Loading...
HomeMy WebLinkAboutNCS000130 DMR SW (9) POpuE .• „c„,:cnoyo. { .1. , orm X 1 4 7 —4041 `ta+.a ell 6 ! wr ire C-.a`.%i 4 mot,t, . u i 2016 Central Files Division of Water Resources 1617 Mail Service Center Raleigh,NC 27699-1617 Subject: Storm Water Monthly Monitoring Report Permit No. N :111 1- Perdue Farms, Rockingham Facility To Whom It May Concern, As specified under the Tier Two Storm Water permit requirements, please find attached two copies of the June monthly storm water monitoring report for the Perdue Foods LLC facility located at Rockingham,North Carilina. This monitoring report meets the requirements under Part II; Section B: Analytical Monitoring Requirements for the facility's Storm Water Permit. The storm water sample was collected on June 16,2016 during a qualifying rain event. If you need any additional information, please do not hesitate to contact me on my cell phone at (757) 710-4436. Sincerely yours, - Paul Bruce Roberts RECEIVED Regional Environmental Manager JUL 2915 bruce.p.roberts@perdue.com CENTRAL FILES , Oct_LS_ (2,6. ` pWR SECTION cc: Fayetteville Regional Office Division of Water Resources 215 Green Street, Suite 714 Fayetteville,NC 28301 STORMWATER DISCHARGE OUTFALL(SDO) MONITORING REPORT ,�rr��, Permit Number NCS 00 0 I '3 0 SAMPLES COLLECTED DURING CALENDAR YEAR: cO I/ (This monitoring report shall be received by the Division no later than 30 days from the date the facility receives the sampling results from the laboratory.) FACILITY NAMER,!`�(Joe_ C.)Q o P k A-rv\ COUNTY d' 3cQ � PERSON COLLECTING SAMPLE(SjaI/ .2.04/1^ OJ � , PHONE NO.( 9 1 U) ei 9 1) — C/3 CERTIFIED LABORATORY(S) Lab# -qr. I' 1'''2C 4 Lab#46 ,, .. SIGNATURE OF PERMITTEE OR DESIGNEE REQUIRED ON PAGE 2. Part A: Specific Monitoring Requirements 1 Outfall Date 50050 No. Sample Total Total ' '~O''A'L t_ vTA-L w___ rte.-CAL K&) Collected Flow(if app.) Rainfall ��O plies opus f .),<1-1,67t-A) 0,0(1 &VA ��'-I mo/dd/yr , ' MG inches _ /vL /v ,//, _ ,M5,-IL IT it- CO. C/ I t:?QrnL_ pi 7 . g Q LJ 1 a / /6/i 1(\)/A 0. 140 V I \ 06 314 9- ♦ Vs- a i s 1, v L ' I .V 9 PECEIVED JUL 122016 CENTRAL FILES DWR SECTION Does this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? Vs _no (if yes,complete Part B) Part B: Vehicle Maintenance Activity Monitoring Requirements Outfall Date 50050 a 00556 00530 00400 No. Sample Total Flow Total Oil&Grease Non-polar Total pH New Motor Collected (if applicable) Rainfall . (if appl.) ' O&G/TPH Suspended . Oil Usage (Method 1664 Solids - SGT-HEM),if appl• mo/dd/yr MG inches mg/I /L mg/I unit gal/mo r) 0 -4 ( /r('/otc. &)/A _ (i 4 ) , Mix 4,, •..6 lD . f Clic5 Form SWU-247,last revised 2/2/2012 Page 1 of 2 STORM EVENT CHARACTERISTICS: Mail Original and one copy to: Division of Water Quality Date 6//6/k Attn: Central Files Total Event Precipitation(inches): (0a 40 1617 Mail Service Center Event Duration(hours): (only if applicable—see permit.) Raleigh,North Carolina 27699-1617 (if more than one storm event was sampled) Date Total Event Precipitation(inches): Event Duration(hours): (only if applicable—see permit.) "I certify,under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." pc a . 7/6 7//C (Signature of Permittee) (Date) Form SWU-247,last revised 2/2/2012 Page 2 of 2