MEMORANDUM
TO: Ms. Cyndi Karoly
Env. Biological Supervisor
Division of Water Quality, Wetlands Unit
FROM: Doug Huggett
Major Permits Processing Coordinator
Coastal Management Division
400 Commerce Avenue
Morehead City NC 28557
DATE: 20 March 2008
SUBJECT: CAMA Application Review
APPLICANT: lZiversedge LLC
Q~c~~ae~~
MAR 2 4 2008
DENR -WATER gUAUIY
WETLANDS AND STORMWATER BRANCH
PROJECT LOCATION: Hertford County, off U.S. Highway 158 on the upsteam (north) side of
the Chowan River Bridge in Winton, Hertford County, North Carolina on the West Side of the
River.
PROPOSED PROJECT: Applicant proposes to construct a boat ramp, launch pier, vehicle turn
around, access road and dock with 10 slips to serve Riversedge Subdivision.
Please indicate below your position or viewpoint on the proposed project and return this form by 9 April
2008. Please contact R. Kelly Spivey at 252-948-3853, if you have any questions regarding the proposed
project. When appropriate, in depth comments with supporting data are requested.
REPLY This office has no objection to the project as proposed.
This office has no comment on the proposed project.
This office approves of the proposed project only if the recommended changes
are incorporated. See attached.
This office objects to the proposed project for reasons described in the attached
comments.
Signed
Date
Noe Carolina
~turaQy
943 Washir~ton Square Mall, Washington, North Carolina 27889
Phone: 252-946-6481 1 FAX: 252-948-0478 1 Internet: www.nccoastalmanagement.net/
Respond to Doug Huggett
Morehead City Office
An Equal Opportunity 1 Affirmative Action Empbyer - 50% Recycled 11096 Post Consumer Paper
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
1. APPLICANT'S NAME: Riversedge, LLC Boat Ramp and Dock for Riversedge Subdivision
2. LOCATION OF PROJECT SITE: Hertford County
Photo Index - 2006: 144-6478, H-13, H-14, I-12 2000: 145-1678, K-18, K-19 1995:N/A
1989:1 (1-19), 0-19, P-18
State Plane Coordinates -X:2,606,600 Y: 972,850
Winton Quad (lower right corner)
3. INVESTIGATION TYPE: CAMA & State Dredge and Fill
4. INVESTIGATIVE PROCEDURE: Dates of Site Visit -13 March 2008
Was Applicant Present - No
5. PROCESSING PROCEDURE: Application Received - 6 March 2008
Office -Washington
6. SITE DESCRIP`T'ION:
(A) Local Land Use Plan -Hertford County
Land Classification From LUP -Conservation (water), Rural (land)
(B) AEC(s) Involved: Coastal Shoreline, Estuarine Water and Public Trust Area
(C) Water Dependent: Yes
(D) Intended Use: Private
(E) Wastewater Treatment: Existing -None
7
Planned - On-site Septic System
(F) Type of Structures: Existing -None
Planned -boat ramp, launch pier, vehicle turn around, access road and dock with
10 slips
(G) Estimated Annual Rate of Erosion: None Observed
HABITAT DESCRIPTION:
[AREAi
DREDGED FI L OTHER
(A) Vegetated Wetlands
(i3} Noti `Jegetated `v4'etlands (352 ftz ~ i,340 ft2
River bottom boat ram shaded
(c) Other (42,000 ft2
Uplands disturbed
(D) Total Area Disturbed: f 43,692ftz (f1.0 acres)
(E) Primary Nursery Area: No
(F) Water Classification: B NSW
Open: NO
8. PROJECT SLTNIIVIARY: Applicant proposes to construct a boat ramp, launch pier, vehicle turn around, access
road and dock with 10 slips to serve Riversedge Subdivision.
Riversedge, LLC
Boat Ramp and Dock for Riversedge Subdivision
Winton
Hertford County
Page 2
orient the 35' radius (70' diameter) turn around (cul-de-sac) between the property line and wetlands.
