Loading...
HomeMy WebLinkAboutNC0086550_Remission Request_20160831Phone: (910) 628-9766 August 18, 2016 TOWN OF FAIRMONT 421 South Main Street • P.O. Box 248 Fairmont, NC 28340 Email: fairmontnc@bellsouth.net www.fairmontnc.com Ms. Belinda S. Henson Regional Supervisor Water Quality Regional Operations Section Fayetteville Regional Office Division of water Resources, NCDEQ 225 Green Street, Suite 714 Fayetteville, NC 28301-5043 Fax: (910) 628-6025 RECEIVEDINCaEQl WR AUG 3 12016 Water Quality Permitting Section Subject: Notice of Violation and Assessment of Civil Penalty For Violations of -north Carolina General Statute ,(G.S.)143-216.1(a)(6) and NPDES WW Permit No. NC0086550 Town of:Fairmont - Fairmont Regional WWTP .• - - ;- Case No:.LV-2016-0144 Robeson County Dear Ms. Henson: This letter is to request remission.of the Civil Penalty assessed -under the subject Violation; Case No. LV- 2016-0144-Limit_Exceed"a6'ce V'iolation(s). - _;w - According,to the Justification for Remission Request, "Pursuant -to N.C.G.S. § 1438-282.1(c), Remission of a civil penalty may be granted only -when one -or -more -of fhe46116wing=five-factors_apply. It is the Town's contention that three of the five -factors apply; (a) one or more -of the civil penalty�assessment factors in N.C.G.S. 1436-282.1(b) were wrongfully applied to`the detriment of the petitioner (the assessment factors are listed in the civil -penalty assessment document; -(b) the -violator promptly abated continuing environmental damage resulting from the violation (i; e.- explain the steps that you took to correct the violation and prevent -future occurrences);-and=(c) the violation was inadvertent or a, result of an accident (i.e. explain why the violation was unavoidable or something you could n'ot prevent or prepare for). `(a) one or more ofihe•civ-il--penalty_assessment factors -in N.0 G.S. 14313 -282.1(b -)-were wrongfully applied to the-detr'imenft'of the petitioner-- ' Assessment Factors (1) The degree and extent of harm to -the: natural resources of the State, to the public health, or to private property resulting from the violation; The Town of Fairmont February DMR shows that the town never exceeded any maximum daily limits for Effluent Discharge. Therefore, we don't believe there was any harm to the natural resources of the State, or to the public health, or to private property resulting from the violation. (2) The duration and gravity of the violation; The Town contends that since the DMR shows no violation of maximum limits for Effluent Discharge, the gravity of the violation was minimal at best. (3) The effect on ground or surface water quantity or quality or on air quality; Again, the effluent discharge limits were never exceeded. The town contends that there was no negative effect on ground or surface water quantity or quality or on air quality. (4) The cost of rectifying the damage; The Town contends that there was no cost associated with to rectify damage because there was no damage. If there is damage that the Town has not been made aware of, we ask that it be identified and that the town be allowed to rectify that damage. (5) The amount of money saved by noncompliance; The violation was inadvertent, beyond the town's control and unpredictable. Therefore the Town couldn't have intentionally failed to comply in an attempt to save money. (6) Whether the violation was committed willfully or intentionally; As explained in the June 14, 2016 letter requesting that no civil penalty be assessed, the town suffered a record amount of rain; 11.3 inches. (See copy of the Town's hand written Sewer Plant Log, demonstrating Rain Fall in inches and a copy of the February eDMR.) Even a system that typically does not have substantial inflow and infiltration issues will experience higher than normal water levels if inundated by the rapid influx of rain water. In addition, our records show that our regional Columbus County partners experienced rainfall totaling 8.6 inches for the month of February. Record levels of rainfall are the result of natural causes and can't be predicted. That being the case, the Town contends that it did not commit the violation willfully or intentionally. (7) The prior record of the violator in complying or failing to comply with programs over which the Environmental Management Commission has regulatory authority; and The Town's record shows that we routinely comply with the programs over which the Environmental Management Commission has regulatory authority. (8) The cost to the State of the enforcement procedures. The Town can't contest the cost to the State to enforce procedures and it realizes that the State must proceed with enforcement action when there are violations, even if those violations were not intentional. The fact that enforcement actions cost the State can't be denied. (b) the violator promptly abated continuing environmental damage resulting from the violation (i.e. explain the steps that you took to correct the violation and prevent future occurrences) The Town acknowledges that it has inflow and infiltration problems and we have and are taking additional steps to rectify these issues. Even though our system is regional, doesn't negate the fact that we are a small town with limited funds. That being said, we rely heavily on assistance through loans and grant funding sources to handle issues that require large sums of money to abate. As you know the state provides most of the available grant funds and a lot of those funds are made available under timed funding cycles. In order to qualify and receive those funds, towns must operate within the time constraints of the state. The following represents our efforts to resolve these issues to date: Since 2014, the town has been taking steps to correct the inflow and infiltration of water coming from all systems connected. One project, funded through the sale of revenue bonds and a CWMTF grant was completed in November of 2014. The grant was in the amount of $600,000, the revenue bonds totaled $385,000 and the town obligated a local match in the amount of $15,000. This project replaced approximately 1,416 linear feet of 10" sewer lines, rehabilitated approximately 1,700 linear feet of sewer lines, and 37 manholes were either replaced or repaired. The Town has solicited the help of the North Carolina Rural Water Association (NCRWA) to perform smoke tests on our system and the systems of our regional partners. The two larger systems have received grants to help eliminate much of the I&I. The Proctorville smoke test is complete, corrective measures are currently underway pursuant to the findings and the smoke tests for the other smaller systems are being scheduled at the convenience of the NCRWA. The I&I grant currently underway with the Town of Fairmont, is in the amount of $1.765 million and was awarded in 2015. The Town has already been approved by NC DEQ to begin the design and construction phase. The field work, in terms of surveying, is essentially complete and the Town will be submitting a request for design review sometime in the fall. A copy of the Updated Letter of Intent to Fund Milestone Requirements is attached. Also, the most recent status report from the Town's Consultants, LKC Engineering, PLLC, is attached. The Town took a good hard look at our system and determined that due to the amount of work needed, we would have a three-phase project. Phase I is complete, Phase II is in progress and we fully intend to continue on to Phase III to make sure we have done everything possible to improve our system. We have also encouraged our regional partners to pursue funding as well. Hopefully, the state will see the merit in approving funding for our partners, as the health of our system is fully integrated with their ability to simultaneously correct any problems they are experiencing. The Town of Fair Bluffs grant was also awarded in 2015 in amount of $3 million. The project will replace sewer collection lines in much of the low/moderate income areas of Fair Bluff and involves the rehabilitation of 18,550 linear feet of sewer lines and 52 manholes. The environmental requirements for the Fair Bluff grant are basically met now, and the engineers are also wrapping up their surveying. They expect to submit the finished plans to the state in September. Hopefully the state approval of the plans will be attained by January 2017, which will allow the project to be bid out in March of 2017. (c) the violation was inadvertent or a result of an accident (i.e. explain why the violation was unavoidable or something you could not prevent or prepare for). In previous correspondence with NC DEQ, the town demonstrated the history of rainfall events from 2014 to present and to reiterate that rainfall events, particularly for Southeastern North Carolina, I submit the following: A review of historical rain events for the last three years shows a steady increase. The month of February alone there has been progressively higher amounts of rain: February 2014 — 6.5", February 2015 —10.2", February 2016 —11.3." Even a system that typically does not have substantial inflow and infiltration issues will experience higher than normal water levels if inundated by the rapid influx of rain water. In recent years, the Town of Fairmont has experienced financial hardships that, at one time, rendered our fund balance as low as 4%, which, as you know, is 4% lower than recommended by the North Carolina Local Government Commission. We have struggled to climb up from this downward financial spiral. We have explored and continue to explore every available resource to help improve our system. The Town respectfully requests that you weigh the evidence and data provided, along with the attachments and that the assessment set forth in your letter dated August 2, 2016 for Case No. LV -2016- 0144 is remitted. Sincerely, Kat ina Y. Tatum Town Manager 4 JUSTIFICATION FOR REMISSION REQUEST Case Number: LV -2016-0144 Assessed Party: Town of Fairmont Permit No.: NC0086550 County: Robeson Amount Assessed: $1,659.26 Please use this form when requesting remission of this civil penalty. You must also complete the 'Request For Remission, Waiver of Right to an Administrative Hearing, and Stipulation of Facts" form to request remission of this civil penalty. You should attach any documents that you believe support your request and are necessary for the Director to consider in evaluating your request for remission. Please be aware that a request for remission is limited to consideration of the five factors listed below as they may relate to the reasonableness of the amount of the civil penalty assessed. Requesting remission is not the proper procedure for contesting whether the violation(s) occurred or the accuracy of any of the factual statements contained in the civil penalty assessment document. Pursuant to N.C.G.S. § 143B -282.1(c), remission of a civil penalty may be granted only when one or more of the following five factors apply. Please check each factor that you believe applies to your case and provide a detailed explanation, including copies of supporting documents, as to why the factor applies (attach additional pages as needed). (a) one or more of the civil penalty assessment factors in N.C.G.S. 143B -282.1(b) were wrongfully applied to the detriment of the petitioner � (the assessment factors are listed in the civil penalty assessment document); (b) the violator promptly abated continuing environmental damage resulting from the violation (Le., explain the steps that you took to correct the violation and prevent future occurrences); X(c) the violation was inadvertent or a result of an accident (i.e., explain why the violation was unavoidable or something you could not prevent or prepare for); Y 1 , (d) the violator had not been assessed civil penalties for any previous violations; (e) payment of the civil penalty will prevent payment for the remaining necessary remedial actions (i.e., explain how payment of the civil penalty will prevent you from performing the activities necessary to achieve compliance). EXPLANATION: STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY *611jetraeldMeM7WL61121 IN THE MATTER OF ASSESSMENT ) WAIVER OF RIGHT TO AN OF CIVIL PENALTIES AGAINST ) ADMINISTRATIVE HEARING AND STIPULATION OF FACTS Town of Fairmont ) Fairmont Regional WWTP ) PERMIT NO. NCO086550 ) CASE NO. LV -2016-0144 Having been assessed civil penalties totaling $1,659.26 for violation(s) as set forth in the assessment document of the Division of Water Resources dated August 2, 2016„ the undersigned, desiring to seek remission of the civil penalty, does hereby waive the right to an administrative hearing in the above -stated matter and does stipulate that the facts are as alleged in the assessment document. The undersigned further understands that all evidence presented in support of remission of this civil penalty must be submitted to the Director of the Division of Water Resources within thirty (3 0) days of receipt of the notice of assessment. No new evidence in support of a remission request will be allowed after (30) days from the receipt of the notice of assessment. This the '� ! 