HomeMy WebLinkAbout20080521 Ver 1_Application_20080324d~~~
.lie.
MICHAEL F. EASLEY
GOVERNOR
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
P. O. Box 25201, Raleigh, NC 27611-5202
PHONE: 919-733-2520
March 19, 2008
~~
e~
0
G ~.
S~v
~~
~ ~
V~
U
Mr. Monte Matthews
U. S. Army Corps of Engineers
Raleigh Regulatory Field Office
3331 Heritage Trade Drive, Suite 105
Wake Forest, NC 27587
Subject: Nationwide Permit #3
~' ~ ~~
~ ~.,, ~ ~ ,
r,
,~
~1~, {.~~ ~~~~~ it
-1~ 2 ~, J ~/~~
,,~ ~,r~ry~, < 0~,8 ,~-~'
~Lx4~ h'g1FR
~ ~?p'~'~TFRB~
icy
LYNDO TIPPETT
SECRETARY
080521
SR 1350 (Big Hill Road)
Watauga County, North Carolina
Project Number: 11.209511 (No DWQ Permit Fee Required)
Dear Mr. Matthews:
The NC Department of Transportation is scheduled to resurface approximately 2.1 miles of
pavement on the subject route. The pavement will not be widened so impervious surface area will
not increase. This project will require the replacement of several wet pipes but only one pipe will
be extended. This existing 40'x 36" CMP with junction box will be replaced with a new 50'x 36"
CMP with junction box at the same Location. The additional length is needed to provide a safer
shoulder width. We may have 10' of riprap at the outlet on the banks only. Therefore, total
project stream impacts will total 20 linear feet including the stone.
Due to the junction box located on the upstream side (west side) of the roadway, dewatering this
pipe during replacement is probably not going to be possible. We therefore will commit to
working during low flow conditions, will honor any trout moratorium that WRC may request and
will complete this pipe replacement in one business day. If requested, we could place a rock silt
screen on top of filter fabric downstream. This material could then be reclaimed after the pipe is
installed.
This wet pipe carries an unnamed tributary to Meat Camp Creek (Class: C, Trout +). This project
was reviewed for the presence of threatened and endangered species on March 14, 2008. This
project will have no effect on any federally listed endangered plant or animal species. Historic
compliance work will be scheduled and concurrence with the State Historic Preservation Office
will be obtained if required.
P. O. Box 250, N. WILxESBORO, NC 28659
PHONE (336)667-9111 Fnx (336)667-4549
Mr. Monte Matthews
SR 1350 (Big Hill Road)
Page 2
March 19, 2008
The project impacts aze minor in nature and should not remove or degrade existing water quality
uses. Pipe sizes used will be the minimum necessary to create a safe roadway. All appropriate
BMPs will be used during construction.
Attached is a Preconstruction Notification Form, a pipe data sheet, a mazked county map, a
marked topography map with the pipe location and photographs.
By copy of this letter, it is requested that Mr. Ron Linville, Mountain Region Coordinator, with
the North Carolina Wildlife Resources Commission comment directly to you concerning the 404
Nationwide Permit application with a copy sent to me.
We would like to begin construction as soon as possible. If further information is required, please
let me know. Your early review and consideration will be appreciated.
Sincerely,
/~~
Heath Slaughter
Division Environmental Officer
Enclosures
cc: Monte Matthews, US Army Corps of Engineers (1 additional copy)
Ron Linville, Western Piedmont Region Coordinator, NCWRC
Brian Wrenn, Division of Water Quality (2 copies)
Mike Pettyjohn, PE, Division Engineer
Michael Poe, PE, District Engineer
Kevin Whittington, County Maintenance Engineer
Heath Slaughter, Division Environmental Officer
Scott Pipes, Roadside Environmental Field Operations Technician
Office Use Only: ~ Form Version Apri12001
20080521
USACE Action ID No. DWQ No.
If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than
leaving the space blank.