The adjacent property owner has agreed to let the applicant impact his property with a no steeper
than 2 to 1 back slope. A 15' wide gravel road is proposed to the turn around. A f130' by f90'
pazking area is proposed approxunately 400' landward of NWL. A X24' wide by f350' long road
will be constructed to connect the parking azea to Riversedge Drive.
Additionally the applicant is proposing t6' by X50' floating launch pier adjacent to the boat
ramp with a f6' by t70' long floating dock running downstream parallel to the NWL. A ~6' by X60'
pier will extend waterwazd at the end of this dock. The pier will have 4- f4' by f20' floating finger
piers for the creation of 10 boats slips. Eight tie pilings will be associated with these slips. The water
depth at the end of the proposed docking facility is approximately 17' deep $0' waterwazd of NWL.
Anticipated impacts
The project as proposed will result in a total upland disturbance of approximately 42,000 ft2
(0.96 acres) along the Chowan River. The total proposed impervious surface area for the common lot
is X5.3%. The total impervious surface area within the Coastal Shoreline Area of Environmental
Concern is f8%. The natural bluff on the common lot will be removed in order to create a 2 to 1
back slope adjacent the vehicle turn around. The construction of the piers and dock will result in the
shading of X1,340 ftz of river bottom. Localized turbidity will be present as a result of the
construction of the boat ramp and pier structure. Storm water runoffwill be sheet flow and road side
collection swales both toward the Chowan River and through Section 404 wooded wetland.
Kelly Spivey -19 Mazch 2008
Project Narrative
Riversedge, LLC is proposing to construct a community 10 slip boat dock and a boat
ramp along the Chowan River in the Riversedge Subdivision in Hertford County, North
Carolina. The proposed location of the project is located at the corner of Riversedge
Drive and Riverview Court. The entrance to the parking facility and access road to the
boat ramp and docks will be off of Riversedge Drive. The access road will follow the toe
of slope next to Lot 11, Jerry Storey's property. The access road will be a gravel road
and the boat ramp will be constructed out of concrete. The docks will be of the floating
kind and be fixed to permanent walkway.
_~ r- ,.,
Commonwealth Engineering Group, Ltd.
Engineers -Planners
17226 Commerce Lane
Smithfield, Virginia 23430
Phone (757) - 356-9140 FAX (757) - 356-9142
R. Kelly Spivey, Field Representative
Division of Coastal Management
943 Washington Square Mall
Washington, North Carolina 27889
March 4, 2008
Subject: Riversedge -Floating Dock and Boat Ramp
Dear Mr. Spivey,
Please find attached one copy of the Application for CAMA Major Development Permit,
26 copies of the plan, check for the application fee, letter from Jerry Storey, and deed.
The following is a list of revisions in accordance with your comments dated January 16,
2008.
Overall:
Signed green cards or copies showing receipt (via certified mail) of the entire application
package by the adjacent property awners must be included. A copy of the purchase
receipts can be furnished to this office until the signed receipt cards are returned. Please
provide 26 copies of the plat(s) if they are larger than 11"xl7".
Response: Copies of the receipts for certified mail are provided in this submittal
package. Atso, 26 copies the plans have been provided.
From DCM-MP-1 Application for Major Development Permit:
3. Street address is Riversedge Drive.
Response: The street address has been revised to Riversedge Drive.
3. Lot No.(s) is the total number of lots that re already exist in Riversedge
Subdivision.
Response: The total number of existing lots have been provided in the application.
From DCM-MP-2 Excavation and Fill:
• In the boat ramp section of the chart you indicated a length of 75'. This should be
changed to 22'. According to the plat the boat ramp is 22' waterward of the
normal water level (NWL). The remaining 53' is landward of NWL and is not
counted as length of boat ramp,
Response: The chart has been revised to 22' reflecting the length of boat ramp
waterward of NWL.
l .a. You indicated that 100 cubic yards of material was to be excavated from NWL.