14 day of ' LLQ/^ , 20_/6 t SIG /BWAf ADDRESS f /��i�o•J t- �cJ c a�3� TELEPHONE 9'(0f �80' x(69 add August 26, 2016 Ms. Katrina Tatum, Manager Town of Fairmont 421 South Main Street Fairmont4, NC 28340 (Sent via email) Re: Phase 2 Sewer Rehabilitation Project Project Status Report Town of Fairmont, North Carolina LKC No. Fair -15.02 Ms. Tatum, RECEIVED/NMEWWR AUG 3 1 2016 Water Quality Permitting Section Design plans (see attached) and specifications for the above referenced project have been completed, and we are preparing to submit the design for permitting. As you are aware, the final design must also be submitted to CDBG-I for their approval before we can advertise the project for bid. We are preparing the design review package for CDBG-I and expect to send that out early next week. The remaining project deadlines set by CDBG are listed below. We do not foresee any difficulty meeting this schedule provided agency reviews are completed in a timely fashion. We will make every effort to stay ahead of schedule. • • Submit Bid and Design Package: September 18, 2016 • Receive Final Approval of Bid and Design Package: January 17, 2017 • Receive Bids and Submit Bid Information for Agency Approval: March 15, 2017 • Execute Construction Contracts: April 17, 2017 We are hopeful of obtaining additional funding through available funding sources to complete the Phase 3 inflow and infiltration improvements included in the Town's Capital Improvement Plan. We will keep you informed of any action the Town will need to take to help secure funding. If you have any questions, please do not hesitate to contact me at (910) 420-1437 or by email at mark@lkcengineering.com. Sincerely, LKC Engineering, PLLC Mark Lacy, P.E. LKC Engineering, PLLC,140 Aqua Shed Court, Aberdeen, North Carolina 28315 PH: 910/420-1437 * FAX: 910/637-0096 * License No. P-1095 I Town of Fairmont Regional Wastewater Treatment plant Sewer Plant T.nQ �. Poe NC®ENR North Carolina Department of Environment and Natural Resources Pat McCrory Donald R. van der Vaart Governor Secretary May 22, 2015 The Honorable Charles Townsend, Mayor Town of Fairmont P.O. Box 248 Fairmont, North Carolina 28340-0248 SUBJECT: CDBG-Infrastructure Funds No. 14-I-2657 Updated Letter of Intent to Fund. Sewer System Rehabilitation Phase 2 -- - - - - - October 2014 Application Cycle Dear Mayor Townsend: The Division of Water Infrastructure has reviewed your application to the Community Development Block Grant Program,, and the State Water Infrastructure Authority has approved your project as eligible to receive a grant of $1,765,000 to rehabilitate approximately 16,700 linear feet of gravity sewer line and 68 manholes. Please note that this intent to fund is contingent on meeting all of the following milestones: Milestone Date Attendance at EA/PER Workshop February 5, 2015 Contract with DWI Executed June 15, 2015 Engineering Report Submitted October 15, 2015 Environmental Document Submitted March 15, 2016 Request for Release of Funds Approved March 30, 2016 Engineering Report Approved March 15, 2017 Bid and Design Package Submitted September 18, 2016 Bid and Design Package Approved January 17, 2017 Advertise Project, Receive Bids, Submit Bid Information March 15, 2017 Execute Construction Contract(s) I April 17, 2017 Division of Water Infrastructure 1633 Mail Service Center, Raleigh, North Carolina 27699-1633 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-707-9160 Internet: hftp://pogal.ncdenr.org/web/wi/home An Equal Opportunity \ Affirmative Action Employer 8/23/2016 2:49:50 PM Budget vs Actual TOWN OF FAIRMONT Ending Date: 08/23/2016 Description Budget MTD 'D K19 --, )6f10AJ7' Page 1 Of 2 YTD Variance Percent Revenues 75-289-0000 FUND BALANCE 0.00 0.00 0.00 0.00 75-289-0100 CDBG-I FUNDS 1,738,000.00 0.00 0.00 (1,738,000.00) Total Revenues for Fund 75 1,738,000.00 0.00 0.00 1,738,000.00 8/23/2016 2:49:50 PM TOWN OF FAIRMONT Description dvkA %29� Budget vs Actual Ending Date: 08/23/2016 Budget MTD YTD Page 2 Of 2 Variance Percent Expenditures 75-660-5700 CDBG ADMINISTRATION 115,200.00 0.00 0.00 115,200.00 75-660-5701 ENVIRONMENTAL REVIEW 0.00 0.00 0.00 0.00 75-660-5702 PRELIMARY ENGINEERING 4,000.00 0.00 0.00 4,000.00 75-660-5703 ENGINEERING & DESIGN 106,000.00 0.00 0.00 106,000.00 75-660-5704 BID AND AWARD 8,000.00 0.00 0.00 8,000.00 75-660-5705 CONSTRUCTION MGMT/ INS 86,000.00 0.00 0.00 86,000.00 75-660-5706 SURVEYING 23,400.00 0.00 0.00 23,400.00 75-660-5707 CONSTRUCTION — - - — --- - --------------------------- 1,395,400.00 ------ -- 0.00 -"--------------- 0.00 -- --- 1,395,400.00 - - - - —------------- ---------- Department Totals 660 NON -DEPT 1,738,000.00 0.00 0.00 --- 1,738,000.00 Total Expenses for Fund 75 1,738,000.00 0.00 0.00 1,738,000.00 Revenues Over/ Under Expenses: 75 0.00 0.00 8/23/2016 2:49:04 PM Budget History Listing Page 1 Of 1 TOWN OF FAIRMONT Reporting - Account: 75-289-0000 thru 75-289-0100 For Date Range: 08/23/2016 thru 08/23/2016 Account: 75-289-0000 - FUND BALANCE -- No Activity -- unt: 75-289-0100 - CDBG-1 FUNDS Balance Forward Budget Balance: 0 1,765,000.00 0.00 1,765,000.06 -10 NP&S kRIVAT NO... NC0086550 FACILITY NAME: FailmohtReyonal WWTP a' OWNER NAME: Town of Fairmont `LADE: WW -3 -�MR PERIOD: 02-2016 (February 2016) COMPLIANCE: PERMIT VERSION: 4.0 CLASS: WW -3. ORC. Kevin H Taylor ORC HAS CHANGED: No VERSION: 1.0 CONTACT PHONE#: 9102720833 PERMIT STATUS: Active COUNTY: Robeson ORC CERT NUMBER 1001446 STATUS: Processed F SUBMISSION DATE: 03/17/2016 1 03/17/2016 ORC/Certifier Signature: Kevin 1pgly2or E-Mail:ktaylormsi@yahoo_com PhoneR# �0�7d1ER1� 300' DVVR Date By this signature, I certify that this report is accurate and complete to the best of my knowledge. AUG 3 12016 Water Quality The permittee shall report to the Director or the appropriate Regional Office any noncompliance that potentially threatens pdbiic !1 th &r f etii®vuonnrent. Any information shall be provided orally within 24 hours from the time the permittee became aware of the circumstances. A written submission shall also be provided within 5 days of the time the permittee becomes aware of the circumstances. If the facility is noncompliant please attach a list of corrective actions being taken and a time -table for improvements to be made as required by part II -E.6 of the NPDES permit 03/17/2016 Permittee/Subihitter Signature:***in Taylor E-Mail:ktaylormsi@yahbo.com Phone #:910-734-7301 Date Permittee Address: Off US Hwy 74 FaitmonbOIK2640 Permit Expiration Date: 07/31/2019 I certify, Under penalty of law, that this document and all attachments were prepared under my direchoh or supervision in accordance with a system designed �—j assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who managed the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, itnd complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. CERTIFIED LABORATORIES LAB NAME: TBL CERTIFIED LAB#: PERSON(s) COLLECTING SAMPLES: Kevin Taylor / Johnny Britt PARAMETER CODES Parameter Code assistance may be obtained by calling the NPDES Unit (919) 807-6300 or by visiting httP://PortaLncdenr.org/we"b/wq/swpfpstnpdedfonns. org/web/wq/swpfpstnpdedfonns. FOOTNOTES Use only riftits of measurement designated in the reporting facility's NPDES permit for reporting data * No NoW/Discharge From Site: Check this box Trio discharge occurs and, as a result there are no data to be entered for all of the parameters on the DMR for entire rhonitoring period- ** ORC on Site?: ORC must visit facility and document visitation of facility as required per 15A NCAC 8G.0204 ***- Signature of Permittee: If signed by other than the permittee, then delegation of the signatory authority must be on file with the state per 15A NCAC 2B �0506(b)(2)(D). w� N?DE� PERMIT NO.:14CO086550 PERMIT VERSION: -o PERMIT STATUS: Active FACILITY NAME: Famhont Regional W WTP CLASS: WW -3. COUNTY: Robeson OWNER NAME: Town of Fairmont ORC: Kevin H Taylor ORC CERT NUMBER 1001446 GRADE - W-3 W-3 ORC HAS CFIANGED: No �jeDMR i`'ERIOD: 02-2016 (February 2016) VERSION: 1_0 STATUS: Processed SAMPLING LOCATION: INFLUENT DISCHARGE NO.: 001 a a m_■m F M_mm C0310 E• O m_mm COS30 ��mm N�m r l,� 2Xweek EiH w 2Xwn pg m o Compas�te G e E z x enn-c 0700 0700 5 MODUdyAve agc is 24.7 Da7yM imoff I 14 ass* N0 247 RepcxtiOgReason ENFRUSE=No Flow-ReuelRecycle; y�rgm=NoV'litaOoR—Ad---Weather; NOFLOW=No Flow; HOLIDAY=No Vrsitation_Holiday m_■m M_mm mmom m_mm ��mm N�m r l,� 0700 5 MODUdyAve agc is 24.7 Da7yM imoff I 14 ass* N0 247 RepcxtiOgReason ENFRUSE=No Flow-ReuelRecycle; y�rgm=NoV'litaOoR—Ad---Weather; NOFLOW=No Flow; HOLIDAY=No Vrsitation_Holiday L N"EWOERMIT NO.: NCO086550 PERMIT VERSION: 4.0 PERMIT STATUS: Active FACILITY NAME: Fairmont Regional W W1P CLASS: WW -3. COUNTY: Robeson OWNER'NAME: Town of Fairmont OkQ Kevin H Taylor ORC CERT NUMBER 1001446 :RADE: WW -3 OkC HAS CHANGED: No "MR PERIOD: 02-2016 (February 2016) VERSION: 1_0 STATUS: Processed A SAMPLING LOCATION: EFFLUENT DISCHARGE NO.: 001 NO DISCHARGE*: NO OODIO 00400 50060 00610 00530 31616 40300 a E � en '`✓; o o F e Contimm�s 5Xweek 3Xweek 3Xwv& 2Xwoek 2Xweek 2Xavwk 2Xweek 3Xweek c o E V =e, a V t Recorder Grab Gob Grab Compmite Composite Composite Grab Grab Q V F F O O O Z a FLOW TED1P-C PH CHLORINE BOD -Cmc 1983W_Cone TBS-Cme FECCOLr 'DO 7400 dock Hes 2400dock Mm Y/B/N mgd degc m 1194 m94 m9/l 1 0710 24 0700 5 y 1.234 13.8 -94 A/100m1 m9fl 3.9 <0.1 9.8 2 0730 24 07m 5 y 12M 142 6.5 24 28 0.1 5.1 <1 8.5 3 0700 5 y 1.178 14.4 65 21 4 0700 5 y 1.887 145 6b 28 <I 85 5 0700 83 5 Y 2338 14 6 0700 2 y 2254 7 0700 2 y 2573 8 0710 24 0700 5 y Z189 13-5 <2 <0.1 4_r 9 0730 24 0700 5 Y 2133 13.7 6.4-d 28 32 <Q1 162 <1 83 10 070D 5 y 2207 132 6.4 30 II 0700 5 y 2226 13.1 6.4 26 <1 8.4 12 0700 5 1985 129 8.4 .3 0700 2 y 53 L8 !4 0700 2 y 1.778 15 0720 24 0700 5 y 1.786 124 <2 Ql 3.6 16 0730 24 0700 5 Y 1.776 124 6.4 28 3.1 0.7 5.6 <1 8.4 17 0700 5 y 229 13 45 25 18 0700 5 y 2085 132 65 21 <1 83 0700 5 Y 1939 13 82 V.