I. Processing
1. Check all of the approval(s) requested for this project:
® Section 404 Permit
^ Section 10 Permit
^ 401 Water Quality Certification
^ Riparian or Watershed Buffer Rules
2. Nationwide, Regional or General Permit Number(s) Requested: NWP #3
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here:
4. If payment into the North Carolina. Wetlands Restoration Program (NCWRP) is proposed for
mitigation of impacts (see section VIII -Mitigation), check here: ^
II. Applicant Information
1. Owner/Applicant Information
Name: North Carolina Department of Transportation
Mailing Address: P. O Box 250 North Wilkesboro NC 28659
Telephone Number: (336) 903-9202 Fax Number: (336) 667-4549
E-mail Address: hslau hter e dot.state.nc.us
2. Agent Information (A signed and dated copy of the Agent Authorization letter must be
attached if the Agent has signatory authority for the owner/applicant.)
Name: Heath Slaughter Division Environmental Officer
Company Affiliation: North Carolina Department of Transportation
Mailing Address: P O Box 250 North Wilkesboro NC 28659
Telephone Number: (336) 903-9202 Fax Number: (336) 667-4549
E-mail Address: hslau hg', ter(c~dot.state.nc.us
Page 3 of 12
III. Project Information
Attach a vicinity map cleazly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundazies and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundazies outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is cleazly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps aze provided.
1. Name of project: SR 1350 Big Hill Road
2. Project Number (NCDOT Only): 11.209511
3. Property Identification Number (Tax PIN): N/A
4. Location
County: Watauga Nearest Town: Boone
Subdivision name (include phase/lot number): N/A
Directions to site (include road numbers, landmarks, etc.): See attached SR map.
Site coordinates, if available (UTM or Lat/Long): Wet pipe: 36.27739 N, 81.63750 W
(Note - If project is linear, such as a road or utility line, attach a sheet that sepazately lists the
coordinates for each crossing of a distinct waterbody.)
5. Describe the existing land use or condition of the site at the time of this application:
Paved Road
6. Property size (acres): Approximately 12.7 acres.
7. Neazest body of water (stream/river/sound/ocean/lake): UT to Meat Camp Creek (Class: C,
Trrn ~t +l
8. River Basin: New
(Note -this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.)
Page 4 of 12
9. Describe the purpose of the proposed work: Resurface pavement on SR 1350.
10. List the type of equipment to be used to construct the project: Trackhoe/backhoe, motor
Grader dump trucks and paving equipment
11. Describe the land use in the vicinity of this project: ResidentiaUFarm
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules.
V. Future Project Plans
Are any additional permit requests anticipated for this project in the future? If so, describe the
anticipated work, and provide justification for the exclusion of this work from the current
application: N/A
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. The applicant must also
provide justification for these impacts in Section VII below. All proposed impacts, permanent
and temporary, must be listed herein, and must be clearly identifiable on an accompanying site
plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a
delineation map, whether or not impacts are proposed to these systems. Wetland and stream
evaluation and delineation forms should be included as appropriate. Photographs may be
included at the applicant's discretion. If this proposed impact is strictly for wetland or stream
Page 5 of 12
mitigation, list and describe the impact in Section VIII below. If additional space is needed for
listing or description, please attach a separate sheet.
1. Wetland Impacts
Wetland Impact
Site Number
indicate on ma)
Type of Impact* Area of
Impact
(acres) Located within
100-year Floodplain**
(es/no Distance to
Nearest Stream
(linear feet)
Type of Wetland***
N/A
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill,
excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding.
** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps
(FIRM), or FEMA-approved local floodplain maps. Maps aze available through the FEMA Map Service Center at 1-800-358-9616, or
online at http://www.fema.gov.
*** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond,
Cazolina Bay, bog, etc.)
List the total acreage (estimated) of existing wetlands on the property:
Total area of wetland impact proposed: 0
2. Stream Impacts, including all intermittent and perennial streams
Stream Impact
Site Number
(indicate on map)
Type of Impact* Length of
Impact
(linear feet)
Stream Name** Average
Width of
Stream Before
Im act perennial or
Intermittent?
(please specify)
See topo Pipe replacement IO feet UT to Meat Camp Creek 2 feet Perennial
* List each impact separately and idernify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap,
dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain),
stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is
proposed, plans and profiles showing the lineaz footprint for both the original and relocated streams must be included.
** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest
downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at
w~v.usgs.gov. Several Internet sites also allow direct download and printing of USGS maps (e.g., www.topozone.com.
www.mapguest.com, etc.).
Cumulative impacts (linear distance in feet) to all streams on site: 10 ln. ft. excludin~pra~
Page 6 of 12
3. Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any
other Water of the U.S.
