Loading...
HomeMy WebLinkAbout20080067 Ver 2_Staff Comments_2008032108-0067v2 Alston Pond AML comments March 21, 2008 In order to receive a 401 approval with a condition for final approval of the stormwater management plan, please provide the following information about the each of the four proposed preliminary BMP designs: a. The type of BMP that will be provided. b. A depiction of the drainage area. c. A calculation of the water quality volume based on the drainage area size and land use. d. A showing that the proposed BMP sizing will be adequate to treat the water quality volume.