povament ---
FJCIStl11g CUfb ---
Drainaga Box: Cafch Basin, DI or JB
Ppved Ditch Guffer
5torm Sewer Manhola
5torm Sewer
V s �LJ� l IIrV�
POWER:
6cisfing Power Pole
Proposed Power Pole
6cisfing Joinf Use Pola
Proposed Joinf Use Pole
Power Manhole
Power Line Tower
Power Transformer
lYG Power Cable Hand Hole
H-Frame Pole
ll�G Power Line LOS B{S.U.E.'j
lLG Power Line LOS C(S.U.E.')
U�G Power Line LOS D(S.U.E.•]
— TELEPHONE:
Proposed 51ope Stakes Cut --- �---
Proposed 51ope Stakes Fill --- F---
Proposed Curb Ramp cR
6cisting Metal Guardrail
Proposed Guardrail T T T T
6cisting Cable Guiderail " ^ ^
Proposed Cable Guidemil ^ ^ ^ ^
Equaliiy Symbol �
Pwement Removal �
YEGET.4TION.-
5ingle Tree �i
5ingle Shru6 n
Hedge �
Woods Line �"'-'"'-'"'-'"'-'"'-'
� � � �
vmayo�d
%'oN�.'
' caxc ww (
WATER:
Water Manhole
Water Meter
Water Valve
Water Hydmnt
11T Water Line L05 B(S.U.E*j
11T Water Line L05 C�S.U.E•]
lYG Water Line L05 D(S.U.E"j
A6ove Ground Waier Line
lY:
cowc �w lY Pedestal
TV Tower
�--------� lYG N Cable Hand Hole
�� lYG N Cable LOS B(S.U.E.*j
lYG N Cable LOS C(S.U.E.•�
� lYG N Cable LOS D[S.U.E.*j
g lYG Fiber Optic Cable LOS B(S.U.E.*)
lYG Fiber Optic Cable LOS C{S.U.E.*j
lYG Fiber Optic Cable LOS D(S.U.E.*j
•
•
O
►�
r
H
6cisiing Telephane Pole �
Proposed Telephona Pole �
Telephona Manhole OO
Telephona Pedestal 0
Telephona Cell Tower .�,
LLG Telephone Cable Hand Hole 0
LLG Telephone Cable L05 6 [S.U.E.*} - - - -�- - - -
LLG Telephone Cable L05 C(S.U.E.'j ---�- --
LLG Telephone Cable L05 D(S.U.E.'j �
LLG Telephone Conduit LOS B (S.U.E.•� — - - - -�_- - - -
LLG Telephona Conduit LOS C[S.U.E.*}— ---��- --
LLG Telephona Conduit LOS D{S.U.E.•)— rc
LLG Fi6er Optics Cable LOS B (S.U.E.*J — - - - -* �- - - �
LLG Fi6er Optics Cable LOS C{S.U.E.•]— ---* ro- --
lLG Fi6er Optics Cable LOS D[S.U.E.*�— ��°
GAS:
Gas Vaha
Gas Meter
L1T Gas Line LOS B{S.U.E.'�
L1T Gas Line LOS C(S.U.E.*}
L1T Gas Line LOS D(S.U.E.*]
A6ove Ground Gas Lina
$ANITARY 5EWER:
Sanitary Sewer Manhole
Sanifary Sewer Cleanouf
LYG 5aniiary Sewer Lina
Above Ground Sanifary 5ewer
S5 Forced Main Line L05 B(S.U.E."}
S5 Forced Main Line L05 C(S.U.E.sj
S5 Forced Main Line L05 D{S.U.E.•j
MISCELLANEOUS:
Utiliiy Pole
Utiliiy Pole with Base
Utiliiy Located 06ject
Utiliiy TrafFic Signal Box
Utiliiy Unknown WG Line L05 B(S.U.E.*}
lLG Tank; Water, Gas, Oil
Underground 5torage Tank, Approx. Loc. -
I4G Tank; Water, Gas, Oil
Geoerrrironmental 8oring
lLG Test Hole LOS A(S.U.E.*j
Abandoned According to Utiliiy Records -
End of Information
y
Ivc wotar
---*�---
rv
----lVFO---
- - -lV FO- -
rv ro
•
0
0
m
,��—
0
u5T
0
�
m
AATU R
E.O.I.
rn
�
n
�
�
�
�
�
m
�
0
�
�
��.
Op
N �I
�s�
\ .I
V :.
PAVEMENT SCHEDULE
lFfNAt PAVEMENT DESlGN7
C1 PROP. APPR�%. 1Y¢" ASPHALT CONCRETE Sl1RFACE COIIBSE� TYPE SF9.5A�
AT AN AVERApE NATE OF 165 LQB. PER $p. Y0.
PROP. YAR. �EPTH ASPHALT CONGNETE Sl1RFACE COl1RSE� TYPE SF8.5A�
(�"z AT AN AVERAGE HATE OF 110 LBS. PEH SQ. Y0. PER 1 DEPTH TO
BE PLACEU IN LAYERS NOT TO EICCEE� 71�" IN �EPTH.
