HomeMy WebLinkAboutNCG080874 DMR SW (3) STORMWATER DISCHARG ONITORING REPORT(DMR)
GENERAL PERiviii NO.NCG080000
GENERAL PERMIT NO.NCG080000 SAMPLES COLLECTED DURING CALENDAR YEAR: 2016
CERTIFICATE OF COVERAGE NO. CG08�„0.8,7,4Y (This monitoring report shall be received by the Division no later than 30 days from the date
the facility receives the sampling results from the laboratory.)
FACILITY NAME Raleigh Transit Operations Facility COUNTY WAKE
PERSON COLLECTING SAMPLE(S) Jim Frei (SwSG) PNE NO.(919) 996-3899
CERTIFIED LABORATORY(S) Pace Labs Lab# 12/633 RFCE
SwSG Lab# 5054EASE SIGN ON THE REVERSE Q
AUG 112� '
Part A: Vehicle Maintenance Activity Monitoring RequirementsC hlT�iAle FILES
o g
Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new itztze pi h'.? ✓ Yes No
(If yes,report your analytical results in the table immediately below)
Outfall Date 00530 00400 00556
No. Sample Total Suspended Solids, pH, Oil and Grease, New Motor Oil Usage,
Collected
mm/dd/yr mg/L . Standard Units mg/L • Annual average gal/mo
Benchmark - 100 Within 6.0—9.0 15 -
001 06/28/16 9.2 6.93 < 0.613 +/- 265
Note: If you report a sampled value in excess of the benchmark value,or outside the benchmark range for pH,you must implement Tier 1 or Tier 2 responses.
See General Permit text.
Part B: Oil Water Separators and Secondary Containment Areas at Petroleum Bulk Station and Terminals
Outfall Date ` 00556 00530 - 00400
No. Sample
Collected Oil and Grease, Total Suspended Solids, pH;-
mm/dd/yr mg/L mg/L • Standard Units
Benchmark - 30 100 Within 6.0—9.0
STORM EVENT CHARACTERISTICS
Date June 28, 2016 (first event sampled)
Total Event Precipitation(inches): 0.76 inches
Date (list each additional event sampled this reporting period, and rainfall amount)
Total Event Precipitation(inches):
Form SWU-250-102107
Page 1 of 2
-Sea/- L,1/10lel(