Given the size of the boat ramp and the existing and proposed water depths please
show calculations. Please be reminded that is the amount of material to be excavated
from below NWL. It does not include excavation for the approach landward of
NWL.
Response: After reviewing the design, there will be little to no excavation below
NWL. The ramp will be precast and placed into position on top of the existing
bottom.
l .c. You checked wetlands. However the plats do not show any wetlands being
disturbed by the approach road, vehicle turn around or boat ramp. I believe none
should be checked.
Response: This part of the application has been revised in accordance with your
comment.
Plat:
Show the entrance road as it connects with Riversedge Drive. Indicate the water depth in
the vicinity of the floating dock that runs parallel to the shoreline. This dock may have to
be a fixed structure due to the potential of the structure sitting on the bottom.
Response: The plan has been revised to show the entrance road connecting to
Riversedge Drive. Water depths have been provided in the vicinity of the floating
dock that runs parallel to the shoreline. This floating dock has been moved
waterward to prevent it from sitting on the ground.
If you have any questions concerning this matter, please contact me at 757-356-9140.
Thank You
M.F. Hall IV, P.E.
.~
~1 l n
(~
rn ' • s - .
-
~ ,
b -
, {~~F
x
~
m --
~ s;
~ .
n
' ~1.E2 ~-
- Postage s
m
0 Certified Fee 32.E5 l+3
~
~ Return P,eciept Fes
~1
1~ Postmark
(Endorsement Required) . Here
Q
ul Restricted Delivery Fes
(Endorsement Required)
~Q•QIl
m
r~ Total Postaga /£ Fees ;~ ~~i.b~ ~l.?irll~~.fUUv
~-
O Sent To
O
[ti Street, Apt No.;
or PO Box No.
Cih„ State, ZIP+4
1 1 1 1 tc '
_ .re .~. - ~.' -
^
~ ~
~. !~ 6 .
~ _ -
~- ~ATESUI N1. ~
..:,,.,.
~ ~1 .4Z 'ICIJ~
!lJ Postage ~
frl Certified Fes 2.65 1~.7i
~ Postmark
~ Return Reclept Fee +~.~ ~ 15 Here
~ (Endorser Ieni Requred)
p Restricted Delivery Fee X17 ~ (~(~
~ (Endorsement P,egwred}
m
~ ~
~2
~•~
~,f~lwi~1111~,
11
,~ Total Postage & Fees t 4+ r. ,
~
O Sent To
~- Street, Apt. FJo.;
ar PO Bux No.
---------
----------------------------
------ -- ------ ------------------
Clty, Stare, ?IP+4 ----------
~ 1 ~a i
"
E _ _ (- _
<Form continues on bacic>
Form DCM MP-1 (Page 2 of 4)
APPLICATION for
Major Development Permit
3. Project Location __
County (can be multiple) Street Address State Rd. #
Hertford County Riversedge Drive US Rte. 158
Subdivision Name City State Zip
Riversedge Subdivision Winton NC 27986 -
Lot No.(s) (~f many, attach additional page with list)
Phone No.
- ext. 24, .
a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project
Chowan Chowan River
Is the water body identified in (b) above, natural or manmade?
c d. Name the closest major water body to the proposed project site.
.
®Natural ^Manmade ^Unknown Chowan River
e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed
^Yes ®No work falls within.
Hertford County
4. Site Description
a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.)
335 ft 13.37 Acres
c Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or
. NWL (normal water level)
> 30,000 s.f.,
(If many lot sizes, please attach additions! page with a list) 20 ft ®NHW or ^NWL
e. Vegetation on tract
Partially wooded with farm fields
f. Man-made features and uses now on tract
Gravel access road to existing lots on the river
g. Identify and describe the existing land uses adjacent to the proposed project site.
The existing land uses adjacent to the proposed project are single family residences
h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning?
