Loading...
HomeMy WebLinkAboutNC0089613_Draft Permit and Fact Sheet Comments_20160908 SEF 082015 August 30, 2016 THEJulie A Grzyb, Environmental Engineer W 0 OT E N NC DEQ/Division of Water Resources/Water Quality Permitting COMPANY NPDES Complex Permitting, Wastewater Branch 1611 Mail Service Center Raleigh,NC, 27699-1611 NGINEERING PLANNING RE: Brunswick Regional Water& Sewer H2GO Draft NPDES Permit and Fact Sheet Comments ARCHITECTURE Dear Ms. Grzyb: Thank you for all your efforts on reviewing the NPDES application and issuing the Draft NPDES permit and the fact sheet for the permit. On behalf of Brunswick Regional Water and Sewer H2GO, The Wooten Company is submitting the attached comments on the draft NPDES permit dated August 24, 2016. The comments are mostly clarifications or questions. Again, we thank you for your continuing efforts on the NPDES permit for this important project. Sincerely, (7:4'i Carl Scharfe, P.E The Wooten Company Cc: Bob Walker, Executive Director, Brunswick Regional Water and Sewer H2GO 120 North Boylan Avenue Raleigh NC 27603-1423 919.828.0531 fax 919.834.3589 1 Comments on Draft NPDES permit and NPDES fact sheet Brunswick Regional Water and Sewer H2GO A. Draft NPDES Permit 1. Item 1 on Page 2 of the Permit Cover Sheet states, "The concentrate and occasional flush waters will be collected in a sump and pumped at a constant rate through a diffuser into the Brunswick River". Pressure from the RO process itself will be used to discharge to the river diffuser. a. Text should be changed to "The concentrate and occasional flush waters will be discharged through a diffuser into the Brunswick River using available RO treatment unit water pressure" b. Please make this same change on the permit fact sheet Page 2 of 10, Paragraph 5 sentence 4. 2. The Effluent Tables on Page 3 and 4 of 10 list a pH limit of 6.8 to 8.5. a. Can the river pH samples be taken 2/month like all the other parameters as it will take a boat to collect the samples? B. Draft NPDES Fact Sheet 3. Page 1 of 10, Paragraph 3, sentence 1 indicates potable water is delivered to greater than 9,000 residents. H2GO actually serves over 10,000 customers and has a service population of more than 23,000 people. Please modify this sentence to reflect this fact. 4. Page 2 of 10, Paragraph 5, sentence 3 states, "The RO concentrate generated from the RO Process will be discharged into the Brunswick River one-mile south of the US-17-74-76 bridge,just downstream from H2GO's existing Belville Sanitary WWTP discharge". We will be locating this discharge approximately 100 feet downstream. a. We suggest the following language change, "The RO concentrate generated from the RO Process will be discharged into the Brunswick River one-mile south of the US- 17-74-76 bridge, approximately 100 feet downstream from H2GO's existing Belville Sanitary WWTP discharge." 5. Page 2 of 10, Paragraph 6 states, "Permittee is not a member of the Cape Fear River Basin Association, which conducts water quality monitoring within the basin to gain a broad water quality perspective. H2G0 is a member of the Lower Cape Fear River Program. a. The text should be changed to "Permittee is a member of the Lower Cape Fear River Program, which conducts water quality monitoring within the basin to gain a broad water quality perspective." 6. Page 5, Paragraph 1 states, "It was determined that this non-municipal facility is not a major facility." a. Sentence should state, "It was determined that this municipal facility is not a major facility."