D1 PROP. APPROX. 9Y¢" ASPHALT CONCRETE INTERME�IATE COIIRSE�
TYPE I19.06� AT AN AVERAGE RATE OF 89$ LBS. PER SR. Y�.
PROP. YAR. OEPTH ABPHALT CONCHETE INTERNEOIATE COUR9E,
D2 TYPE I7B.OB� AT AN AVERRGE HATE OF 774 LB3. PER SO. Y�. PER 1"
�EPTH TO BE PLACEO [N LAYERS NOT LE$$ THAN 2L¢" IN UEPTH OR
pREATER THAN 4" IN �EPTH.
E1 PROP. APPRO%. 4" A9PHALT CONCRETE BA$E GOURBE, TYPE B25.OB,
AT AN AVERAGE RATE OF 458 LBS. PER Sfl. Y0.
R BHOUL�ER BERM OUTTER
T EARTH MATERIAL
w ASPHALT WE09IN0 (SEE �ETAIL)
NOTE: PAVEMENT EOOE 9LOPES ARE 1:1, UNLEB$ SHOMfN OTHERWI9E
FULL �EPTFI
PAVED
SHOULDER 3'-0"
2 VARIES
4'�i" TO
= 5'-5"
c�
�
�
02
II
El � ' '
DEfAIL SHOWING PAVING TO
THE FACE OF GUARDRAIL
d'-F d'-5" EDL
=�-I �� U l�1 U � q.
GRAbE TO THIS IJNE
DETAIL SHOWING GUARDRAIL WITH
SHOULDER BERM GUTTER
USE SHOl1LDER BERM GUTfER AT THE FOLLOWING LOCATIONS:
-L- STA.15+48.00 TO -L- STA.15+61.94 BEGIN APPROACH SLAB} LE
-L- STA. 15+48.00 TO -L- STA. 15+61.94 ( EGIN APPROACH SLABj ( IGH
ORIGINAL GROUND
��_
�
�r
8' 6' 11' � 11' 6'
[4' W/ Gltj u, I GRADE u, {9' VV/ Gltj
4, I POINT 4.
Z Z
e p � � G1 i C1 0� � �P ....
" `--GRADE TO' THIS LINE `"`
TYPICAL SECTION NO. 1
-L- STA 12+00.00 TO -L- STA 15+72.81 BEGIN 6RIDG�
-L- STA 16+95.19 �END BRIDGE} TO �- A. 21 +00.00
CE-L-
i
3S' OUT-0UT [ll CORED SLAB UNITSj
I
_ 36'-10" jCLEAR ROADWAYJ
1' 1' 4'�' 11` � 11` 4'�� 1' 1'
I
� GRA�E
02 � ri � 02
I
TYPICAL SECTION NO. Z
-L- STA. 15+72.81 (BEGIN BRIdGE) TO � STA. 16+95.19 (ENd BRIDGEj
CORED SLAB BRIDGE
(SEE STRUCTURE PLANS7
4$8 Q AhIDSPAN
DETAIL SHOWING METHOD OF WEDGING ON BRIDGE
usE IN coNJUNC71oN WIrH TYPICAL sECT1oN No. 2
(SEE STRUGTURE PLANSj
•••••• 42l Poyattm
�I
RalNph, NC
�.�ro
STEWART
QRIGINAL GRQUND
�
i�i [� � BRG
ii4 @ MI�SPAN
PROJECf RffERBiGE NO.
B-5166
IDAAWAY QESIGN
ENGINEER
SNEEf NO.
2A-1
�IENT �FSIGN
ENGINEE0.
�OGYMEN� MOT GONf1OEREO FIMAL
YNLl56 ALL a16NA7URES OOMPLlTCU
N
z
D
�
�
�
B
L
a
�
L
t9
c9
u�
m
v
�.
BEGIN T!P PRQJECT B-5166
-L- PUT STAI2+0�0A0
i
� �����., ..: ��
�
�
_� �.+��r� ..
_ ..�t:^.s.'h�,^i_r^+._.:,.
i
�
b
�
_�;
��'�t.: C1A55 II WP A
�:�`'. �•.- �,SfR PAY IISM
\...
n " _ _��
ClAtii B WP MP
�EST 1 TON
EST S SY GEOTEKIIL� �.
i0'TAPER � �� \
CT.6 RT. �
is• v�vaeows
--r �
F ��_� � :. .-�� ..
� 4'FDP�`--4—�--�'-- @����
l—
�II fi _ ' _ _I _ � Ol!
---�i�� atl
F �----
�
PUE � PUE
�
T6
NAD 83
NSRS 2007 g
*
�
PROJECf RffERBiGE NO. I SNEEf NO.
ENGINEER
ENGINEE0.
�� a �e.
�� ��� v�i�ae�r��
TEWART -
oocuMFxr Mor �owsioeneo FiMu
uN�ess w� a�oNwrurtes ooMr�er�o
�,,u.,���" `
o r� �.
