Loading...
HomeMy WebLinkAboutNCS000093 DMR SW (4) BRP US Inc. 1211 Greenwood Road Spruce Pine,North Carolina USA 28777 BRP T 828 766 1100 F 828 765 2391 www brp corn July 20, 2016 Division of Water Quality Surface Water Protection Section ATTENTION. Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 RECEIVED JUL 26 2016 Subject. SDO Monitoring Report Sample#5 Year 3 Period 1 CENTRAL FILES BRP US Inc. DWR SECTION Spruce Pine, Mitc l 3e,. ty Permit No X49 0 To Whom It May Concern: Enclosed are the original and one copy of the completed Stormwater Discharge Outfall (SDO) Monitoring Report for the BRP US Inc. facility located in Spruce Pine. These results were received July 12, 2016 for samples collected June 27, 2016 and are for Sample Number 5, Year 3- Period 1 of the Monitoring Schedule. No parameters tested exceeded Table 3 Benchmark Values of the Permit. I trust this satisfies the reporting requirements pursuant to Permit Number NCS000093 Part III Section E 1 &2. Should you have any questions regarding this information, please contact me at(828) 766-1185. ff,6BRespectfully, 1111/61—‘— Bernice ernice Wilson EHS Coordinator cc: Stephen Floyd Ski-Doo Lynx Sea-Doo Evinrude Johnson Rotax Bombardier ATV s STORMWATER DISCHARGE OUTFALL(SDO) MONITORING REPORT / Permit Number►, S0B'�Z093 ' SAMPLES COLLECTED DURING CALENDAR YEAR: Zo PCD (This monitoring report shall be received by the Division no later than 30 days from the date the facility receives the sampling results from the laboratory.) FACILITY NAME gg COUNTY A I TGi4 g/.L, PERSON COLLECTING SAMPLE(S) _OW'J C i lel—LTU1J PHONE NO. ( 32 ) 7ZW4, //0J CERTIFIED LABORATORY(S) 19.4CG A-AIA-(S!1/( L Lab# 2-110 Lab# ' SIGNATURE OF PERMITTEE OR DESIGNEE REQUIRED ON PAGE 2. Part A:Specific Monitoring Requirements RECEIVED Outfall Date RECEIVED No. Sample Total TSS Aluminum pH JUL 2 6 2016 Collected Rainfall JUL 2 6 2016 CENTRAL FILES mo/dd/yr inches mg/1 mg/1 - DWR SECTION 001 Ng/IW/ O& 0 40 7 <3'i ND la,27 CENTRAL FILES DWR SECTION Does this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month?_yes /no (if yes,complete Part B) Part B:Vehicle Maintenance Activity Monitoring Requirements Outfall Date No. Sample Total Flow Total Oil&Grease Non-polar Total pH New Motor Collected (if Rainfall (if appl.) O&G/TPH Suspended Oil Usage applicable) (Method 1664 Solids SGT-HEM), if appl. mo/dd/yr MG inches mg/1 mg/1 unit gal/mo N/A FORM SWU-247,LAST REVISED 2/2/2012 PAGE 1 OF 2 0 STORM EVENT CHARACTERISTICS: Mail Original and one copy to: Division of Water Quality Date 1401220 Attn: Central Files Total Event Precipitation(inches): .0, M 1617 Mail Service Center Event Duration(hours):ZH45gjM,U (only if applicable-see permit.) Raleigh,North Carohna 27699-1617 (if more than one storm event was sampled) Date Total Event Precipitation(inches): Event Duration(hours): (only if applicable-see permit.) "I certify,under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete. I am aware that there are significant penalties for submitting false information,including the possibility of fines and imprisonment for knowing violations." ,— - 0 7-ZO--)(e (Signature of Permittee) (Date) FORM SWU-247, LAST REVISED 2/2/2012 PAGE 2 OF 2