- 0700 2 Y 1.851 07002 y 1.747 24 0700 5 Y 1.715 146 <2 0.7 as 23 0730 24 0700 5 y 1.766 143 6.4 28 <2 Rl <29 <1 24 0700 5 y 2.118 147 65 25 gq 25 0700 5 y 2741 14.6 6.5 24 <1 18A 26 ' 0700 5 y 2107 14.2 83 27 2 y 2095 28 0700 2 y 1.811 29 0720 ' 24 0700 5 y :1.696 14.8 MmrLlyAve n-IImit: 3 0.1 83 1.75 y 1.938276 IS a 30 200 13.738095 25666667 1.77!77810,11661161044444 1 8366667 DaHy a6munea DnOyns...,,,.2573 14.8 6.6 3039 162 0 SS 124 6.421 p 0 p •'••NoRepoldnSReasaxENFRUSE=No Flow-ReuselRecyde; ENVWTHR=No Visitation -Adverse Wealher, NOFLOW=No 82 Flow; HOLIDAY=NoVisiWon-Holiday A 5r 'NPDE51 PERMIT NO.: NCO086550 - PERMIT VERSION: 4_0 PERMIT STATUS: Active FACILITY NAME: Fairmont Regional W W Ip CLASS: WW -3_ COUNTY: Robeson OWNENAME: Town of Fairmont ORC: Kevin H Taylor ORC CERT NUMBER 1001446 GRADE: WW -3 ORC HAS CLANGED: No eDMR PERIOD: 02-2016 (February 2016) VERSION: 1.0 STATUS: Processed SAMPLING LOCATION: EFFLUENT DISCHARGE NO.: 001 NO DISCHARGER: NO (Continue) E E u u F F C C0600 C066S THP3B TMB 01092 01042 00625 00630 2 O E > a U c O c Manthly Monthly Monthly 9---Mdy Qwe_ asrtedy Monthly tNmawly e o O O ltd Cmpse Cmposite ITOrALN- Cmpaskc ComposteCalcamposft composfte Fg OU Z TOrALP-CDV COPPER TOrKJE ZnvCft!!;] t�Yo0m2&poNsiOle: 2dnYfim __11 _ MomehryAvmge Lrmlt•. Mmffi1yAvermgei 421 1.08 Danyftuimimnw: 421 LOS '•*'NoReportingReawo ENFRUSE=No Flow-Reose/R de; ENVW7'flR=No Visitation 1.H �Y tion—AdvetseWeather, NOFLOW=No Flow; HOLIDAY=No Visitation_Holiday ' NM11S �jk IIT NO.: NC0086550 FACILITY NAME: Fairmont Regional W WTp OWNER NAME: Town of Fairmont GRADE: WW -3 �,—°DMR PERIOD: 02-2016 (February 2016) PERMIT VERSION: 4.0 CLASS: WW -3. dRC: Kevin H Taylor ()RC HAS CHANGED: No VERSION: I.0 Report Cmhments: c, We had 113in of rain fall for the month and our average of the month was 1.937 mgd PERMIT STATUS: Active COUNTY: Robeson ORC CERT NUMBER: 1001446 STATUS: Processed TOWN OF FAIRMONT 2016-2017 BUDGET ORDINANCE 16-165 BE IT ORDAINED by the Board of Commissioners of the Town of Fairmont, N.C. meeting in regular session this 21st day of June 2015, that the following fund revenues and department expenditures together with certain restrictions and authorizations are adopted: SUMMARY GENERALFUND POWELL BILL WATER & SEWER FUND FEDERAL DRUG FUND STATE DRUG FUND USDA - RBEG PROGRAM SEWER REHAB PROJECT PHASE II CEMETERY TOTAL SECTION I GENERAL FUND Source MOTOR VEHICLE TAX REVENUE CURRENT TAX REVENUE PRIOR YR TAX REVENUE DISCOUNTS PENALTY CABLE/VIDEO TAX REVENUE LOT CUTTING RENT - PUBLIC BLDGS. FIRE INSPECTIONS MISC. FINES/PARKING FEES MAY DAY DONATIONS FRANCHISE TAX BEER & WINE SALES TAX ABC REVENUE COURT FEES ZONING FEES SANITATION REVENUE SANITATION - OTHER SOLID WASTE DISPOSAL TAX SUBTOTAL Department GOVERNING BODY ADMINISTRATION CLERK FINANCE TAX LEGAL PLANNING, CODES ENFORCEMENT PUBLIC BUILDING POLICE POLICE DISPATCH FIRE DEPT. $1,851,030.00 $89,500.00 RECEIVEDINCI)EQN,212,650.00 $50.00 AUG 312016 $200.00 Water Quality $6,000.00 P.,mitting Section $1,738,000.00 $18,830.00 $4,916,260.00 REVENUE ANTICIPATED EXPENDITURES AUTHORIZED Page 1 Amount $92,000.00 $650,000.00 $75,000.00 ($7,000.00) $15,000.00 $15,430.00 $1,500.00 $19,000.00 $750.00 $1,000.00 $200.00 $2,000.00 $140,000.00 $12,750.00 $570,000.00 $22,000.00 $3,250.00 $1,200.00 $235,000.00 $250.00 $1,700.00 $1,851,030.00 Amount $13,560.00 $91,244.00 $58,092.00 $125,347.00 $21,275.00 $12,000.00 $11,050.00 $131,785.00 $673,040.00 $81,229.00 $61,256.00 GARAGE STREET SANITATION PARKS & RECREATION PALMER DRUG LIBRARY BORDER BELT MUSEUM FARMERS' FESTIVAL MAY DAY FESTIVAL NON -DEPARTMENTAL SUBTOTAL SECTION II POWELL BILL FUND Source POWELL BILL ALLOC. SUBTOTAL Department PERSONNELEXPENSE MAINTENANCE DRAINAGE SUBTOTAL SECTION III WATER & SEWER FUND Source WATER REVENUE SEWER REVENUE SEWER REVENUE - MISCELLANEOUS SEWER CONTRACT REVENUE SEWER CONTRACT O/M TAPS/CONNECTIONS LATE FEES RECONNECTIONS SUBTOTAL Department NON -DEPARTMENTAL WATER/SEWER ADMINISTRATION WATER TREATMENT WATER MAINTENANCE SEWAGE TREATMENT SEWER MAINTENANCE SEWER CONTRACT O & M SUBTOTAL TOWN OF FAIRMONT 2016-2017 BUDGET ORDINANCE 16-165 REVENUE ANTICIPATED EXPENDITURES AUTHORIZED REVENUE ANTICIPATED EXPENDITURES AUTHORIZED Page 2 $49,960.00 $161,240.00 $235,950.00 $15,395.00 $500.00 $6,825.00 $1,000.00 $2,000.00 $4,000.00 $94,282.00 $1,851,030.00 Amount $89,500.00 $89,500.00 Amount $49,645.00 $30,455.00 $9,400.00 $89,500.00 Amount $382,000.00 $450,000.00 $500.00 $300,000.00 $55,000.00 $1,100.00 $21,550.00 $2,600.00 $1,212,650.00 Amount $277,573.00 $217,491.00 $164,426.00 $82,795.00 $358,644.00 $80,221.00 $31,500.00 $1,212,650.00 I TOWN OF FAIRMONT 2016-2017 BUDGET ORDINANCE 16-165 SECTION IV FEDERAL DRUG FUNDS Source REVENUE ANTICIPATED FEDERAL DRUG FUNDS SUBTOTAL Department EXPENDITURES AUTHORIZED NON -DEPARTMENTAL SUBTOTAL SECTION V STATE DRUG FUNDS Source REVENUE ANTICIPATED STATE FUNDS SUBTOTAL Department EXPENDITURES AUTHORIZED NON -DEPARTMENTAL SUBTOTAL SECTION VI USDA - RBEG FUND Source REVENUE ANTICIPATED LOAN REPAYMENTS SUBTOTAL Department EXPENDITURES AUTHORIZED ECONOMIC DEVELOPMENT GRANTS SUBTOTAL SECTION VII SEWER SYSTEM REHAB PROJECT PHASE II Source REVENUE ANTICIPATED CDBG-I FUNDS SUBTOTAL Department EXPENDITURES AUTHORIZED NON -DEPARTMENTAL SUBTOTAL SECTION VIII CEMETARY FUND Source REVENUE ANTICIPATED FUND BALANCE SUBTOTAL Department EXPENDITURES AUTHORIZED i LABOR,SUPPLIES & EQPT. SUBTOTAL Page 3 Amount $50.00 $50.00 Amount $50.00 $50.00 Amount $200.00 $200.00 Amount $200.00 $200.00 Amount $6,000.00 $6,000.00 Amount $3,000.00 $3,000.00 $6,000.00 Amount $1.738,000.00 $1,738,000.00 Amount $1,738,000.00 $1,738,000.00 Amount $18,830.00 $18,830.00 Amount $18,830.00 $18,830.00 TOWN OF FAIRMONT 2016-2017 BUDGET ORDINANCE 16-165 SECTION IX TAX RATE ESTABLISHED An Ad Valorem Tax Rate of .73 per $100 full valuation is hereby established as the official tax rate for the Town of Fairmont for the fiscal year 2015-2016. This is based on an estimated valuation of $99,131,557.00 and an estimated collection rate of 90%. SECTION X SPECIAL AUTHORIZATION - BUDGET OFFICER A. The Budget Officer shall be authorized to reallocate departmental appropriations among the various OBJECTS of expenditures as she believes necessary. B. The Budget Officer shall be authorized to execute interdepartmental transfers, in the same fund, not to exceed 10% of the appropriated monies for the department whose allocation is reduced. Notation of all such transfers shall be made to the Board on the next succeeding financial report. C. He/she may make interfund loans for a period of not more than 60 days. D. Interfund transfers, established in the budget document, may be accomplished without recourse, to the board. ' SECTION XI RESTRICTION - BUDGET OFFICER A. The interfund transfer of monies, except as noted in Section X, Paragraph C and D, shall be accomplished by Board authorization only. B. No salary increase may be made without Board approval. C. No contributions to any agencies shall be made without board approval. SECTION XII UTILIZATION OF BUDGET AND BUDGET ORDINANCE This Ordinance and the Budget Document shall be the basis of the 2016-2017 Fiscal Year. The Budget Officer shall administer the Budget and shall insure that operating officials are provided guidance and sufficient details to implement their appropriate portion of the budget. The accounting section shall establish records which are in agreement with the Budget and this Ordinance and the appropriate statutes of the State of N.C. Adopted this 21st day of June, 2016. By: Bobby dkarles Townsend, Mayor Attest: H. LA(rson, NCCMC, Town Clerk Page 4 PHASE 2 SANITARY SEWER SYSTEM REHABILITATION CDBG No. 14-I-2675 FOR THE TOWN OF FAIRMONT ROBESON COUNTY, NORTH CAROLINA COUNTY LOCATION MAP NTS tiM'��Rp i Digitally signed by - Charles Townsend Mark Lacy, P.E. ��e��°`"'°": Date: 2016.08.26 . 09:23:34-04'00' Town Council Mayor - Charles Townsend Mayor Pro -Tem - Monte McCallum Commissioner - J.J. McCree Commissioner - Casandra Gaddy Commissioner - Charles Kemp Commissioner - Amelia A. McLean Commissioner - Terry Evans FINAL DRAWING — FOR REVIEW ONLY — NOT FOR CONSTRUCTION t.\fro.- - pc - r me `eov - wo..,v.�e�o o...v+ o,a.�va\oz cu\oe 0. uw a.v: t�,t x..a ersfwr mtaot� a/tv/zo�e z3o-ta vtt taio,nt. vaw ey wq ron.�+m m/ze/ts axssaa w w rd,-ieoz-aoaemi-�\ror�iam - ws - w,�.em m a.im\em - ^mV�v w• �v.\m c.r\rm,- z -v at v: ewe ��O°tnnumoo��` I N K Lh O ` fD a, I'TI FINAL DRAWING — FOR REVIEW ONLY — NOT FOR CONSTRUCTION o w = g Q s p o g PHASE 2 SANITARY SEWER SYSTEM REHABILITATION LAYOUT MAP Engineering Landscape Architecture LKC LKC Engmeenn9, pllc 140 Aqua Shed Court Aberdeen, NC 28315 0.910.420.1437 aMwe - FOR THE TOWN OF FAIRMONT Planning F: 910.637.0096 Ikcenglneering com 3,c4'ctRE�Ey ROBESON COUNTY, NORTH CAROLINA License No. P-1095 hK w N s ;� ...•..:.: ..:. -.. +.'- . is ..... v� p: INV'OUT 01,12' ` SYA. 0 0 001 a 90 ?: _ + .... o; INV IN 9202 : . RIM ELEY, to6.5B' ..... : ..... S�F ' x z A O do /m\ a E >> : I ♦ • � o Hp H�cH e ♦h N. .. , .. ... All MAN12, OLE (2 MV' OUT 92 40' _ SfA 2ibt ss s-1. [ - '-INV IN 9250' - {4M• ELEV. 1ffi711ffi71' - �m .... mg ............. ..... :...nov o :. O: avo _ i .. ..... E Ie I c� 3� Nov, ♦ �.. •(� .I. o/ ..: .. is N: INV 0Vi 92,87' SFA Hd�w9712CS�1�- L - bpp INV IN 9297' RIM O m rq Ln... ....1 .. ... .. :. - +: .:. A ....:.... S' I_ €'. ... •.:: .:. •:.: _. is-' '_.... � - • _ , _ ... ANNOLE p4 �M'A'IERTIGHp INV OVT 93.38` . STA 7+70 96 5-1 9288""itM"ECFV i01.b9 + 1 m• .:,.. i r .. m �a p' °offmo r {l -..,:...:.... ,. .:'..-�5 • •INVOul9.3 5 ' •SiAK6+702BS-i 'INV IN 9J,73' )--.'RIM ETEV, IO TY-•��)i `, �^o'^ p: . o ....:..... ......�._I.:........ „m OUT p455 NV - HOLE STA ?l44Z35-�••• z Q :.. .. ..-'•.INV IN 9394 I 9384'' 9$��mboa o.01 - poi ..._.. o:• Ali ;9 -�)- =P ' INV OUl! 9410 �g •STA. /w50�23 $=1 ` gy i I+'� /� ....(Hgmm ♦ og� F �A INV IN 44,20' I� •RIMr- EIEV 104.67 ��m�DF A - ?'; - _ ` •• � INV OUT 946U� YTMIT�46907•S« ^I♦ m�^ 4 N ••.• ^•••• NINV IN.9460'� - --321N E1EV:40F70' - b. I a O.. w. o :t.;R i ;STA .12{79 5-i i N 9EGIN D1P..-:.;.• ! .. ND P .. .. /ya/ O Q + N . o ? '": _ w .' • i&"RCP. .°'. "c 10 : -.. AI o.. ivNd a o- _ - N O x"G i :� �� ... - i•m .00 -0 VJ :O i0 � � � 'N O T 0 N o :N :o - N ;o.p FINAI nPAWINr: — FnR RFVIFW rw V — NnT FnR CnNSTRIICTInN ^ 9 ; PHASE 2 Kilic LKC Engineenng, pIIC_�xEugy,�SANITARY SEWER SYSTEM :I Engineenng 140 Aqua ShCourt? s y4STA 0+00 TO STA 11 +72 Abedeen, C5 "A:REHABILITATION n Landscape Arch/tecture 0.910.4201437 wexeeFOR THE LINE S-1 :i F: 910.637.0096TOWN OF FAIRMONT _ _ I Planning Ikcenglneering.com p�'elNt�y ROBESON COUNTY, NORTH CAROLINA License No. P-1095 A J :��: �b s oti 4,� wWb s„�z.e�\aoo - o� ��a�o o..�a, o.,.\� roe o.��o��,a° a"� ow;» o.:go� \`Q. � �..a �-,wo-� P.,� \�in.�:o �.9 a w. oo - :„ �e.N. �,�� � Ma oa�..� �n5ns waoo� w �\fs-b a2 - 4F - f„mmt COBG A.v wms\aaa - pv..q,\eta Osvp� Po.�,ga\a2 P�P�o3W t Tm a haa. Snni 5-02a.P �t 3ona 6r ,wT' wtlFt+mx. e/]s/]ata s �E �e w. sa Owo - sm a.s�. vba.e eyxray vonmm�. ae/L5its aCPb iY Xafc arcvb slv�mlun rots Nw+1 ste}Strim xetca.a. fo,-IS Ot-gMnpol. \Ea.-t}ps-p.IXemt aq, ro.-130 Dugs\!> -If W auq+a.0. EiBRE03-\®p9],nP r4cE ,n sv+P PHASE 2 IMLKC Engineering, pllc e SANITARY SEWER SYSTEM ., KC Englneernng 140 Aqua Shed Court REHABILITATION STA 0+00 TO STA 9+34 Aberdeen, NC 28315 g g s - ¢ Landscape Architecture 0.910.420.1437FOR THE LINE S-2 �1 F910637.0096 TOWN OF FAIRMONT Planning Ikcengineering.com a ROBESON COUNTY, NORTH CAROLINA License Na. P-1095 .o.p��+6,•., Digitally signed by Mark Lacy, P.E. D e.2 6.08.26 y i 8:41- 0' 1 GRAVITY SEWER u ❑ % FENCE W0005 I CRAVIIY SEWER EVERT TUTH01OL'I ' +82 S-LE10481' REHAB MANHOLE A5 STA 5+2358 S-3 15' RIM ELEV 10621' `, APARTMENTS j Nro INVERT OUT 101 62' xl '�/^lJ 407.49' (12` CIPP) MANHOLE 14 pp� 21081' -2L CIPP 28858' 12- CIPP 8 458 25' 12' CIPP) STA 0+00 00 S-3 1 ° STA 0+0000 S-4 REHAB MANHOLE 84 _----'-- a� _____________ -RIM ELEV 105 64' STA 4+99 40 S-3 RIM ELEV.IN 10828' / LJ PoLE INVERT IN 10221' INVERT IN 101 53' 2418, '0005 Yl'ri REHAB MANHOLE f♦6 INVERT IN 10092' INVERT IN 101.47' 12' CIPP STA 9+8183 S-3 INVERT OUT 10084 INVERT OUT 10143' ( ) RIM ELEV 10782' INVERT IN 10401' ('INVERT OUT 10253' _^� 1 I Y Y Y Y l( 1' ', C WOODS FARMONT RECYCLING % 4 LINE S-3 (CIPP REHABILITATION) CIPP REHABILITATION NOTES: 1 BEFORE BEGINNING CIPP INSTALLATION. THE CONTRACTOR SHALL PRESSURE CLEAN ALL UNES TO BE RECONDITIONED ALL WASTEWATER, SLUDGE, AND SEDIMENT REMOVED DURING THE CLEANING PROCESS SHALL BE PROPERLY DISPOSED OF AT THE FAIRMONT WASTEWATER TREATMENT PLANT OR COUNTY LANDFILL ANY DISPOSAL COSTS SHALL BE CONSIDERED INCIDENTAL TO THE PROJECT AFTER CLEANING, THE CONTRACTOR SHALL VIDEO TAPE THE INTERIOR OF THE SEWER MAIN TO DETERMINE THE LOCATION OF ALL SEWER SERVICE CONNECTIONS AND LOCATION OF MANHOLES THAT HAVE BEEN BURIED OR PAVED OVER THE CONTRACTOR SHALL PROVIDE ALL BYPASS PUMPING REQUIRED TO PROPERLY VIDEO TAPE THE INTERIOR OF THE SEWER MANS THE VIDEO TAPE SHALL ALSO BE USED TO DETERMINE IF POINT RE IRS ARE REQUIRED PRIOR TO BEING RECONDITIONED AFTER ALL VIDEO TAPING HAS BEEN COMPLETED AND REVIEWED. THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER AND OWNER FOR THE LOCATION OF ALL NEW MANHOLES, MANHOLE REPLACEMENTS OR MODIFICATIONS, UNE REPLACEMENTS, AND POINT REPAIRS THE QUA TTY AND LOCATION OF CIPP INSTALLATION IS SUBJECT TO CHANGE FOLLOWING CCN INSPECTION FINDINGS 2 THE CONTRACTOR SHALL REPLACE EXISTING MANHOLES WHERE INDICATED AND WHERE DETERMINED BY THE ENGINEER. THE CONTRACTOR SHALL INSTALL EITHER A NEW MANHOLE OR DOGHOUSE MANHOLE AS DIRECTED. THE CONTRACTOR SHALL INSTALL 8 LF OF NEW SANITARY SEWER MANS TO MATCH EXISTING FOR RECONNECTION TO THE NEW MANHOLE. ALL COSTS ASSOCIATED WITH THE PIPE INSTALLATION SHALL BE INCLUDED IN THE UNIT PRICE BID ITEM FOR MANHOLE INSTALLATION ANY ASPHALT REPLACEMENT. IF NEEDED, SHALL BE PAD FOR SEPARATELY THE CONTRACTOR SHALL INSTALL NEW OUTSIDE DROPS FOR INVERT DROPS OF MORE THAN 25 VERTICAL FEET, OUTSIDE DROPS SHALL BE PAD FOR SEPARATELY 3. