HomeMy WebLinkAbout20080067 Ver 2_Staff Comments_2008032108-0067v2 Alston Pond
AML comments
March 21, 2008
In order to receive a 401 approval with a condition for final approval of the
stormwater management plan, please provide the following information about the
each of the four proposed preliminary BMP designs:
a. The type of BMP that will be provided.
b. A depiction of the drainage area.
c. A calculation of the water quality volume based on the drainage area size
and land use.
d. A showing that the proposed BMP sizing will be adequate to treat the
water quality volume.