Loading...
HomeMy WebLinkAbout20041934 Ver 2_401 Application_20050801~0 ® Soil & Environmental Consultants, PA 11010 Raven Ridge Road Raleigh, North Carolina 27614 Phone: (919) 846-5900 Fax: (919) 846-9467 - www.SandEC.com August 1, 2005 S&EC Project # 9772.W1 To: NC-Division of Water Quality Attn: Cyndi Karoly 2321 Crabtree Blvd. LS~~~~~ (~ Suite 250 ~ \-J IIJI Raleigh, NC 27604 -~ AU G ? - 2005 From: Chris Flowers Soil & Environmental Consultants, P.A. DENiz-wAttltuutiuTY 11010 Raven Ridge Road ~•dETLAtIDSWaos7oP.1fivA7ERBRAtrCk{ Raleigh, NC 27614 Re: Peyton Hall Phase 2 Wake County, NC On behalf of the owner, Centex Homes, Attn: Grey Methuen, please find attached a complete application and supplemental information requesting written concurrence from the N.C. Division of Water Quality (DWQ) that the activities proposed below comply with the Neuse River Riparian Buffer Rules. Please contact meat (919) 846-5900 if you have any questions or require additional information. PROJECT SUMMARY Project Name Pe on Hall Phase 2 Project T e Residential Develo ment Owner / A licant Centex Homes, Attn: Gre Methven Count Wake Nearest Town Ralei h Waterbod Name Rock Creek 03-04-02, 27-28 Class C, NSW IMPACT SUMMARY Stream Impact (acres): 0 Wetland Impact (acres): 0 Open Water Impact (acres): 0 Total Impact to Waters of the U.S. (acres) 0 Total Stream Impact (linear feet): 0 Total Buffer Impact (square feet) 3,134 Attachments: Pre-construction Notification (PCN) Application Form Agent Authorization Form Figure 1, Raleigh East, NC - USGS Map Figure 2, Wake County Soil Survey Map Overall Site Plan Inset Maps (3 Sheets) Stonnwater Basin worksheets (3 bundles) Impervious Surface Calculations Level Spreader Guidance Document Previously Approved 401 Permit Charlotte Office: Greensboro Office: 236 LePhillip Court, Suite C 3817-E Lawndale Drive Concord, NC 28025 Greensboro, NC 27455 Phone: (703) 720-9305 Phone: (336) 540-8234 Fax: (70-1) 720-9-106 Fax: (336) 540-8235 Office Usc Only: Fonn Version March OS USACE Action ID No. DWQ No. (If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".) I. Processing II. 1. Check all of the approval(s) requested for this project: ^ Section 404 Permit ® Riparian or Watershed Buffer Rules ^ Section 10 Permit ^ Isolated Wetland Permit from DWQ ^ 401 Water Quality Certification ^ Express 401 Water Quality Certification 2. Nationwide, Regional or General Petmit Number(s) Requested: NA 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ^ 4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed for mitigation of impacts, attach the acceptance letter from NCEEP, complete section VIII, and check here: ^ 5. If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coas ~f ~ ent Area of Environmental Concern (see the top of page 2 for furth U ~ i~ ~~1if~e_ t~' Applicant Information AuG 1 ' 2005 1. Owner/Applicant Information `+~~~,DS~ osso~ np~RgRpt1CN Name: Centex Homes Mailing Address: Attn: Mr. Grey Methuen 2301 Sufiar Bush Rd Suite 400 Raleigh, NC 27612 Telephone Number: (919) 781-1952 Fax Number: (919) 571-8346 E-mail Address: 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Chris Flowers Company Affiliation: Soil & Environmental Consultants Mailing Address: 11010 Raven Ride Rd Raleigh, NC 27714 Telephone Number: (919) 846-5900 Fax Number:~919) 846-9467 E-mail Address: cflowers a,sandec.com Page 1 of 8 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps maybe included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Peyton Hall, Phase 2 2. T.I.P. Project Number or State Project Number (NCDOT Only): NA, not a DOT project 3. Property Identification Number (Tax PIN): 1735143505 4. Location County: Wake Nearest Town: Raleigh Subdivision name (include phase/lot number): Peyton Hall Phase 2 Directions to site (include road numbers/names, landmarks, etc.): From Raleigh take US 64 east to New Hope Rd. (SR 2036. Take New Hope Road north to Wedgewood Drive. Turn right on Wedaewood Drive. Take the first left onto Stonewall Drive. Stonewall can ent1X stubs at the property boundary. 5. Site coordinates (For linear projects, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) Decimal Degrees (6 digits minimum): 35.826675 °N 78.560619 °W 6. Property size (acres): +\-42 7. Name of nearest receiving body of water: Rocky Creek (27-28; C, NSW) 8. River Basin: Neuse (03-04-02) (Note -this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.) 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application:The site is currently undeveloped. The majority of the surrounding properties are residential subdivisions. Page 2 of 8 10. Describe the overall project in detail, including the type of equipment to be used: The overall project is the development of the second phase of a residential subdivision. The project will involve the construction stormwater devices to comply with the bb~pass option described in the attached level spreader guidance document dated 10/10/O1. 11. Explain the purpose of the proposed work: The purpose of the project is to meet the demand for residential property in Wake County. IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. Previous permits have been issued to cover impacts from the existing phase of the subdivision. The 401 was issued on January 12, 2005 (,DWQ # 04-1934, . Please see the attached copy of the previously approved 40l . A road crossing which is depicted on the attached site plan and inset maps was covered under the previous permit. V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. No future permits are anticipated. VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. Each impact must be listed separately in the tables below (e.g., culvert installation should be listed separately from riprap dissipater pads). Be sure to indicate if an impact is temporary. All proposed impacts, permanent and temporary, must be listed, and must be labeled and clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) should be shown on a delineation map, whether or not impacts arc proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs maybe included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Provide a written description of the proposed impacts: Impacts to Neuse River Buffers will result from the construction of 3 proposed stormwater basins. The bypass outfalls of the basins will extend into Zone 1 and 2 of the Neuse Buffers and a dissipater pad will be Page 3 of 8 implemented to diffuse the energ,V of the overflow during storm events. The three basins will impact a total of 1,833 square feet of Zone 1 of Neuse Buffers and 1,251 feet of Zone 2 of Neuse Buffers. 2. Individually list wetland impacts. Types of impacts include, but are not limited to mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. Wetland Impact Type of Wetland Located within Distance to Area of Site Number Type of Impact (e.g., forested, marsh, 100-year Nearest Impact (indicate on map) herbaceous, bog, etc.) Floodplain Stream (acres) es/no linear feet N/A N/A N/A N/A N/A N/A Total Wetland Impact (acres) 0.0 3. List the total acreage (estimated) of all existing wetlands on the property: +/- 0.5 ac 4. Individually list all intermittent and perennial stream impacts. Be sure to identify temporary impacts. Stream impacts include, but are not limited to placement of fill or culverts, dam construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib walls, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. To calculate acreage, multiply length X width, then divide by 43,560. Stream Impact Perennial or Average Impact Area of Number Stream Name Type of Impact Intermittent? Stream Width Length Impact indicate on ma Before Im act linear feet acres N~' NA NA NA NA NA NA Total Stream Impact (by length and acreage) NA NA Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.). Open water impacts include, but arc not limited to fill, excavation, dredging, flooding, drainage, bulkheads, etc. Open Water Impact Name of Waterbody Type of Waterbody Area of Site Number (if applicable) Type of Impact (lake, pond, estuary, sound, bay, Impact indicate on ma ocean, etc. acres NA NA NA NA NA Total Open Water Impact (acres) 0.0 ae 6. List the cumulative impact to all Waters of the U.S. resulting from the project: Stream Im act (acres): 0 Wetland Im act (acres): 0 O en Water Im act acres : 0 Total Itn act to Waters of the U.S. (acres) 0 Total Stream Im act linear feet): 0 7. Isolated Waters Do any isolated waters exist on the property? ^ Yes ~ No Page 4 of 8 Describe all impacts to isolated waters, and include the type of water (wetland or stream) and the size of the proposed impact (acres or linear feet). Please note that this section only applies to waters that have specifically been determined to be isolated by the USACE. There are no isolated wetlands on the property so there are no impacts to isolated wetlands proposed. 8. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ^ uplands ^ stream ^ wetlands Describe the method of construction (e.g., dam embankment, excavation, installation of draw-down valve or spillway, etc.): NA Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): NA Current land use in the vicinity of the pond: NA Size of watershed draining to pond: NA Expected pond surface area: NA VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It maybe useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. All of the impacts resulting; from the installation of the stormwater basin outfalls are considered "allowable" according; to the Neuse Buffer Rules. VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on January 15, 2002, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of Page 5 of 8 aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DVVQ's Draft Technical Guide for Stream Work in North Carolina, available at http://h2o.enr.state.nc.us/ncwetlands/strmgide.html. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. All of the impacts resulting from the installation of the stormwater basin outfalls are considered "allowable" according to the Neuse Buffer Rules, therefore no mitigation is proposed. 2. Mitigation may also be made by payment into the North Carolina Ecosystem Enhancement Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at (919) 715-0476 to determine availability, and written approval from the NCEEP indicating that they are will to accept payment for the mitigation must be attached to this form. For additional information regarding the application process for the NCEEP, check the NCEEP website at http://h2o.enr.state.nc.us/wrp/index.htm. If use of the NCEEP is proposed, please check the appropriate box on page five and provide the following information: Amount of stream mitigation requested (linear feet): 0 Amount of buffer mitigation requested (square feet): 0 Amount of Riparian wetland mitigation requested (acres): 0 Amount ofNon-riparian wetland mitigation requested (acres): 0 Amount of Coastal wetland mitigation requested (acres): 0 IX. Environmental Documentation (required by DWQ) 1. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes ^ No 2. If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ^ No ^ Page 6 of 8 3. If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ^ No ^ X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. 1. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 02B .0243 (Catawba) 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ® No ^ 2.. If "yes", identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact Multiplier Required (square feet) Mitigation 1 1,833 3 (2 for Catawba) 0 2 1,251 1.5 0 Total ~ 3,084 ~ ~ 0 ~ * Zone 1 extends out 30 feet perpendicular from the top of the near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. 2. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Riparian Buffer Restoration /Enhancement, or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or .0244, or .0260. NA, the activity is considered "allowable". XI. Stormwater (required by DWQ) Describe impervious acreage (existing and proposed) versus total acreage on the site. Discuss stotmwater controls proposed in order to protect surface waters and wetlands downstream frotn the property. If percent impervious surface exceeds 20%, please provide calculations demonstrating total proposed impervious level. The proposed project will result in impervious surface area below 30% therefore no stormwater plan is proposed for approval. Please see the attached impervious surface calculations. The proposed project will comply with the diffuse flow requirements of the Meuse Buffer Rule. The bypass option described within the attached Level Spreader Desi *tg 1 Options document is proposed to be used. This option will require disturbance to the buffer to install the bypass conveyances. Page 7 of 8 XII. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. The project will tie into the City of Raleigh's existing sanitary sewer network. XIIL Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes ^ No Is this an after-the-fact permit application? Yes ^ No XIV. Cumulative Impacts (required by D~VQ) Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality? Yes ^ No If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent North Carolina Division of Water Quality policy posted on our website at http://h2o.enr.state.nc.us/ncwetlands. If no, please provide a short narrative description: We have reviewed the "DRAFT Internal Policy, Cumulative impacts and the 401 Water Quality Certification and Isolated Wetland Programs" document prepared by the NC Division of Water Quality on October 3, 2002, version 1.6. The draft states that most residential subdivisions are unlikely to cause cumulative impacts. Of the three criteria of~rivate projects that can clearly result in cumulative impact Peyton Hall Phase 2 only meets one. The project is not relatively lame for a residential development in Wake County, the project will involve no commercial development, however the project will occur in an otherwise relatively undeveloped landscape. Some of the current regulations protecting water quality associated with this project include the 401, 404, C, NSW rules. We anticipate that you will advise us if a qualitative or quantitative impact analysis is required. XV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). ~ Ct~/~+~ Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 8 of 8 u7iz9iu5 iY•46 FAX 9195718846 Centex Homes ~ ~ ~ .:or cvva lu: pt rea 1Q10 0 2 1002 moil ~ ~nvironmerl~tal Consultants, PA 31010 Raven Ride Road Raleigh. Notch Carolia~ 27616 Pho~ (919) Sd6.5900 Pam: (929) 846-~s67 •r~yySaHiF1-' .•pm .GENT AUTI-iORIZATI0A1 FORM project Name/ Atin; Field Office: Re: Watlands Related Consulting ~axld Permitting To Whom It May Concern: 5dzEC Project # 1, the current ro owner, herehy designate and authorize Soil & Environmental Consultants. PA to act in my behalf as my agent in the processing of permit Applloatiorls, to Furnish upon request supplemental information in support of appIic~tipns, etC from this day forward. 'The _ '7q~' day of This zl,otificativn supersedes nny pnviou~ caorresporldenre conce+~ing the ogent Eor this project NOTICE: This authoxization,for li,,bihtpand professional courtery reasons, is valid only for government officials to enter the propestyjvhen accompanied by 6&EC staff. Yotit ,should ea11 S&EC to ssrrange a vita meeting pz3or to v~lsft~ng the Bite. -~c ~'~ ~- Print Property ~wnef s Name Property s Si e cc: IvSs, Cyncli Karoly cc: Ivfr. Chris Flowers i~TCDENR - DWQ Soil & Er-vironmerital Consultants, PA 2321 Crabtree Boulevard Rmleigh, NC 2760 ~r„ftone ors; . 23G P Court Suiw C ~rcnsbom Ofi?c .• Concord, NC 28025 3817-E Iawndala Drive Phony (704) 724-94x5 Cm~utwto, NC 27455 1=u: (704) 724-g4pG 7Pfsone: {33~ 5408234 Pnz: (336154aR235 The Department of the Army V,S, Army Corps of Engineers, Wz~mington L?istrut P.O, Bax 1690 Wilmington, NC 28102 ~ - ~-~ 'j ~ ~ ` ~ ~ ' ~ ~i- j TY ~ r ~~Y t ~ { ~ ~CORP :,_8DY 1 1~ j ~~ 1 ~ ~ ~ ~ ~ l ~ i / ,` ~ ' ; 1 , ~. 1: r ~_ . / > / 1 C~ ~ ~ I - ,~ b4 /~ i ,~, ,~ I a ree ~ -~ ~ ~ 1 ~, i :/ \ ~J+ i•/ ,~ j ,-~ ~ '!~. >~~ , - reek- .~ ~ • ~ ~jj r-- '~'~ J '~/ I) x • ~- ~~ ~, -_~ ~ bura~d ~ a Park ~ ' --) ~ •,~ ~ ~ --~ ~'~ P•. ~ ~ ~r1..\ \~ /, ' L/ .. ~\. \~< c ~~ bfv~`' C% ~} ~. ~L~r T . earl"'f' f.'. ?y 1 J _r _ ! ~ ~ ~. ~/' '' ' ~-'""^~~h ~_- ~. • ~ Cam--- ~ ~ ~ - ~ -fi ~ ~\ " . ~ -----~_ --+Y_ .,-- •. / . ~ ,~~ , ~c\3~ r ~- ~ ~a~s ~ . . ~ 1 ~~ .~r~ , r S -~i ~l\_ \`f 1 ``~~. /( , ~lCi' 1 u~= / ,~ r ~ r ,, \ `-_` ~,y,..~ ~J /-- ~ J ~ ~~ ) 41 ~ r` /4 i (/ U ~ ~,~,.L ~ / Z~; , !``I \ ' ~\l/ ~ ;' ~~~I.! ' `` 'AY` p ~~.lC ; _~ -~ . _ J ~J ' ,\. j_r, ~ ~_ _, ~.. ~ _r ~~ - ~ j , , • ~ ~' ~ r!' ~~ t ` r:e ti ~__ ~.~ \~ .,-• '~. T 1''l . _ , ~-- 1 ' q, ~i ~ I '~ ~ r . v~ r I .ri ~ -\ , ~ ~. _ 1 . ~; ~ ~,' :; - ]{ ; ~ ~_~ (j ~ -_ S ,- -~" ~ ~ - 2eW No. 9 ure 1 - USGS Ma Fi 77 p g PA ~ Soil & Environmental Consultants Peyton Hall Phase 2 , Project Mgr.: Centex Homes 11010 Raven Ridge Rd.• Raleigh, NC 27614 CF Wake Count NC y (919) 846-5900 • (919) 846-9467 dEC P S , .com age: www. an Web Scale: 1" = 2,000' July 27, 2005 Raleigh EastQuadrangle - ~ ~,~ ..~ WmC pc rir~~~` Ma -( ~. ~ I ~ Lo0 ~ s ~ ~-.<~ ~. ~ Wr \ ~. ~ , WkE 1 LwC2 WkE y 11 ~/ 4~l `~~., LoC' ~ ~ LAC ~~ ~ - - L wC -- LoD / - ~LoD y ~ ~ z 1 m J. Lof3 ~oG . W ~ ~ o ~ ,; Ir I ~ WmC i ~ WkE .~1M1'o\ AP32 \ o ~ LwC , WmC2 ~ ~ MoD ..~+ , ~ LoD / v ~~ v° ..- WmC2 v 1 / ~~WmC2 P APC2 \ WkE' lwC2 ~ S ~' ~F ` WmC2. WmB2 F ~ - LwC ~0'L i. ~~© \ q4c CU ~ ~ ~ WmC2 is WmC2." .~ ~-. da \ \ . ~ / _. .ice LoD~: ~ / LoC fc~` ; r /Wm o ~ Me LoC ,'~G - ~. LwB2 ';~ i~ ~E w LoE3 ~ t ~ r ,.;. \ ~. m V Y '-..~ _- APB2 - ~. .. - '. .'.. :~ °n r,'. -~ i 'mB2 ~ _- ._.J ~ CIB3 a/~ WmB2 ~ ~ DuL ' ~ WmB2 j ) I' ~> ' - PPG !CeBZ © f wmBi Lw[Li ~' ~~n,C~ ,wn,Ej- _ APB2 Cm /0 - - /. ~. _ t 4~ Wr \ ~'- ' 1 Loo ' , ' Me 1 LwC2 = ._ /~ ~ c' ~p •- G1. AGB2 - W C LwC2 ~ ' t~ -_~ _ • ~ WmC Wr _ ~ ~,r~ PQ_~ = ~~ WmB2 0 1 wyC ' Q~ ~ ~~ 1 ~~ ~ ~~ - o .: _ APB2 ~ ( p ~ J~fn(,/ ~ 1 LwC - ~Q /. _~ _ i~ _ - WkE LoC 94<~ i LwC3 \1` •- LoD:~ ' ~ } [bU \__`-- " APC2. I - - DuC • , y~ -~ A°C2 \ W E I PQG~ ~a~ LoC , ~-~_ 0- - w~ 9p`~• ~t a / nUD ~4 ~. -- - ____ .._ _ - - - ~ ~ Q- 9 WkE \ ~ 'b 1h'kE kF A, B2 -- -- .. -i ./~ ' 11'kC k. Wk \ AoG1,~ ~ 00 ~ Q r - - - - - -° ~ _- ~ ' ~ k-~_ _ APB2 APC2 0`\' WkC V/kE 4`r _ Vo4E q r j !y ~~(Ap- - - ~ ~ ' / -- - 4 -r q W t .'~ -- .. - v QQ - - o`'' q y .. _ ~~ /kE LvC.. ~i1 (-0 4~1 i - _ LoEi - WkC .nl j °~r, ~ m APC2 ~ APB2 ' ~ ~ APC2 , . .. \ i C - ~ l' LoC, - 0 ' ' WkE ~' _ ~o~ o~ ~ OuB2 ,' o v ~' •~P[32~ !',A13 .APB2 ;LoC f Mc . ~~ LoD ~ Me.WkC ~- .~ /~ v _ __ ~ _ ` - ~ ' ~ ~ ~ SOD AIC2 LoC . .: ~ ~,WkE _. ~ T og _ V° h C2 ~UC2. APC2 /. v ...ALC2.~ - lam:: / Me • WkC 4G -_ / ~' .~ LoF P ! PC _ " LuC ` ~ - - --- o APB2 Vv - ~ .- - -_ - ~' •~\~ ~ S _ AP~2 -____ r __- -- _ __ _ -~ ~. . ., a Y`/ r -`J APB2 - ---- Ap13 1 ~ ~ A ~ ,~~ ! \~1 •- , ~` ~' ; .~ ~` .APB2 PCZ - ApB2 ~ \\1 _ [ ~~'/ n ~C ~ ~ LoC =LoC. hPB2,~~~ LoE3 v ~ AP[3 ~ r e ^\ ~. : ~f '~ ~7 Me4. LoQ 1n ~,.. / - `. AUf3 ~ WkC LoE3 LoC ~ 11 ,.. , _ , Me '' )/- ~ - l Mr I ~ LoC ~ I oD ~'~ U ' ~ : . _L \ AP E3 AACI j f B2 9 \, - n , LoC ADB2 j , WkC . <a - LoC . o ~' 11 (- ~. -~.1 , _ O. /APC2 ~ - ~ ~ ~' , f \c. . ~ , _ , G j ry ~ j _ •APC2 ``s ApB2 G ' ~ V v ~+ t Lo[3 , ~ // \ <Q Pp 0ti :/ ~ { ~ APC2 APB2 ~ ~ -~Cn PQ W4'C DuB /.... i' ~ .~ A~2APl3 APB2 ~~ . . - . - APC2 '".. ~ ~ '.`~' - _ -- -- _--- ---- __ __ 9772 W N~~ Figure 2 -Soil Survey Map -- - -- ----- ~ Soil & Environmental Consulfanls, PA ,. Project Mgr.: Peyton Hall Phase 2 {° 11010 Raven Ridge Rd.• Raleigh, NC 27614 CF Centex Homes ~ (919) 846-5900 • (919) 846-9467 - -- - ~ " ~ '~ Web Page: v/w'rv.SandEC.com scale: Wake County, NC ~ . ,. 1" = 1,320' July 27, 2005 Wake County Soil Survey November, 1970 r. \~-r'o;?cls~Vr~HC~\DrQevinQS\5'ie "!-~ _a~'~Q'L'~.`'.~@.J~~_ - ur.' _ _ ~_ - _. ~~ N O Z m N ~i ~a ~~ r v I I ~. ^ I .. ~m ,,/; ~ _ _ _ _a),.,-,i. I A~A~\\~\~\>~~A\ v ~, - ~~llll~/ m II i ~III~ ~~' ll~ll ~~1~ !;f ` ~ ~ i ~/ llll~~ ~ l; 11 ' III I~ ~\\ ~~~-, 1 I 1 ~ ~~111 "Jj'1I ill~lll i ~ ~ v I I \ 1t11~ 1 ~ ~ 1~1 ii III, IIIIIIIi,I'~ ~I1\\.~~ ,~ •~ \ \ \\\\ IJJ' ti \ III I ~ ! 1 ~4 -.. ~ ' \ \ 1 ~\ \\\\ , ~I1~ I// \\ O ~" ~ 11111`\\\\~ ~ `~~~~ ~ 1\\ (I I I ~ v \ ~~VAAVA O ...r ~i~~~,r VA VGA\~ ~~~~~~~t f ; J I ~ I ~ ' ' ( \~ ~ ~v ' I U I v ~ \\ 111 ;~ I 1 JJI ~I ~ J \.~\~ 1 1111 ~ ~ . I ~~ \ ~ 1 ~] m h ;lay , ~~' I jl I I! I !~lJ J ~~ i j I t I I !'! ~\\ l.~ a ,. , ,, 11 1 III ~~11~11\~ ~ \ ~~'~\ J \ 1 \ 11hik~111 ~II I I I ~11 ~ \~ OVA\\~\ V A~~~ ~ f 1 ~d~,r, III I 1111A'V' \ ~ A~~A ~/ ' J ~ z ~;~'~ II~II~11 1 \V ~~~v~~~~v~ ~~ /I~ ^ f I U ~ ! ~alll 11 `111 1\`\`\ \~` ~ ~ ~~\~~~~ ~ ~ I I ~ \ \ \\ \\ , ~~_ :~\\ D I ~ I I I I I II I I \ ~~~~<~~ ~ ~ 1 VA \ \\~\~~. ~' ~~ ~ ~~ ~ 11\~ p,~~ (n 1 \ \ ~ -~ 1~ ~~ I I~ I I I /~ I I I I J i~' ' I J I~ ~~ / \\ ~w ~~ I I I I // / / II i t Itll ~,~j~~ . j ~ ~ ~ ~ ~ ~ wv IJ ~ I ~ ~ ll ~r~w„n, ,,I ~.~~_.-~ ~y~ ~i /i/ NFL JJ ~ ~ lIII` ~~vvv ~; ~~~ ~ `~~~ ~-,z: - ~ / ~ // / ~ II 1 1\ ~~, ~. ~~ v ~~~~ _ ~ ~ tyh f~Ii ICI ~~ ill !/ / // JI Il\\\ \~ ~~~~~ ~ _ ~i// ~~ ,( I ! I I III t ~~ / ~j U~ // /1 ~ -I~ I ~ ~ ~- ~ i IIJ 11 1 1111\ \\\\\ II ,\1 \\ ~ ~ ~/// ~~~ I \ ~I%~1 J / ~~~ M ~ II ////~ I I~ I 1 VA\\ ~ ~ ,A \~1 I ~ ~ i ~ ~~ ~' 1 ~'' , ~ ; 111 ~ ~ , ~ ~~V ~ ~ ~ ~ ~ I I 1 ~, ~' ~ ~ ~ ~ II , ~~~~;%, ~/% lI X111 ~; .~ V , ~ I ( d .~ pg~ I 1 II ~ v A~\ ~~; /Y _ ~~ I =~,~~ .~~'' //l~~ i J Iii 11 ~~ 11~11111~~,~ ~ ~j/j~l ,~~ ,~~~- ~\\\*\\ / /~ ~~ 1 111 ~1 ' I) / ,~ ~1:` \\ ~ I I ~ ~ i i / ~~ 1 ~ ~ ~ 11 IIR i~ % ~~ III V ~ti ~ ~ z i' i i % ~/l / ~ l ~\ VAA \ 1 .1~ )~I ~n ~ ~ II 1 'y `~~' ~',I J I 1 I " I ~ ./~ i ijo~~i /~'/. 1 i II /!(~~ 11. iI T /`;~~- -%z ~- /h1~~1 1/ ,fII,iIIjU'IIi~Ht~„~I~III1\\\1\ ~~ ~IIII11~ f p . ~ ~`~ ~~ ~ ~ / 11 '~ ~ I ' i~ ;~: A~~I \ ~ 1 ~ ~ ~ - I '= J \ ~! j '~~ / 1////11~,~~, J ~A -II ~ ~~~~ iii~~ ////~JIIJ~IIIIII~~1~ ~ ~~ _ ~~ =~ -_-` - i \ __ ~ ~ ,~ ~ I m ~ JJJJ C I \ \ 1\\\ ~ ~ \J ~\11 ~'~ I \ ~" ( i - - --- - - -- ~ J ~ _,_ , _ I _ ~ ~ _ _ _-_ -- - _ - -- ~ z O -~ z v ~ -cn ~~ (7 ov~-o D ~ ~ ~ ~ -° m o °- ~ -n + STI LLM~,~DOW R,~OI7 ~rN17 ~ ~ o ~ . . ~ N~D6~WOOJ~ I7f?I YE ~ ~ p~ ~ }~,4LE 16H, NORT4~ G~rfZOL I N,~ \Frojects\PHC\Drov~ings\Site\PHC_engrtos=.~~'.'9 - ~`~~ ~' "'~' `''' N ~i O Z ~a ~~ u ~/ ~/, NoyN~N ~ ~ / ~~~ ,~i~i~~~~'~i~.