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY INTERNAL PRESSURE GROUTING OF THE SEWER MANS REQUIRED TO PROPERLY INSTALL THE CIPP INTERNAL PRESSURE GROUTING SHALL BE PAD UNDER A SEPARATE UNI PRICE BID ITEM AND SHALL INCLUDE ALL GROUT, MATERIALS, TOOLS AND OR REQUIRED PRESSURE GROUT LOCATIONS WILL BE DETERMINED FROM THE INITIAL VIDEO INSPECTION 4 THE CONTRACTOR SHALL BE REQUIRED TO COORDINATE WITH THE ENGINEER AND THE OWNER THE AMOUNT OF CIPP TO BE INSTALLED PRIOR TO ORDERING MATERIALS 5 THE CONTRACTOR SHALL BE REQUIRED TO RECONDITION ALL EXISTING MANHOLES AS INDICATED ON THE PLANS. THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER AND THE OWNER, PRIOR TO INSTALLATION, FOR THE EXACT MANHOLES TO BE RECONDITIONED, THE NUMBER MAY CHANGE DUE TO BUDGET CONSTRAINTS 6 THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER AND THE NCDOT FOR ALL NEW MANHOLES TO BE INSTALLED IN NCDOT ROADWAYS THE CONTRACTOR SHALL NOTIFY NCDOT 72 HOURS PRIOR TO ANY INSTALLATION 7. ANY BYPASS PUMPING OF WASTEWATER REQUIRED TO FACILITATE CONSTRUCTION SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. THIS INCLUDES ALL WORK ASSOCIATED WITH ANY PART OF THE PROJECT, INCLUDING UNE CONNECTIONS. UNE REPLACEMENTS, RECONDITIONING AND/OR COORDINATING AROUND EXISTING LINES DURING CONSTRUCTION 25 0 50 SCALE IN FEET Nor[ti $' Carolina THE CONTRACTOR SHALL LIMIT THE DISTURBED AREA TO THE AMOUNT THAT SHALL ALLOW FOR STABILIZATION OF THE DISTURBED AREA TO BE COMPLETED AT THE END OF EACH WORKING DAY PER NCAC REQUIREMENTS FOR LINEAR CONSTRUCTION NOTES: 1. THE CONTRACTOR SHALL CONTACT THE POWER CO., GAS CO, AN TELEPHONE CO. FOR THE EXACT LOCATION OF ALL UNDERGROUND MAINS, CABLES. OR LINES BEFORE CONSTRUCTION BEGINS. 2 PIPE SEPARATION. THE FOLLOWING MINIMUM PIPE SEPARATION WILL BE MAINTAINED 24 INCHES VERTICAL SEPARATION BETWEEN CROSSING OF SANITARY SEWER AND STORM SEWERS 24 INCHES VERTICAL SEPARATION BETWEEN CROSSING OF SEWER (INCLUDING FORCE MAINS) AND WATER MANS, AND 10 FEET HORIZONTAL SEPARATION BETWEEN SANITARY SEWER (INCLUDING FORCE MAINS) AND WATER MANS. IF THESE SEPARATIONS CANNOT BE MANTANED. DUCTILE IRON PIPE WILL BE USED 10 FEET EITHER SIDE OF CROSSING AND ALONG ENTIRE LENGTH OF LINE LESS THAN 10 HORIZONTAL FELT FROM WATER MANS THE CONTRACTOR SHAT RECEIVE APPROVAL FROM THE ENGINEER IN THE FIELD BEFORE PAYMENT WILL BE MADE AT DUCTILE IRON PRICES 3. THE RIGHT-OF-WAY OR SHOWN UTILITY EASEMENT SHALL DICTATE THE LIMITS OF CONSTRUCTION. 4. THE CONTRACTOR SHAT BE RESPONSIBLE FOR THE COORDINATION OF THE ADJUSTMENT OF EXISTING UTILITIES, INCLUDING POWER POLES THE CONTRACTOR SHALL REMOVE AND REPLACE ANY EXISTING 5 HEADWALLS, AS REQUIRED FOR THE CONSTRUCTION OF THE PROJECT ANY BYPASS PUMPING OF WASTEWATER REQUIRED TO FACILITATE CONSTRUCTION SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. THIS INCLUDES ALL WORK ASSOCIATED WITH ANY PART OF THE PROJECT, INCLUDING UNE CONNECTIONS, UNE REPLACEMENTS. AND/OR COORDINATING AROUND EXISTING UNES DURING CONSTRUCTION � MH / MEADOW WDODS APARNAENTS CR40N SEWER WODDS , - - 11 ' 407,49' 1Y dPP REHAB MANHOLE #6 PotE Y�1 STA 9+81 83 5-3 1.1 Ll �'v ' RIM ELEV 10782' QLl INVERT IN 104.01' PoLE INVERT WOODS CIPP REHABILITATION NO 1. BEFORE BEGINNING CIPP INSTALLATION, THE CONTRACTOR SHALL PRESSURE CLEAN ALL LINES TO BE RECONDTTONED ALL WASTEWATER, SLUDGE, AND SEDIMENT REMOVED DURING THE CLEANING PROCESS SHALL BE PROPERLY DISPOSED OF AT THE FAIRMONT WASTEWATER TREATMENT PLANT OR COUNTY LANDFILL ANY DISPOSAL COSTS SHALL BE CONSIDERED INCIDENTAL TO THE PROJECT AFTER CLEANING, THE CONTRACTOR SHALL VIDEO TAPE THE INTERIOR OF THE SEWER MAIN TO DETERMINE THE LOCATION OF ALL SEWER SERVICE CONNECTIONS AND LOCATION OF MANHOLES THAT HAVE BEEN BURIED OR PAVED OVER. THE CONTRACTOR SHALL PROVIDE ALL BYPASS PUMPING REQUIRED TO PROPERLY VIDEO TAPE THE INTERIOR OF THE SEWER MANS THE VIDEO TAPE SHALL ALSO BE USED TO DETERMINE IF POINT REPAIRS ARE REQUIRED PRIOR TO BEING RECONDITIONED AFTER ALL VIDEO TAPING HAS BEEN COMPLETED AND REVIEWED, THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER AND OWNER FOR THE LOCATION OF ALL NEW MANHOLES, MANHOLE REPLACEMENTS OR MODIFICATIONS, LINE REPLACEMENTS, AND POINT REPAIRS. THE QUANTITY AND LOCATION OF CIPP INSTALLATION IS SUBJECT TO CHANGE FOLLOWING CCN INSPECTION FINDINGS 2 THE CONTRACTOR SHALL REPLACE EXISTING MANHOLES WHERE INDICATED AND WHERE DETERMINED BY THE ENGINEER THE CONTRACTOR SHALL INSTAL EITHER A NEW MANHOLE OR DOGHOUSE MANHOLE AS DIRECTED. THE CONTRACTOR SHALL INSTAL 8 LF OF NEW SANITARY SEWER MANS TO MATCH EXISTING FOR RECONNECTION TO THE NEW MANHOLE ALL COSTS ASSOCIATED WITH THE PIPE INSTALLATION SHALL BE INCLUDED IN THE UNIT PRICE BIO ITEM FOR MANHOLE INSTALLATION ANY ASPHALT REPLACEMENT, IF NEEDED, SHALL BE PAD FOR SEPARATELY THE CONTRACTOR SHALL INSTAL NEW OUTSIDE DROPS FOR INVERT DROPS OF MORE THAN 25 VERTICAL FEET. OUTSIDE DROPS SHALL BE PAD FOR SEPARATELY 3 THE CONTRACTOR SHALL PROVIDE ALL NECESSARY INTERNA. PRESSURE GROUTNG OF THE SEWER MANS REQUIRED TO PROPERLY INSTALL THE CIPP. INTERNAL PRESSURE GROUTING SHALL BE PAID UNDER A SEPARATE UNIT PRICE BID ITEM AND SHALL INCLUDE ALL GROUT, MATERIALS, TOOLS AND OR REQUIRED PRESSURE GROUT LOCATIONS WILL BE DETERMINED FROM THE INITIAL VIDEO INSPECTION 4 THE CONTRACTOR SHALL BE REQUIRED TO COORDINATE WITH THE ENGINEER AN THE OWNER THE AMOUNT OF CIPP TO BE INSTATED PRIOR TO ORDERING MATERIALS ysigned by Mark Lacy,P.E Date: 2016.08.26 0ew ' REHAB MANHOLE #9 STA 21 ' 5-3 CIPP) ^ _ RIM ET O 11214' INVERT Ui 104 49' - REHAB MANHOLE STA 16+78.19 S-3 J RIM ELEV. 110 53' J INVERT IN 10367' INVERT OUT 10357' \\J POND` ✓ I -REHAB MANHOLE �] STA 13+89 32 S-3 RIM ELEV. 11045' INVERT OUT 103 12' r LINE S-3 0) (CIPP REHABILITATION) NOTES. S. THE CONTRACTOR SHALL BE REQUIRED TO RECONDITION ALL EXISTING I THE CONTRACTOR SHALL CONTACT THE POWER CO.. GAS CO, Q MANHOLES AS INDICATED ON THE PLANS THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER AND THE OWNER. PRIOR TO AND TELEPHONE CO FOR THE EXACT LOCATION OF ALL UNDERGROUND MAINS, CABLES. OR LINES BEFORE fYT F' 1 Ln INSTALLATION, FOR THE MGT MANHOLES TO BE RECONDITIONED. THE CONSTRUCTION BEGINS O NUMBER MAY CHANGE DUE TO BUDGET CONSTRAINTS 2 PIPE SEPARATION: THE FOLLOWING MINIMUM PIPE SEPARATION W F" Z 6 THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER AND THE NCDOT WILL BE MAINTAINED 24 INCHES VERTICAL SEPARATION J FOR ALL NEW MANHOLES TO BE INSTALLED IN NCDOT ROADWAYS THE BETYEEN CROSSING OF SANITARY SEWER AND STORM SEWERS W CONTRACTOR SHALL NOTIFY NCDOT 72 HOURS PRIOR TO ANY 24 INCHES VERTICAL SEPARATION BETWEEN CROSSING OF + INSTALLATION. SEWER (INCLUDING FORCE MAINS) AND WATER MAINS. AND 10 HORIZONTAL SEPARATION BETWEEN HEWER OT 7 ANY BYPASS PUMPING OF WASTEWATER REQUIRED TO FACILITATE 25 0 50 (INCFEE (INCLUDING FORCE MANS) AND WATER MAINS. IF THERE NNS.SANITIF CONSTRUCTION SHALL BE THECIA RESPONSIBILITY OF THE CONTRACTOR. THIS INCLUDES ALL WORK ASSOCIATED WITH ANY PART THE PROJECT, ® SEPARATIONS CANNOT BE MAINTAINED. DUCTILE IRON PIPE INCUNE CONNECTIONS LINER . ENIH, RING SCALE IN FEET WILL BE TIRE 10 FEET ETHER SIDE T CROSSING AND ALONG ENTIRE LENGTH OF LINE LESS THAN 10 HL _ In TING LI CONSTRUCTION. ANO/OR COORDINATING AROUND EXISTING LINER DURING CONSTRUCTION. RECTAL FET FROM WATER MANS THE CONTRACTOR SHALL RECEIVE Q Z APPROVAL FROM THE ENGINEERIN 7HE FIELDBEFORE PAYMENT WILL BE MADE AT DUCTILE IRON PRICES W 3 THE RIGHT-OF-WAY OR SHOWN UTILITY EASEMENT SHALL DICTATE THE LIMITS OF CONSTRUCTION h H O s 1 L 4 THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE Z Z I}iR O 0. 1 COORDINATION OF THE ADJUSTMENT OF EXISTING UTILITIES, C 1- INCLUDING POWER POLES THE CONTRACTOR SHAT REMOVE N w W Q O AND REPLACE ANY EXISTING 5 HEADWALLS. AS REQUIRED FOR THE CONSTRUCTION OF THE _ '^ m O (j Z PROJECT. ANY BYPASS PUMPING OF WASTEWATER REQUIRED TO FACILITATE CONSTRUCTION SHALL BE THE RESPONSIBILITY OF 6 } Q w d' = Z =O Q w 3 NOh. THE CONTRACTOR THIS INCLUDES ALL WORK ASSOCIATED WITH ANY PART OF THE PROJECT, INCLUDING LINE CONNECTIONS, U H Z THE CONTRACTOR SHALL LIMIT THE DISTURBED AREA TO THE AMOUNT THAT SHALL ALLOW LINE REPLACEMENTS, AND/OR COORDINATING AROUND Z O FOR STABIUZATION OF THE DISTURBED AREA EXISTING LINES DURING CONSTRUCTION. uh TO BE COMPLETED AT THE END OF EACH p WORKING DAY PER NCAC REQUIREMENTS FOR UNEAR CONSTRUCTION C LEWIS-BRADY BUILDERS SUPPLY FENCE REHAB MANHOLE 810 `Al STA 24+82 58 S-3 RIM ELEV. 10901' INVERT OUT 10508' REHAB MANHOLE #9STA(('� - - RIM REV. 13 S-3 2830��'2- 10.52'' REHAB MANHOLE 11 RIM ELEV. 533 INVERT OUT 104 4E _ - (12- CIPP) STA 24+93.10 5-3 _ - RIM ELEV. 108.84' INVERT OUT 10494' SDS'-- 50y,1i,, ' O LINE S-3 (CIPP REHABILITATION) C 1 BEFORE BEGINNING CIPP INSTALLATION. THE CONTRACTOR SHALL PRESSURE CLEAN ALL UNES TO BE RECONDITIONED ALL WASTEWATER, SLUDGE, AND SEDIMENT REMOVED DURING THE CLEANING PROCESS SHALL BE PROPERLY DISPOSED OF AT THE FAIRMONT WASTEWATER TREATMENT PLANT OR COUNTY LANDFILL ANY DISPOSAL COSTS SHALL BE CONSIDERED INCIDENTAL TO THE PROJECT. AFTER CLEANING, THE CONTRACTOR SHALL VIDEO TAPE THE INTERIOR OF THE SEWER MAIN TO DETERMINE THE LOCATION OF ALL SEWER SERVICE ECTILE CONNONS AND LOCATION OF MANHOS THAT HAVE BEEN BURIED OR PAVED OVER THE CONTRACTOR SHALL PROVIDE ALL BYPASS PUMPING REQUIRED TO PROPERLY VIDEO TAPE THE INTERIOR OF THE SEWER MAINS THE VIDEO TAPE SHALL ALSO BE USED TO DETERMINE IF POINT REPAIRS ARE REQUIRED PRIOR TO BEING RECONDITIONED AFTER ALL VIDEO TAPING HAS BEEN COMPLETED AND REVIEWED, THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER AND OWNER FOR THE LOCATION OF ALL NEW MANHOLES, MANHOLE REPLACEMENTS OR MODIFICATIONS, UNE REPLACEMENTS, AND POINT REPAIRS THE QUANTITY AND LOCATION OF CIPP INSTALLATION IS SUBJECT TO CHANGE FOLLOWING CCN INSPECTION FINDINGS 2. THE CONTRACTOR SHALL REPLACE EXISTING MANHOLES WHERE INDICATED AND WHERE DETERMINED BY THE ENGINEER THE CONTRACTOR SHALL INSTALL EITHER A NEW MANHOLE OR DOGHOUSE MANHOLE AS DIRECTED THE CONTRACTOR SHALL INSTALL 8 LF OF NEW SANITARY SEWER MAINS TO MATCH EXISTING FOR RECONNECTION TO THE NEW MANHOLE. ALL COSTS ASSOCIATED WITH THE PIPE INSTALLATION SHALL BE INCLUDED IN THE UNIT PRICE BID ITEM FOR MANHOLE INSTALLATION ANY ASPHALT REPLACEMENT, IF NEEDED, SHALL BE PA FOR SEPARATELY THE CONTRACTOR SHALL INSTALL NEW OUTSIDE DROPS FOR INVERT DROPS OF MORE THAN 2 5 VERTICAL FEET, OUTSIDE DROPS SHALL BE PAID FOR SEPARATELY 3 THE CONTRACTOR SHALL PROVIDE ALL NECESSARY INTERNAL PRESSURE GROUTING OF THE SEWER MAINS REQUIRED TO PROPERLY INSTALL THE CIPP. INTERNAL PRESSURE GROUTING SHALL BE PAID UNDER A SEPARATE UNIT PRICE BID REM AND SHALL INCLUDE ALL GROUT, MATERIALS. TOOLS AND LABOR REQUIRED PRESSURE GROUT LOCATIONS WILL BE DETERMINED FROM THE INITIAL VIDEO INSPECTION 4. THE CONTRACTOR SHALL BE REQUIRED TO COORDINATE WITH THE ENGINEER AND THE OWNER THE AMOUNT OF CIPP TO BE INSTALLED PRIOR TO ORDERING MATERIALS 5 THE CONTRACTOR SHALL BE REQUIRED TO RECONDITION ALL EXISTING MANHOLES AS INDICATED ON THE PUNS THE CONTRACTOR SHALL COORDINATE WITH TRE ENGINEER AND THE OWNER, PRIOR TO INSTALLATION. FOR THE EXACT MANHOLES TO BE RECONDITIONED, THE NUMBER MAY CHANGE DUE TO BUDGET CONSTRAINTS 6 THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER AND THE NCDOT FOR ALL NEW MANHOLES TO BE INSTALLED