Open Water Impact
Site Number
(indicate on ma)
*
Type of Impact Area of
Impact
acres
Name of Waterbody
(if applicable) Type of Waterbody
(lake, pond, estuary, sound,
ba ,ocean, etc.
Wet pipe Riprap 0.0005 UT to Meat Camp Creek Stream
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging,
flooding, drainage, bulkheads, etc.
4. Pond Creation
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ^ uplands ^ stream ^ wetlands
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.): N/A
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.):
Size of watershed draining to pond: Expected pond surface area:
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts.
Since this is an existing_roadway, the stream impacts cannot be avoided. However, the
replacement pine lengths will be the minimum needed to safely construct the resurfaced
roadway. All annropriate BMPs will be used during construction. _
Page 7 of 12
VIII. Mitigation
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on March 9, 2000, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in deternvning acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as
incomplete. An applicant may also choose to review the current guidelines for stream restoration
in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at
http: //h2o. enr.state. nc. us/ncwetlands/strm~ide. html.
Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
EEP if necessary
Page 8 of 12
2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration
Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that
you would like to pay into the NCWRP. Please note that payment into the NCWRP must be
reviewed and approved before it can be used to satisfy mitigation requirements. Applicants
will be notified early in the review process by the 401/Wetlands Unit if payment into the
NCWRP is available as an option. For additional information regarding the application
process for the NCWRP, check the NCWRP website at httpa/h2o.enr.state.nc.us/wra/indeY.htm. If
use of the NCWRP is proposed, please check the appropriate box on page three and provide
the following information:
Amount of stream mitigation requested (linear feet): To be determined by COE
Amount of buffer mitigation requested (square feet): N/A
Amount of Riparian wetland mitigation requested (acres): N/A
Amount ofNon-riparian wetland mitigation requested (acres): N/A
Amount of Coastal wetland mitigation requested (acres): N/A
IX. Environmental Documentation (DWQ Only)
Does the project involve an expenditure of public funds or the use of public (federaUstate/local)
land?
Yes ® No ^
If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ^ No
If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a
copy of the NEPA or SEPA final approval letter.
Yes ^ No ^
X. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to _
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Neese), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and
Water Supply Buffer Requirements), or other (please identify )?
Yes ^ No ® If you answered "yes", provide the following information:
Page 9 of 12
Identify the squaze feet and acreage of impact to each zone of the Xipazian buffers. If buffer
mitigation is required calculate the required amount of mitigation by applying the buffer
multipliers.
Zone* Impact
(s uare feet) Multiplier Required
Miti ation
I 3
2 1.5
Total
* Zone 1 extends out 3U feet perpendicular tiom near bank oT channel; Gone 1 extends an
additiona120 feet from the edge of Zone 1.
If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation
of Property, Conservation Easement, R.ipazian Buffer Restoration /Enhancement, Preservation or
Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as
identified within 15A NCAC 2B .0242 or .0260.
N/A
XI. Stormwater (DWQ Only)
Describe impervious acreage (both existing and proposed) versus total acreage on the site.
Discuss stormwater controls proposed in order to protect surface waters and wetlands
downstream from the property.
Impervious surface area will not increase. All appropriate best mans eg ment practices for
sediment and erosion control will be implemented during construction.
XII. Sewage Disposal (DWQ Only)
Cleazly detail the ultimate treatment methods and disposition (non-dischazge or dischazge) of
wastewater generated from the proposed project, or available capacity of the subject facility.
XIII. Violations (DWQ Only)
Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules?
Yes ^ No
Is this an after-the-fact permit application?
Yes ^ No
Page 10 of 12
XIV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
3//9/ o
Applicant/Agent's Signatur~ Date
(Agent's signature is valid only if an authorization letter from the applicant is provided.)
