HomeMy WebLinkAbout20041934 Ver 2_Staff Report_20050914Staff Report
Project Num: 20041934 Version: 2 Status: Received
Name: Peyton Hall Subdivision C/O Helen Lattimore Project Type: Residential Subdivision
County: Wake Region: Raleigh
Location: Ut Rocky Creek, Peyton Hall, Raleigh
Latitude: +35°49'36" Longitude: -78°33'38"
SW Plan Location:
Owner: Lattimore, Helen
Contact Person: Lattimore, Helen Title: Phone: 7820131
Inspection Date: 09/14/2005 Entry Time: 12:51 PM Exit Time:
Reason for Inspection: Routine Inspection Type: Staff Report
On-Site Representative(s):
Primary Inspector: Mike Horan Phone:
Secondary Inspector(s):
Question Areas:
Sitc Visit
Inspection Summary:
~ ,~ ~
~ ~~~ CU ~ u
~ ~ ~~ f~ ~~ ~~ ~~
~'I (~ ~ - ~ V `~D ~
c~ ~ ` t~~ ~S lk'~ ~ '
o ~~ ~~
~ ~ ~~
~~ ~,, ~~
S w S~ ~
~ ~ ~
~l ~ ~-
c~
.~~ ~~
~~ >* ~
~. ~ , ~ ~~~
F~ ~ "~J ~~~,'~
~ `~ ~ U ~~~v~~
_ ~~ ~~
~ ~ ` t .
~ ~ f.
~~~.~ ~ -~
~vv~G
~.~ ~ ~ - .
~ Page: 1
c
Project Num: 20041934 Owner: Lattimore, Helen
Inspection Date: 09/14/2005 Inspection Type: Staff Report
Reason for Visit: Routine
Sit . Visit
Do impacts described in the application differ those seen in the field? Yes
~ No NA
~ ~ NE
~
If yes, please describe differences:
Are the Intermittent/Perennial calls different in the application? ~ ~ ~ ~
If yes, please describe differences, and how mitigation ratios are affected:
Are there additional impacts not described in the application? ~ ~ ~ ~
If yes, please describe and quantify:
Were the impacts in place prior to the application for the 401 Certification? ~ ~ ~ ~
Additional conditions recommended for the Certification:
Recommended project modifications:
Is this a modification request to an existing Certification? ~ ~ ~ ~
Are there additional stromwater conditions that should be required due to the following classifications: ~ ~ ~ ~
303(d)list, Class WS, NSW, ORW, HOW
Describe:
Is this a subdivision or otherwise part of a larger project? ~ ~ ~ ~
If yes, what phase is this?
Are there prior impacts from prior phases? ® ~ ~ ~
If yes, what are the cumulative imacts for this project? 198 linear feet of perennial, 95 linear feet of intermittent, 20,078sq.
ft. of Zone 1 Buffer, & 13,523 sq. ft. of Zone 2 Buffer
Possible secondary impacts noted:
Comment: Why was mitigation not required for Buffers for Peyton Hall Phase I. I believe that mitigation should be
required for cumulative buffer impacts. Please put on-hold.
Page: 2