IN NCDOT ROADWAYS THE CONTRACTOR SHALL NOTIFY NCDOT 72 HOURS PRIOR TO ANY INSTALLATION 7 ANY BYPASS PUMPING OF WASTEWATER REQUIRED TO FACILITATE CONSTRUCTION SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. THIS INCLUDES ALL WORK ASSOCIATED WTH ANY PART OF THE PROJECT, INCLUDING UNE CONNECTIONS, UNE REPLACEMENTS, RECONDITIONING AND/OR COORDINATING AROUND EXISTING UNES DURING CONSTRUCTION REHAB MANHOLE #13 P` STA 29+5975 S-3 RIM ELEV 112 68' INVERT OUT 10571' ` GRAVITY SEWER a~ AINGT r/ NCE V it u ^v REHAB MANHOLE #12 STA 27+4317 S-3 RIM ELEV 110.46' INVERT IN 10553' INVERT OUT 10547' LB 25 0 50 SCALE IN FEET North $' Carolina U4TE- THE CONTRACTOR SHALL LIMIT THE DISTURBED AREA TO THE AMOUNT THAT SHALL ALLOW FOR STABILIZATION OF THE DISTURBED AREA TO BE COMPLETED AT THE END OF EACH WORKING DAY PER NCAC REQUIREMENTS FOR LINEAR CONSTRUCTION. DfscMrma oan signed .yy� ' = U Mark Lac by Y Y, P.E. '��4i44#A�loZ Date: 2016.08.26 09:29:46 -04'00' E m e O U m� ' S m� mv—Hi � yp9OLLy= Z z z w C Z O Q C C ro � V w i c� z _ z I NOTES: 1 THE CONTRACTOR SHALL CONTACT THE POWER CO. GAS CO, AND TELEPHONE CO FOR THE EXACT LOCATION OF ALL UNDERGROUND MAINS, CABLES. OR ONES BEFORE CONSTRUCTION BEGINS 2 PIPE SEPARATION: THE FOLLOWING MINIMUM PIPE SEPARATION WILL BE MAINTAINED 24 INCHES VERTICAL SEPARATION BETWEEN CROSSING OF SANITARY SEWER AND STORM SEWERS 24 INCHES VERTICAL SEPARATION BETWEEN CROSSING OF SEWER (INCLUDING FORCE MAINS) AND WATER MAINS, AND 10 FEET HORIZONTAL SEPARATION BETWEEN SANITARY SEWER (INCLUDING FORCE MAINS) AND WATER MAINS IF THESE SEPARATIONS CANNOT BE MAINTAINED, DUCTILE IRON PIPE WILL BE USED 10 FEET EITHER SIDE OF CROSSING AND ALONG ENTIRE LENGTH OF UNE LESS THAN 10 HORIZONTAL FELT FROM WATER MAINS THE CONTRACTOR SHALL RECEIVE APPROVAL FROM THE ENGINEER IN THE REM BEFORE PAYMENT WILL BE MAGE AT DUCTILE IRON PRICES. 3 THE RIGHT-OF-WAY OR SHOWN UTILITY EASEMENT SHALL DICTATE THE LIMITS OF CONSTRUCTION 4 THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF THE ADJUSTMENT OF EXISTING UTILITIES, INCLUDING POWER POLES THE CONTRACTOR SHALL REMOVE AND REPLACE ANY EXISTING 5 HEADWALLS, AS REQUIRED FOR THE CONSTRUCTION OF THE PROJECT. ANY BYPASS PUMPING OF WASTEWATER REQUIRED TO FACILITATE CONSTRUCTION SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR THIS INCLUDES ALL WORK ASSOCIATED WITH ANY PART OF THE PROJECT, INCLUDING UNE CONNECTIONS, LINE REPLACEMENTS, AND/OR COORDINATING AROUND EXISTING UNES DURING CONSTRUCTION. M v n N a L M Ln I o tf) F- W 0) 01 + �\r..-u m - ac - re.,,,o�n mac s..r x.be\eoo - a,...q.\mo n.,.v. oa.�,q.\ov caY�waoi vw, s arta. sn.w s -w e.v � so..a ey umr v.rmaax. a/vVp�e � sup w, w owo - sm ia.ao. vena eJ wdy vmi.,e..�, ce/xs/�a wmsa ru vvv. w..e smw.mua ,w«\oo.,a s.es:oum xmw.v. rw,-um-smaeoa-\r..-um-v'+am.oa a.v. r..-asm aa,q.-\ro.-uam o..ro^nw. ��aw-\csvma av wca ue n,ov� y � n ' PHASE 2 IM KC LKC Engineering, pllc140 Aqua Shed Court SANITARY SEWER SYSTEM EngineeringSTA 0+00 TO STA 7+72 Aberdeen, NC 1437REHABILITATION a LandscapeArch/tecture 0.9104201437FOR THE LINE 5-4 F 910 637 0096 TOWN OF FAIRMONT V/arming Ikcengineering.com ROBESON COUNTY, NORTH CAROLINA License No. P-1095 - L\k:— - cxc - Fourr 1 Q—s.... x.nm\� - u...m\ato ompr wa.� \oz rr.J�osoot 1'w., s vrotu. sn.n 5-9 lu. Sw.a A / e�>t • a/n/xols xn w Pr sa o.00 - sm c.a4 rau.a er. �rM e�.rean. WWII — w Im[scrou.a xote sbe&xow. . \GvuC S.ceazmm nn. o. r-Ism-gommot-\Far-ts o�-9ao1c.0: aF• Fw-15 P! 0.yn-\Fo.-ts W ceTa9. C4vm:M�\CSSVM.Of.a4 ....- Ia uegn ° $ £ PHASE 2 LKC E.. I.. nn9, Pllc g SANITARY SEWER SYSTEM Engineering 14o Aqua shed coup .te sp `4 STA 0+00 TO STA 4+23LKC Aberdeen, NC 28315 �� R D B N REHABILITATION Landscape Architecture 0.910.420.1437 mea6eFOR THE LINE S-5 F: 9106370096 TOWN OF FAIRMONT Planning Ikcengineering.com v�'on+c�'d RO9ESON COUNTY, NORTH CAROONA Ocense No. P-1095 '1RK O' n ;.. .,. , ......I ..-.:. I =PPS .. • ......:.....:. AN HOLE >B a O: o ` INV OUT 118;12' E INV IN 11019' 1-5 I STA. S+ Ol $-6 RdA E1EV 127,ITGT O - & O .: INV IN 1[6 29 5-6 :1 m � f } ............................. o!. ;- .. '� .t. 4 .. . e 1 / a 1 O:• .. .; . sn 1 1 ID I � I Q 1 .............. I El 1 �5 m ; ! �' :...: � ;, ....: d... ... .. 360 E STR•3:"+4360 .. BEGIN UIP. .. .... ..: o f 1 O:.. }• ••...... • .... ..... ..:........:........ ..... :INV OU7130.{1' i ..:..... , .. p....... STA, 44+2560 S-5 . • .. •INV P! 12II51' ENO AIP.�� •' XII 123.39 i .. ...... I ;.. ..� !; ... m 1 MARKS! STREET m: o' ..:: '• ': :... e U v, :;. sh�� }'. .. ................. ...... ....... .... .....,. ............. ...... ........ ..... 0 ......................: ....'...................!...................=..'...:.... .. .... .. ;. ;. O••.::. } I.. .......: �:.i :..: ..... .. ... ..... • �. O :. e , qgmp F : .. ....::.: .. N ..: Pip- 0 3i uj La ! 41 W N 4 w" aN n cn i o N :0 o FINAL DRAWING — FOR REVIEW ONLY — NOT FOR CONSTRUCTION ° $ £ PHASE 2 LKC E.. I.. nn9, Pllc g SANITARY SEWER SYSTEM Engineering 14o Aqua shed coup .te sp `4 STA 0+00 TO STA 4+23LKC Aberdeen, NC 28315 �� R D B N REHABILITATION Landscape Architecture 0.910.420.1437 mea6eFOR THE LINE S-5 F: 9106370096 TOWN OF FAIRMONT Planning Ikcengineering.com v�'on+c�'d RO9ESON COUNTY, NORTH CAROONA Ocense No. P-1095 '1RK O' �D A 1. BEFORE BEGINNING CIPP INSTALLATION, THE CONTRACTOR SHALL PRESSURE CLEAN ALL LINES TO BE RECONDITIONED. ALL WASTEWATER, SLUDGE. AND SEDIMENT REMOVED DURING THE CLEANING PROCESS SHALL BE PROPERLY DISPOSED OF AT THE FAIRMONT WASTEWATER TREATMENT PLANT OR COUNTY UIJJDFILL ANY DISPOSAL COSTS SHALL BE CONSIDERED INCIDENTAL TO THE PROJECT. AFTER CLEANING, THE CONTRACTOR SHALL VIDEO TAPE THE INTERIOR OF THE SEWER MAN TO DETERMINE THE LOCATION OF AIL SEWER SERVICE CONNECTIONS AND LOCATION OF MANHOLES THAT HAVE BEEN BURIED OR PAVED OVER THE CONTRACTOR SHALL PROVIDE ALL BYPASS PUMPING REQUIRED TO PROPERLY VIDEO TAPE THE INTERIOR OF THE SEWER MAINS THE VIDEO TAPE SHALL ALSO BE USED TO DETERMINE IF POINT REPAIRS ARE REQUIRED PRIOR TO BEING RECONDITIONED AFTER ALL VIDEO TAPING HAS BEEN COMPLETED AND REVIEWED, THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER AND OWNER FOR THE LOCATION OF ALL NEW MANHOLES, MANHOLE REPLACEMENTS OR MODIFICATIONS, UNE REPLACEMENTS, AND POINT REPAIRS THE QUANTITY AND LOCATION OF CIPP INSTALLATION IS SUBJECT TO CHANCE FOLLOWING CCN INSPECTION FINDINGS 2 THE CONTRACTOR SHALL REPLACE EXISTING MANHOLES WHERE INDICATED AND WHERE DETERMINED BY THE ENGINEER THE CONTRACTOR SHALL INSTALL EITHER A NEW MANHOLE OR DOGHOUSE MANHOLE AS DIRECTED THE CONTRACTOR SHALL INSTALL 8 LF OF NEW SANITARY SEWER MAINS TO MATCH EXISTING FOR RECONNECTION TO THE NEW MANHOLE ALL COSTS ASSOCIATED WITH THE PIPE INSTALLATION SHALL BE INCLUDED IN THE UNIT PRICE BID ITEM FOR MANHOLE INSTALLATION ANY ASPHALT REPLACEMENT. IF NEEDED, SHALL BE PAID FOR SEPARATELY THE CONTRACTOR SHALL INSTALL NEW OUTSIDE DROPS FOR INVERT DROPS OF MORE THAN 25 VERTICAL FEET, OUTSIDE DROPS SHALL BE PAID FOR SEPARATELY. 3. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY INTERNAL PRESSURE GROUTING OF THE SEWER MAINS REQUIRED TO PROPERLY INSTALL THE CIPP. INTERNAL PRESSURE GROUTING SHALL BE PAID UNDER A SEPARATE UNIT PRICE BID ITEM AND SHALL INCLUDE ALL GROUT, MATERIALS. TOOLS AND LABOR REQUIRED PRESSURE GROUT LOCATIONS WILL BE DETERMINED FROM THE INITIAL VIDEO INSPECTION 4 THE CONTRACTOR SHALL BE REQUIRED TO COORDINATE WITH THE ENGINEER AND THE OWNER THE AMOUNT OF CIPP TO BE INSTALLED PRIOR TO ORDERING MATERIALS 0 MANHOLE #18 STA. 3+03 01 S-6 STA 0+00 00 S-5 RIM ELEV. 127 15' INVERT OUT 11812' INVERT IN 118.19• INVERT IN 11829' 1 IPP J.. _.. 117 N 17 STREET l A_ PP I -mPROPOUNE S V LINE S-6 (CIPP REHABILITATION) 5 THE CONTRACTOR SHALL BE REQUIRED TO RECONDITION ALL EXISTING MANHOLES AS INDICATED ON THE PLANS THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER AND THE OWNER, PRIOR TO INSTALLATION, FOR THE EXACT MANHOLES TO BE RECONDITIONED, THE NUMBER MAY CHANGE DUE TO BUDGET CONSTRAINTS 6 THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER AND THE NCDOT FOR ALL NEW MANHOLES TO BE INSTALLED IN NCDOT ROADWAYS, THE CONTRACTOR SHALL NOTIFY NCDOT 72 HOURS PRIOR TO ANY INSTALLATION. 7. ANY BYPASS PUMPING OF WASTEWATER REQUIRED TO FACILITATE CONSTRUCTION SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR THIS INCLUDES ALL WORK ASSOCIATED WITH ANY PART OF THE PROJECT, INCLUDING UNE CONNECTIONS, UNE REPLACEMENTS, RECONDITIONING AND/OR COORDINATING AROUND EXISTING ONES DURING CONSTRUCTION N �15 d LD L) P.E. .26 z0' O REHAB MANHOLE 114D H00 NOTES: STA O+5-6 RIM ELEV. 127.29' O INVERT 11759' M. � 1. BEFORE BEGINNING CIPP INSTALLATION, THE CONTRACTOR SHALL PRESSURE CLEAN ALL LINES TO BE RECONDITIONED. ALL WASTEWATER, SLUDGE. AND SEDIMENT REMOVED DURING THE CLEANING PROCESS SHALL BE PROPERLY DISPOSED OF AT THE FAIRMONT WASTEWATER TREATMENT PLANT OR COUNTY UIJJDFILL ANY DISPOSAL COSTS SHALL BE CONSIDERED INCIDENTAL TO THE PROJECT. AFTER CLEANING, THE CONTRACTOR SHALL VIDEO TAPE THE INTERIOR OF THE SEWER MAN TO DETERMINE THE LOCATION OF AIL SEWER SERVICE CONNECTIONS AND LOCATION OF MANHOLES THAT HAVE BEEN BURIED OR PAVED OVER THE CONTRACTOR SHALL PROVIDE ALL BYPASS PUMPING REQUIRED TO PROPERLY VIDEO TAPE THE INTERIOR OF THE SEWER MAINS THE VIDEO TAPE SHALL ALSO BE USED TO DETERMINE IF POINT REPAIRS ARE REQUIRED PRIOR TO BEING RECONDITIONED AFTER ALL VIDEO TAPING HAS BEEN COMPLETED AND REVIEWED, THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER AND OWNER FOR THE LOCATION OF ALL NEW MANHOLES, MANHOLE REPLACEMENTS OR MODIFICATIONS, UNE REPLACEMENTS, AND POINT REPAIRS THE QUANTITY AND LOCATION OF CIPP INSTALLATION IS SUBJECT TO CHANCE FOLLOWING CCN INSPECTION FINDINGS 2 THE CONTRACTOR SHALL REPLACE EXISTING MANHOLES WHERE INDICATED AND WHERE DETERMINED BY THE ENGINEER THE CONTRACTOR SHALL INSTALL EITHER A NEW MANHOLE OR DOGHOUSE MANHOLE AS DIRECTED THE CONTRACTOR SHALL INSTALL 8 LF OF NEW SANITARY SEWER MAINS TO MATCH EXISTING FOR RECONNECTION TO THE NEW MANHOLE ALL COSTS ASSOCIATED WITH THE PIPE INSTALLATION SHALL BE INCLUDED IN THE UNIT PRICE BID ITEM FOR MANHOLE INSTALLATION ANY ASPHALT REPLACEMENT. IF NEEDED, SHALL BE PAID FOR SEPARATELY THE CONTRACTOR SHALL INSTALL NEW OUTSIDE DROPS FOR INVERT DROPS OF MORE THAN 25 VERTICAL FEET, OUTSIDE DROPS SHALL BE PAID FOR SEPARATELY. 3. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY INTERNAL PRESSURE GROUTING OF THE SEWER MAINS REQUIRED TO PROPERLY INSTALL THE CIPP. INTERNAL PRESSURE GROUTING SHALL BE PAID UNDER A SEPARATE UNIT PRICE BID ITEM AND SHALL INCLUDE ALL GROUT, MATERIALS. TOOLS AND LABOR REQUIRED PRESSURE GROUT LOCATIONS WILL BE DETERMINED FROM THE INITIAL VIDEO INSPECTION 4 THE CONTRACTOR SHALL BE REQUIRED TO COORDINATE WITH THE ENGINEER AND THE OWNER THE AMOUNT OF CIPP TO BE INSTALLED PRIOR TO ORDERING MATERIALS 0 MANHOLE #18 STA. 3+03 01 S-6 STA 0+00 00 S-5 RIM ELEV. 127 15' INVERT OUT 11812' INVERT IN 118.19• INVERT IN 11829' 1 IPP J.. _.. 117 N 17 STREET l A_ PP I -mPROPOUNE S V LINE S-6 (CIPP REHABILITATION) 5 THE CONTRACTOR SHALL BE REQUIRED TO RECONDITION ALL EXISTING MANHOLES AS INDICATED ON THE PLANS THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER AND THE OWNER, PRIOR TO INSTALLATION, FOR THE EXACT MANHOLES TO BE RECONDITIONED, THE NUMBER MAY CHANGE DUE TO BUDGET CONSTRAINTS 6 THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER AND THE NCDOT FOR ALL NEW MANHOLES TO BE INSTALLED IN NCDOT ROADWAYS, THE CONTRACTOR SHALL NOTIFY NCDOT 72 HOURS PRIOR TO ANY INSTALLATION. 