~ z O 70 -~ ~ -o ~ om,-m m ~ o N°o ~ ~ ~ P~YTO~I HALL - PH~S~ II STILLM~~I~OW R~017 ~NI7 WE176~WOOi7 17RIY~ R~L~ 16H, NORTH G~ROL I N,~ -~ ~~ ~~ ~~ ~ ~. ~ 0 0 0 .., ~- ~. ~- A. ~o d ~a a r- ~ ~ ~ ~„ F: ~Projects\PHC~Drawings\Site\PHC_engrbase.dv~g - rJB.2 Jun 30, 'G5 - 5: 3opm ~/ //~~I:~/1111 I ~ III I j I \\~ \\\ \\ 1\ ``~~ / /~//I I I I I I I I j ~\\ \\ \\ ~~ ~/ / /II I I I I I I I I \\ \ \ \ `. ///I I I I I i I I II II I \\ \\ \I \\ \ ~~~~ \. I I I I I I I\ \ \ `\ \~ \\ ~~ y~ 111 I I I i I I I' I I I \ \ ~ \\ ~ `~ ~~~~~. /I I I I I I I I \ \ ~ ~ ~ ` l l j l I I I I ill I I I \ \\ ~~ ~~ \~~, ~ `1~ 'I I III I I I I ~'I I I I \ I \ ` ~ ~ _ /~ \ ~ ~ ~ II I i I 1 I \ \ 1 ~~ ~`\\ ~ .~~~ II ~I I~ I ~ I I I I \ ~ \ 1 1 `` ~~ ~ ~ ^ , I I I I ~I I \ \ 1 1 ~ ~\ ^ \ I I ~ II \ ~ 1 1 \ I \ ~ YI, III ; I , \ \ I \ ~ ~' o I I I ~ I ~ I II ~ I ~\ \ \ 1 \ .` ~~ i 1 ~~ \ I I (/ i I I I I• ~ I \ \ ( 11 1 \\ \~/ '7~ 258 \\ ~ ~ i i I I I. I 1 1 ~ I I I i I I III 1 1 1 1 ~ ~ ~ ~ \ I~ l I l l l 1l1` \ i I` I 1 ~\ ~` ~ \ ~' /~ I I I` I I / ~ ~ I I I I ~ I I I \ \\\\\ \ I I I 1 \ -_ ~ a ~ ~ ti ~ \ \ \ \ I~I I I `I\\\\ ~ / \ \ \ I 1 \ ~ ~ ~? ~ \ \ \ \ \ \ I I I I \ \\ ' 2Sa ~ \ \ ~ \ \ I ti ~ li i ~ y~ \\ \ \ \\ ~. ` \\ I ~ \ i I , `\ \ ~~ '~ ~ y ~ i i /I / a6 ~ , 1 ~ i i ~ a~~ ° ~s~ ~ \ \ 252 ~ ~ \ 1 ^53 n ~ \ ~I `~ ~ ~ \ ~~~~ ~ ~ ~ ~ ~ ~ r \ ~~ ~ _- -~ D ~ ~~ ~ r DLD~~~- ~s ~ Z \ \ / ';' \ 1 / / J N ~ C ~ ~ ` 'TI -~ I ~ / / ~ J / ~ (n ~~ AA i /~/ / f~ l -o G~ p r= ~ o - `~ v~ i /,f// AlI ~~~ ~ z ~ o~~ ,\\ ~~ ~' ~ n i v Z i~ Z C \~~- ~i/ ~~ ~ ~ n ~ I~TI O \~~\~~ ~ m~ o~ ~ ~~ ~ ~I .I \~~\\`\1~1' ~~~\" ~~. z \ ~~ / ,I ~ ii -~ • ~ -tnov~a-o ~~ v_D~~ a ~ -~ o -~ °~ ~ i ~ ~ ~ ~, ~~ 0 0 ~. .-n.+ STILLN1E,~rI70W Rr~017 ,AND °~- ~ o _ ~ ~' lN~D6EWOOD I71?11~~ ' R,~L~ 16H, NORTt~ G,~ROL I N~ F: \Projects\PHC\Drawings\Site\PHC_engrbase.d;vg - IIB.~ Jug 01, '05 -- 9: ~~c'~"~ ~zrn ~m -~-o ~~°- W O ~ O v~o ~~ I ~~ro (J1 Z W Z ~ n N ~ m cn z m (~ fTl (n ~m z~ ~ ~~~ '*1N ~~ ~ ~ c~ Z Z ~ ~~ m~ ~ o ~ ~ ~ ~ ~m ~• ~ .< ~~, i / / 1 \ \ \ ~I 1 it I I I 1 ~ \\ \ \ \~ \ \ \\ \\ \ d\ ~ \ ~ ~~ / / / / // / / / , '1 \ \ \ I I I I I I I I a I \ \\\ \ \ \ \ \\ y~ ~\ / . ~ / / / / / I I I I I I I ¢ I I~1~~ \ \ \ \ ~\1 ~ ~~ /tee- ~~ / / / / / / / / e I I I ~ I I 1 \ \ \ \ \ \ \ ~ \ ` ~ ~ i~ / / / / / / / / I, I I I~ // // // ~/ / // / / a J- ~j' I I II I 1 I I \ \ \ \\\ \ ~ ~ ~ -~ i / / / / / / p/ ~. ~ ! I I I I I I I 1 I I\ \\ ~~ ~ ~~ / % // // // / ~ ~ / ~ I I I Ij I ~ I I \I\ \\\ \\\ ~ ~~ '~~ a„ ~~ / /~ /~~/ / / / ! I aI I 1 1` 1 I / / ~ \ / / ~ I 1 ~t i 1~a \ \ I I ~ JI \ ( / // ~ \/ / 1 a I 1 1 \ 1 1 1 II I 1 \\\ 1\\ l 1 I ~a 1 / I / r~ i1 \ ~\ \\ \ ` 1 1 1 1 1•\ 1 \ ~ ~ a 1' I a , N = \ \ \ I I I \~ 1 I ~ ~ .~ ~ 1 ~ `~ a. 1 1 11 1' 1 ~ ~/a // a a I 1 / // W \ \ ~'1 l \ 1 11 1 1 I / _- 1 q I I 1 \ / 11 1 1 1 1 a 1~~~ !i 1 I I I / O /~ \ / 1 ~ ~ 11 11 1 al 1 n\\ I 1 1 1 I ~I N / / / .^! ~.1 1 I J //~ a \oo \ \ 11 ~I N / / / / / / //l/~ / 1 1 \ \ \ 1 ~ n, rn / / / / / //// / / / ~ ~ ~ 1 111 , ~'~ \,\ \ \ \ ~~ . ~ ! \ 1 N~ ~ ~ I ~ , ~ I / ~ , / //// ~~~%/ //,/// I i // N \ I` \ \ 1 I N~ /~ / / / / /• / / / \ \ ~, \ j \ \ \ \ ~ \ \ / / / ~/ /~/ / / / / / / I i \ N\ o \\ , \ \ / \ \ \ I / /~,// ~ / / //~ / / / / I • \ \ ~\ \ ~~ / \ \ \ \ \ \ 1 / / 5l0' , // / / / / l j/ 1 ~ \ \ cn \ \ \ \ / / O , / ~// / / / / I '~ \ \ ~, \ \ \ ~ ~ \ \ \ 1 / /,./,// // / / / I/ \ \ - ~ \ 1 I I I (/ GS i / ~ l ~ ~C ` \ \ \ 6 RM \ ,, 1 ~ 1 I I I I Fqs F i / // / / / / 1 \ I I I 111 O,c• Ci,Q ~/A ~~ / / / / \ ~ \ \ ~ ~ \ \ b \ - \ 1 1 ~ 1 I I 1 I I ,/1 11 J1 /l / / ~"1~ \\ .~ \ \ \ \\ \ \ 1 1 ~ 1 it 1 1 I I I I ~ 1 !!ll lI l / //i '~ O O~~ B(~ // // ~ !I \ ~ \\ 1 1 1 1 1 1 1 I I I I I h! 1// // ti~ F, \ \ \ \ ° \ 1 1 1 1 1 I I I I /' II 111 1111 / '/ / / Fq, °'y ~F / ! I \ \ \ \ \ ~ o I 1 1 1 1 1 1 1 1 I I I I I I11I111111 // ;' // // Sip TOA // l ~ \\\\ \~ 1 1 1 1 1 1 I I I«!1'rll/~ „, F l l \~ \~.~~ 1 1 1 1 1 I I t~ «r11j1111(/~~ / l 1 / \ \ \ 1 1 1 1-- I I '111 1111 (. // / / / / \ \\ ~ \ 11 1 II 1~- ~ ~ 1 11 1 I I I I 1 111111 I I II 111 II (•/ / / / / 1 I \\ \ \ 1 ~,`I - J; '~ 1 II 1 11 1 II I I I I I l l j I l l j I I I I j y/I I//~/ ~/ \ \ \- ~~-.r \ 1 \ 1 1 1 11 1 1 1 I I I // II IIII I~I~I¢I I I~ I l j j I \\ \ ~ \ 1 \ 1 1 I I 1// II I I; I \ ~1 \ 1 1 1 1 \ \ 1 1 1 I I I I // /~/ / IIII I I IIII;¢ I I I I I I 11 \~~ \ \ \ ~ , , 1 1 1 1 , \ 1 1 1 1 , I ~ , , , , / / 1 I I I I ,11~~I j I I ~ I I , , , \\ \\ ~ ~ , \ \ \ 1 , 1 1 \ \ \ \ 1 1 1 ,, ,,, / / / I I lpl I I I \ I .~ ~ \ 1 1 \ ~ 1 1 1 / / / / /~ /lIII111'III I'~II I I \ I \ \ \ \ \ 1 1 1 1 1 1 / I/ I l/ I .• \ \ ® \ 1 1 l I / ! / / / / Illllll I II I I \ •\ \ ~ \ \\ 1 1 1 1 1 1 1 I I 1 r / /~ /// // / / `' //III~~!~jI I I I II I , \,~ `\ \\ \\ I, R1 \ ~ \ \\ \~ \ \\ 1\ 1~ 11 1 ~ I II ; ~ ,1 I i ~l1/~/,/ ~,~////,/l/~/,~~~~;/r~~ ~ ~ ~ ICI -~ I , \ \ ~\ \\ ~ \\\\ \\ \I l i l i i l ~ 1 11 j l l 1 l r ~' //, /i ,//~~~ 11 I I I~~ i I I I ~~ ~` I ~ \ \ 1 1\ 1 l I, t I i ~ I/ ~ 1 1 1 1 11 ~ / i i~ 11. ~ i~ ~ I ~~ ~ ~,.~ I ® ~~~o i o~x N~~ i ~ ~~c o~ z O °o 70 ~' x ~ '~nOD~~ ~~~ o m ~ .. m ~~YT®N ~#~LL o ~ STILLME~DOY~I R>~OD ~uD ~ ~ d ~' W~D6EWOOD DRI~~ ~F ta,~rLE 16H, 1~lORTH G~fZOL I N~ W ^ ,~. j ~g 'v'NI'10~'~O H1ZlON 'H91~'i'~ ~ m~ ~l~I~a aoONi39a3Nt A m~ o Z .~ H ~. aN'~ a0~~ MOa'~31~!'1"1115 W ~ w o ~ ~~ ~,~~ aa.oocn= o -' P-~---_ \ ' Fes-. ~;F- \ \ ~~- '~\ `\ \ \ \\ \\ \ \ \ \ \ \ 2 ~' \ \ I _ . ~ W 1 \~ \ \ \ \ \\ ~w ~ \ \ \ \ I ~~~ ._~_ ~ ~~ _ ~~ Nit' \ NtD \\ \ \ \ \\ \~a. \\ \\ \ \ \ \ \ \ \ _ . ~ ~ ~\ \ \ ~~ ~ \ \ \ \ \ \ \'3~j~\. \\\ \\\ \ \ \ \ \ \ \ - ---~~~\ `~~ \ \ ~ \\ \~ ~~ \ ,~ \ \ \\,OW ~\ \\\ \\\\ \ \ \ \ \ \ -- `\ ~\ \ \ \ \ Z9Z \ `~~ \ ~ \\ \~~ \v\\ \\\\\ \\\~ \ \\ \ \ \\ ~ ~ . 1 \ \ \ \ ~ \ \ \ \\ \ \ \ \ \\ \\ \ \ \ ~ \ \ \ \ \ \ \ \~ 1 \ a ~ ~ ~ \ \ \\ \\ \ \ \\ \ \ \ , \ 1 \ \\ \ \\ 9~ ~ ~~\ '~~ ~ ~ \\\ \ \ \\\\\\ \ \~\ \\ ~ \\ \ \ -~ o \ \ 9 \ \.. \ \\ ~ \ \\ \ owN\ \ ~\\\\ \ \ iY~~~ \\ ~ ~\ \\\ \\ \\\ \\\\\ \\ \ \\\\\~ \\ ~ \\6a\\ \ \ \99 ~~ ~~ ~~\ \ \\ \\\ \\~ \\\\\\ \ ~a 11 \\ \ 1 \ '( , ~ \ ~ ~~ \ ~ \\\\\ \\\\ \ \\\ \\\\ \ \\ , Z cn w 1 ~( \~ ~\\ z ~ _ _ \ \ \ \ \\~ . \ \~\ \ \\ \\ \ \\ \ \ \ JW~ \~~\'\1 \ ~ \'/ ~ ~ ~~ \ ~\ ` \ \ \ \ \\\ \\\ \\\ \\\\ ~~~~,~ ,~\ I \ \ ,\ \ \\ ` \,Lp \\\P~\P~p~ 6\ \\\\`\\\\ \ ` F \ \`~ , \\\\ 1 \\ \ \ \\\ ~ \ \\ \ \\ \ \\ \ \ 1 111 1 II I ~ II I II II ~ \ 90- - ., \ \ \ 1 \ \ \1 ~11 1111 II 1 11\,,1 1 I l i \ `\\ \` -- `~ - - ---------- \\~\~ \\ \ \ I I 1 \ 1 1 11 1111\ }1111 \ '- \ o - - - - - - - - - \ \ ~~~~ ~ \ \ \ 1 1 f/ ! \ \\ 1\\~11 11} 111 1 \\I~ \\ \ ~~ ~ \~\\ \\ \ \ I I \ \.\1 1}11 11} -\ ----~ \ \ \ \ \ \ \ \ ~ \ / \ \' 1 1141 1 I \ \ \ 1 \ 11 1 II r~\\ - - _ \\ \\ \ \\ \ \ \ \ \ \\ \ 1 ~,11 i~lj III _ \ \ \ ~~ \ ~\\\ \ \ \ \ \ ,\\ \ \~ \\ \\ \\\\ \\ IIII ~ ~ I ~ ~.~ \ \ \ ~ \ \ \\ \ \ \ \ \ \ \~ IIII III ~ ~ \ _ -- \ \ I \ \ \ 1\ \\\ \\ \I IIII III ~~ \ \ \ ~ I \ \ ~\ \ \ \\ \ 1}I I III \ \ \ \ \ \ \ 1 \ \ 1' III I ~ \ \ \ \ \ \ \ \ \ \ \ \ Irllll I I I - \ ~ \ \\ \ \I \ \ 1 / l l ~ /~~il / r l _ _ I y f /f `\ `\ \` 1 I~ /I / // // /~ // i i f1' ill f ~ ~ f I ,, \ \ ~ \ I J l l / / / rl/flf fllf ~_--- \ \ \ \ I 1 j I / l l /I l r l l I I I I -t' m _ \ \ \ \ \ \ ~\ \ \ \ 11 1 I 1 / 111 I I I I f I . \- _ _ \ \~ \\ \ \ \\ \ \ \ \ \ \ \ \\ \ \ ~, 111111 III I !~ _ ~ \ \ ~ \ \\o ~"n \ \ \ \ \ \\ \ \ \\ \ \, \~ \ \\ 1` I} 1111 ~ I I I I I ` • \ \\ \~. m ~ \ \ \\, \\ \ \\\ \ 1 \ \ 1111111}1; \ \ \ ~ -\ \ \ \\\ \\ \ \ \\ \ \ ~ \ \ \ 1 11111\ j I I I ~ I - \ \ ~ \`~\ \ \ \ \ \ \ 1 ~I II II , \ ~ \ \ \ \ \\ \ \\ \\ \ \ \ \ 1 1 I ,'ll l i l IIII I ~ ~ \ \ \ o \ \ \ \ \\ \ \\ \ \ \' \ \ 1 } I ~ I I I I III i \ 1 \ \ \ \ \ ~ ~ \ \ 1 1 1 1 11••1111 II' \\ \ \ \ \ \\ \ \ \\ ~ \\ 1 1 ~ 1 1 1 1 I • •I I - I IIII , \ \ \ \ \ \ \ \ 1 1 1 1 1 }I~IIII IIII \~ \ ~ \ \ \ \ \ \ ~ 1 1 1 1 1II,~ Itl IIII \~ ~ \\ \ ~ \\ \ \ \\ \\ \ ~ \ i i 1 I 1 1 1 tl`~illl I,II;, \\ \ \ \ \ I ! ~ 1 I I }}`1111 \ • \ , \ \ \\\ , , , , , , I \\} I, I ,, ,I \ \\ \ \ \ ~ / \ \ \ \ \ \ 1 I I /~i' ~ %iii \ \ / \ \ \ \ \\ \ \ I I ~/~ %~//// / \ \ \ \ \ \\\ \I b/~ j ///~ ~//i \ \ \ \ \ \ \ \ \ \ f !~ ~/%/ /% % ~ ~//// .~ i DWQ Project DIVISION OF WATER QUALITY -LEVEL SPREADER WORKSHEET I. PROJECT INFORMATION (please complete the following information): Project Name : TbN I-~~~L.r~- ~E I Contact Person: 'DDtNnJy oFk WEt,~~ PhnnP Level SpreaderlD:, ~ SIN .,~31 Level Spreader Length (D ft. Drainago Area 2.0lo ac Impervious Area 1. ~ 5 ac Maximum Filter SUip/Buffer Slope 2 t grass Max. Discharge from a 10 Year Storm I.54 cfs Max. Discharge to Level Spreader 0.03 cfs Filter Strip/Buffer Vegetation Pre-Ueatment or Bypass Method •~y '~f~n(ftO(~ II. REQUIRED ITEMS CHECKLIST (perpendicular to flow) (on-site and off-site drainage to the level spreader) ~# (on-site and off-site drainage to the level spreader) ~c# (6%for forested, leaf littler cover, 8%for thick ground cover)' To syPaSS ~~~M (thick ground cover or grass, canopied forest with leaf litter roundcover Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. !f a requirement has not been met, attach an explanation of why. At a minimum, a complete stormwater management plan submittal indudes a worksheet for each BMP, design calculations, plans and spedfications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. Applicants Initials .~~ Level spreader is at least 13 ft. per cfs for thick ground cover or grass or 100 ft per cfs in canopied forest with leaf litter. jA Pre-Form Scour Holes are on flat slopes only ~ fit. No structures are located in protected buffers' o~lrry F~5 ~ ~tP [L4F's~~,,~ l C Fog gy~ASS SySCEr-t . If bypass method specified in the Draft Level Spreader Design Option Document: 'DL~ Bypass method is spedfied (if applicable) and plan details and calculations are provided bLF+ Discharge to level spreader and subsequent filter strip is hydrauliglly and spatially separate from the bypass discharge. f~L~} No structures are located in protected buffers. ~ O~ty FEy t. ~~ ~ ~~~ >~~ g,~ ~~y 'DLfr-4 Plan details for the bypass and outlets are provided. SySt~~) " 1 * ~k d~ The operation and maintenance agreement includes annual erosion and vegetation repair. i~~k~K The operation and maintenance agreement signed and notarized by the responsble party is provided. 'Level spreaders in series can be used on slopes of up to 15% in forested areas with leaf littler cover or on slopes of up to 25% in areas with thick ground cover or grass if designed according to the Draft Level Spreader Design Option Document This potentially requires a minor variance in protected buffer areas. In any event the second level spreader cannot be located in Zone 1 of a protected buffer area. ~k'* 'D(latt n1~yc,>~ Ta t.EVE~- S Ptz-t~A DE K IS FRQ -'1 ~L(, t~D,~ fR~r"1 ~I ~,C>T 1' o f R0~1 ~~A~ LL . 4c By~ASS ~ys7~wl ~ S QCLOV tD~D r°i2- L,~(,,g~ s.~-ohs. ?