_ �, ,a�
RGMhQVE FXIS7ING '' " ' , .. . . .
CONCREfE SLOPE PROTEGfIO�Y:�i�•'s.> . �!-�.vr„' _ _
�nN�o�a�r�u To sraucru� anir
srecu� cur ortcH
wr nnr �r r�a�w�Hr sff oeuu� i .
�T 116 70N5 IXA55 6 WP RAP 50' LT
�, 1- - 5au ��r i6c sr c�ohxn� � cuss i ar w�r esr izo roNs END TIP PROJECT 8-51bfi
$EE �FfAll 4 EST S9 TONS EST 956 SY GE07IXTIIE
�T $� s" �O7°�"� -L- Por sra2,�1�0o,oa
,5• Yb�� � j .
EIHONfS /
ClAiS B RIP RAP
ESf 1 TON
ESf 5 SY GEOTQf1LE
� 1
�
f�m
PAVEAfEHT -BRIOIGE REL4TIONSNIP SKETCH
fNOT TO SCALEI
BM •50
` PUE �
i� � - -�_
� RIP RAP AT EMB1INICMENf
67 95 iONB
EdT 105 SY GEOTEXIILE
sff oeru� z
BENM DIfCN
SEE DEfA1L 6
.. . G7AR5 I dP RAP
EST 90 TON
EST 163 SY GEOTEICf1LE
RLL IN WfTH CUSR IIWP NAP
AFfER REMOVAL OF F70S71NG
IM9U0R BEIVT $i
(SIR. PAY RFAy
DETAIL 1
SPECVLL CUf �ffCH
(wre smb
n.M
► �
�
d� o
c.�'°� Mn. o- �.o a
Typs ef Ifnr� GlASS B RF RAP Mm�. d= 1.0 k
RIDM STA 18+55 TO STA 41 +OQ � LT
FROM STA 17+90 TO STA ZI+00 � 1[f
TOE PROIECIION
Sff DEfA1L 5
cuss a �ur w�r
EST 49 TONS
BEIIM IXTCM �
$ff.DEfA1L 3
CIl35 B IUP RAP
EST�19 TONS
EST 746 SY GEOTEKIILE
snwaun �r orrcri
see o�rN� a
EST 1 TON
EST 5 SY GEO7FXfIlE
E5f OGE -ld GY
SIAPE = 0.9%
oEra� z
RIP RAP�E B�VKAAENf
� Nrro se�q
77mn.
Dlld� I.0' lA'
�b
aso,omu
Typ oF Uwr- LIAES II A! Al1r
DETAIL 4 DEfAIL 5
STAN�ARD N' GRCH TOE PROIECIION
[Melb fid� [Ne�ro Srtl-0
Nm�rol NeuW FLL
&OPE
a ° "�e""° d
�
�� d= 1 R,
AAin. D�1.5 R.
T oF linw- ClABS I NIP NAP � d-1.0 H.
Type aFliner� CIAiS 6 WP RM
STA 19+DD � RT F0.0M STA 18+00 TO S7A.1B+Si k LT
STA 19+49 � RT
C
6ERM �IfCX �. �.t
Sff UEGIL 3
G1A53 B WP IIAP
ESf 70 TONS
EST 59 SY CEOTE7Cf1LE
suwo�,w � orrcH -
$EE �EfAIL I
EST 10 TONS
ES'f 25 SY GEbTE]LIILE
ESf UUE -22 CY
SLOPE - +,U9.09G
J
�1 C
. 5�:..� . . . . . . . . . .
� �
W ' � :..,;:'-qyrhjr�y'+"45,:r....
7
� _
� -- ' s �
5U" HT n' �. V.,
SPECULL CLlT ORCH 50' AI +, �, �:. �.
SEE DETAIL 1 � ry � ���1-r`+�._„�
C7A55 B RIP RAP ' _..
E5T 195 TONS
EST 582 SY GEOlEX11lE . . . .
DEfAIL 3
BERM URCH
�w'b so.W i
e� �g�
IUA'Y.C. d
aw.e�
AUM1O=IA F.
T17r Y� li�w= CUSS B!I� W �� d.1.0 F.
RqM STI�18+pp TO STI.19+d0 � R7
oEr,v� 6
BENM �fTCM
�Nolb Sml� Z
�� �
�v a�
10-0'YC. d
c.owar
►c�. o-i.o r�.
rrw d u�..- cuss � er uv �. d-i.a n.
iIOM STA17+00 TO STA1B+00 � 0.T
0
EHD 8EM EXCAVATNNi
SEE 5TRULTIlRE PLAVS
rsrr�ucruRe PAr RF�ri
FOR 'L- PR(IFILE,SEE SffEET 5
O PHQADSEO PAVED SNWLD�R
A!1 DRlVEN'AY RAQPARF YUNLESS OTHEAN7SE NOTED OH PYANS
FOR STRUCiUldE PLAN.�SEE SHEETS 5-lTNAU S-T