RA-20 (Attach zoning compliance certificate, if applicable)
^Yes ^No ®NA
j. Is the proposed activity part of an urban waterfront redevelopment proposal? ^Yes ®No
k. Has a professional archaeological assessment been done for the tract? If yes, attach a copy. ^Yes ®No ^NA
If yes, by whom?
I. Is the proposed project located in a National Registered Historic District or does it involve a ^Yes ®No ^NA
National Register listed or eligible property?
<Form continues on next page>
252-808-2808 .. 1-888-4RCOAST :: www.nccoastalmanagement.net
Form DCM MP-1 (Page 4 of 4)
APPLICATION for
Major Development Permit
6. Additionallnformation
In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in onier for the application
package to be complete. Items (a) - (t) are always applicable to any major development application. Please consult the application
instruction booklet on how to properly prepan; the required items below.
a. A project narrative.
b. An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale. Please give the present status of the
proposed project. Is any portion already complete? If previously authorized work, cleady indicate on maps, plats, drawings to distinguish
between work completed and proposed.
c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site.
d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties.
e. The appropriate application fee. Check or money order made payable to DENR.
f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such
owners have received a copy of the application and plats by certfied mail. Such landowners must be advised that they have 30 days in
which to submit comments on the proposed project to the Division of Coastal Management.
Name Jerry B. Storey Phone No. 1-252-398-7468
Address 311 E. Woodrow School Road, Murfreesboro, NC 27855
Name Larry J. Stewart Phone No. 1-252-357-1850
Address P.O. Box 225, Gatesville, NC 27938
Name Phone No.
Address
g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates.
U.S. Army Corps of Engineers - NW-18 -#200512062
h. Signed consultant or agent authorization form, if applicable.
i. Wetland delineation, 'rf necessary.
j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner)
k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure
of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act.
7. Certification and Permission to Enter on Land
I understand that any permit issued in response to this application will allow only the development described in the application.
The project will be subject to the conditions and restrictions contained in the permit.
f certify that I am authorized to grant, and do in fact grant permission to representatives of state and faders! review agencies to
enter an the aforementioned lands in connection with evaluating information related to this permit application and follow-up
monitoring of the project.
I further certify that the information provided in this application is t'rut/hful to the best of" my.knowledge.
Date _8 -14 - 07 Print Name J • 1~ ~~~7 ~ 1.~~
-s ! ,~ ~ _
Signature~~ .~ L`~ ~ .~L,°.,~," ~l-
~,
Please indicate application attachments pertaining to your proposed project.
^DCM MP-2 Excavation and Fill Information ODCM MP-5 Bridges and Culverts
®DCM MP-3 Upland Development
®DCM MP-4 Structures Information
Form DCM MP-2
EXCA,V,a,T[C~N and SILL
(Except for bridges and culverts)
Attach this form to Joint Application for CAMA Major Permit,. Form OCM MP-7, Be sure to complete all other sections of the Joint
Application that relate to this proposed protect. Please Include all supplemental information.
Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feat.
Access Other
Channel
(NLW or Cana( Boat.Basin Boat Ramp Rock Grolri Rock
Breakwater (excluding
shoreline
NWL stabilization
Length ,L.Z r
Width ~~
Avg. Existing
th
r
•
NA
NA
Dep 6
Final Project
De
th b ~ NA NA
p
1. EXCAVATION ^This section not applicable
a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated.
cubic yards.
(3 GY:
c. (i) Does the area "to be excavated include coastal wetlands/marsh
(CW), submerged•aquatic vegetation (SAV), shell bottom (SB).
or other wetlands (WL)? If any boxes are checked: provide the
number of square feet affected.
[~CW ^SAV ^SB
(AWL j~None
(ii) Describe the purpose of the excavation in these areas:
TG /!S57Jk Lt, J3G,47' /~+fl~ ~
,mow prfa+' ~ sra~ro ~ ct..n-Yl
d. High-ground excavation in cubic yards.
9a6 ~-y.
~ 2. DISPOSAL OF ~E'XCAVATED MATERIAL pThis section not applicable ~
a. Location of disposal area.