(~** OPE(ZRTto~l ~• F~IAttJT~n~A(yGE '4~~~MF~T TD FiG F>,c~cwr~b EXTENDED DRY DETENTION BASIN #3 CALCULATIONS Drainage Area = DA = 2.06 ac Impervious Area = 1.15 ac Impervious Cover : I = 55.8 1" Rainfall Event = Rv = 0.05 + 0.0091 = 0.05 + 0.009(55.8) = 0.552" Volume = Rv(DA) = 0.552" (2.06 ac)(1'/12")(43,560 sf/1 ac) = 4129 cf (V01)Runott= 4,129 cf 1" Elev. 247.30 (Vol)e-rear= 9,974 Cf 2-Yr Elev. 249.86 (V01)to-Year= 17,949 Cf 10-Yr Elev. 251.32 (V01)too-Year= 28,693 Cf 100-Yr Elev. 251.77 (Vol)rotas = 34,105 cf Berm Elev. 253.00 Freeboard 1.23' BASIN VOLUME Water Level ft Surface Area sf Elevation ft Incremental Volume cf Accumulated Volume cf 0 0 245.5 0 0 0.5 800 246 200 200 1.5 2,810 247 3,135 3,335 2.5 3,460 248 3,815 7,150 3.5 4,170 249 4,550 11,700 4.5 4,930 250 5,340 17,040 5.5 5,750 251 6,190 23,230 6.5 6,630 252 7,095 30,325 7.5 7,560 253 3,780 34,105 Use 4' x 4' RTCB with (4) 8" openings Weir Elevation = 251.40 yz Qwoir = Q100- (Q10)max = CWLht~ Qweir = 12.37 Cfs - 1.54 Cfs = 10.83 CfS Cw = 3.0 L = 16' htoo = 0.37' 100-Year Elevation = 251.4 + 0.37' = 251.77 Pipe size to drain temporary pool in 2 days Q = (4129 cf/48 hr)(1 hr/3600 s) = 0.024 cfs Try 0.75" diameter pipe Average head = h = 1.8'/2 - 0.0313' = 0.87' Q = cdA(2gh)°'s = 0.6(0.0031)[2(32.2)(0.87)]^0.5 Q = 0.014 cfs -Therefore use 0.75" diameter pipe (Qto)max = 0.6(0.0031)[2(32.2)(2.91)]^0.5 = 0.025 CfS PHC_Detention 3.xis f)tv Rain #~ 6/30/2005 PLD I. . BASIN # 3 DETENTION CALCULATIONS ON-SITE DRAINAGE AREA TO SYSTEM = OFF-SITE DRAINAGE AREA = DRAINAGE AREA AWAY FROM SYSTEM = TOTAL DRAINAGE AREA TO SYSTEM = HEIGHT OF REMOTE POINT IN WATERSHED ABOVE OUTLET = HYDRAULIC LENGTH OF WATERSHED COMPOSITE RUNOFF COEFFICIENT AFTER DEVELOPMENT = COMPOSITE RUNOFF COEFFICIENT BEFORE DEVELOPMENT = COMPOSITE RUNOFF COEFFICIENT OFF-SITE _ COMPOSITE RUNOFF COEFFICIENT (AWAY) _ SCS CURVE NUMBER AFTER DEVELOPMENT = ESTIMATE PEAK RUNOFF (OP) Design Storm = 2 -YR T~= 2.65 MIN -- USE 5.00 MIN (I~POSr = 5.76 INMR ON-SITE RUNOFF TO POND (POST) Qn = C(In)A = 7.26 CFS OFF-SITE RUNOFF TO POND On = C(In)A = 0.07 CFS TOTAL RUNOFF TO POND (POST) On = C(IaA = 7.33 CFS RUNOFF AWAY FROM POND (POST) QAWAY = C(In)A = 1.71 CFS MAXIMUM RELEASE Qaoow = Qpre ' ~Qaway = 1.26 CFS COMPUTE DEPTH OF RUNOFF (O~~) Pn= 3.60 IN ESTIMATE SOIL STORAGE S =1000/CN -10 = 2.20 Q' _ (P,; 0.2S)Z/(Pn+0.8S) On' = 1.86 IN PHC_Detention 3.xis 2-YR DESIGN STORM - 6/30/2005 '(PRE) Qn = C(In)A = (PRE) Qn = 0(In)A = (PRE) QAWAY = C(In)A = 2 YR - 24 HR PRECIP la = .2S = 0.44 DAoN = 2.00 ACRES DAoFF = 0.06 ACRES DAAwav = 0.51 ACRES DA = 2.06 ACRES H = 26 FEET L = 460 FEET CPOSr = 0.63 (58% ) CPRE = 0.20 C'OFF = x•20 CawAV = 0.58 (50% ) CN = 82 (58% ) 2.31 CFS 2.37 CFS 0.59 CFS RALEIGH, NC PlD I. CALCULATE TIME TO PEAK TP = VOLUME/1.390p = Q'DA/1.390p Tp = 22.3 MIN ESTIMATE REQUIRED STORAGE S = (POST Q - PRE Q + 0 AWAY Q)TP S„ = 8,127 CF+25% = 10,159 CF STAGE STORAGE WATER LEVEL SURFACE AREA SF ELEVATION INCREMENTAL VOLUME C ACCUMULATED VOLUME CF 0 3,005 247.30 0 0 _0.70 . _ 3 460 , ... _ 248.00 2,263. 2,263. 1.70 4,170 249.00 3,815 6,078 _ 2.70. 4,930..._,....... .250.00 _ 4,550_ .. _ _ 10,628 3.70 5,750 251.00 5,340 15,968 _ 4.70 _ ~--- ~. .. _.6,630 _..- - --- - _ _ ~ _ ...252.00_ - ~:._ _ _._6,1.90.__....._. - -__ _22,158........ 5.70 7,560 253.00 7,095 29,253 2 •YR STORM ELEV. 249.86 STAGE DISCHA RGE OP = 7.33 CFS WATER HW ACCUMULATED LEVEL D FLOW (F~ D = 0.46 (CFS) 0 0 0 . - 0.5_ __ _ _.1.09 - 0.41 1.5 3.27 0.90 2.5 5.45.. 1.20 3.5 7.64 1.44 4.5 9.82..._. _ ._ . _ _ .__ .. . _ 1.64 5.5 12 00 1.82 ..._ 6 5 .~. ~ _ ...- _ - 1418 ._ _..._.... ~ ~ _W _ ___ _ 1 99 ...,~~ ~ ~ 7.5 16.36 2.14 8.5 18.55 __. .: ~, . _ ... .. _- ... 2.28. 9.5 20.73 2.42 -10.5 22.91 2.55 2 -YR STORM PEAK 1.21 CFS PHC_Detention 3.xls 2-YR DESIGN STORM - 6/30/2005 5.5 'ORIFICE K= 1.23 OP = CaA(~9h)o.s Cd = 0.6 A = 0.16 g = 32.2 IF HW/D<t, Op = K(stage)'s PLD CHAINSAW ROUTING TABLE OP = 7.33 CFS P~IAX RELEASE = 1.26 CFS Tp = 22.3 MIN dT = 5 MIN TIME (MIN) INFLOW (CFS) STORAGE (103 CF) IS AS STAGE (FT) OUTFLOW (CFS) 1 0 0 0 0 0 0 2 5 0.9 0.00 0 0 0 3 10 3.1 0.26 0.26 0.08 0.07 4 15 5.6 0.90 1.16 0.36 0.30 5 20 7.1 1.58 2.74 0.83 0.57 6 25 7.1 1.97 4.71 1.34 0.82 7 30 5.5 1.88 6.59 1.81 0.99 8 35 4.1 1.36 7.95 2.11 1.08 9 40 3.1 0.92 8.87 2.31 1.14 10 45 2.3 0.58 9.45 2.44 1.18 11 50 1.7 0.34 9.79 2.52 1.20 12 55 1.3 0.16 9.95 2.55 1.21 13 60 1.0 0.02 9.97 2.56 1.21 14 65 0.7 -0.07 9.90 2.54 1.21 15 70 0.5 -0.15 9.75 2.51 1.20 16 75 0.4 -0.20 9.56 2.46 1.19 17 80 0.3 -0.24 9.32 2.41 1.17 18 85 0.2 -0.26 9.06 2.36 1.15 19 90 0.2 -0.28 8.78 2.29 1.13 20 95 0.1 -0.29 8.49 2.23 1.12 INFLOW CALCULATED USING THE FOLLOWING FORMULAS: ForO<t<1.25TP Fort > 1.25 TP STORAGE CALCULATED USING THE FOLLOWING FORPJ~ULA: O = O~ [1 -cos n t)] 2 Tp 0= 4.340pe~r3o~urvrl STORAGE _ [INFLOW(cfs) - OUTFLOW(cts)] ' DTIME(min) ' 60 sec 1 (min) CONCLUSION: MAXIMUM DISCHARGE FROM THE SYSTEM IS 1.21 CFS (WATER ELEVATION - 249.86) WHICH IS LESS THAN THE ALLOWABLE DISCHARGE OF 1.26 CFS FORA 2-YR STORM. DESIGN IS ACCEPTABLE. PHC_Detention 3.xls ~ T 2-YR DESIGN STORM - 6/30/2005 L BASIN # 3 DETENTION CALCULATIONS ON-SITE DRAINAGE AREA TO SYSTEM OFF-SITE DRAINAGE AREA = DRAINAGE AREA AWAY FROM SYSTEM = TOTAL DRAINAGE AREA TO SYSTEM = HEIGHT OF REMOTE POINT IN 1ATERSHED ABOVE OUTLET = HYDRAULIC LENGTH OF WATERSHED = COMPOSITE RUNOFF COEFFICIENT AFTER DEVELOPMENT = COMPOSITE RUNOFF COEFFICIENT BEFORE DEVELOPMENT = COMPOSITE RUNOFF COEFFICIENT OFF-SITE _ COMPOSITE RUNOFF COEFFICIENT (AWAY) _ SCS CURVE NUMBER AFTER DEVELOPMENT = ESTIMATE PEAK RUNOFF (OP) Design Storm = 10 -YR T~= 2.65 MIN -- USE 5.00 MIN (I~POSr = 7.22 INMR ON-SITE RUNOFF TO POND (POST) Q„ = c(I,JA = 9.10 CFS OFF-SITE RUNOFF TO POND Q„ = c(I,~A = 0.09 CFS TOTAL RUNOFF TO POND (POST) Q~ = c(I,~A = 9.19 CFS RUNOFF AWAY FROM POND (POST) QAWAY = c(I,JA = 2.14 CFS MAXIMUM RELEASE Oa,b,,, = Oaa - e0„~Y = 1.58 CFS COMPUTE DEPTH OF RUNOFF (O~ ) '(PRE) Qn = c(In)A = (PRE) Qn = c(In)A = (PRE) QAWAY = C(I,JA = Pn= 5.38 IN 10 YR - 24 HR PRECIP ESTIMATE SOIL STORAGE S=1000/CN-10= 2.20 I,_.2S= 0.44 Q,; = 3.42 IN PHC_Detention 3.xls 10-YR DESIGN STORM - 6/30/2005 DAaN = 2.00 ACRES DAoFF = 0.06 ACRES DAAWAy = 0.51 ACRES DA = 2.06 ACRES H = 26 FEET L = 460 FEET CPOSr = 0.63 (58% ) CPRE = 0.20 COFF = 0.20 CAWAY = 0.58 (50% ) CN = 82 (58% ) 2.89 CFS 2.98 CFS 0.74 CFS RALEIGH, NC PLD CALCULATE TIME TO PEAK TP = VOLUME/1.390P = Q'DA/1.39QP TP = 32.7 MIN ESTIMATE REQUIRED STORAGE S = (POST O - PRE O + 0 AWAY Q)Tp Sn = 14,932 CF+25% = 18,665 CF STAGE STORAGE WATER LEVEL SURFACE AREA SF ELEVATION INCREMENTAL VOLUME CF ACCUMULATED VOLUME CF 0 3,005 247.30 0 0 _ .0.70. . __ - - - ...3,460... _ _. 248.00 _ 2,263 _.:.:2,263.. , _ 1.70 4,170 249.00 3,815 6,078 2.70 . 4,930__ .~ . 250.00 _ . 4,550, 10,628 3.70 5,750 251.00 5,340 15,968 _. 4.70... .:. _ .. , .6,630. ... _...252.00. _ . 6,1:90 _ _ _ .._ _22,158 5.70 7,560 253.00 7,095 29,253 10 -YR STORM ELEV. 251.32 JlAlit UISI:nA HCit uP= s.1s crs WATER HW ACCUMULATED LEVEL D FLOW (FT) D = 0.46 (CFS) 0 0 0 05 ... _.. ,.e__.. .. ,,.~.. _ _ _ _ 1 09__._~.~... _,. _-...._. . _LL. , .,..,._. 0.41_.... :_,,:..,. 1 5 3.27 0.90 2.5 5.45 1.20 3.5 7.64 1.44 4.5 __.._.v . .,,.~ _ 9 82 ..._-., _._...., __ 1 64 . .. _..,. S.5 12.00 1.82 6.5 14.18-___.. _ -1.99 -_ 7.5 16.36 2.14 8.5 ... 18.55..... _ . ._ . _ - 228....... 9.5 20 73 2.42 10.5 _~ T' 22.91 _ . 2.55 10 -YR STORM PEAK = 1.54 CFS 5.5 "ORIFICE K = 1.23 QP = CaA(~9h)o.s Ca = 0.6 A = 0.16 g = 32.2 IF HW/Dc1, Op = K(stage)'s PHC_Detention 3.xls nT 10-YR DESIGN STORM - 6/30/2005 j~+ L CHAINSAW ROUTING TABLE OP = 9.19 CFS MAX RELEASE = 1.58 CFS Tp = 32.7 MIN dT = 5 MIN U TIME (h11N) INFLOW (CFS) STORAGE (103 CF) IS AS STAGE (FT) OUTFLOW (CFS) 1 0 0 0 0 0 0 2 5 0.5 0.00 0 0 0 3 10 2.0 0.16 0.16 0.05 0.04 4 15 4.0 0.58 0.73 0.23 0.19 5 20 6.2 1.14 1.88 0.58 0.45 6 25 8.0 1.72 3.59 1.05 0.68 7 30 9.0 2.19 5.78 1.62 0.93 8 35 9.1 2.43 8.21 2.17 1.10 9 40 8.1 2.39 10.61 2.70 1.24 10 45 6.7 2.06 12.67 3.08 1.34 11 50 5.5 1.60 14.26 3.38 1.41 12 55 4.5 1.22 15.48 3.61 1.46 13 60 3.7 0.91 16.39 3.77 1.49 14 65 3.0 0.65 17.04 3.87 1.51 15 70 2.5 0.45 17.49 3.95 1.53 16 75 2.0 0.28 17.77 3.99 1.54 17 80 1.7 0.15 17.91 4.01 1.54 18 85 1.4 0.03 17.95 4.02 1.54 19 90 1.1 -0.06 17.89 4.01 1.54 20 95 0.9 -0.13 17.76 3.99 1.54 INFLOW CALCULATED USING THE FOLLOWING FORMULAS: ForO<t<1.25T° 0= O~[1 -cos rit)J 2 Tp Fort > 1.25 T° O = 4.34 Op e~' ~' ~~~D11 STORAGE CALCULATED USING THE FOLLOWING FORMULA: STORAGE _ [INFLOW(cfs) - OUTFLOW(cis)J ' DTIME(min) ' 60 sec 1 (min) CONCLUSION: MAXIP~IUM DISCHARGE FROM THE SYSTEM IS 1.54 CFS (WATER ELEVATION - 251.32) WHICH IS LESS THAN THE ALLOWABLE DISCHARGE OF 1.58 CFS FORA 10-YR STORM. DESIGN IS ACCEPTABLE. PHC_Detention 3.xls ~ T 10-YR DESIGN STORM - 6/30/2005 L 251.77 -AJAX. 100-1R WATER SURFACE ELEVATION 251.32 -MAX. 10-Yft WATER SURFACE ELEVATION PROPOSED 4'x4' PRE-CAST BOX 249.86 -MAX, 2-YI2 WATER SURFACE ELEVATION (REFER TO DETAIL) 247.30 - 1' RUNOFF WATER SURFACE ELEVATION PROVIDE 3a PERFORATED, THREADED PVC OR METAL PIPE W/ CAP do BRACKETED 3:1 TO CB WALL VARIABLE WIDTH 10' BERM - 253.0 -- ._ - - -- - _ 3:1 3:1 Fl BOTTOM - 245.5 12' RCP OUTLET PIPE ANTI-SEEP COLLAR EXTENDED DRY BASIN #3 CROSS-SECTION (PRE-CAST BOX #??) SCALE: N.T.S. 251.77 -MAX. 100-YR WATER SURFACE ELEVATION 251.32 -MAX. 10-YF2 WATER SURFACE ELEVATION PROPOSED 4'x4' PRE-CAST 249.86 -MAX. 2-YR WATER SURFACE ELEVATION (REFER TO DETAIL) 2X :. VARIABLE WIDTH BOTTOM 247.30 - 1" RUNOFF WATER SURFACE ELEVATION 3a 10' BERM - 253.0 _ ---- 3 I \ " 3:1 n BOTTOM - 245.5 18' RCP OUTLET PIPE ANTI-SEEP COLLAR EXTENDED DRY BASIN #3 CROSS-SECTION (RAISED-TOP CATCH BASIN #??) SCALE: N.T.S. DWO Project DIVISION OF WATER QUALITY • LEVEL SPREADER WORKSHEET I. PROJECT INFORMATION (please complete the following information): Project Name : ~ . E Contact Person: o Phone Number: Level Spreader ID: - ~ SIN ~4) Level Spreader Length I O ft. Drainage Area 12. to$ ac. Impervious Area 2.63 ac. Maximum Filter Strip/Buffer Slope _ I~}t _ grass Max. Discharge from a 10 Year Storm _ ~°1.5~} cfs Max. Discharge to Level Spreader _ O.O~j _cfs Filter Strip/Buffer Vegetation F~t?kVy RQuSN- ~ ~+5~r-t t~lT) Pre-treatment or Bypass Method ~y ~~rl0f~ II. REQUIRED ITEh1S CHECKLIST (perpendicular to flow) (on-silo and off-site drainage to the level spreader) ~~ (on-site and off-site drainage to the level spreader) ~c# (6%for forested, leaf littler cover, 8%for thick ground cover)' -rte syPa~s s~~M (thick ground cover or grass, canopied forest with leaf litter groundcover) Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. Ifa requirement has not been met, attach an explanation of why. At a minimum, a complete stormwater management plan submittal indudes a worksheet for each BMP, design calculations, plans and spedfications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. A_ pplicants Initials .-mac{'}' Level spreader is at least 13 ft. per cfs for thick groundcover or grass or 100 ft per cfs in canopied forest with leaf litter. f A Pro-Form Scour Holes are on flat slopes only _ ~1r No structures are located in protected buffers' On1Ly FtrS ~ ~iP l~P A~~ 1 C Foe ~y~Ass sysrErl. l If bypass method specified in the Draft Level Spreader Design Option Document: 'D~} Bypass method is spedfied (if applicabl©) and plan details and calculations are provided bL ~ Discharge to level spreader and subsequent filter strip is hydraulically and spatially separate from the bypass discharge. T7LN' No structures are located in protected buffers. ~ Only 'rEy t~ YAP p~.p kp,~„~ ~~y ~ P~~ _ 'DLE4 Plan details for the bypass and outlets are provided. Sy~E,.~~ 1 „" I * ~k ~ Tha operation and maintenance agreement includes annual erosion and vegetation repair. '~~k~ Tho operation and maintenance agreement signed and notar¢ed by tho responsible party is provided. 