7. ANY BYPASS PUMPING OF WASTEWATER REQUIRED TO FACILITATE CONSTRUCTION SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR THIS INCLUDES ALL WORK ASSOCIATED WITH ANY PART OF THE PROJECT, INCLUDING UNE CONNECTIONS, UNE REPLACEMENTS, RECONDITIONING AND/OR COORDINATING AROUND EXISTING ONES DURING CONSTRUCTION N WORKING DAY PER NCAC REQUIREMENTS FOR LINEAR CONSTRUCTION- �15 d LD L) P.E. .26 z0' O ;oma om rysSm NOTES: o¢ao°- O xp' < Z I � O V y y Q C O C W N C � 01 2j� W CO WILL BE MAINTAINED 24 INCHES VERTICAL SEPARATION BETWEEN CROSSING OF SANITARY SEWER AND STORM SEWERS I 24 INCHES VERTICAL SEPARATION BETWEEN CROSSING OF + a z - WORKING DAY PER NCAC REQUIREMENTS FOR LINEAR CONSTRUCTION- N NOTES: Q I THE CONTRACTOR SHALL CONTACT THE POWER CO., GAS CO, AND TELEPHONE CO FOR THE EXACT LOCATION OF ALL Ln I UNDERGROUND MAINS, CABLES, OR LINES BEFORE CONSTRUCTION BEGINS. O 2. PIPE SEPARATION THE FOLLOWING MINIMUM PIPE SEPARATION LN F -Z WILL BE MAINTAINED 24 INCHES VERTICAL SEPARATION BETWEEN CROSSING OF SANITARY SEWER AND STORM SEWERS O O J 24 INCHES VERTICAL SEPARATION BETWEEN CROSSING OF + SEWER (INCLUDING FORCE MAINS) AND WATER MAINS, AND 10 0 25 0 50 FEET HORIZONTAL SEPARATION BETWEEN SANITARY SEWER FORCE MAINS) AND NS ITHESE ® TILERONPIPE SEPARATIONS CANNOTT BEMAINTAIN DR DUCTILE )--• SCALE IN FEET WILL BE USED 10 FEET EITHER SIDE OF CROSSING AND N ALONG ENTIRE LENGTH OF UNE LESS THAN 10 HORIZONTAL FEET FROM WATER MAINS THE CONTRACTOR SHALL RECEIVE Z APPROVAL FROM THE ENGINEER IN THE FIELD BEFORE PAYMENT WILL BE MADE AT DUCTILE IRON PRICES. 3. THE RIGHTWAY SHOWN UTILITY EASEMENT SHALL. DICTATE THE OMITS TS OOF CONSTRUCTION Z 2 V 1 I 4 THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE V}1 O 0, 1 COORDINATION OF THE ADJUSTMENT OF EXISTING UTILITIES, INCLUDING POWER POLES THE CONTRACTOR SHALL REMOVE lal Q p AND REPLACE ANY EXISTING Q W J LL Z 5 HEADWALLS, AS REQUIRED FOR THE CONSTRUCTION OF THE PUMPING OF WASTEWATER REQUIRED TO _ DO O O Z d LL PROJECT. ANY BYPASS FACIUTATE CONSTRUCTION SHALL BE THE RESPONSIBILITY OF Q 0-' = Z p THE CONTRACTOR THIS INCLUDES ALL WORK ASSOCIATED WITH CONNECTIONS, Q W 3 U F' THE CONTRACTOR SHALL LIMIT THE DISTURBED ANY PART OF THE PROJECT, INCLUDING LINE REPLACEMENTS, COORDINATING AROUND 0 Z Z O AREA TO THE AMOUNT THAT SHALL ALLOW FOR STABIUZATION OF THE DISTURBED AREA UNE AND/OR EXISTING ONES DURING CONSTRUCTION. N TO BE COMPLETED AT THE ENO OF EACH O WORKING DAY PER NCAC REQUIREMENTS FOR LINEAR CONSTRUCTION- REHAB MANHOLE 716 TRNTN STA 0}0000 S-7 TABERN4LLE RIM ELEV. 125.67' FAMILY-CONMONITr INVERT OUT 116 72' -EXISTING INVERT IN 11672' REHAB MANHOLE X17 I -WATER MAIN INVERT IN 117.78' STA 1+454] S-7 RIM ELEV. 126.72' WV 1 __ 14548' a CL=- • 3]826'18�CIPP THOMPSON STREET__ 1 WM PP PP s UBPARY BB&T EXISTING q GRAVITY SEWER I CIPP REHA 1 BEFORE BEGINNING CIPP INSTALLATION, THE CONTRACTOR SHALL PRESSURE CLEAN ALL LINES TO BE RECONDITIONED ALL WASTEWATER, SLUDGE, AND SEDIMENT REMOVED DURING THE CLEANING PROCESS SHALL BE PROPERLY DISPOSED OF AT THE FAIRMONT WASTEWATER TREATMENT PLANT OR COUNTY LANDFILL ANY DISPOSAL COSTS SHALL BE CONSIDERED INCIDENTAL TO THE PROJECT. AFTER CLEANING, THE CONTRACTOR SHALL VIDEO TAPE THE INTERIOR OF THE SEWER MAIN TO DETERMINE THE LOCATION OF ALL SEWER SERVICE CONNECTIONS AND LOCATION OF MANHOLES THAT HAVE BEEN BURIED OR PAVED OVER THE CONTRACTOR SHALL PROVIDE ALL BYPASS PUMPING REQUIRED TO PROPERLY VIDEO TAPE THE INTERIOR OF THE SEWER MANS THE VIDEO TAPE SHAH ALSO BE USED TO DETERMINE IF POINT REPAIRS ARE REQUIRED PRIOR TO BEING RECONDITIONED AFTER ALL VIDEO TAPING HAS BEEN COMPLETED AND REVIEWED, THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER AND OWNER FOR THE LOCATION OF ALL NEW MANHOLES, MANHOLE REPLACEMENTS CEMES OR MODIFICATIONS, UNE REPLACEMENTS, AND POINT REPAIRS THE QUANTITY AND LOCATION OF CIPP INSTALLATION IS SUBJECT TO CHANGE FOLLOWING CCN INSPECTION FINDINGS 2 THE CONTRACTOR SHALL REPLACE EXISTING MANHOLES WHERE INDICATED AND WHERE DETERMINED BY THE ENGINEER. THE CONTRACTOR SHALL INSTALL EITHER A NEW MANHOLE OR DOGHOUSE MANHOLE AS DIRECTED THE CONDUCTOR SHALL INSTALL 8 LF OF NEW SANITARY SEWER MANS TO MATCH EXISTING FOR RECONNECTION TO THE NEW MANHOLE ALL COSTS AS AMD WITH THE PIPE INSTALLATION SHALL BE INCLUDED IN THE UNIT PRICE BID REM FOR MANHOLE INSTALLATION. ANY ASPHALT REPLACEMENT, IF NEEDED, SWILL. BE PAD FOR SEPARATELY THE CONDUCTOR SHALL INSTALL NEW OUTSIDE DROPS FOR INVERT DROPS OF MORE THAN 25 VERTICAL FEET, OUTSIDE DROPS SHALL BE PAD FOR SEPARATELY 3 THE CONTRACTOR SHALL PROVIDE ALL NECESSARY INTERNAL PRESSURE GROUTING OF THE SEWER MANS REQUIRED TO PROPERLY INSTALL THE CIPP. INTERNAL PRESSURE GROUTING SHALL BE PAD UNDER A SEPARATE UNIT PRICE BID TEM AND SHALL INCLUDE ALL GROUT, MATERWS, TOOLS AND OR REQUIRED PRESSURE GROUT LOCATIONS WILL BE DETERMINED FROM THE INITIAL VIDEO INSPECTION 4 THE CONTRACTOR SHALL BE REQUIRED TO COORDINATE WITH THE ENGINEER AND THE OWNER THE AMOUNT OF CIPP TO BE INSTALLED PRIOR TO ORDERING MATERIALS 5 THE CONTRACTOR SHALL BE REQUIRED TO RECONDITION ALL EXISTING MANHOLES AS INDICATED ON THE PIANS THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER AND THE OWNER. PRIOR TO INSTALLATION, FOR THE EXACT MANHOLES TO BE RECONDITIONED, THE NUMBER MAY CHANGE DUE TO BUDGET CONSTRAINTS 6. THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER AND THE NCDOT FOR ALL NEW MANHOLES TO BE INSTALLED IN NCDOT ROADWAYS THE CONTRACTOR SHALL NOTIFY NCDOT 72 HOURS PRIOR TO ANY INSTALLATION 7. ANY BYPASS PUMPING OF WASTEWATER REQUIRED TO FACILITATE CONSTRUCTION SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. THIS INCLUDES ALL WORK ASSOCIATED WITH ANY PART OF THE PROJECT, NCLUDING LINE CONNECTIONS, LINE REPLACEMENTS, RECONDITIONING AND/OR COORDINATING AROUND EXISTING LINES DURING CONSTRUCTION Digitally signed 1� CARP /iii �Z04pFEE9%Qi �.� Lacy, P.E. te: 2016.08.26 �OIxE �F s09:32:02 -04'00 n\ REHAB MANHOLE #18 STA 5+23 73 S-7 RIM ELEV. 129.83' INVERTOUT 119.67' INVERT IN 119 71' �- WM LT REHAB MANHOLE #19 ` POLE I STA 8+2425 S-7 ?P• e I RIM ELEV 12702' OUT 5 PP IOUT IN 120.73'0.73' PP EXISRNG WATER MAN 25 0 50 SCALE IN FEET North $�' C�olina`,� THE CONTRACTOR SHALL LIMIT THE DISTURBED AREA TO THE AMOUNT THAT SHALL ALLOW FOR STABILIZATION OF THE DISTURBED AREA TO BE COMPLETED AT THE END OF EACH WORKING DAY PER NCAC REQUIREMENTS FOR UNEAR CONSTRUCTION NOTES, 1. THE CONTRACTOR SRALL CONTACT THE POWER CO.. GAS CO., AND TELEPHONE CO. FOR THE EXACT LOCATION OF ALL UNDERGROUND MAINS. CABLES, OR LINES BEFORE CONSTRUCTION BEGINS 2 PIPE SEPARATION THE FOLLOWING MINIMUM PIPE SEPARATION WILL BE MAINTAINED 24 INCHES VERTICAL SEPARATION BETWEEN CROSSING OF SANITARY SEWER AND STORM SEWERS 24 INCHES VERTICAL SEPARATION BETWEEN CROSSING OF SEWER (INCLUDING FORCE MAINS) AND WATER MAINS, AND 10 FEET HORIZONTAL SEPARATION BETWEEN SANITARY SEWER (INCLUDING FORCE MANS) AND WATER MANS. IF THESE SEPARATIONS CANNOT BE MAINTAINED, DUCTILE IRON PIPE WILL BE USED 10 FEET EITHER SIDE OF CROSSING AND ALONG ENTIRE LENGTH OF LINE LESS THAN 10 HORIZONTAL FELT FROM WATER MANS. THE CONTRACTOR SHALL RECEIVE APPROVAL FROM THE ENGINEER IN THE FIELD BEFORE PAYMENT WILL BE MADE AT DUCTILE IRON PRICES 3. THE RIGHT-OF-WAY OR SHOWN UTILITY EASEMENT SHALL DICTATE THE LIMITS OF CONSTRUCTION 4 THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF THE ADJUSTMENT OF EXISTING UTILITIES. INCLUDING POWER POLES THE CONTRACTOR SHALL REMOVE AND REPLACE ANY EXISTING 5 HEADWALLS. AS REQUIRED FOR THE CONSTRUCTION OF THE PROJECT ANY BYPASS PUMPING OF WASTEWATER REQUIRED TO FACILITATE CONSTRUCTION SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR THIS INCLUDES ALL WORK ASSOCIATED WITH ANY PART OF THE PROJECT, INCLUDING UNE CONNECTIONS, LINE REPLACEMENTS, AND/OR COORDINATING AROUND EXISTING LINES DURING CONSTRUCTION Z H �Z ZS v o Os �waw�o Za 1 0 LL �= Z=O H K O u ~ Z O 0 O 13 xa, toes s..nr P.nob\�- - Pv..v.\oto soave �.n\oY cw�agopl vbn s Prom. sn..t 5-w ut e.v. �rt Sa..e By u,m vurlElrsox. B/35/Iola J5o.w w. Ignutl. Honea By uay Pon.nan oe/Y5/t6 wa51• PY 112 �I- \1-11 12-g-1 I dvq 1-11 • 0 0 0 MANHOLE VA ol(IR 9-1 U118 b + 0: .. .... .... ... : !WL TON— IE14V. 125,I$7 0 ol + ii WANIae'12 .1 INV 011! 11 "STA. Ls ;INVIN RIM ELEV. !2672' + .... ........... . .. ......... .... ...... ............................... .......... O ss S MALSTREET + .... .. . .. .... ... ... .. .. ........ ... . ...... ...... +: ... . .. ...• ... ..... . .. .... . .. .. .. ... .... .. HOU� . . . . V 119.77 RIM ELEV 1291533 INNaU 11. STA- 52174 S-7 m4 rN..j + 0 0 0 + 7 En + ........ '!Nv pyrr 120 so- 6 MANHOLE 4 0. A' 8+2 S 7 R INV IN 120 69' • RIM 12702, •2R P + O 0 + - ... NI rm 0 + - . ... ....... + R O�. 0 + + 0 90 rD 0 .0 0 0 1 FINAL DRAWING FOR REVIEW ONLY NOT FOR CONSTRUCTION PHASE 2 LKC Eng,reering, pjlc Engineering 140 Aqua Shed Court Aberdeen, NC 28315 REHABILITATION LINE S-7 Landscape Architecture 0 910.420.1437 FOR THE F. 110.637 0096 TOWN OF FAIRMONT ALTERNATE Planning '.erg Ine ring.com ROBESON COUNTY, NORTH CAROLINA KCLicense No. P-1095 cl, SANITARY SEWER SYSTEM STA 0+00 TO STA 8+24 L / ul I u0 I plH'CARi Digitally signed by Mark Lacy, P.E. Date: 2016.08.26 09:33:37 -04'00' r i � ~ � � y REHAB MANHOLE X20 tmt��1 l 1m� STA 7+81 52 S REHAB MANHOLE -8 823 STA 0+00.00 S-8 -1 t `I RIM ELEV. 12477' STA 0+0000 S-11 RIM ELEV. 12424' INVERT OUT 11909' INVERT OUT 11550' INVERT IN 119 T' INVERT IN 115.63' d I IN 11571 CIPP RPP INVERT N 12052' PP INVERT PP PP 27893' 8" PP 0B,B- I• (CIPP J, 22549' (e" CIPP PPS J BPP 18441' 8' CIPP PP 23880' 8' CIPP HyD MARTIN LUTHER KING DRIVE wM A Iw 1 a oWM WM WM 4HYD WM LB a e HYO ¢' I LB c REHAB MANHOLE 821 L REHAB MANHOLE 822 ❑ wM WM WM REHAB MANHOLE 25 I STA ELEV. 5-8 STA 5+0259 S-8 REIM MANHOLE 824 STA 12+45 87 S�8 STA 0+0000 S-14 STA 10+0701 S—e RIM ELEO 12380' RIM EIEV. 13044' RIM EIFV 124.50' TRIM ELEV. 12].72 INVERT OlIT 11643' IJ ❑ INVERT 122.91' W INVERT OUT 11773' INVERT 12172' � INVERT IN 1164J' INVENT IN 11]73' x INVERT IN 118.47' x 2 C--T-)IN 8 n n n ABILITATION NO 1. BEFORE BEGINNING CIPP INSTALLATION, THE CONTRACTOR SHALL PRESSURE CLEAN ALL LINES TO BE RECONDITIONED ALL WASTEWATER, SLUDGE, AND SEDIMENT REMOVED DURING THE CLEANING PROCESS SHALL BE PROPERLY DISPOSED OF AT THE FAIRMONT WASTEWATER TREATMENT PLANT OR COUNTY LANDFILL ANY DISPOSAL COSTS SHALL BE CONSIDERED INCIDENTAL TO THE PROJECT AFTER CLEANING, THE CONTRACTOR SHALL VIDEO TAPE THE INTERIOR OF THE SEWER MAIN TO DETERMINE THE LOCATION OF ALL SEWER SERVICE CONNECTIONS AND LOCATION OF MANHOLES THAT HAVE BEEN BURIED OR PAVED OVER THE CONTRACTOR SHALL PROVIDE ALL BYPASS PUMPING REQUIRED TO PROPERLY VIDEO TAPE THE INTERIOR OF THE SEWER MAINS THE VIDEO TAPE SHALL ALSO BE USED TO DETERMINE IF POINT REPAIRS ARE REQUIRED PRIOR TO BEING RECONDITIONED AFTER ALL VIDEO TAPING HAS BEEN COMPLETED AND REVIEWED. THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER AND OWNER FOR THE LOCATION OF ALL NEW MANHOLES, MANHOLE REPLACEMENTS OR MODIFICATIONS, UNE REPLACEMENTS, AND POINT REPAIRS. THE QUANTITY AND LOCATION OF CIPP INSTALLATION IS SUBJECT TO CHANGE FOLLOWING CCTV INSPECTION FINDINGS 2. THE CONTRACTOR SHALL REPLACE EXISTING MANHOLES WHERE INDICATED AND WHERE DETERMINED BY THE ENGINEER THE CONTRACTOR SHALL INSTALL EITHER A NEW MANHOLE OR DOGHOUSE MANHOLE AS DIRECTED. THE CONTRACTOR SHALL INSTALL 8 LF OF NEW SANITARY SEWER MAINS TO MATCH EXISTING FOR RECONNECTION TO THE NEW MANHOLE ALL COSTS ASSOCIATED WITH THE PIPE INSTALLATION SHALL BE INCLUDED IN THE UNIT PRICE BID REM FOR MANHOLE INSTALLATION ANY ASPHALT REPLACEMENT, IF NEEDED, SHALL BE PAID FOR SEPARATELY THE CONTRACTOR SHALL INSTALL NEW OUTSIDE DROPS FOR INVERT DROPS OF MORE THAN 25 VERTICAL FEET. OUTSIDE DROPS SHALL BE PAID FOR SEPARATELY 3 THE CONTRACTOR SHALL PROVIDE ALL NECESSARY INTERNAL PRESSURE GROUTING OF THE SEWER MAINS REQUIRED TO PROPERLY INSTALL THE CIPP INTERNAL PRESSURE GROUTING SHALL BE PAID UNDER A SEPARATE UNIT PRICE BID REM AND SHALL INCLUDE ALL GROUT, MATERIALS, TOOLS AND OR REQUIRED PRESSURE GROUT LOCATIONS WILL BE DETERMINED FROM THE INITIAL VIDEO INSPECTION 4 THE CONTRACTOR SHALL BE REQUIRED TO COORDINATE WITH THE ENGINEER AND THE OWNER THE AMOUNT OF CIPP TO BE INSTALLED PRIOR TO ORDERING MATERIALS LINE S-8 (CIPP REHABILITATION) 5 THE CONTRACTOR SHALL BE REQUIRED TO RECONDITION ALL EXISTING MANHOLES AS INDICATED ON THE PLANS THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER AND THE OWNER. PRIOR TO INSTALLATION, FOR THE EXACT MANHOLES TO BE RECONDITIONED. THE NUMBER MAY CHANGE DUE TO BUDGET CONSTRAINTS. 