1N ~¢CCL~53 ~'AD F4K /36I1T IL+q~'iP
c. (i) Oo you claim title to disposal area?
[Yes ^No ^NA
(ii) If no, attach a letter granting permission from the owner. .
b. Dimensions ofdisposal area.
I.C" ' dr ~S"6 ~
d. (i) Will a disposal area be available .for future maintenance?
Yes ^No ^NA
(ii} If yes, where?
e. {i) Doss the disposal area include any coastal wetlands/marsh
(CW), submerged aquatic vegetation {SAV), shell bottom (SB},
or other wetlands (WL}? If any boxes are checked, provide the
number of square feet affected.
^CW ^SAV ^S8
^ W L None
(ii} Describe the purpose of disposal in these areas:
f. {i) Doss the disposal include any area in the water?
^Yes ~No ^NA
(ii) If yes, how much water area is affected?
3.:SHORELlNE STABIL/ZAT10N . ^This section-not applicable
~(If development is a wood groin, use MP-4 -Structures)
a. Type of shoreline stabilization: b. Length:
^Bulkhead ^Riprap ^BreakwaterlSill ^Other. _._„_
c. Average distance waterwbrd of NHW or NWL:
e. Type of stabilization material:
g. Number of square feet of fill to be placed below water level.
Bulkhead hackflll Riprap
Brea kwaterlSill Other
I. Source of fill material.
Width:
d. Maximum distance waterward of NHW or NWL:
f. (i) Has there been shoreline erosion during preceding 12
months?
^Yes ^No ^NA
(li) If yes, state amount of erosion and source of erosion amount
tnformatlon.
h. Type of fill material.
4. OTHER FILL ACTIVITIES ^This section not applicable
(Excluding Shoreline Stabilization)
a. (i1 Will fill material be brought to the site? ^Yes ^No ^NA b. (i) Will fill material be placed in coastal wetiandslmarsh (CW).
If yes,
(ii) Amount ofmaterial to be placed in the water
(iii) Dimensions of fill area
{iv) Purpose of 611
submerged aquatic vegetation t~AVi, snen ooaom i~ol, ~r
other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
^CW ^SAV ^SB
^WL ^None
(ii) Describe the purpose of the fill in these areas:
~ 5. GENERAL ~
a. How will excavated or 611 material be kept on si-e and erosion b. What type of construction equipment will be used (e.g., dragline,
controlled? backhoe, or hydraulic dredge)?
Wi~~ /SC CGR~~~s1~U S~Z~L-~'s ~ Sic.T iG~+vct% Gxc.~v~^~r~,,~ I3~~rfiuG~ d- l~ccc.~..•,o~~
WrLL /sir ~~r~ j~;GG,+V".i~L~~G~
c. (i) Will navigational aids be required as a result of the project? d. (i) Will wetlands be c ossed in transporting equipment to project
^Yes (~No ^NA site? ^Yes o ^NA
(ii) If yes, e(xpl'ain what type and how they will be implemented. (ii) If yes, explain s eps that will be taken to avoid or minimize
environmental impacts.
/ot-~6-C1 "/ ~~ ~ C.~it~f~
Date Applicant Name
Project Name Applicant Signature
Form DCM MP-3
UPLI~ND DEVELOPMENT
(Construction and/or land disturbing activities)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
GENERAL UPLAND DEVELOPMENT
a. Type and number of buildings, facilities, units or structures
proposed.
Proposed project will consist of asphalt parking lot and
drive, concrete boat ramp, and a wooded dock.
c. Density (give the number of residential units and the units per
acre).
12 residential units at 1.45 units per acre
e. If the proposed project will disturb more than one acre of land, the
Division of Land Resources must receive an erosion and
sedimentation control plan at least 30 days before land-disturbing
activity begins.
{i) tf applicable, has a sedimentation and erosion control plan been
submitted to the Division of Land Resources?