'Level spreaders in series can be used on slopes of up to 15% in forested areas with leaf littler cover or on slopes of up to 25% in areas with thick ground cover or grass if designed according to the Draft Level Spreader Design Option Document This potentially requires a minor varianco in protected buffer areas. In any event the second level spreader cannot be located in Zono 1 of a protected buffer area. 'k~'V(lhtnl~~ 1'o L~vEt~ SPR.EA~EIZ IS >:f~~ " I '~ur~o Ft~'t Ft~T- - ~F Rda~~ALL . 4 8`I ~f~s ~yST~w1 ~ S ~CLOV~~p '~i't- L.~IC~E~ s-~-oR.-Y15. ~* * oPF.R~riv~ ~ t'1~~ rJ~itinJcE. ~44~M ~1T Ta ~ c ~ ~cwT~b Wt~'4}- TN~E CITY 0~ ~rt~El~(.~. 6/30/2005 EXTENDED DRY DETENTION BASIN #4 CALCULATIONS Drainage Area = DA = 12.68 ac Impervious Area = 2.83 ac Impervious Cover : I = 22.3 1" Rainfall Event = Rv = 0.05 + 0.0091 = 0.05 + 0.009(22.3) = 0.251" Volume = Rv(DA) = 0.251" (12.68 ac)(1'/12")(43,560 sf/1 ac) = 11539 cf (VOI)R„~ott = 11,539 cf 1 "Elev. 273.30 (Vol)e-rear = 18,703 cf 2-Yr Elev. 276.90 (V01)to-near= 33,118 cf 10-Yr Elev. 278.80 (Vol)too-v°ar= 54,300 cf 100-Yr Elev. 279.30 (Vol)roca, = 63,858 cf Berm Elev. 280.50 Freeboard 1.2' BASIN VOLUME Water Level ft Surface Area sf Elevation ft Incremental Volume cf Accumulated Volume cf 0 0 269.5 0 0 0.5 970 270 243 243 1.5 2,380 271 2,675 2,918 2.5 2,970 272 3,295 6,213 3.5 3,620 273 3,970 10,183 4.5 4,320 274 4,700 14,883 5.5 5,080 275 5,485 20,368 6.5 5,890 276 6,325 26,693 7.5 6,760 277 7,225 33,918 8.5 7,690 278 8,185 42,103 9.5 8,680 279 9,200 51,303 10.5 9,720 280 9,990 61,293 11 10,260 280.5 2,565 63,858 Use 4' x 8' RTCB with (4) 8" openings Weir Elevation = 278.80 3,z Qweir = Q100- (Qto)max = CWLht~ Qweir = 45.32 CfS - 19.54 CfS = 25.78 CfS Cw = 3.0 L = 24' ht~ = 0.5' 100-Year Elevation = 278.8 + 0.5' = 279.30 Pipe size to drain temporary pool in 2 days Q = (11539 cf/48 hr)(1 hr/3600 s) = 0.07 cfs Try 1.25" diameter pipe Average head = h = 3.8'/2 - 0.0521' = 1.85' Q = cdA(2gh)°'s = 0.6(0.0085)[2(32.2)(1.85)]^0.5 Q = 0.06 cfs -Therefore use 1.25" diameter pipe (Qto)max = 0.6(0.0085)[2(32.2)(4.65)]^0.5 = 0.09 Cfs PHC_Detention 4.xls n,,. ct~~~., ttn PlD BASIN # 4 DETENTION CALCULATIONS ON-SITE DRAINAGE AREA TO SYSTEM = OFF•SITE DRAINAGE AREA = DRAINAGE AREA AWAY FROM SYSTEM = TOTAL DRAINAGE AREA TOSYSTEM = HEIGHT OF REMOTE POINT IN WATERSHED ABOVE OUTLET = HYDRAULIC LENGTH OFWATERSHED = COMPOSITE RUNOFF COEFFICIENT AFTER DEVELOPMENT = COMPOSITE RUNOFF COEFFICIENT BEFORE DEVELOPMENT = COMPOSITE RUNOFF COEFFICIENT OFF-SITE _ COMPOSITE RUNOFF COEFFICIENT (AWAY) _ SCS CURVE NUMBER AFTER DEVELOPMENT = ESTIMATE PEAK RUNOFF (OP) Design Storm = 2 -YR T~= 2.65 MIN -- USE 5.00 MIN (In)POSr = 5.76 IN/HR ON-SITE RUNOFF TO POND (POST) O~ = c(I~)A = 15.85 CFS OFF-SITE RUNOFF TO POND O~ = c(I,~A = 11.02 CFS TOTAL RUNOFF TO POND (POST) Qn = C(in)A = 26.87 CFS RUNOFF AWAY FROM POND (POST) Oaway = c(I,JA = 3.28 CFS MAXIMUM RELEASE Qauow = Ope ' ~Qaway = 15.62 CFS COMPUTE DEPTH OF RUNOFF (O~~) P„= 3.60 IN ESTIMATE SOIL STORAGE S=1000/CN-10= 3.51 O,; = 1.31 IN PHC_Detention 4.xls 2-YR DESIGN STORM -6/30/2005 '(PRE) Qn = o(In)A = (PRE) On = o(I,JA = (PRE) Qaway = c(h)A = 2 YR - 24 HR PRECIP 1,=.2S= 0.70 DAoN = 5.85 ACRES DAoFP = 6.83 ACRES DAgyygy = 0.98 ACRES DA = 12.68 ACRES H = 26 FEET L = 460 FEET CPOSr = 0.47 (36% ) CPRE = U.20 C'oPP = 0.28 (11 % ) Cawav = 0.58 (50% ) CN = 74 (36% ) 6.74 CFS 17.77 CFS 1.13 CFS RALEIGH, NC PLD CALCULATE TIME TO PEAK Tp = VOLUME/1.390P = O'DA/1.3900 Tp = 21.0 MIN ESTIMATE REQUIRED STORAGE S = (POST O - PRE Q + O AWAY O)TP S~= 14,176 CF+25%= 17,721 CF STAGE STORAGE WATER LEVEL SURFACE AREA SF ELEVATION INCREMENTAL VOLUME CF ACCUMULATED VOLUME CF 0 3,830 273.3 0 0 _0.70. 4,320. __ .. 274.0 2,852. 2,852 1.70 5,080 275.0 4,700 7,552 2.70....._ _5,890 , , , _ 276.0, 5,485.. ,13,038 3.70 6,760 _ 277.0 6,325 19,363 .4.70....... - 7,690.... _ a . _ _ _ . 278.0..._ _ 7,22.5........ . _ __ 26,588.._ _ _ _ _ _ 5.70 8,680 279.0 8,185 34,773 6.70 _9,720 _ . _ .. 280.0.......... 9,200, _ _ 43,973 ,. _ .. , 7.20 10,260 280.5 4,995 48,968 2 •YR STORM ELEV. 276.90 5 i apt ui5c;na K~t uo = zs.s~ cars WATER HW ACCUMULATED LEVEL D FLOW (F"i) D = 1.54 (CFS) 0 0 0 0.5 _ _.___...__., ..._: 0.32 ,.._..__,__~.~.__ .f _ _. 1.46 __..._.____...___. _.. 1.5 0.97 7.57 2.5 . ..._ - 1.62 - ~..___._.._.~._.W._._ ~.y •11.82 ..~~,___..________._,._.___~ _ 3.5 2.27 14.85 4.5 _... _ .,..._,.2.92....:........_... _ . _ .17.36_ _ 5.5 3 57 19.55 6.5._ ... . 4.22 ,. - 21.51___ 7.5 4.86 23.32 .8.5 ~ b.51 24.99 9.5 6.16 26.56 10.5 6.81 ~ .. 28.04 2 -YR STORM PEAK = 15.09 CFS 18.5 "ORIFICE K= 4.12 Op = CaA(~9h)o.s Cd = 0.6 A = 1.87 g = 32.2 IF HW/D<1, Op = K(stage)'s PHC_Detentlon 4.xls nT 2-YR DESIGN STORM - 6/30/2005 lr L CHAINSAW ROUTING TABLE O~ = 26.87 CFS MAX RELEASE = 15.62 CFS Tp = 21.0 MIN dT = 4 MIN U TIME (MIN) INFLOW (CFS) STORAGE (103 CF) IS AS STAGE (FT) OUTFLOW (CFS) 1 0 0 0 0 0 0 2 4 2.3 0.00 0 0 0 3 8 8.5 0.56 0.56 0.14 0.40 4 12 16.4 1.95 2.51 0.62 2.17 5 16 23.3 3.42 5.93 1.36 6.69 6 20 26.7 3.98 9.92 2.13 10.25 7 24 25.5 3.95 13.87 2.83 12.82 8 28 20.6 3.05 16.92 3.31 14.28 9 32 16.1 1.52 18.44 3.55 14.98 10 36 12.6 0.26 18.70 3.60 15.09 11 40 9.8 -0.61 18.10 3.50 14.85 12 44 7.7 -1.21 16.89 3.31 14.27 13 48 6.0 -1.59 15.30 3.06 13.51 14 52 4.7 -1.81 13.49 2.77 12.64 15 56 3.6 •1.91 11.58 2.43 11.54 16 60 2.8 -1.89 9.68 2.09 10.07 17 64 2.2 -1.73 7.95 1.77 8.73 18 68 1.7 -1.56 6.38 1.45 7.28 19 72 1.4 -1.33 5.05 1.17 5.54 20 76 1.1 -1.01 4.05 0.95 4.24 INFLOW CALCULATED USING THE FOLLOWING FORMULAS: ForO<t<1.25TP Fort > 1.25 TP STORAGE CALCULATED USING THE FOLLOWING FORMULA: 0 = O~ (t -cos n t)J 2 Tp O = 4.34 Op el~' so ~ vrPq STORAGE _ (INFLOW(cfs) - OUTFLOW(cfs)J ' DTIME(min) ' 60 sec 1 (min) CONCLUSION: MAXIMUM DISCHARGE FROM THE SYSTEM IS 15.09 CFS (WATER ELEVATION • 276.9) WHICH IS LESS THAN THE ALLOWABLE DISCHARGE OF 15.62 CFS FORA 2-YR STORM. DESIGN IS ACCEPTABLE. PHC_Detention 4.xls n T 2-YR DESIGN STORM - 6/30/2005 Y L BASIN # 4 DETENTION CALCULATIONS ON-SITE DRAINAGE AREA TO SYSTEM = OFF-SITE DRAINAGE AREA = DRAINAGE AREA AWAY FROM SYSTEM = TOTAL DRAINAGE AREA TO SYSTEM = HEIGHT OF REMOTE POINT IN WATERSHED ABOVE OUTLET = HYDRAULIC LENGTH OFWATERSHED = COMPOSITE RUNOFF COEFFICIENT AFTER DEVELOPMENT = COMPOSITE RUNOFF COEFFICIENT BEFORE DEVELOPMENT = COMPOSITE RUNOFF COEFFICIENT OFF-SITE _ COMPOSITE RUNOFF COEFFICIENT (AWAY) SCS CURVE NUMBER AFTER DEVELOPtENT = ESTIMATE PEAK RUNOFF (OP) Design Storm = 10 -YR T~ = 2.65 MIN -- USE 5.00 MIN (I„)~sT = 7.22 INMR ON-SITE RUNOFF TO POND (POST) O~ = c(I,~A = 19.86 CFS OFF-SITE RUNOFF TO POND O„ = c(I,~A = 13.81 CFS TOTAL RUNOFF TO POND (POST) O„ = o(I,~A = 33.67 CFS RUNOFF AWAY FROM POND (POST) OAwnr = c(I,~A = 4.11 CFS MAXIMUM RELEASE Qaaow = Qpre - ~Qaway = 19.57 CFS COMPUTE DEATH OF RUNOFF (O~~) P~= 5.38 IN ESTIMATE SOIL STORAGE S =1000/CN -10 = 3.51 0„' = 2.67 IN PHC_Detention 4.xls ]0-YR DESIGN STORM - 6/30/2005 '(PRE) Qn = o(In)A = (PRE) Qn = C(In)A = (PRE) QAWAY = ~(In)A = 10 YR - 24 HR PRECIP la = .2S = 0.70 DAaN = 5.85 ACRES DAoPP = 6.83 ACRES DAAlvnv = 0.98 ACRES DA = 12.68 ACRES H = 26 FEET L = 460 FEET CPOSr = 0.47 (36% ) CPRE = U.2U COPF = 0.28 (11 % ) r'AWAY = 0.58 (50% ) CN = 74 (36% ) 8.45 CFS 22.26 CFS 1.42 CFS RALEIGH, NC PLD CALCULATE TIME TO PEAK Tv = VOLUME/1.390v = Q'DA/1.390v Tv = 34.2 MIN ESTIMATE REQUIRED STORAGE S = (POST Q - PRE Q + ~ AWAY O)Tv Sn = 28,927 CF+25% = 36,159 CF STAGE ST(IRAGE WATER LEVEL SURFACE AREA SF ELEVATION INCREMENTAL VOLUME CF ACCUMULATED VOLUME CF 0 3,830 273.30 0 0 .0.70 _ 4,320 274.0 2,852 2,852 _ ___ __ _ 1.70 5,080 ... 275.0 4,700 7,552 .2.70. _. 5,890..._..: ._ . 276.0...... _ 5,485 13,038 3.70 6,760 . _ 277.0 6,325 19,363 4.70 7,690 _. ~ _ . _ _ 278,0._. _ _ _ 7,225. 26,588.......:. _. . 5.70 8,680 279.0 8,185 34,773 _ 6.70..... __ 9,720. _... _ .......280.0.. _. _ _ _ _ ......9,200....._ _ . 43,973.: - 7.2 10,260 280.5 4,995 48,968 10 -YR STORM ELEV. 278.80 SIAGtU15Gt1A HGE Uv= 33.67CF5 WATER HW ACCUMULATED LEVEL 0 FLOW (Ff) D = 1.54. (CFS) 0 0 0 0.5_ - _ _ ._ 0.32..._......._ , _ .. - ..__.._ _ 1.46 . 1.5 0.97 7.57 2.5 1.62 ~ 11.82 3.5 2 27 14.85 _. _. 4.5. ,.. .. . -.. :.: _2 92, -....:... - --- ., _ ,-...r„ 1736 ... _... 5.5 3.57 19.55 _ _ _.__ 6.5~.__~ .__..._ __ ._:..422_...._ .. .... _~...__21 51 .__.......~.~_ 7.5 4.86 23.32 8.5 _5.51 _ . . _ 24.99 9.5 6.16 26.56 10.5 6.81 -~- -- -. . _-.28.04 ~__ 10 •YR STORh1 PEAK 19.54 CFS 18.5 "ORIFICE K = 4.12 Ov = CdA(~9h)o.s Ca = 0.6 A = 1.87 g = 32.2 IF HW/Dci, Op = K(stage)'s PHC_Detention 4.xls nT n 10-YR DESIGN STORM - 6/30/2005 lr L11 J1 CHAINSAW ROUTING TABLE OP = 33.67 CFS MAX RELEASE = 19.57 CFS Tp = 34.2 MIN dT = 4 MIN U TIME (MIN) INFLOW (CFS) STORAGE (103 CF) IS AS STAGE (FT) OUTFLOW (CFS) 1 0 0 0 0 0 0 2 4 1.1 0.00 0 0 0 3 8 4.3 0.27 0.27 0.07 0.19 4 12 9.2 1.00 1.27 0.31 0.91 5 16 15.1 2.00 3.26 0.79 3.22 6 20 21.3 2.86 6.13 1.40 6.94 7 24 26.8 3.44 9.56 2.07 9.98 8 28 31.0 4.04 13.60 2.79 12.70 9 32 33.3 4.40 18.00 3.48 14.80 10 36 33.4 4.45 22.44 4.13 16.42 11 40 31.3 4.08 26.53 4.69 17.78 12 44 27.4 3.25 29.78 5.09 18.65 13 48 23.6 2.11 31.89 5.35 19.21 14 52 20.2 1.05 32.94 5.48 19.49 15 56 17.4 0.18 33.12 5.50 19.54 16 60 14.9 -0.52 32.60 5.43 19.40 17 64 12.8 -1.07 31.53 5.30 19.12 18 68 11.0 -1.51 30.02 5.12 18.71 19 72 9.5 -1.85 28.17 4.89 18.22 20 76 8.1 -2.10 26.07 4.63 17.64 INFLOW CALCULATED USING THE FOLLOWING FORMULAS: ForO<t<1.25Tv Fort > 1.25 Tv STORAGE CALCULATED USING THE FOLLOWING FORMULA: O. Off. [t -cos n t)) 2 Tp Q = 4.34 Op e(~i aoturv)1 STORAGE _ [INFLOW(cfs) - OUTFLOW(cis)) ' DTIME(min) ' 60 sec 1 (min) CONCLUSION: MAXIMUM DISCHARGE FROM THE SYSTEM IS 19.54 CFS (WATER ELEVATION - 278.8) WHICH IS LESS THAN THE ALLOWABLE DISCHARGE OF 19.57 CFS FORA 10-YR STORM. DESIGN IS ACCEPTABLE. PHC_Detention 4.xls ~T 10-YR DESIGN STORh1 - 6/30/2005 L 10' BERM - 280.5 `. ~ ~ - - 12" RCP OUTLET PIPE ~ 3:f~~ ~ i~ - - ~ ~i ANTI-SEEP ~ ~ . ~ ~ ~~•~. COLLAR ~~ ` ~~ ~ / , ,. 279.30 -MAX. 100-YR WATER SURFACE ELEVATION PROPOSED 4'x4' PRE-CAST BOX 278.80 -MAX. 10-YR WATER SURFACE ELEVATION (REFER TO DETAIL) 276.90 -MAX. 2-YR WATER SURFACE ELEVATION PROVIDE 1.25" PERFORATED, 273.30 - 1" RUNOFF WATER SURFACE ELEVATION THREADED PVC OR METAL PIPE W/ CAP do BRACKETED TO CB WALL - - -- -- --- - -- -- - - - - - --- ~ ~~/ ;, i ---- _ x/,3.1\ ~ /., 2X ,;/j~/;,/ j~/ ~ ~ } ~ \ ~ BOTTOM 269.5 35' BOTTOM WIDTH EXTENDED DRY BASIN #4 CROSS-SECTION (PRE-CAST BOX #??) SCALE: N.T.S. 279.30 -MAX. 100-1R WATER SURFACE ELEVATION 10' BERM - 280.5 PROPOSED 4'x8' PRE-CAST RTCB 278.80 -MAX. 10-YR WATER SURFACE ELEVATION (REFER TO DETAIL) 276.90 -MAX. 2-YI2 WATER SURFACE ELEVATION 273.30 - 1" RUNOFF WATER SURFACE ELEVATION 30" RCP OUTLET PIPE ~~~t ~.