6 THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER AND THE NCDOT FOR ALL NEW MANHOLES TO BE INSTALLED IN NC OT ROADWAYS THE CONTRACTOR SHALL NOTIFY NCOOT 72 HOURS PRIOR TO ANY INSTALLATION. ] ANY BYPASS PUMPING OF WASTEWATER REQUIRED TO FACILITATE CONSTRUCTION SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. THIS INCLUDES ALL WORK ASSOCIATED WITH ANY PART OF THE PROJECT. NCLUDING LINE CONNECTIONS. LINE REPLACEMENTS, RECONDITIONING AND/OR COORDINATING AROUND EXISTING LINES DURING CONSTRUCTION 25 0 50 SCALE IN FEET Nori1� $� Carolina �1 EE C CONTRACTOR ONTRACTOR SHALL LIMIT THE DISTURBED AREA TO THE AMOUNT THAT SHALL ALLOW FOR STABILIZATION OF THE DISTURBED AREA TO BE COMPLETED AT THE END OF EACH WORKING DAY PER NCAC REQUIREMENTS FOR UNEAR CONSTRUCTION NOTES: 1 THE CONTRACTOR SHALL CONTACT THE POWER CO, CAS CO, AND TELEPHONE CO. FOR THE EXACT LOCATION OF ALL UNDERGROUND MAINS. CABLES, OR LINES BEFORE CONSTRUCTION BEGINS 2. PIPE SEPARATION: THE FOLLOWING MINIMUM PIPE SEPARATION WILL BE MAINTAINED 24 INCHES VERTICAL SEPARATION BETWEEN CROSSING OF SANITARY SEWER AND STORM SEWERS 24 INCHES VERTICAL SEPARATION BETWEEN CROSSING OF SEWER (INCLUDING FORCE MAINS) AND WATER MAINS, AND 10 FEET HORIZONTAL SEPARATION BETWEEN SANITARY SEWER (INCLUDING FORCE MAINS) AND WATER MAINS. IF THESE SEPARATIONS CANNOT BE MAINTAINED, DUCTILE IRON PIPE WILL BE USED 10 FEET EITHER SIDE OF CROSSING AND ALONG ENTIRE LENGTH OF LINE LESS THAN 10 HORIZONTAL FELT FROM WATER MAINS THE CONTRACTOR SHALL RECEIVE APPROVAL FROM THE ENGINEER IN THE FIELD BEFORE PAYMENT WILL BE MADE AT DUCTILE IRON PRICES 3 THE RIGHT-OF-WAY OR SHOWN UTILITY EASEMENT SHALL DICTATE THE LIMITS OF CONSTRUCTION 4 THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF THE ADJUSTMENT OF EXISTING UTILITIES. INCLUDING POWER POLES THE CONTRACTOR SHALL REMOVE AND REPLACE ANY EXISTING 5. HEADWALLS. AS REQUIRED FOR THE CONSTRUCTION OF THE PROJECT ANY BYPASS PUMPING OF WASTEWATER REQUIRED TO FACILITATE CONSTRUCTION SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR THIS INCLUDES ALL WORK ASSOCIATED WITH ANY PART OF THE PROJECT, INCLUDING LINE CONNECTIONS, LINE REPLACEMENTS, AND/OR COORDINATING AROUND EXISTING LINES DURING CONSTRUCTION. Ln v N I- 00 N N O Z O J + O Q N 15 I i I , I I i I I I 1 I EnEM cNURCN E _ 'WM NYD REHAB MAN101%f24 W'V STA 10+20.32 RIM ELEV. 127.25' \\ INVERT 121 72' u REHAB MANHOLE B2I " REHAB MANHOLE }26 STA 15+0697 S-8 STA 12+45 81 5-8 RIM ELEV22. 13044' INVERT 191' RIM ELEV 131 35' INVERT 12379' L] \ \ Opp Digitally signed `QN��Ago�2 by Mark Lacy, P.E. Date: 2016.08.26 09:34:07-04'00' Opp Q A � O¢ � Z Z A O O= VN W Q w y O aQW'�zo Fz 00 0 O K 16 LINE S-8 (CIPP REHABILITATION) CIPP REHABILITATION NOTES, NOTES, 1. BEFORE BEGINNING CIPP INSTALLATION, THE CONTRACTOR SHALL 5 THE CONTRACTOR SHALL BE REQUIRED TO RECONDITION ALL EXISTING 1. THE CONTRACTOR SHALL CONTACT THE POWER CO. GAS CO.. PRESSURE CLEAN ALL UNES TO BE RECONDITIONED ALL WASTEWATER, SLUDGE, AND SEDIMENT REMOVED DURING THE CLEANING PROCESS SHALL MANHOLES AS INDICATED ON THE PLANS THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER AND THE OWNER, PRIOR TO AND TELEPHONE CO. FOR THE EXACT LOCATION OF ALL UNDERGROUND MAINS, CABLES, OR LINES BEFORE BE PROPERLY DISPOSED OF AT THE FAIRMONT WASTEWATER TREATMENT PLANT OR COUNTY LANonLL ANY DISPOSAL COSTS SHALL BE INSTALLATION, FOR THE EXACT MANHOLES TO BE RECONDITIONED, THE NUMBER MAY CHANCE DUE TO BUDGET CONSTRAINTS CONSTRUCTION BEGINS CONSIDERED INCIDENTAL TO THE PROJECT. AFTER CLEANING, THE CONTRACTOR SHALL VIDEO TAPE THE INTERIOR OF 6. THE CONTRACTOR SHKLL COORDINATE WITH THE ENGINEER AND THE NCDOT 2. PIPE SEPAMTION: THE FOLLOWING MINIMUM PIPE SEPARATION WILL BE MAINTAINED 24 INCHES VERTICAL SEPARATION THE SEWER MAIN TO DETERMINE THE LOCATION OF ALL SEWER SERVICE CONNECTIONS AND LOCATION OF MANHOLES THAT HAVE BEEN BURIED OR FOR ALL NEW MANHOLES TO BE INSTALLED IN NCDOT ROADWAYS. THE CONTRACTOR SHALL NOTIFY NCOOT 72 HOURS PRIOR TO ANY BETWEEN CROSSING OF SANITARY SEWER AND STORM SEWERS 24 INCHES VERTICAL SEPARATION BETWEEN CROSSING OF PAVED OVER. THE CONTRACTOR SHALL PROVIDE ALL BYPASS PUMPING INSTALLATION SEWER (INCLUDING FORCE MAINS) AND WATER MAINS, AND 10 REQUIRED TO PROPERLY VIDEO TAPE THE INTERIOR OF THE SEWER MANS THE VIDEO TAPE SWILL ALSO BE USED TO DETERMINE IF POINT REPAIRS 7, ANY BYPASS PUMPING OF WASTEWATER REQUIRED TO FACILITATE 25 0 50 FEET HORIZONTAL SEPARATION BETWEEN SANITARY SEWER (INCLUDING FORCE MAINS) AND WATER MANS IF THESE ARE REQUIRED PRIOR TO BEING RECONDITIONED, AFTER ALL VIDEO CONSTRUCTION SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR THIS ® SEPARATIONS CANNOT BE MAINTAINED. DUCTILE IRON PIPE TAPING HAS BEEN COMPLETED AND REVIEWED, THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER AND OWNER FOR THE LOCATION OF ALL INCLUDES ALL WORK ASSOCIATED WITH ANY PART OF THE PROJECT. INCLUDING UNE CONNECTIONS, LINE REPLACEMENTS, RECONDITIONING SCALE IN FEET WILL BE USED 10 FEET EITHER SIDE OF CROSSING AND ALONG ENTIRE LENGTH OF UNE LESS THAN 10 HORIZONTAL NEW VANHOLES, MANHOLE REPLACEMENTS MODIFICATIONS, LINE AND/OR COORDINATING AROUND EXISTING LINES DURING CONSTRUCTION. FEET FROM WATER MANS. THE CONTRACTOR SHALL RECEIVE N U AND LOCATION OF REPLACEMENTS, ANO POINT RFPNRS. THE FOLLOWING CIPP INSTALLATION IS SUBJECT TO CHANCE FOLLOWING CCN APPROVAL FROM THE ENGINEERIN THE BEFORE INSPECTION FINDINGS PAYMENT WILL BE MADE AT DUCTILE IRONN PRI PRICES. 2 THE CONTRACTOR SHALL REPLACE EXISTING MANHOLES WHERE INDICATED 3. THE RIGHT-OF-WAY OR SHOWN UTILITY EASEMENT SHALL DICTATE AND WHERE DETERMINED BY THE ENGINEER. THE CONTRACTOR SHALL THE UMTS OF CONSTRUCTION INSTALL EITHER A NEW MANHOLE OR DOGHOUSE MANHOLE AS DIRECTED THE CONTRACTOR SHALL INSTALL 8 LF OF NEW SANITARY SEWER MANS I F 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE TO MATCH EXISTING FOR RECONNECTION TO THE NEW MANHOLE ALL 1 COORDINATION OF THE ADJUSTMENT OF EXISTING UTILITIES, COSTS ASSOCIATED WITH THE PIPE INSTALLATION SHALL BE INCLUDED IN THE UNIT PRICE BIO ITEM FOR MANHOLE INSTALLATION ANY ASPHALT INCLUDING POWER POLES THE CONTRACTOR SHALL REMOVE AND REPLACE ANY EXISTING REPLACEMENT, IF NEEDED, SHALL BE PND FOR SEPARATELY. THE CONTRACTOR SHALL INSTAL. NEW OUTSIDE DROPS FOR INVERT DROPS OF 5 HEADWALLS, AS REQUIRED FOR THE CONSTRUCTION OF THE MORE THAN 25 VERTICAL FEET. OUTSIDE DROPS SHALL BE PND FOR PROJECT. ANY BYPASS PUMPING OF WASTEWATER REQUIRED TO SEPARATELY FACORATE CONSTRUCTION SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR THIS INCLUDES ALL WORK ASSOCIATED WITH 3 THE CONTRACTOR SHALL PROVIDE ALL NECESSARY INTERNAL PRESSURE THE CONTRACTOR SHALL UMIT THE DISTURBED ANY PART OF THE PROJECT, INCLUDING UNE CONNECTIONS, GROUTING OF THE SEWER MAINS REQUIRED TO PROPERLY INSTALL THE AREA TO THE AMOUNT THAT SHALL ALLOW UNE REPLACEMENTS, AND/OR COORDINATING AROUND CIPP. INTERNAL PRESSURE GROUTING SHALL BE PAID UNDER A SEPARATE UNIT PRICE BID REM AND SHALL INCLUDE ALL GROUT, MATERIALS, TOOLS FOR STABILIZATION OF THE DISTURBED AREA TO BE COMPLETED AT THE END OF EACH EXISTING LINES DURING CONSTRUCTION. AND OR REQUIRED. PRESSURE GROUT LOCATIONS WILL BE DETERMINED FROM THE INITIAL VIDEO INSPECTION WORKING DAY PER NCAC REQUIREMENTS FOR LINEAR CONSTRUCTION 4 THE CONTRACTOR SHALL BE REQUIRED TO COORDINATE WITH THE ENGINEER AND THE OWNER THE AMOUNT OF CIPP TO BE INSTALLED PRIOR TO ORDERING MATER OM Q A � O¢ � Z Z A O O= VN W Q w y O aQW'�zo Fz 00 0 O K 16 U ,«R - lul .a;.,, Digitally signed lesalo.s, 4' = by ark acy, P.E. Dat : 20 6.08.26 01 ., 4. 401NEE j 09.3 . -04'00' r W � I �I J ti REHAB MANHOLE 830 REHABMANHOLE 82] STA 12+0833 S-9 STA 0+0000 9-9 RIM ELEV 12625' STA 3+09.35 S- 17 I ° INVERT Illi 124 18' RIM ELEV12440 I° INVERT IN 124.18'4.18' O INVERT OUT 11674' ❑ INVERT IN 124 20" INVERT IN 116 74' INVER IN 11908' CO 0 IR" RCP L--399116' ❑ vp PP PP PP 139E 10' (8' CIPP) °WM PP I<—x—x-399116' B' CIPP PP PP — —xJ PP 409 46' (B' CIPP) NrD $ I MADISON STREET PP I ° PP PP 'WM °WM PP LT PP °WN Opp WN Ypp ° w,N WN Opp WM dpP V REHAB MANHOLE 28 ❑ ❑ REHP9 MANHOLE 829 PP PP ROSE -ILD STA 3+99 ]0 S-9 STA 7+9886 S-9 EGEMFNiPRY I RIM ELEV. 125.11' RIM ELEV 12649' SCHOOc I °wN ❑ ❑ INVERT OUT 1z111, I275 NVERT IN 121 13' INVERT IN 1 1275' iINVERT IN 122 ]5' CIPP R 1 BEFORE BEGINNING CIPP INSTALLATION. THE CONTRACTOR SHALL PRESSURE CLEAN ALL LINES TO BE RECONDITIONED ALL WASTEWATER, SLUDGE, AND SEDIMENT REMOVED DURING THE CLEANING PROCESS SHALL BE PROPERLY DISPOSED OF AT THE FAIRMONT WASTEWATER TREATMENT PLANT OR COUNTY LWDFILL ANY DISPOSAL COSTS SHALL BE CONSIDERED INCIDENTAL TO THE PROJECT AFTER CLEANING, THE CONTRACTOR SHALL VIDEO TAPE THE INTERIOR OF THE SEWER MAIN TO DETERMINE THE LOCATION OF ALL SEWER SERVICE CONNECTIONS AND LOCATION OF MANHOLES THAT HAVE BEEN BURIED OR PAVED OVER THE CONTRACTOR SHALL PROVIDE ALL BYPASS PUMPING REDUIRED TO PROPERLY VIDEO TAPE THE INTERIOR OF THE SEWER MAINS THE VIDEO TAPE SHALL ALSO BE USED TO DETERMINE IF POINT REPAIRS ARE REQUIRED PRIOR TO BEING RECONDITIONED. AFTER ALL VIDEO TAPING HAS BEEN COMPLETED AND REVIEWED, THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER AND OWNER FOR THE LOCATION OF ALL NEW MANHOLES, MANHOLE REPLACEMENTS OR MODIFICATIONS, UNE REPLACEMENTS, AND POINT REPAIRS. THE QUANTITY AND LOCATION OF CIPP INSTALLATION IS SUBJECT TO GRANGE FOLLOWING CCN INSPECTION FINDINGS 2. THE CONTRACTOR SHALL REPLACE EXISTING MANHOLES WHERE INDICATED AND WHERE DETERMINED BY THE ENGINEER THE CONTRACTOR SHALL INSTALL EITHER A NEW MANHOLE OR DOGHOUSE MANHOLE AS DIRECTED THE CONTRACTOR SHALL INSTALL 8 LF OF NEW SANITARY SEWER MAINS TO MATCH EXISTING FOR RECONNECTION TO THE NEW MANHOLE ALL COSTS ASSOCIATED WITH THE PIPE INSTALLATION SHALL BE INCLUDED IN THE UNIT PRICE BID ITEM FOR MANHOLE INSTALLATION ANY ASPHALT REPLACEMENT, IF NEEDED, SHALL BE PAID FOR SEPARATELY THE CONTRACTOR SHALL INSTALL NEW OUTSIDE DROPS FOR INVERT DROPS OF MORE THAN 2.5 VERTICAL FEET. OUTSIDE DROPS SHALL BE PAID FOR SEPARATELY. 3 THE CONTRACTOR SHALL PROVIDE ALL NECESSARY INTERNAL PRESSURE GROUTING OF THE SEWER MAINS REQUIRED TO PROPERLY INSTALL THE CIPP. INTERNAL PRESSURE GROUTING SHALL BE PAID UNDER A SEPARATE UNIT PRICE BID REM AND SHALL INCLUDE ALL GROUT, MATERIALS, TOOLS AND LABOR REQUIRED PRESSURE GROUT LOCATIONS WILL BE DETERMINED FROM THE INITIAL VIDEO INSPECTION 4 THE CONTRACTOR SHALL BE REQUIRED TO COORDINATE WITH THE ENGINEER AND THE OWNER THE AMOUNT OF CIPP TO BE INSTALLED PRIOR TO ORDERING MATERIALS n LINE (CIPP REHABILITATION) S-9 5 THE CONTRACTOR SHALL BE REQUIRED TO RECONDITION ALL EXISTING MANHOLES AS INDICATED ON THE PIANS THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER AND THE OWNER. PRIOR TO INSTALLATION, FOR THE EXACT MANHOLES TO BE RECONDITIONED. THE NUMBER MAY CHANGE DUE TO BUDGET CONSTRAINTS 6 THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER AND THE NCDOT FOR ALL NEW MANHOLES TO BE INSTALLED IN NCDOT ROADWAYS THE CONTRACTOR SHALL NOTIFY NCDOT 72 HOURS PRIOR TO ANY INSTALLATION 7 ANY BYPASS PUMPING OF WASTEWATER REQUIRED TO FACILITATE CONSTRUCTION SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR THIS INCLUDES ALL WORK ASSOCIATED WITH ANY PART OF THE PROJECT, INCLUDING UNE CONNECTIONS. UNE REPLACEMENTS. RECONDITIONING PND/OR COORDINATING AROUND EXISTING UNES DURING CONSTRUCTION. 