^Yes ^No ®NA
(ii) If yes, list the date submitted:
g. Give the percentage of the tract within the coastal shoreline AEC to
be covered by impervious and/or built-upon surfaces, such as
pavement, building, rooftops, or to be used for vehicular driveways
or parking.
3,221 s.f. = 0.84%
i. Give the percentage of the entire tract to be covered by impervious
and/or built-upon surfaces, such as pavement, building, rooftops,
or to be used for vehicular driveways or parking.
11%
j. Describe proposed method of sewage disposal.
On site wastewater disposal system
I. Describe location and type of proposed discharges to waters of the
state (e.g., surface runoff, sanitary wastewater, industrial/
commercial effluent, 'tinrash down" and residential discharges).
Surface Runoff
b. Number of lots or parcels.
1 Lot - 8.71 Acres
d. Size of area to be graded, filled, or disturbed including roads,
ditches, etc.
42,000 S.F.
f. List the materials (such as marl, paver stone, asphalt, or concrete)
to be used for impervious surfaces.
Asphalt and concrete
h. Projects that require a CAMA Major Development Permit may also
require a Stormwater Certification.
{i) Has a site development plan been submitted to the Division of
Water Quality for review?
^Yes ®No ^NA
(ii) If yes, list the date submitted:
k. Have the facilities described in Item {i) received state or local
approval?
^Yes ®No ^NA
If yes, attach appropriate documentation.
m. Does the proposed project inGude an innovative stormwater
design?
^Yes ®No ^NA
If yes, attach appropriate documentation.
m. Describe proposed drinking water supply source (e.g., well,
community, public system, etc.)
Public Water -Town of Winton
o. When was the lot(s) platted and recorded?
December 2006
n. (i) Will water be impounded? ^Yes ®No ^NA
(ii) If yes, how many acres?
p. If proposed development is a subdivision, will additional utilities be
installed for this upland development?
®Yes ^No ^NA
8-14-07
Date
Riversedge Subdivision
Project Name
Riversedge, LLC
Appf nt Name ,~
~ ~ ~,, y ~ i
Applicant Signature
_-w
~` " ~ `
}_ C GL ry~! ~ j.
~~
Form DCM MP-4
STRUCTURES
(Construction within Public Trust Areas)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
7. DOCKING FACILITY/MARINA CHARACTERISTICS
a. (i) Is the docking facility/marina: b.
^Commercial ^PubliGGovernment ®Private/Community
^This section not applicable
(i) Will the facility be open to the general public?
^Yes ®No
c. (i) Dock(s) and/or pier(s)
(ii) Number 1
(iii) Length 70
(iv) Width 6
{v) Floating ®Yes ^No
e. (i) Are Platforms included? ®Yes ^No
If yes:
(ii) Number 4
(iii) Length 20'
(iv) Width 4'
(v) Floating ®Yes ^No
Note: Roofed areas are calculated from dripline dimensions.
g. (i) Number of slips proposed
10
(ii) Number of slips existing
0
i. Check the proposed type of siting:
^ Land cut and access channel
^Open water; dredging for basin and/or channel
®Open water; no dredging required
^Other; please describe:
k~ Typical boat length: 18'
m. (i) Will the facility have tie pilings?
®Yes ^No
(ii) If yes number of tie pilings?
8
d. (i) Are Finger
If yes:
(ii) Number
(iii) Length
(iv) Width
(v) Floating
Piers included? ®Yes ^No
2
40',60
6'
®Yes ^No
f. (i) Are Boatlifts included? ^Yes ®No
If yes:
(ii) Number
(iii) Length
(iv) Width
h. Check all the types of services to be provided.