~ , - -- - - - -- - ------ --- - ~. ~~:1' i0 ~i ANTI-SEEP -/i ~ /~., 2X / _~ ~/ \ ~ / COLLAR ~~ . ~. ~~~~. /~~~ / I \ / `.,BOTTOM / /269.5 / / ~ / / ~ / / ` ~ ~ /\ 35' BOTTOM WIDTH EXTENDED DRY BASIN #4 CROSS-SECTION (RAISED-TOP CATCH BASIN ~??) SCALE: N.T.S. DWQ Project DIVISION OF WATER QUALITY -LEVEL SPREADER WORKSHEET I. PROJECT INFORMATION (please complete the following information): Project Name : ~ . E Contact Person: o Phone Number: Level Spreader ID:. ~ SIN ,~ 5~ Level Spreader Length (2 ft. Drainage Area _ g. t2 ac. Impervious Area 4.O fo ac. Maximum Filter SUip/Buffer Slope 14t % grass Max. Discharge from a 10 Year Storm (IO• foq cis Max. Discharge to Level Spreader 0• t 2 cfs Filter Strip/Buffer Vegetation t•1 V CEAS ~'1trN~Ft Pre-treatment or Bypass Method •1~y t~rditOnj II. REQUIRED ITEMS CHECKLIST (perpendicular to flow) (on-site and off-site drainage to the level spreader)-#~~ (on-silo and off-silo drainage to the level spreader) *# (6% for forested, leaf litger cover, 8%for thick ground cover)' T~ BYPAtiS ~ys~r"1 (thick ground cover or grass, canopied forest with leaf litter roundcover Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. !fa requirement has not been met, attach an explanation of why. At a minimum, a complete stormwater management plan submittal incudes a worksheet for each BMP, design calculations, plans and spedfications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. Applicants Initials .-_~c~' Level spreader is at least 13 ft. per cfs for thick ground cover or grass or 100 ft per cfs in canopied forest with leaf litter. f A Pro-Form Scour Holes are on flat slopes only 'DV No structures are located in protected buffers' Onl ~Y FFS. ~ ~tP ~P ~~rJ C F~Q BYPASS SysrEt-t . J If bypass method specified in the Draft Level Spreader Design Option Document: '~~ Bypass method is spedfied (if applicable) and plan details and calculations are provided t~L F+ Discharge to level spreader and subsequent filter strip is hydraulically and spatially separate from the bypass discharge. T71. ~F No structures are located in protected buffers. !; O~ty FEy t; ~~ Q~.p ~p,~„~ ~~ ~I P~ 'DLl-~ ~ Plan details for the bypass and outlets are provided. Sy~EM~~,t t ""' " 11 * ~K ~ The operation and maintenance agreement includes annual erosion and vegetation repair. iG ~k~fc The operation and maintenance agreement signed and notar¢ed by the responsible party is provided. 'Level spreaders in series can be used on slopes of up to 15°~ in forested areas with leaf littler cover or on slopes of up to 25°~ in areas with thick ground cover or grass if designed according to the Draft Level Spreader Design Option Document This potentially requires a minor variance in protected buffer areas. In any event the second level spreader cannot be located in Zone 1 of a protected buffer area. *~'Df~-~c,>e To t,EVE~ sPr~aDeR IS ~rzo~ y~,l,rio fR-o+~t ~~~r 1" ~' R~+J~QtLL. 4c gY~~s ~ys>~ t5 pCLOVtD~D ~rZ- t~uie~ S-i-oR.-l,'1S. ~* * ~P~2~t'rlorl ~ ~1kr rJT~~nJc~ ~44~'>GM FAT Ta ~ G ~ 1~ cwT~b wt,-1~- -r1~E c~Ty o~ ~,e~G~. 6/30/2005 EXTENDED DRY DETENTION BASIN #5 CALCULATIONS Drainage Area = DA = 8.12 ac Impervious Area = 4.06 ac Impervious Cover : I = 50.0 1 " Rainfall Event = Rv = 0.05 + 0.0091 = 0.05 + 0.009(50) = 0.5" Volume = Rv(DA) = 0.5" (8.12 ac)(1'/12")(43,560 sf/1 ac) = 14738 cf (Vol)q~~otr= 14,738 cf 1" Elev. 265.60 (V01)2-near= 24,922 Cf 2-Yr Elev. 267.97 (Vol)to-near= 41,877 cf 10-Yr Elev. 269.21 (VOI)t~-year= 67,533 Cf 100-Yr Elev. 270.01 (Vol)rotat = 95,035 cf Berm Elev. 271.50 Freeboard 1.49' BASIN VOLUME Water Level ft Surface Area sf Elevation ft Incremental Volume cf Accumulated Volume cf 0 0 261.5 0 0 0.5 495 262 124 124 1.5 2,150 263 1,323 1,446 2.5 4,355 264 3,253 4,699 3.5 6,930 265 5,643 10,341 4.5 9,205 266 8,068 18,409 5.5 10,850 267 10,028 28,436 6.5 12,545 268 11,698 40,134 7.5 14,300 269 13,423 53,556 8.5 16,110 270 15,205 68,761 9.5 17,980 271 17,045 85,806 10 18,935 271.5 9,229 95,035 Use 4' x 4' RTCB with (4) 12" openings Weir Elevation = 269.30 ~z Qweir = Q100- (~10)max = CwLh100 Qweir = 45.2 CfS - 16.69 CfS = 28.51 CfS Cw = 3.0 L = 16' h~~ = 0.71' 100•Year Elevation = 269.3 + 0.71' = 270.01 Pipe size to drain temporary pool in 2 days Q = (14738 cf/48 hr)(1 hr/3600 s) = 0.09 cfs Try 1.5" diameter pipe Average head = h = 4.1'/2 - 0.0625' = 1.99' Q = cdA(2gh)°'S = 0.6(0.0123)[2(32.2)(1.99)]^0.5 Q = 0.08 cfs -Therefore use 1.5" diameter pipe (Q1o)max = 0.6(0.0123)[2(32.2)(3.85)]^0.5 = 0.12 cfs PHC_Detention 5.xis rlnr Rasin #F PLD BASIN # 5 DETENTION CALCULATIONS ON•SITE DRAINAGE AREA TO SYSTEM = OFF-SITE DRAINAGE AREA = DRAINAGE AREA AWAY FROM SYSTEM TOTAL DRAINAGE AREA TO SYSTEM = HEIGHT OF REMOTE POINT IN WATERSHED ABOVE OUTLET = HYDRAULIC LENGTH OF WATERSHED = COMPOSITE RUNOFF COEFFICIENT AFTER DEVELOPMENT = COMPOSITE RUNOFF COEFFICIENT BEFORE DEVELOPMENT = COMPOSITE RUNOFF COEFFICIENT OFF-SITE COMPOSITE RUNOFF COEFFICIENT (AWAY) SCS CURVE NUMBER AFTER DEVELOPMENT = ESTIMATE PEAK RUNOFF (OP) Design Storm = 2 -YR T~ = 2.65 MIN -- USE 5.00 MIN (I~)POSr = 5.76 IN/HR ON-SITE RUNOFF TO POND (POST) 0~ = c(I,~A = 16.01 CFS OFF-SITE RUNOFF TO POND Q„ = c(I,JA = 10.79 CFS TOTAL RUNOFF TO POND (POST) Q~ = c(I,JA = 26.80 CFS RUNOFF AWAY FROM POND (POST) Qnway = c(I,~A = 4.65 CFS MAXIMUM RELEASE Qanaw = Qpre - OQaway = 13.79 CFS COMPUTE DEPTH OF RUNOFF (O~~) P~= 3.60 IN ESTIMATE SOIL STORAGE S =1000/CN -10 = 2.82 O,; = 1.57 IN PHC_Detentlon 5.xis 2-YR DESlGN STORM - 6/30/2005 '(PRE) 0~ = c(I,~A = (PRE) Qn = c(Ir~A = (PRE) QAWAY = c(In)A = 2 YR - 24 HR PRECIP 1,=.2S= 0.56 DAcN = 5.24 ACRES DOFF = 2.88 ACRES DAAtiYAy = 1.39 ACRES DA = 8.12 ACRES H = 26 FEET L = 460 FEET CPOST = 0.53 (45% ) CPRE = 0.20 CoFF = 0.65 (60% ) CAWAY = 0.58 (50% ) CN = 78 (45% ) 6.04 CFS 16.83 CFS 1.60 CFS RALEIGH, NC PLD CALCULATE TIME TO PEAK TP = VOLUME/1.390p = O'DA/1.39Qp TP= 22.4 MIN ESTIMATE REQUIRED STORAGE S = (POST O - PRE Q + D AWAY Q)Tp S~ = 17,488 CF+25% = 21,860 CF STAGE STORAGE WATER LEVEL SURFACE AREA SF ELEVATION INCREMENTAL VOLUME CF ACCUMULATED VOLUME CF 0 8,295 265.6 0 0 ..:0.40.. , _. u. _ _._. ...9,205. _.:__ , _ _.._ :..... .._...;._ _266.0... _ 3,500, . _ _ _.:..3,500 . - 1.40 10,850 267.0 10,028 13,527 .2.40.... ..............12,545::,:., ..:,.: , . .. ~. 268 0_.. 11,698 _. ...25,225,. , - 3.40 14,300 269.0 13,423 38,647 4.40,_ _ 16110____, ,__ _. _ ____270A __ 15,205.. _,63,852 5.40 . 17,980 271.0 17,045 70,897 ..5.90, .,.. ...18,935 __._._..~. .. _, _.~ 271y5._. _ .. 9,229 .80,126.._..._._..... 2 -YR STORM ELEV. = 267.97 51AGtU15GI1A HGt Up= 26.80GF5 WATER - HW ACCUMULATED :LEVEL D FLOW (F"f) D = 1.63 (CFS} 0 0 0 . _~, _ Q,5r_. _. _..__._. ____..._031-__rM-_......, _ ,. _ _. _ _ ._.._.___..1 ~.~.e~_..___.. 1.5 _ 0.92 7.98 2 5 , - 1 54 12.97 __..v __. _, 3.5 2.15 16.37 __. 4.5 _. 2.77 19.18 5.5 3 38 2L62 _ 6.5 _. _ .~_._ _ . _- - _._.___ 4.00 _.. _..___. ~.._.._ .- .~ - _23.82 ._-~_,. Y~_.~_._ 7.5 4.62 25.82 ,~u.u 8 5 z _~_ ~ ._... r _ .. -~5 23 .__~..~... . , F- ..._ 27 69 ~........ 9.5 5.85 29.43 10.5. 6.46 -~ ~- 31.08{" 2 -YR STORM PEAK = 12.34 CFS 19.5 ' ORIFICE K = 4.35 OP = CaA(~9h)os Ca = 0.6 A = 2.07 g = 32.2 IF HW/D<1, Op = K(stage)'S PHC_Detention 5.xls ~T 2-YR DESIGN STORM -6/30/2005 L CHAINSAW ROUTIPJG TABLE OP = 26.80 CFS MAX RELEASE = 13.79 CFS Tp = 22.4 MIN dT = 4 MIN U TIME (MIN) INFLOW (CFS) STORAGE (103 CF) IS AS STAGE (FT) OUTFLOW (CFS) 1 0 0 0 0 0 0 2 4 2.1 0.00 0 0 0 3 8 7.6 0.49 0.49 0.06 0.17 4 12 14.9 1.78 2.27 0.26 0.80 5 16 21.8 3.38 5.66 0.62 2.28 6 20 26.0 4.67 10.33 1.08 5.28 7 24 26.5 4.98 15.31 1.55 8.25 8 28 22.9 4.37 19.69 1.93 10.11 9 32 18.2 3.07 22.76 2.19 11.42 10 36 14.4 1.62 24.37 2.33 12.11 11 40 11.4 0.55 24.92 2.37 12.34 12 44 9.0 -0.22 24.70 2.35 12.25 13 48 7.2 •0.77 23.93 2.29 11.92 14 52 5.7 -1.14 22.79 2.19 11.44 15 56 4.5 -1.38 21.41 2.07 10.85 16 60 3.6 -1.52 19.89 1.94 10.20 17 64 2.8 -1.59 18.30 1.81 9.52 18 68 2.2 -1.60 16.70 1.67 8.84 19 72 1.8 -1.58 15.12 1.54 8.16 20 76 1.4 -1.53 13.58 1.40 7.37 INFLOW CALCULATED USING THE FOLLOWING FORMULAS: ForO<t<1.25TP Fort > 1.25 TP STORAGE CALCULATED USING THE FOLLOWING FORMULA: 0= ~I1 -cos nt)1 2 Tp O = 4.34 Op e~~, 30 ~ v,v~l STORAGE _ (INFLOW(cis) - OUTFLOW(cts)) ' DTIME(min) ' 60 sec 1 (min) CONCLUSION: P~IAXIh1UM DISCHARGE FROM THE SYSTEM IS 12.34 CFS (WATER ELEVATION - 267.97) WHICH IS LESS THAN THE ALLOWABLE DISCHARGE OF 13.79 CFS FORA 2-YR STORM. DESIGN IS ACCEPTABLE. PHC_Detention 5.xls ~T 2-YR DESIGN STORM - 6/30/2005 L BASIN # 5 DETENTION CALCULATIONS ON-SITE DRAINAGE AREA TO SYSTEM = OFF-SITE DRAINAGE AREA = DRAINAGE AREA AWAY FROM SYSTEM = TOTAL DRAINAGE AREA TO SYSTEM = HEIGHT OF REMOTE POINT IN WATERSHED ABOVE OUTLET = HYDRAULIC LENGTH OFWATERSHED = COMPOSITE RUNOFF COEFFICIENT AFTER DEVELOPMENT = COMPOSITE RUNOFF COEFFICIENT BEFORE DEVELOPMENT = COMPOSITE RUNOFF COEFFICIENT OFF-SITE _ COMPOSITE RUNOFF COEFFICIENT (AWAY) _ SCS CURVE NUMBER AFTER DEVELOPMENT = ESTIMATE PEAK RUNOFF (OP) Design Storm = 10 -YR T~ = 2.65 MIN -- USE 5.00 MIN (I~POSr = 7.22 INMR ON-SITE RUNOFF TO POND (POST) On = C(IaA = 20.06 CFS OFF-SITE RUNOFF TO POND On = C(I,JA = 13.52 CFS TOTAL RUNOFF TO POND (POST) On = C(I,JA = 33.58 CFS RUNOFF AWAY FROM POND (POST) Qaway = c(I,~A = 5.82 CFS MAXIMUM RELEASE QaGow = apre' ~Qaway = 17.27 CFS COMPUTE DEPTH OF RUNOFF (O„ ) '(PRE) Qn = C(In)A = (PRE) Qn = c(I,~A = (PRE) QAWAY = C(In)A = Pn= 5.38 IN 10 YR - 24 HR PRECIP ESTIMATE SOIL STORAGE S=1000/CN-10= 2.82 I,_.2S= 0.56 O,; = 3.04 IN PHC_Detention 5.xis f0-YR DESIGN STORM - 6/30/2005 DAoN = 5.24 ACRES DAaFP = 2.88 ACRES DAawar = 1.39 ACRES DA = 8.12 ACRES H = 26 FEET L = 460 FEET C~sr = 0.53 (45% ) CPRE = 0.20 COFF = 0.65 (60% ) CawaY = 0.58 (50% ) CN = 78 (45% ) 7.57 CFS 21.09 CFS 2.01 CFS RALEIGH, NC PlD CALCULATE TIME TO PEAK Tp = VOLUME/1.390P TP = = Q'DAl1.390P 34.6 MIN ESTIMATE REQUIRED STORAGE S = (POST Q • PRE Q + ~ AWAY O)TP Sn = 33,846 CF+25% = 42,307 CF STAGE STORAGE WATER LEVEL SURFACE AREA SF ELEVATION INCREMENTAL VOLUME CF ACCUMULATED VOLUME CF 0 8,295 265.60 0 0 Q40 _ ... ~. ,9,205 _. _ _ ... 266.0 _ .3,500 ... ... , _..3,500 1.40 10,850 267.0 10,028 13,527 2.40.., ._. . ,.. .... _12,545 :..._:... _... .. ...:..268.0 ... _ 1..1,698 .. _ _. _ . ...._25,225.... 3.40 14,300 269.0 13,423 38,647 4.40 - - _._.16,1.10...-- - ... _ __ 270.0 _. 15,205 _.._ ..... .. _ ...._ ..-53,852 ___ ._._~ 5.40 17,980 271.0 17,045 70,897 5.90. 18 935 __ s ... ._..__.. 271.5,.. __ __ . . - .9,229 _ ,. ..80,126 - 10 -YR STORM ELEV. 269.21 STAGE DISCHARGE OP= 33.58 CFS 19.5 "ORIFICE WATER HW ACCUMULATED LEVEL D FLOW (FT) D = 1.63 (CFS) 0 0 0 0.5 _ :.....0.31.._ __, -1.54_ _ 1.5 0.92 . 7.98 2.5 _ . 1.54 . _ .. _ 12.97 3.5 2.15 16.37 _ 4.5... __ _ -. _...:~ ~_ __y .. .: . _ .. ~.._1918~..... _ _. 5.5 3.38 21.62 .. __ 6.5 _r_ __ . _4.00 - .. _ __ __ __.__..~. ____--- _ _ _ ..... __ _._ _ - -23.82 ~_-- 7.5 4.62 25.82 8.5 _ ....._..__.... ._. 5.23. .- r.,._~...~. .__.._..__ . . -- 27.69_... ,__..~....~..:....~...~_~._,~ .x... 9.5 5 85 29.43 10.5 6.46 31.08 10 •YR STORM PEAK 16.69 CFS K = 4.35 OP = CaA(~9h)o.s Ca = 0.6 A = 2.07 g = 32.2 IF HWlD<1, Op = K(stage)'s PHC_Detention 5.xls ~T 10-YR DESIGN STORM - 6/30/2005 L CHAINSAW ROUTING TABLE OP = 33.58 CFS MAX RELEASE = 17.27 CFS Tp = 34.6 MIN dT= 4 MIN U TIME (MIN) INFLOW (CFS) STORAGE (103 CF) IS AS STAGE (FT) OUTFLOW (CFS) 1 0 0 0 0 0 0 2 4 1.1 0.00 0 0 0 3 8 4.2 0.26 0.26 0.03 0.09 4 12 9.0 0.99 1.26 0.14 0.44 5 16 14.8 2.06 3.32 0.38 1.16 6 20 20.9 3.28 6.59 0.71 2.88 7 24 26.4 4.32 10.91 1.14 5.65 8 28 30.7 4.98 15.88 1.60 8.49 9 32 33.1 5.32 21.20 2.06 10.76 10 36 33.4 5.37 26.57 2.50 12.97 11 40 31.6 4.91 31.48 2.87 14.22 12 44 27.9 4.17 35.65 3.18 15.27 13 48 24.0 3.03 38.68 3.40 16.04 14 52 20.7 1.91 40.59 3.53 16.45 15 56 17.8 1.01 41.60 3.59 16.64 16 60 15.3 0.27 41.88 3.61 16.69 17 64 13.2 -0.33 41.54 3.59 16.62 18 68 11.3 -0.83 40.71 3.54 16.47 19 72 9.7 -1.24 39.48 3.45 16.22 20 76 8.4 -1.55 37.92 3.35 15.85 INFLOW CALCULATED USING THE FOLLOWING FORMULAS: ForO<t<1.25To Fort > 1.25 Tp STORAGE CALCULATED USING THE FOLLOWING FORMULA: O = O~ [t -cos n t)) 2 Tp O = 4.34 Op e~~, ~' ~ vtvn STORAGE _ [INFLOW(cis) - OUTFLOW(cis)) ' DTIME(min) ' 60 sec 1 (min) CONCLUSION: MAXIP~IUM DISCHARGE FROM THE SYSTEM IS 16.69 CFS (WATER ELEVATION - 269.21) WHICH IS LESS THAN THE ALLOWABLE DISCHARGE OF 17.27 CFS FORA 10-YR STORM. DESIGN IS ACCEPTABLE. PHC_Detention 5.xls 10-YR DESIGN STORM - 6/30/2005 n 10' BERM - 271.5 3 1: PROPOSED 4'x4' PRE-CAST BOX (REFER TO DETAIL) PROVIDE 1.25' PERFORATED, THREADED PVC OR METAL PIPE W/ CAP do BRACKETED TO CB WALL - - ,_'1. 