US Army Corps Of Engineers Field Offices and County Coverage
Asheville Regulatory Field Office Alexander Cherokee Iredell Mitchell
US Army Corps of Engineers Avery Clay Jackson Polk
151 Patton Avenue Buncombe Cleveland Lincoln Rowan
Room 208 Burke Gaston Macon Rutherford
Asheville, NC 28801-5006 Cabarrus Graham Madison Stanley
Telephone: (828) 271-4854 Caldwell Haywood McDowell Swain
Fax: (828) 271-4858 Catawba Henderson Mecklenburg Transylvania
Raleigh Regulatory Field Office Alamance Durham Johnston Rockingham
US Army Corps Of Engineers Alleghany Edgecombe Lee Stokes
6508 Falls of the Neuse Road Ashe Franklin Nash Surry
Suite 120 Caswell Forsyth Northampton Vance
Raleigh, NC 27615 Chatham Granville Orange Wake
Telephone: (919) 876-8441 Davidson Guilford Person Warren
Fax: (919) 876-5283 Davie Halifax Randolph Wilkes
Washington Regulatory Field Office Beaufort Currituck Jones
US Army Corps Of Engineers Bertie Dare Lenoir
Post Office Box 1000 Camden Gates Martin
Washington, NC 27889-1000 Carteret* Green Pamlico
Telephone: (252) 975-1616 Chowan Hertford Pasquotank
Fax: (252) 975-1399 Craven Hyde Perquimans
Wilmington Regulatory Field Office Anson Duplin Onslow
US Army Corps Of Engineers Bladen Harnett Pender
Post Office Box 1890 Brunswick Hoke Richmond
Wilmington, NC 28402-1,890 Carteret Montgomery Robeson
Telephone: (910) 251-4511 Columbus Moore Sampson
Fax: (910) 251-4025 Cumberland New Hanover Scotland
Pitt
Tyrrell
Washington
Wayne
Union
Watauga
Yancey
Wilson
Yadkin
*Croatan National Forest Only
Page 11 of 12
--?~
` b 1305 ~
SP+rsiaw
1308 r
1~4
` ~ \ 1307
1_~ \
1308
183
1379
\ P
,\
~~_~ X1312 `_-~
v ---~ --
~_ J
1380
~ o
l:7
~ 1372
~ ' '
I/ /
1~8
~`\ .
1 . \
I v.
.\
'!i`;.
~ Tan Kno4
oT \ Fiv. ®~
~~ ~ ~ /;
~raowr~ tTn'A '1 '
Ro
Sondf and VkinNp Boone and VklnMy
~f DrD~ o~u~~zvr ~ ~S2- /~.~y
Z ~
/ ~ Jam/ ~ ~i ' 34 ~~...v---~ ' ~ - '- \ ~i ; ' ~ r t ~ _'_ \,\; 1 d ~ . 1 ~1\ ~--~~ ~~.
1 ~ i _ ! ~ r iyGO 1 ~ r '/ ~ j! ~ ! _ ! _ P \ \` ~,` I f ~, I l\ ~ ~ ~ 1 t~ ~ ) 4 (~\_.-~_ .
I`r. ~~ / /~ / c ~~ ~ ~ /` ~_
L ii y I ~/ \ 1/ 1 ~( J ~ J
i ~ • 1 \ ,' , , `' ! ~ -. - . -. -- , ' fG 34854 Sti7ne ' `~
/ ~\pid Ho9erw _ em;.A~ '(~, ~ 'i ~ i ,\ •i - ~_ _- `.a.1 ~ !1~i~'I f ~ 1 ~ ~ \\ \~I, ~\
--~ `.~~:1'epe.vell, G1. ~// '. `,. / 111 ~ r ~ ? ~~ ll ( f .' /{ \ ~~ ~-- _ `\.
.c'-- - . .\ ,. `~ ~ Church ,. .. __ ~ ~ ~ ; \ ~ \A ~ `.L ,. ~-!: ~_~. ~ ! /~- `J
~\ MCD 294 ~,' i ~ / r, \ ~ h ~\° t `~ ~~~'~ ~. J\\\
-
_~,~ ,~
. ,~ Wet pipe ~~°o \ `'~
~~/^ ~~ '` ~ \ r. replacement L. _ _ '~_\`~ a , i>r i ~l\.
- 1~~ ~~ , .. ~~1 '; on SR 1350 ~'~' _._ ~` ~ j (~ /~ ~\•
~\ ~,~v. .v 1 /, /~ .. ~~ 1 ~" GrQaM1 Vs11oY $th • °~., ...~~ethenY'Ch \v~.. - ( v l ~ L \, \ \ !.
