Loading...
HomeMy WebLinkAbout20041934 Ver 2_Staff Report_20050914Staff Report Project Num: 20041934 Version: 2 Status: Received Name: Peyton Hall Subdivision C/O Helen Lattimore Project Type: Residential Subdivision County: Wake Region: Raleigh Location: Ut Rocky Creek, Peyton Hall, Raleigh Latitude: +35°49'36" Longitude: -78°33'38" SW Plan Location: Owner: Lattimore, Helen Contact Person: Lattimore, Helen Title: Phone: 7820131 Inspection Date: 09/14/2005 Entry Time: 12:51 PM Exit Time: Reason for Inspection: Routine Inspection Type: Staff Report On-Site Representative(s): Primary Inspector: Mike Horan Phone: Secondary Inspector(s): Question Areas: Sitc Visit Inspection Summary: ~ ,~ ~ ~ ~~~ CU ~ u ~ ~ ~~ f~ ~~ ~~ ~~ ~'I (~ ~ - ~ V `~D ~ c~ ~ ` t~~ ~S lk'~ ~ ' o ~~ ~~ ~ ~ ~~ ~~ ~,, ~~ S w S~ ~ ~ ~ ~ ~l ~ ~- c~ .~~ ~~ ~~ >* ~ ~. ~ , ~ ~~~ F~ ~ "~J ~~~,'~ ~ `~ ~ U ~~~v~~ _ ~~ ~~ ~ ~ ` t . ~ ~ f. ~~~.~ ~ -~ ~vv~G ~.~ ~ ~ - . ~ Page: 1 c Project Num: 20041934 Owner: Lattimore, Helen Inspection Date: 09/14/2005 Inspection Type: Staff Report Reason for Visit: Routine Sit . Visit Do impacts described in the application differ those seen in the field? Yes ~ No NA ~ ~ NE ~ If yes, please describe differences: Are the Intermittent/Perennial calls different in the application? ~ ~ ~ ~ If yes, please describe differences, and how mitigation ratios are affected: Are there additional impacts not described in the application? ~ ~ ~ ~ If yes, please describe and quantify: Were the impacts in place prior to the application for the 401 Certification? ~ ~ ~ ~ Additional conditions recommended for the Certification: Recommended project modifications: Is this a modification request to an existing Certification? ~ ~ ~ ~ Are there additional stromwater conditions that should be required due to the following classifications: ~ ~ ~ ~ 303(d)list, Class WS, NSW, ORW, HOW Describe: Is this a subdivision or otherwise part of a larger project? ~ ~ ~ ~ If yes, what phase is this? Are there prior impacts from prior phases? ® ~ ~ ~ If yes, what are the cumulative imacts for this project? 198 linear feet of perennial, 95 linear feet of intermittent, 20,078sq. ft. of Zone 1 Buffer, & 13,523 sq. ft. of Zone 2 Buffer Possible secondary impacts noted: Comment: Why was mitigation not required for Buffers for Peyton Hall Phase I. I believe that mitigation should be required for cumulative buffer impacts. Please put on-hold. Page: 2