2X 3:1 BOTTOM - 261.5 VARU1BlE WIDTH BOTTOM 270.01 - A1AX. 100-YR WATER SURFACE ELEVATION 269.21 - A1A)C. 10-1R WATER SURFACE ELEVATION 267.97 - A1,4X. 2-YR WATER SURFACE ELEVATION 265.60 - 1' RUNOFF WATER SURFACE ELEVATION EXTENDED DRY BASIN ~5 CROSS-SECTION (PRE-CAST BOX #??) SCALE: N.T.S. 10' BERA1 - 271.5 i 3:1 270.01 - AL4X. 100-YR WATER SURFACE ELEVATION 269.21 - AIAX. 10-YR WATER SURFACE ELEVATION 267.97 - A1AX. 2-YR WATER SURFACE EIEVATION 265.60 - i' RUNOFF WATER SURFACE ELEVATION PROPOSED 4'x4' PRE-CAST RTCB (REFER TO DETAIL) 3 1 ~\ 12' RCP OUTLET PIPE ANTI-SEEP COLLAR - 30' RCP OULTET PIPE ANTI-SEEP COLLAR - EXTENDED DRY BASIN ~5 CROSS-SECTION (RAISED-TOP CATCH BASIN #??) SCALE: N.T.S. 07/27/2005 16:16 9198457703 PIEDMONT LAND DESIGN PAGE 02/02 PLD r Pied~ao~t Land Design,l,LP 85ZZ-204 Siz forks Road - Raleigh, NC 2715 • (919) 845-7600 • Fax: (919) 845-2703 ;, March 3, 2005 Peyton Hall St~llziaeadow Drive and Wedgewpgd Road Raleigh, North Carolina impervious Area Calculations ~: ;: Total Site Area = 42.06 ages Impervious Areas ;; Lot 1 40,000 sf Lot 2 - 116 (2,500! s~~ each) 287,500 sf Pump Station and Dhtve 3,600 sf Ri ~ht of Wa~~ ~ _ 211,400 sf Total 542,500 sf .12.45 acres lja~pervious Axea Perceztta~e = (12.45/42.06) 100 = 29.60 % Since the percentage of impervio` s; area is less than 30%, no stortuwater measures are required to meet Divisiom of Water Qualit~ ; or >r1.S. Army Corps of Engiuo,eers requirements. However storriawater measures are requtred to meet the City of ,Raleigh stormwater quantity control require~oaents. Dry detention pond$ will be provided to meet this req>;urement. ~, ;; Clrtl I;ng~neers Landscape Archilecls .I Land Planuecs `.~~ ~' f ~',~r°, _: 5 i_ i~~~' i i Michael F. Easley Governor William G. Ross, Jr., Secretary Department of Environment and Natural Resources Kerr T. Stevens Division of Water Quality Draft Level Spreader Design Options Version 1.0 October 10, 2001 Using Level Spreaders to Provide Diffuse Flow Through Buffers for Compliance with Riparian Area Protection Rules Level spreaders are one means of providing diffuse flow through protected buffers. It is always preferable to not concentrate stormwater initially and provide as many outfalls as possible. This can reduce or even eliminate the need for engineered devices to provide diffuse flow. However, this is not feasible in many cases. Some buffer protection rules such as the Neuse, Catawba, and Tar-Pamlico Riparian Area Protection Rules do not allow direct discharges of stormwater through the protected buffers. However, it is "allowable" with written approval from the DWQ to provide best management practices (BMPs) that remove the nutrients or pollutants in question in order to discharge directly through the buffer. These measures could include the use of the buffer itself as a forested filter strip, for instance, to remove the desired substances. In addition to providing diffuse flow, level spreaders can be used to distribute flow into filter strips. There are certain criteria that apply to every design that utilizes level spreaders to provide diffuse flow: 1) The entire system must safely pass a 10 year storm event without failing or causing erosion, gullies or rills. 2) The design of the level spreader must take into consideration site specific conditions such as topography, vegetative cover, soil and other geologic conditions. If diffused flow is not attainable based on site conditions they should not be used. (i.e. the slope of the natural ground away from or parallel to the level spreader should be relatively smooth in the direction toward the stream so that the flow will not reconcentrate.) 3) Level spreaders should have a minimum length of ten feet and an absolute, maximum length of 300 feet. 4) It is always easier to keep flow distributed than to redistribute it after collection. 5) The type and amount of vegetative ground cover must also be considered. 6) Level spreaders must be level. Level Spreader Design Options: Conventional level spreader design option where entire discharge is passed through the level spreader with no bypass conveyance for larger storms: • For grass or thick ground cover vegetation: i)13 feet of level spreader for every 1 cfs flow (Based on Q10 discharge) ii) maximum length of 300 feet per level spreader iii) Slopes of 8% or less from level spreader to top of stream bank • For forested areas with little or no ground cover vegetation: i) 100 feet of level spreader for every 1 cfs flow (Based on 010 discharge) ii) maximum length of 300 feet per level spreader iii) slopes of 6% or less from level spreader to top of stream bank Another conventional level spreader design technique that can be used to accommodate steeper slopes where grading is allowed or exempt in zone 2 of protected buffers is to provide level spreaders in series as follows: • Can be used on slopes of up to 15% for forested areas and 25% for grass or thick ground cover • Structural level spreader just outside of zone 2 followed by a grassed berm level spreader just outside of zone 1 North Carolina Division of Water Quality, 401 Wetlands Certification Unit, 1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address) 2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location) 919-733-1786 (phone), 919-733-6893 (fax), htto~//h2o.enr.state.nc.us/ncwetlands/ Page 2 of 2 • Maximum Q10 discharge of 1 cfs per 100 feet of level spreader for forested areas and 1 cfs per 13 feet of level spreader for grass or thick ground cover In some instances, because of topography, the size and imperviousness of the drainage area, or other site constraints, conventional level spreader designs are not appropriate. However, there are alternative designs, like the ones listed below, that would allow a level spreader to function properly by bypassing the larger discharge events. This is based on the assumption used in designing most water quality BMPs that the "first flush" of stormwater discharge contains the most substances of concern. These other alternatives are "allowable (require written approval from DWQ)" for protected buffers in the Neuse, Tar-Pamlico and Catawba basins, but would not be allowable in protected buffers of the Randleman watershed. Level spreader with bypass for larger drainage areas that require 85%TSS removal or where lateral constraints limit the level spreader length severely: • Dry detention basin designed per NCDENR stormwater BMP Manual* sized to detain 1" rain and release it over 2-5 days* through a level spreader. • Level spreader length based on the maximum release rate discharge • Discharges from greater than a 1" rain can be bypassed via an appropriate conveyance such as a grassed swale (rip rap lined ditch or pipe may be used if necessary) • Maximum discharge of 1 cfs per 100 feet of level spreader for forested areas and 1 cfs per 13 feet of level spreader for grass or thick ground cover *( in order to meet 85%TSS Removal criteria) Another bypass alternative can be used that would not be considered to remove 85%TSS: • Detention basin such as a type B silt basin preceding the level spreader • Level spreader length based on the 1"per hour intensity storm • A system designed to bypass the greater than 1" in per hour intensity storm through an appropriate conveyance such as a grassed swale (rip rap lined ditch or pipe may be used if necessary) • Maximum discharge of 1 cfs per 100 feet of level spreader for forested areas and 1 cfs per 13 feet of level spreader for grass or thick ground cover Yet another design that can be used in very specific areas with virtually flat slopes is a Preformed Scour Hole with a Level Spreader Apron (typical detail attached): • Discharge area must have virtually flat slopes such as those in flood plains or wetlands • Must be located outside of zone 2 • B = 3 x discharge pipe size for pipes of either 15 or 18 inches B= base width (see detail) • Maximum allowable discharge (Q10) of 6 cfs fora 15 inch pipe and 10 cfs for an 18 inch pipe • Minimum apron width of 4 feet. Any of the above options will be considered acceptable if designed in accordance with the outlined criteria. Please keep in mind that some of the above practices may still require written approval, for instance when a direct bypass discharge is proposed through a protected buffer in the Neuse orTar-Pamlico River Basin. i~f ~I:• ~I •'1::~~: ICI.-, :r: ~-~: r~c;~l ~~~• ~ rl~ .. .. ,~ - ff, .'J' ~C'•. '1_ ~ J .. • - 7~'r'.~ ~1 i~• Y ~•: ~- ~:li-:Il~ !h 3 I r'~. r~. v 1 ~ JUL-28-2005 11:34 FROM:DWQ-WETLANDS 9197336893 70:98469467 P:2~7 Q~O~ W AT ~~QG Michael F. Aaslcy, Governor William d. Ross Js., 5ccrctary Vj ~ North Carolina Department of EnviroIImeRt and Nan~ral Resources ~ ~ a .~ Alan ZV. Klimek, P.E. Dirr,Clbr Division of Water Quality ' January 12, 2005 • DWQ Project ~ 04-1934 Wake County page 1 of 4 Helen T. Lattimore 3,122 Eton Road Raleigh, CN 27608 Subject Property: )Peyton Sall Subdivision T,TZ';Rocky Creek ,t~pprovnl of 4011 Water Quality Certifiicationt and Authorization Certificate per the Neuse )[fiver Buffer Protection Mules (SSA NCAC 2B .0233) with Ad.dational Conditions Dear Ms. Lattimore: Xou have vur approval., in, accordance with the attached conditi.on.s and those listed beJ.ow, to place fill within or otherwise impact 198 feet of pexenzlial, streams, 95 feet of intermittent streams, 18,245 square feet (ft2) Zone 1 buffers and 12,272 square feet (ft2) Zone 2 of protected riparian buffers for the purpose of constructing a residential subdivision at the subject property, as described within your application dated Decembei'2, 2004 and received by the N.C. Division of Water Quality (DWQ) on December 2, 2004. After reviewing. your. application, we have decided shat the impacts are covered by General Water Quality Certif cation Number(s) 3402 (GC3402). The Certification(s) allows you to use Nationwide Permit(s) 39 when issued by the US Army Corps of Exxgiuaeers (USAGE). This letter shall also act as your approved Authorization Certificate for impacts to the protected riparian buffers per 1SA NCAC 2B .0233. l;n addition, you should obtain or otherwise conopiy with. any other required federal, state or local pcrznits before you go ahead with youx pzoject including {but not limited to) Erosion and Sediment Control, and Nod-discharge regulations. Also, this npp><•oval to proceed with your proposed iz~npacts or to conduct impacts to waters as depicted in, your ~itpplicativty s1xaU expire upon expiration o~ the 404 Permit. This approval. is for. the purpose and design that you described in your application. Yf you change your project, you must notify us and you maybe required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with. alJ conditions. If total fills for this pzoject (now or in the future) exceed one acre of wetland or. 180 linear feet of stream, compensatory mitigation may be required as described in. 1SA NCAC 2H A506 (h). This approval requires you to follow the cotditions Iisted in the attached certification and any additional con...ditions listed below. N~n~carel A01 Ovsr'fghYExprss; FeviavtUnit Ql!liXl~l 1650 h1a11 SBMca Center, l3aielgh, North Carolina 27699-1650 221 Crablrr~a Boulevard, Sult2 250, Ralelah, North CaroMa 27801 . PhonO: 919.733.1785! EAX 919-733-6893! lntameC MtoJih2o.