1j• Cem ~!~ ' ~:~ ~`~ - M~uLtPleas~r.~hC .%'.~`. ~, '. ~ ~,
_ •- i ~ ~ 11 BM MCD ~9b~' n ~ ~~=~~__~.~da H,ll /.'- ~ - \ ~ '(.~ `yam-~ ~
_ ~ _ r
a. i ~ ~ \\ ~.\Mea; Carno Ch\. ~~ N ' - ~ ~ s \Z, E ~'. -~ ~: _i v, ~~ ~ • ~ -
/ ,\ r~ r r.
->--' i ,~~` ._ \~ '~ jy -Creek \/ (, . ~' l ~~ '_" ` \;ti ~`~
.'~ ~'-~.-~--~.__.i ~; tr,CD 296' _ ~? __ i \ ~ \~\ - \ ~~ _
~J
'' G~eEk r3259 ~ ~~. ~ ~ '~ , `~ • ~: ss
- /'. ~ `\~~ ~~' ~.- ~ '//~ /ate
1 1 S'i~-.. ~` ~... 1 ~ ~
1 ~;^ _ _ ,;, ~ ,
~ ~ ~ r- ~ , ', jir !
- , r ~\. -~ MCO 317.
~_,
G r(e~e~ 3521
. ~ .._, 1, .t. -__- ~.,. ~ ,_
.'
. _ _
i ~ 1 ~~_J
~, .
\~~-``\,.~..~~~/~\-~". .: ,1 yam. =' Hodges',i..' ~ .,~~ \\~,.'. ~~` 1~~ '.-- ,-
Name: ZIONVILLE
Date: 3/19/2008
Scale: 1 inch equals 2000 feet
Location: 036.2787595° N 081.6383470° W
Copyright (C)
1.
3.
2.
1. Downstream view of UT to Meat Camp Creek on SR 1350, Watauga.
2. Upstream junction box.
3. Narrow shoulder width @ wet pipe location.
03/18/2008 06:59 FAIL 8282655.14
P~EL7?
~ rc
ArOT TO
SR~~O ECG Hll1
#ri-ATAU~nA
OF 1 __ ~ DATEr
hCDOT HObNE DISTRICT
ST.3~',4M NAIVE: L~NNAMEQ TR!$UTAifiI' TD MEAT CAdIP CR~'EK
2' AVERY ~E STRf ~Ab! WlpTH
~ 002
-J-..-L_ CEXT~'R t~A~E
~~ P+~'lDSEG Riw
REW F/Y.F PAV~'MENT
- - Ex+sri,~c ~~ mar
~~
~ ~ Ex~ST/NG P~PF
~X!$;" ING PIPE SIZE: 90' x 3b"' GNP
VEIM piPE Sly E: SD' x 36' PIPE TQ BE ~A1D ON A 9p° S1CEyy I NfT F! 3X F~v 1
-~-,
..
I ~ -
., ,.
..
„
.,.
.
I I
.. r i
. _
} ~ i ~ ~ _.~ T ,. ~., ~~ 4
I
I . ~ . ,., II
I I , 1 I ~ ..~ .1
•~ f
1 I ~ I
l ~ ~ ~ •I ~
1 1 , . ~ I i
i
i , _
~
, ~ .
, . ,•r
I
I
i ~
.~-
~ I
f.
I
~. ,
I
.--t.
_~
-
I
I L
• i l i
t _
- ~ _L..:
... i I I _ _ ~,
- f
I I i t
„
,...,
I
~
I
~
I
~ .
...
~.
I
~
I r
j
~
I
I
I
.. .
..
( .,
l
I
4
yl
I
I
..
I
,
I
I
I
~ i
~y .,. , .~ . .
_
:, ,
. ~ j. .4.
I
, 1.11
I.
j - I
~
_ I I I I I 1
~
.~
.. . _
. _ l.
.
~
~ .
I
~, , -~ ~ - 1
r` rI III • I ~.~ - - 1
- I
I I
!
~ I
I I I
I l i I I ! !! i
!I
1 i
i-
- •
-~
I
I ._
i r
_ ICI
I y
'Y I ~, .,I },
.L.L.
_ . ..
,
€ ,
III -
r-
-
f ._ _.. ~ 1 .(. . . ., ,. -'
,. _
I - -
~-0'rE: T.:A/PoRAR'~' E +T'OSION GUh?ROL pEYIGES Mal- Sf•IOWM. 5~lftZllEf' DIATE:.3-11^08
DR AWIN(' MOT TC SCALE