HomeMy WebLinkAboutNCS000093 DMR SW (4) BRP US Inc.
1211 Greenwood Road
Spruce Pine,North Carolina
USA 28777
BRP T 828 766 1100 F 828 765 2391
www brp corn
July 20, 2016
Division of Water Quality
Surface Water Protection Section
ATTENTION. Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617 RECEIVED
JUL 26 2016
Subject. SDO Monitoring Report
Sample#5 Year 3 Period 1 CENTRAL FILES
BRP US Inc. DWR SECTION
Spruce Pine, Mitc l 3e,. ty
Permit No X49 0
To Whom It May Concern:
Enclosed are the original and one copy of the completed Stormwater Discharge Outfall (SDO) Monitoring
Report for the BRP US Inc. facility located in Spruce Pine. These results were received July 12, 2016 for
samples collected June 27, 2016 and are for Sample Number 5, Year 3- Period 1 of the Monitoring
Schedule. No parameters tested exceeded Table 3 Benchmark Values of the Permit.
I trust this satisfies the reporting requirements pursuant to Permit Number NCS000093 Part III Section E
1 &2. Should you have any questions regarding this information, please contact me at(828) 766-1185.
ff,6BRespectfully, 1111/61—‘—
Bernice
ernice Wilson
EHS Coordinator
cc: Stephen Floyd
Ski-Doo
Lynx
Sea-Doo
Evinrude
Johnson
Rotax
Bombardier ATV
s
STORMWATER DISCHARGE OUTFALL(SDO)
MONITORING REPORT /
Permit Number►, S0B'�Z093 ' SAMPLES COLLECTED DURING CALENDAR YEAR: Zo PCD
(This monitoring report shall be received by the Division no later than 30 days
from the date the facility receives the sampling results from the laboratory.)
FACILITY NAME gg COUNTY A I TGi4 g/.L,
PERSON COLLECTING SAMPLE(S) _OW'J C i lel—LTU1J PHONE NO. ( 32 ) 7ZW4, //0J
CERTIFIED LABORATORY(S) 19.4CG A-AIA-(S!1/( L Lab# 2-110
Lab#
' SIGNATURE OF PERMITTEE OR DESIGNEE
REQUIRED ON PAGE 2.
Part A:Specific Monitoring Requirements
RECEIVED
Outfall Date
RECEIVED
No. Sample Total TSS Aluminum pH JUL 2 6 2016
Collected Rainfall JUL 2 6 2016
CENTRAL FILES
mo/dd/yr inches mg/1 mg/1 - DWR SECTION
001 Ng/IW/ O& 0 40 7 <3'i ND la,27 CENTRAL FILES
DWR SECTION
Does this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month?_yes /no
(if yes,complete Part B)
Part B:Vehicle Maintenance Activity Monitoring Requirements
Outfall Date
No. Sample Total Flow Total Oil&Grease Non-polar Total pH New Motor
Collected (if Rainfall (if appl.) O&G/TPH Suspended Oil Usage
applicable) (Method 1664 Solids
SGT-HEM),
if appl.
mo/dd/yr MG inches mg/1 mg/1 unit gal/mo
N/A
FORM SWU-247,LAST REVISED 2/2/2012
PAGE 1 OF 2
0
STORM EVENT CHARACTERISTICS: Mail Original and one copy to:
Division of Water Quality
Date 1401220 Attn: Central Files
Total Event Precipitation(inches): .0, M 1617 Mail Service Center
Event Duration(hours):ZH45gjM,U (only if applicable-see permit.) Raleigh,North Carohna 27699-1617
(if more than one storm event was sampled)
Date
Total Event Precipitation(inches):
Event Duration(hours): (only if applicable-see permit.)
"I certify,under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance
with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry
of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information
submitted is,to the best of my knowledge and belief,true,accurate,and complete. I am aware that there are significant penalties for
submitting false information,including the possibility of fines and imprisonment for knowing violations."
,— - 0 7-ZO--)(e
(Signature of Permittee) (Date)
FORM SWU-247, LAST REVISED 2/2/2012
PAGE 2 OF 2