~~r.state.nc.us/ncwetlands JUL-28-2005 11:35 FROM:DWQ-WETLANDS 9197336893 70:98469467 P:3~7 $elcn I,3ttimoze Page 2 of 4 January 12, 2005 The ,c3.dditxonal Conditions of the Certification are: 1. Impacts Approved -The followizig impacts ai~e hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: . Amount Approved (Units Plan Location or 12eference Stream -Perennial 198 (feet) Stream - Intezmittent . 95 feet Buffers -Zone 1 , 18,245 (s uare ft.) Buffers -Zone 2 ` 12,272 s ware ft.) 2. 1/rosion & Sedi~aaent Control Practices -Erosion and sediment control practices must be in full couapliance with all specifications govcming the propex design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: . a. The erosion and sediment control measures for the project must be designed,. installed, operated, and maintained in accordance with the most recent version of the ,North Carolirua Sediment and Erosion Control ,Planning caul. Design ll~fanual. b. The design, installation, operation, artd maintenance of the sedi,mcnt and erosion control measures must be sdch that they equal, or exceed, the requirements specified in the most recent version of the Nortlz Carolina Sediment and Erosion Control Manual. The devices shall be maintained on. alI construction sites, borrow sites, abd waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. 3. No Waste, Spoil, Solids, or Fi11 of Any Kind - No waste, spoil, solids, or fill o;f any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre-Construction Notification. All construction activities, including the desi.gz~, installation; operation, and maintenance of sediment and erosion control. Best Management Practices, shall be performed so that no violations of state water quality standards, statutes,ior rules occur. 4, No Sediment & Erosion Control Measures w/n Wetlands or Waters -Sediment and crosivn control measures shall not be placed in wetlands or waters to the maximum e~.tent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural Bade restored within six months of the date that the Division of Land Resources has released the.project. 5. Certificate of Completion -Upon completion of all work approved within the 401 Water Quality Cemification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. JUL-28-2005 11:35 FROM:DWQ-WETLANDS 9197336893 70:98469467 P:4~7 Helen Lattimore Paga 3 of 4 January 12, 2005 6. Written Storz>tx~~~ater NZanagememt Plan - ,An additional condition is that a final., written stormwater ~on.anagement plan (includi.ng a signed and notarized Operation and Maintenance Agreement) shall be approved i..n writing by this Office before the impacts specified in this Certification occur per Condition No. 4 in GC No. 3402. The stotmwater managemeztt plan must include pl.an.s and specifications for stormwater nnanagezner~t: facilities that are appropriate fo.r sux.Pace waters classified as Class C and designed to remove 85~1o TSS according to the most recent version of the NC DENR Storzrawater Best Ma~aageznent Practices IVlanual. These facilities must be designed to treat the runoff from the entire project, unless otherwise explicitly approved by the Division of tiVater Quality. Also, before any permanent building is occupied at the subject site, th.e facilities (as approved by this Office) shall be constructed and operational, and the stormtivater management plan (as approved by this Office) shall be implemented. The structural stormwater practices as approved by this O>ftce as we]1 as drainage patterns must be maintained in perpetuity. No changes to the structural stormwater practices shall be made without written authorization from the Division of Water Quality. 7. Deed of Notification - Deed ztotiftcations or similar mechanisms shall be placed on all retained jurisdictional wetlands, waters and protective buffers iuo. order to assure compliance for future wetland, water and buffer impact. These mechanisms shall be put in place pri.ox to impacting any wetlands, waters andlor buffers approved for i:atapact under this Certification Approval and Authorization Certificate. A sample deed notification can be downloaded from the 401JWet~ands Unit web site at ~ttp://h2o.enr. state.ric.usJnewct.lands. S. Compensatory Mitigati.o.n Using the Ecosystem Enhancement Program (EEP) - ]Vlitigation must be provided for the proposed impacts as specified in the table below. We understand that you wish to make a payment to the Wetlands Restoration Fund administered by the NC Ecosystem Enhance~oaeztt l?zogram (EEP) to meet this mitigation requirement. This has been. determined by the DWQ to be a suitable method to meet the mitigation requirement. Until the EEP receives and clears your check (made payable to: DENR -Ecosystem Enhancement Program Office), no impacts specified in this Authorization Certificate shall occur. Tote EEP should be contacted at (919) 733-5208 if you have any questions concerning payment into a restoration fund. You have one month from the date of this approval tv make this payment. Tor accounting purposes, this AuthoxizAtiom Certificate authorizes payment iuato tbte Wetlands Restoration end 1:n meet the t'ollowiuxg cotlapetxsatory tuuitigation requirement: Compensatory Mitigation. it wired River and Sub-basin Number Stream ~ 193 (feet) Violations of any condition herein set forth may result in revocation of this Certification and may result i.n eri.rainal andlor civil penalties. The authorization to proceed with your proposed impacts or to conduct .inoparas to waters as depicted in your application and as authorized by this Certification, shall expire upon expiration of the d04 Permit. JUL-28-2005 11:35 FROM:DWQ-WETLANDS 9197336893 T0: 98469467 P:5~7 Helen I.atti~aora Page 4 of 4 January 12,2005 zf you do not accept any of the conditions of this Certification (associated with the approved wetland or stream impact), you may ask .for an adjudicatory hearing. You must act within 60 days of the date that you r~cceive this lettex. To ask for a hearing, send a written petition, which conforms to Chapter 1508 of the North. Carolina General Statutes to the Office of Administrative Uearings, 6? l,4 Mail Service Centex, IZaleigh, N.C. 27G99-6714. This certification and its conditions are f~.nal and binding unless you ask for a hearing. Any disputes ovex determznations regarding this Authorization Certificate (associated with the approved buffet impacts) 'shall be referred in writing to the Director for a decision. The Director's decision. is subject to review as provided in Articles 3 and 4 of G.S. 150B. This letter completes the review of the Division of Water Quality under Section 401 of th.e Clean Water Act and the Neuse riparian buffer protection rule as described within 15A NCAC 2B .0233. IS you have any questions, please telephone John Dorney at 919-733-9646 or Bob 2;anec.ki. at 919733-9726, AWKJbs Enclosures: GC 3402 Certificate of Completion Sincerely, ~~ ,A.lan W. Klimek, P.E. . cc: Sean Clark, S&EC, Tx~.c., 11010 Raven Ridge Road, Raleigh, NC 27587 USACE Raleigh Regulatory Field Offiice DWQ Raleigh Regional Office N.C. Ecosystem Enhancement Program File copy Central Files Filezrame: 04-1934 Peyton Hall Subdivision (Wake) 401 NBR JUL-28-2005 11:35 FROM:DWQ-WETLANDS 9197336893 70:98469467 P:6~7 o`'O~ WArFRQ~ ~ -i o -c Michael F. F-astcy, Governor William G. Ross Jr., Secretary North Carolina Departrncttt of Enviroameat aid Natural Rcsoutccs AL~tn STJ. Klimek, P.1:. L?iructor Division of Water puality North Carolina Division of Water Quality 401 Water Quality Certification Summary or Permitted Impacts and Mitigation Requirements >•zl acco.rdance with l5A NCr~C 2H.0500, IIelen T. Lattimore has permission as outlined below to impact 293 linear feet of streams for the purpose(s) of constructing the proposed Peyton Hall Subdivision in Wake County. All acti.vi.ties associated with these authorized impacts must be conducted with the conditions listed in the attached Permit transmittal letter. THIS PERMIT IS NOT VALID WI'THOVT THE ATTACHIVIENTS. COMPENSATORY MITIGATION REQUIREMENTS, ECOSYSTEM ENHANCEMENT PZZOGRAM DWQ Project No.: 04-1934 DA'R'E: January 12, 2005 LOCATION: Cary COUNTY: Wake PASINN/ SUB ZiASIN/ STREAM INDEX: 03-04-02 / 27-28 As required by l5A NCAC 2Fi.0500, and the conditions of this Permit, you are required to compensate for the above innpacts through the restoration, creation., enhancement or presetvati.on oi;' wetlands and surface waters as outlined below prior to conducting any activities that impact or degrade the waters of the state. Note: Acreage requirements proposed to be mitigated through the Ecosystem Enhancement Program must be rounded to one-quarter acre increments and linear foot requirements must be rounded up to the nearest foot according to 15 2R.0503(b). Zrxapacts: 293 ft streams (198 ft perennial & 95 ft intermittent) Mitigation: 1.98 t;t perenlaial streams Note; While .DWG is only requiring a 1:1 mitigation ratio, the US,A,CE will most Iikery require a 2:1 ratio. As such, the total mitigation required by the applicant will rrcost likely he 396, ft of perennial stream. Zn correspondence dated December 22, 2004, the EEP indicated that up to 396. linear feet of mitigation will be conducted by EEP if necessary. 1~A~QM~hCarolinn 401 1Vetlands Cenltlcatron Un1t ~ dValitrnll~ 1650 M~II Sorvlco Censer, Asleigh, Notch Carolina 27899-y650 2321 Cr»btree Bouletiard, Sulte 250, Raleigh, North Caroline 27604 AhOlte: 919.7331766 /FAX 918-7336393/ Internet Ftttp;//h2o.enrstatB.nc.us/ncwetland; An Eoual OooortunltvlAmtm~Wa Aa}on Etnolover-5t7'b FiPr./~1Pd11(19G, PrniCcvLCUtrar Parwr JUL-28-2005 11:36 FROM:DWQ-WETLANDS 9197336893 70:98469467 P:7~7 Helen T. Lattizzaore Page 2 of 3 January 12, Zoos One of the options you hake available io satisfy the compensatory mitigation requirement is through the payment of a fee to the Wetlands.Restozation Fund per NCAC 28.0503. If you clzoosc this option, please sign this form and mail it to the Ecosystem Enhancement Pro~arra at the address below. An invoice for the appropriate amount of payment will be'sent to you upon receipt of this form. PLEASE NOTE, THE ABOVE IMPAC'Z'S ARE NOT AUTHORIZED UNTII. YOU RECEIVE NOT7FICA.TION THAT YOUR PAY,N.~N~' HA.S BERN QI~OCESSED BX THE ECOSYTEM ENHA.NCMEN'T' PROGRAM. Signature Date ECOSYSTEM CEMENT PROGRAM 1619 Mail Sezvice C`eriter RALEIGH, N.C. 27669-1619 (919} 733-5208 Pileztarx~e: 04-1934