Loading...
HomeMy WebLinkAboutNCS000130 DMR SW (8) ''.•E''•r4' e 1 ,-,*fir :; st xF is e a ,.,.;7 Z.'4+ `a M air •,r a-.,. , ,, n.•„n -, fto 111£'_,hitlii4�1•UC S 1111;Aid(l� 3 ? _ 4-1' 1! ?. tl ,,-4,i: i -.�, , ? 1`j,�,jr•(Ct.. , . '*E. .: '�” S.�,^4 ', FZI4ti�i'� �C8 4319. 2'" **4,s ' d -1,4,,,: }r •;I • Il I I ' , Central Files Division of Water Resources !PeECEIVED 1617 Mail Service Center Raleigh, NC 27699-1617 SEP Q 8 2016 CENTRAL FILES Subject: Storm Water Monthly Monitoring Report DWR SECTION Permit No. Wd S1,+00� Perdue Farms, Rockingham Facility To Whom It May Concern, As specified under the Tier Two Storm Water permit requirements, please find attached two copies of the August monthly storm water monitoring report for the Perdue Foods LLC facility located at Rockingham, North Carolina. This monitoring report meets the requirements under Part II; Section B: Analytical Monitoring Requirements for the facility's Storm Water Permit. The storm water sample was collected on August 2, 2016 during a qualifying rain event. If you need any additional information, please do not hesitate to contact me on my cell phone at (757) 710-4436. Sincerely yours, Paul Bruce Roberts Regional Environmental Manager bruce.p.roberts@perdue.com cc: Fayetteville Regional Office Division of Water Resources 215 Green Street, Suite 714 Fayetteville,NC 28301 STORMWATER DISCHARGE OUTFALL (SDO) MONITORING REPORT Permit Nunnbet NCN'=mil &-``' 4' r. SAMPLES COLLECTED DURING CALENDAR YEAR:g9 L (This monitoring report shall be received by the Division no later than 30 days front the date the facility receives the sampling results from the laboratory.) FACILITY NAMERer gtAe__ P.RoCti srv' COUNTY b C�b1 CYp CO i\-1C9 PERSON COLLECTING SAMPLE(S) i&.)j 1 A,,,.. 1M0G/t t= PHONE NO.(OW ) cci I) ('' aq CERTIFIED LABORATORY(S) ll b � � l •Ct' �c4. fa SEP 08 �0� SIGNATURE OF PERMITTEE OR DESIGNEE REQUIRED ON PAGE 2. Part A: Specific Monitoring Requirements CENTRAL FILES Outfall Date 50050 D SECTION No. Sample Total Totale-o-C-AL Tr +lits � —11(-1.1/4-)C -11(-1.1/4-)Collected Flow(if app.) _ Rainfall ®� Pko. hits N �r63-t;t) , � C O t t q&P°,n mo/dd/yr MG inche /11/1— r `°L cJI- /4_ 6,60‘,/ 100AL. fh /' _ D011 /Call6 Iu /A. o.c2. 35" 0, g&G mS° <g3 0, 09J gi i z a. 4, 15 Does this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month?_yes no (if yes,complete Part B) Part B: Vehicle Maintenance Activity Monitoring Requirements Outfall Date 50050 00556 00530 00400 No. Sample Total Flow Total Oil&Grease Non-polar Total pH New Motor Collected (if applicable) Rainfall (if appl.) O&G/TPH Suspended Oil Usage (Method 1664 Solids SGT-HEM),if app!. mo/dd/yr MG inches mg/1 ril IL mg/1 unit gal/mo 00 4 ! © /e9_./ltp1 .0 A.)14 4. 8 6 ,, t 5 7i1 Form SWU-247,last revised 2/2/2012 Page I oft "! certify, under penalty of last-, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." pa,...0 c-2(yeee...11-4-. / / (Signature of Permittee) (Date) SWU-249-102107 Pane2of2