HomeMy WebLinkAboutNCG030043 DMR SW (5) Honeywell
June 17, 2016
Certified Mail
Return Receipt Requested
Julie Ventaloro
Stormwater Permitting Program
NC Division of Energy, Mineral, and Land Resources
1612 Mail Service Center
Raleigh, NC 27699-1612
Ms. Ventaloro:
Please find enclosed a copy of the 6/17/16 Stormwater Discharge Outfall Monitoring Report and
laboratory analysis for the Honeywell International Inc. facility located in Rocky Mount, North
Carolina. This DMR covers the period from January 1st to June 30th'. All Permit Benchmarks
have been met.
If further information or discussion is needed, please feel free to contact me directly.
Sincerely,
Sean Hae
Director, Integrated Supply Chain
Americas Mechanical Operations Center
Office: (252) 972-6220
Mobile: (252) 458-3713
Sean.Haves2@Honeywell.com
R
JUN24201&
DENR Lfi�1'�QUALITY
STORMWATLR PERMITTING
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 6/17/2016
CERTIFICATE OF COVERAGE NO. NCG030043 SAMPLE COLLECTION YEAR_2016
FACILITY NAME Honeywell Aerospace SAMPLE PERIOD ® Jan-June ❑July-Dec
COUNTY Nash or ❑ Monthly1 (month)
PERSON COLLECTING SAMPLES Patrick Lavin DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
LABORATORY: Pace Analytical Lab Cert.#_12 ❑Zero-flow ❑Water Supply OSA
Comments on sample collection or analysis: Request for Tier II ®Other_Class C; NSW
Relief from off site run on and supporting documentation submitted to
NCDENR 10/28/14 PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 -->
Part A: Stormwater Benchmarks and Monitoring Results
❑ No discharge this period?2
Date Sample 24-hour rainfall pH Non-Polar O&G/ Total Toxic
Outfall No. Collected1 amount, Total Suspended Solids Standard units Copper Lead Zinc Total Petroleum Organics
(mo/dd/yr) Inches
3 Hydrocarbons
Benchmarks===> - - 100 mg/L or 50 mg/L4 6.0—9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L
1 5/30/2016 1.5 25.1 6.1 0.007 ND 0.053 0.790 N/A
1 Monthly sampling(instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
2 For sampling periods with no discharge at any single outfall,you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on-site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
'See General Permit,Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
'Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12;for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFRq
NLGEI
ED
JUN 24 2016
DENR-LAND QUALITY
Permit Date: 11/1/2012-10/31/2017 $TORMWATER PERMITTING SWU-245, last revised 10/25/2012
Page 1of3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver,the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Sean Hayes
Name(Print name)
Site Leader
Title(Priv e
6/17/16
(Signa u ) (Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL,<PQL, Non-detect, ND,or other similar non-numerical
format. When results are below the applicable limits,they must be reported in the format, "<XX mg/L",where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark,you must implement Tier 1, Tier 2,or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging> 55 gal of new oil per month.
n No discharge this period?2
Outfall No. Date Sample 24-hour rainfall
Collected" amount, Non-polar O&G/TPH by Total Suspended Solids pH
(mo/dd/yr) Inches EPA 1664(SGT-HEM)
Benchmarks===> - - 15 mg/L 100 mg/L or 50 mg/L*, 6.0—9.0 SU '
Footnotes from Part A also apply to this Part B
*See General Permit text,Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
Note: If you report a sample value in excess of the benchmark,you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO❑
REGIONAL OFFICE CONTACT NAME:
Mail an original and one copy of this DMR, including all"No Discharge"reports, within 30 days of receipt of the lab results(or at end of monitoring period
in the case of"No Discharge"reports)to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system,or
those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete. I
am aware that there ar i ifi ant penalties for submitting false information,including the possibility of fines and imprisonment for knowing violations."
ie-2 jU41 20/6
(Signature of Permitte ) (Date)
Permit Date• 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 3 of 3