^ Full service, including travel lift and/or rail, repair or
maintenance service
^ Dockage, fuel, and marine supplies
® Dockage ("wet slips") only, number of slips: 10
^ Dry storage; number of boats:
® Boat ramp(s); number of boat ramps:
^ Other, please describe:
j. Describe the typical boats to be served (e.g., open runabout,
charter boats, sail boats, mixed types).
open runabout
I. (i) Will the facility be open to the general public?
^Yes ®No
252-808-2808 :: 1-888-4RCOAST :: www,,nccoastalmana~ement.net revised: 12/27/06
__.
2, DOCKING FACILITY/MARINA OPERATIONS ®This section not applicable
a. Check each of the following sanitary facilities that will lie included in the proposed project.
^ Office Toilets
^ Toilets for patrons; Number: ;Location:
^ Showers
^ t3oatholding tank pumpout; Give type and location:
b. Describe treatment type and disposal location for all sanitary wastewater.
c. Describe the disposal of solid waste, fish offal and trash.
d. How will overboard discharge of sewage from boats be controlled?
e. (i) Give the location and number of °No Sewage Discharge° signs proposed.
(ii) Give the location and number of °Pumpout Available" signs proposed.
f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products.
g. Where will residue from vessel maintenance be disposed of?
h~ Give the number of channel markers and °No Wake" signs proposed.
i. Give the location of fuel-handling facilities, and describe the safety measures planned to protect area water quality.
j. What will be the marina policy on overnight and live-aboard dockage?
k. Describe design measures that promote boat basin flushing?
I. If this project is an expansion of an existing marina, what types of services are currently provided?
m. Is the marina/dodcing facility proposed within a primary or secondary nursery area?
^Yes ^No
n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area?
^Yes ^No
o. Is the marina/docking facility proposed within or adjacent to coastalwetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom
(SB), or other wetlands (VUL)? If any boxes are checked, provide the number of square feet affected.
^CW ^SAV ^SB
^WL ^None
p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ^Yes ^No
If yes, give the name and address of the leasehokfer(s), and give the proximity to the lease.
3. BOATHOUSE (including covered lifts) ®This section not applicable
a. (i) Is the boathouse structure(s);
^Commercial ^PubliclGovemment ^Private/Community
(ii) Number
(iii) Length
(iv) Width
Note: Roofed areas are calculated from dripfine dimensions.
4, GRONV (e.g., wood, sheetpile, etc. if a rock groin, use MP-2, Excavation and Fill.) ®This section not applicable
a. (i) Number
(ii) Length
(iii) Width
5. EREAKWATEI~ (e. g., wood, sheetpile, etc.) ®This section not applicable
a. Length
b. Average distance from NHW, NWL, or wetlands
c. Maximum distance beyond NHW, NWL or wetlands
~ 6. MOORING P/L/NGS and BUOYS ®This section not applicable ~
a. Is the structure(s):
^Commercial ^Public/Govemment ^Private/Community
b• Number
c• Distance 4o be placed beyond shoreline
Note: This should be measured from marsh edge, if present.
d. Description of buoy (color, inscription, size, anchor, etc.)
e. Arc of the swing
7. GENERAL
a. Proximity of structure(s) to adjacent riparian property lines
i
Note: For buoy or mooring piling, use arc of swing including length
of vessel.
b. Proximity of structure(s) to adjacent docking facilities.
'>
c. Width of water body
Q~ e
e. (i) Will navigational aids be required as a result of the project?
^Yes (~No ^NA
(ii) If yes, explain what type and how they will be implemented.
d. Water depth at waterward end of structure at NLW or NWL
8. OTHER ^This section not applicable
a. Give complete description:
8-14-07
Date
Riversedge Subdivision
Project Name
Riversedge, LLC
Applicant Name °--
~.
/applicant Signature ~,
Z~
Jerry B. Storey
311 E. Woodrow School Road
Murfreesboro, NC 27855
Riversedge, LLC
22730 Main Street
Courtland, VA 23837
Attn: S.V. Camp III
December 3, 2007
Dear Mr. Camp,
I, Jerry Storey, hereby give authorization for Riversedge, LLC to re-grade the portion of
my lot for the construction of the boat ramp and docks.
Sincerely,
.~~ 1
Jerry Storey