25 0 50 SCALE IN FEET Norah $�' C�olina�� THEE CONTRACTOR SHALL LIMIT THE DISTURBED AREA TO THE AMOUNT THAT SHALL ALLOW FOR STA91UZATION OF THE DISTURBED AREA TO BE COMPLETED AT THE ENO OF EACH WORKING DAY PER NCAC REQUIREMENTS FOR LINEAR CONSTRUCTION. NOTES, 1 THE CONTRACTOR SHALL CONTACT THE POWER CO, GAS CO, AND TELEPHONE CO FOR THE EXACT LOCATION OF ALL UNDERGROUND MAINS. CABLES. OR UNES BEFORE CONSTRUCTION BEGINS 2. PIPE SEPARATION THE FOLLOWING MINIMUM PIPE SEPARATION WILL BE MAJNTAINED 24 INCHES VERTICAL SEPARATION BETWEEN CROSSING OF SANITARY SEWER AND STORM SEWERS 24 INCHES VERTICAL SEPARATION BETWEEN CROSSING OF SEWER (INCLUDING FORCE MAINS) AND WATER MAINS, AND 10 FEET HORIZONTAL SEPARATION BETWEEN SANITARY SEWER (INCLUDING FORCE MAINS) AND WATER MAINS IF THESE SEPARATIONS CANNOT BE MAINTAINED. DUCTILE IRON PIPE WILL BE USED 10 FEET EITHER SIDE OF CROSSING AND ALONG ENTIRE LENGTH OF UNE LESS THAN 10 HORIZONTAL FEET FROM WATER MAINS. THE CONTRACTOR SHALL RECEIVE APPROVAL FROM THE ENGINEER IN THE FIELD BEFORE PAYMENT WILL BE MADE AT DUCTILE IRON PRICES 3. THE RIGHT-OF-WAY OR SHOWN UTILITY EASEMENT SHALL DICTATE THE OMITS OF CONSTRUCTION 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF THE ADJUSTMENT OF EXISTING UTILITIES. INCLUDING POWER POLES THE CONTRACTOR SHALL REMOVE AND REPLACE ANY EXISTING 5 HEADWALLS. AS REQUIRED FOR THE CONSTRUCTION OF THE PROJECT ANY BYPASS PUMPING OF WASTEWATER REQUIRED TO FACILITATE CONSTRUCTION SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR THIS INCLUDES ALL WORK ASSOCIATED WITH ANY PART OF THE PROJECT, INCLUDING LINE CONNECTIONS, LINE REPLACEMENTS, AND/OR COORDINATING AROUND EXISTING LINES DURING CONSTRUCTION. Z w O >z ZS v o rvwa=�o W J K LL Z ar¢°O10 K = Z O H 10 - F- O K 17 ►0 m 0 1. BEFORE BEGINNING CIPP INSTALLATION, THE CONTRACTOR SHALL PRESSURE CLEAN ALL UNES TO BE RECONDITIONED ALL WASTEWATER, SLUDGE. AND SEDIMENT REMOVED DURING THE CLEANING PROCESS SHALL BE PROPERLY DISPOSED OF AT THE FAIRMONT WASTEWATER TREATMENT PLANT OR COUNTY LANDFILL ANY DISPOSAL COSTS SHALL BE CONSIDERED INCIDENTAL TO THE PROJECT. AFTER CLEANING, THE CONTRACTOR SHALL VIDEO TAPE THE INTERIOR OF THE SEWER MAIN TO DETERMINE THE LOCATION OF ALL SEWER SERVICE CONNECTIONS AND LOCATION OF MANHOLES THAT HAVE BEEN BURIED OR PAVED OVER. THE CONTRACTOR SHALL PROVIDE ALL BYPASS PUMPING REQUIRED TO PROPERLY VIDEO TAPE THE INTERIOR OF THE SEWER MAINS THE VIDEO TAPE SHALL ALSO BE USED TO DETERMINE IF POINT REPAIRS ARE REQUIRED PRIOR TO BEING RECONDITIONED AFTER ALL VIDEO TAPING HAS BEEN COMPLETED AND REVIEWED, THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER AND OWNER FOR THE LOCATION OF ALL NEW MANHOLES, MANHOLE REPLACEMENTS OR MODIFICATIONS, UNE REPLACEMENTS, AND POINT REPAIRS THE QUANTITY AND LOCATION OF CIPP INSTALLATION IS SUBJECT TO CHANGE FOLLOWING CCN INSPECTION FINDINGS 2 THE CONTRACTOR SHALL REPLACE EXISTING MANHOLES WHERE INDICATED AND WHERE DETERMINED BY THE ENGINEER THE CONTRACTOR SHALL INSTALL EITHER A NEW MANHOLE OR DOGHOUSE MANHOLE AS DIRECTED THE CONTRACTOR SHALL INSTALL 8 LF OF NEW SANITARY SEWER MAINS TO MATCH EXISTING FOR RECONNECTION TO THE NEW MANHOLE ALL COSTS ASSOCIATED WITH THE PIPE INSTALLATION SHALL BE INCLUDED IN THE UNIT PRICE BID REM FOR MANHOLE INSTALLATION ANY ASPHALT REPLACEMENT, IF NEEDED, SHALL BE PAID FOR SEPARATELY THE CONTRACTOR SHALL INSTALL NEW OUTSIDE DROPS FOR INVERT DROPS OF MORE THAN 2 5 VERTICAL FEET. OUTSIDE DROPS SHALL BE PAID FOR SEPARATELY 3 THE CONTRACTOR SHALL PROVIDE ALL NECESSARY INTERNAL PRESSURE GROUTING OF THE SEWER MAINS REQUIRED TO PROPERLY INSTALL THE CIPP. INTERNAL PRESSURE GROUTING SHALL BE PAID UNDER A SEPARATE UNIT PRICE BID ITEM AND SHALL INCLUDE ALL GROUT, MATERIALS, TOOLS AND LABOR REQUIRED PRESSURE GROUT LOCATIONS WILL BE DETERMINED FROM THE INITIAL VIDEO INSPECTION 4 THE CONTRACTOR SHALL BE REQUIRED TO COORDINATE WITH THE ENGINEER AND THE OWNER THE AMOUNT OF CIPP TO BE INSTALLED PRIOR TO ORDERING MATERIALS LINE S-9 (CIPP REHABILITATION) 5 THE CONTRACTOR SHALL BE REQUIRED TO RECONDITION ALL EXISTING MANHOLES AS INDICATED ON THE PIANS THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER AND THE OWNER, PRIOR TO INSTALLATION. FOR THE EXACT MANHOLES TO BE RECONDITIONED, THE NUMBER MAY CHANGE DUE TO BUDGET CONSTRAINTS. 6. THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER AND THE NCDOT FOR ALL NEW MANHOLES TO BE INSTALLED IN NCDOT ROADWAYS THE CONTRACTOR SHALL NOTIFY NCDOT 72 HOURS PRIOR TO ANY INSTALLATION 7 ANY BYPASS PUMPING OF WASTEWATER REQUIRED TO FACILITATE CONSTRUCTION SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR THIS INCLUDES ALL WORK ASSOCIATED WITH ANY PART OF THE PROJECT. INCLUDING UNE CONNECTIONS. UNE REPLACEMENTS. RECONDITIONING AND/OR COORDINATING AROUND EXISTING LINES DURING CONSTRUCTION 25 0 50 SCALE IN FEET Colina=� NOTE. THE CONTRACTOR SHALL LIMIT THE DISTURBED AREA TO THE AMOUNT THAT SHALL ALLOW FOR STABIUZATION OF THE DISTURBED AREA TO BE COMPLETED AT THE END OF EACH WORHING DAY PER NCAC REQUIREMENTS FOR UNEAR CONSTRUCTION. �N1CAR0 ii. �.rOpo4E51%p� L.� FAlRPG1hT FREE I— BAPRSF Cvl/RLH Digitally signed by Mark Lacy, P.E. Date: 2016.08.26 09:35:35 -04'00' NOTES, 1 THE CONTRACTOR SHALL CONTACT THE POWER CO. GAS CO. AND TELEPHONE CO FOR THE EXACT LOCATION OF ALL UNDERGROUND MAINS. CABLES. OR UNES BEFORE CONSTRUCTION BEGINS. 2 PIPE SEPARATION THE FOLLOWING MINIMUM PIPE SEPARATION WILL BE MAINTAINED 24 INCHES VERTICAL SEPARATION BEM'EEN CROSSING OF SANITARY SEWER AND STORM SEWERS 24 INCHES VERTICAL SEPARATION BETWEEN CROSSING OF SEWER (INCLUDING FORCE MAINS) AND WATER MAINS, AND 10 FEET HORIZONTAL SEPARATION BETWEEN SANITARY SEWER (INCLUDING FORCE MAINS) AND WATER MAINS. IF THESE SEPARATIONS CANNOT BE MAINTAINED, DUCTILE IRON PIPE WILL BE USED 10 FEET EITHER SIDE OF CROSSING AND ALONG ENTIRE LENGTH OF LINE LESS THAN 10 HORIZONTAL FEET FROM WATER MAINS. THE CONTRACTOR SHALL RECEIVE APPROVAL FROM THE ENGINEER IN THE FIELD BEFORE PAYMENT WILL BE MADE AT DUCTILE IRON PRICES 3 THE RIGHT-OF-WAY OR SHOWN UTILITY EASEMENT SHALL DICTATE THE LIMITS OF CONSTRUCTION 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF THE ADJUSTMENT OF EXISTING UTILITIES, INCLUDING POWER POLES THE CONTRACTOR SHALL REMOVE AND REPLACE ANY EXISTING 5 HEADWALLS. AS REQUIRED FOR THE CONSTRUCTION OF THE PROJECT ANY BYPASS PUMPING OF WASTEWATER REQUIRED TO FACILITATE CONSTRUCTION SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR THIS INCLUDES ALL WORK ASSOCIATED WITH ANY PART OF THE PROJECT, INCLUDING LINE CONNECTIONS, UNE REPLACEMENTS, AND/OR COORDINATING AROUND EXISTING LINES DURING CONSTRUCTION 18 ❑ 05 T\ N REHAB MANHOLE 831 ST0. 14+9984 S-9 REHAB MANHOLE 830 STA12+08.33 S-9 RIM ELEV. 131.44' INVERT OUT 125.24' RIM ELEV. 126.25' INVERT IN 12112- NVERT 12� IERTT OUT ENVIIT 124208 PP WMo a PP WMir_ — — PP 291 50° 8 CIPP WM° PP�� —•—"—^� 23615' 8` CIPP) 00Dm0m PP MADISON STREET PP LT ° .OPP ew MYDWM a °IAM° WMA e D❑ ❑ ❑ REH48 MANHOLE 832 INVERT O'LEVUT 126610' m 0 1. BEFORE BEGINNING CIPP INSTALLATION, THE CONTRACTOR SHALL PRESSURE CLEAN ALL UNES TO BE RECONDITIONED ALL WASTEWATER, SLUDGE. AND SEDIMENT REMOVED DURING THE CLEANING PROCESS SHALL BE PROPERLY DISPOSED OF AT THE FAIRMONT WASTEWATER TREATMENT PLANT OR COUNTY LANDFILL ANY DISPOSAL COSTS SHALL BE CONSIDERED INCIDENTAL TO THE PROJECT. AFTER CLEANING, THE CONTRACTOR SHALL VIDEO TAPE THE INTERIOR OF THE SEWER MAIN TO DETERMINE THE LOCATION OF ALL SEWER SERVICE CONNECTIONS AND LOCATION OF MANHOLES THAT HAVE BEEN BURIED OR PAVED OVER. THE CONTRACTOR SHALL PROVIDE ALL BYPASS PUMPING REQUIRED TO PROPERLY VIDEO TAPE THE INTERIOR OF THE SEWER MAINS THE VIDEO TAPE SHALL ALSO BE USED TO DETERMINE IF POINT REPAIRS ARE REQUIRED PRIOR TO BEING RECONDITIONED AFTER ALL VIDEO TAPING HAS BEEN COMPLETED AND REVIEWED, THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER AND OWNER FOR THE LOCATION OF ALL NEW MANHOLES, MANHOLE REPLACEMENTS OR MODIFICATIONS, UNE REPLACEMENTS, AND POINT REPAIRS THE QUANTITY AND LOCATION OF CIPP INSTALLATION IS SUBJECT TO CHANGE FOLLOWING CCN INSPECTION FINDINGS 2 THE CONTRACTOR SHALL REPLACE EXISTING MANHOLES WHERE INDICATED AND WHERE DETERMINED BY THE ENGINEER THE CONTRACTOR SHALL INSTALL EITHER A NEW MANHOLE OR DOGHOUSE MANHOLE AS DIRECTED THE CONTRACTOR SHALL INSTALL 8 LF OF NEW SANITARY SEWER MAINS TO MATCH EXISTING FOR RECONNECTION TO THE NEW MANHOLE ALL COSTS ASSOCIATED WITH THE PIPE INSTALLATION SHALL BE INCLUDED IN THE UNIT PRICE BID REM FOR MANHOLE INSTALLATION ANY ASPHALT REPLACEMENT, IF NEEDED, SHALL BE PAID FOR SEPARATELY THE CONTRACTOR SHALL INSTALL NEW OUTSIDE DROPS FOR INVERT DROPS OF MORE THAN 2 5 VERTICAL FEET. OUTSIDE DROPS SHALL BE PAID FOR SEPARATELY 3 THE CONTRACTOR SHALL PROVIDE ALL NECESSARY INTERNAL PRESSURE GROUTING OF THE SEWER MAINS REQUIRED TO PROPERLY INSTALL THE CIPP. INTERNAL PRESSURE GROUTING SHALL BE PAID UNDER A SEPARATE UNIT PRICE BID ITEM AND SHALL INCLUDE ALL GROUT, MATERIALS, TOOLS AND LABOR REQUIRED PRESSURE GROUT LOCATIONS WILL BE DETERMINED FROM THE INITIAL VIDEO INSPECTION 4 THE CONTRACTOR SHALL BE REQUIRED TO COORDINATE WITH THE ENGINEER AND THE OWNER THE AMOUNT OF CIPP TO BE INSTALLED PRIOR TO ORDERING MATERIALS LINE S-9 (CIPP REHABILITATION) 5 THE CONTRACTOR SHALL BE REQUIRED TO RECONDITION ALL EXISTING MANHOLES AS INDICATED ON THE PIANS THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER AND THE OWNER, PRIOR TO INSTALLATION. FOR THE EXACT MANHOLES TO BE RECONDITIONED, THE NUMBER MAY CHANGE DUE TO BUDGET CONSTRAINTS. 6. THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER AND THE NCDOT FOR ALL NEW MANHOLES TO BE INSTALLED IN NCDOT ROADWAYS THE CONTRACTOR SHALL NOTIFY NCDOT 72 HOURS PRIOR TO ANY INSTALLATION 7 ANY BYPASS PUMPING OF WASTEWATER REQUIRED TO FACILITATE CONSTRUCTION SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR THIS INCLUDES ALL WORK ASSOCIATED WITH ANY PART OF THE PROJECT. INCLUDING UNE CONNECTIONS. UNE REPLACEMENTS. RECONDITIONING AND/OR COORDINATING AROUND EXISTING LINES DURING CONSTRUCTION 25 0 50 SCALE IN FEET Colina=� NOTE. THE CONTRACTOR SHALL LIMIT THE DISTURBED AREA TO THE AMOUNT THAT SHALL ALLOW FOR STABIUZATION OF THE DISTURBED AREA TO BE COMPLETED AT THE END OF EACH WORHING DAY PER NCAC REQUIREMENTS FOR UNEAR CONSTRUCTION. �N1CAR0 ii. �.rOpo4E51%p� L.� FAlRPG1hT FREE I— BAPRSF Cvl/RLH Digitally signed by Mark Lacy, P.E. Date: 2016.08.26 09:35:35 -04'00' NOTES, 1 THE CONTRACTOR SHALL CONTACT THE POWER CO. GAS CO. AND TELEPHONE CO FOR THE EXACT LOCATION OF ALL UNDERGROUND MAINS. CABLES. OR UNES BEFORE CONSTRUCTION BEGINS. 2 PIPE SEPARATION THE FOLLOWING MINIMUM PIPE SEPARATION WILL BE MAINTAINED 24 INCHES VERTICAL SEPARATION BEM'EEN CROSSING OF SANITARY SEWER AND STORM SEWERS 24 INCHES VERTICAL SEPARATION BETWEEN CROSSING OF SEWER (INCLUDING FORCE MAINS) AND WATER MAINS, AND 10 FEET HORIZONTAL SEPARATION BETWEEN SANITARY SEWER (INCLUDING FORCE MAINS) AND WATER MAINS. IF THESE SEPARATIONS CANNOT BE MAINTAINED, DUCTILE IRON PIPE WILL BE USED 10 FEET EITHER SIDE OF CROSSING AND ALONG ENTIRE LENGTH OF LINE LESS THAN 10 HORIZONTAL FEET FROM WATER MAINS. THE CONTRACTOR SHALL RECEIVE APPROVAL FROM THE ENGINEER IN THE FIELD BEFORE PAYMENT WILL BE MADE AT DUCTILE IRON PRICES 3 THE RIGHT-OF-WAY OR SHOWN UTILITY EASEMENT SHALL DICTATE THE LIMITS OF CONSTRUCTION 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF THE ADJUSTMENT OF EXISTING UTILITIES, INCLUDING POWER POLES THE CONTRACTOR SHALL REMOVE AND REPLACE ANY EXISTING 5 HEADWALLS. AS REQUIRED FOR THE CONSTRUCTION OF THE PROJECT ANY BYPASS PUMPING OF WASTEWATER REQUIRED TO FACILITATE CONSTRUCTION SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR THIS INCLUDES ALL WORK ASSOCIATED WITH ANY PART OF THE PROJECT, INCLUDING LINE CONNECTIONS, UNE REPLACEMENTS, AND/OR COORDINATING AROUND EXISTING LINES DURING CONSTRUCTION 18 1 i I I MANHOLE g19 I STA 0+00.00 B-10 I � I STA 5+52 BB 5-11 1 STA ELEV. 12 .38' I I RIM EIEV. 124.J8' PROPOSED I INVERT IN 117.78' LINE S-13 NrD L' I I INVERT OUT 117 65' 1 LINDEN STREET CIPP REHABILITATION NOTES: 1. BEFORE BEGINNING CIPP INSTALU' 1 1 1 1 1 1 1 1 1 1 SPP. al a PROPOSED UNE 5-12 1 1 1 1 1 1 j 1Al I 1 1: COSTS SHALL BE DEO TAPE THE INTERIOR OF )N OF ALL THE SERVICE THAT HAVE BEEN BURIED OR REPLACEMENTS. AND POINT REPAIRS. THE QUANTITY AND LOCATION OF CIPP INSTALLATION IS SUBJECT TO CHANCE FOLLOWING CCN INSPECTION FINDINGS 2 THE CONTRACTOR SHALL REPLACE EXISTING MANHOLES WHERE INDICATED AND WHERE DETERMINED BY THE ENGINEER. THE CONTRACTOR SHALL INSTALL EITHER A NEW MANHOLE OR DOGHOUSE MANHOLE AS DIRECTED THE CONTRACTOR SHALL INSTALL 8 LF OF NEW SANITARY SEWER MAINS TO MATCH EXISTING FOR RECONNECTION TO THE NEW MANHOLE ALL COSTS ASSOCIATED WITH THE PIPE INSTALLATION SHALL BE INCLUDED IN THE UNIT PRICE BID REM FOR MANHOLE INSTALLATION ANY ASPHALT REPLACEMENT, IF NEEDED, SHALL BE PAID FOR SEPARATELY. THE CONTRACTOR SHALL INSTALL NEW OUTSIDE DROPS FOR INVERT DROPS OF MORE THAN 25 VERTICAL FEET, OUTSIDE DROPS SHALL BE PAID FOR SEPARATELY. 3 THE CONTRACTOR SHALL PROVIDE ALL NECESSARY INTERNAL PRESSURE GROUTING OF THE SEWER MAINS REQUIRED TO PROPERLY INSTALL THE CPP. INTERNAL PRESSURE GROUTING SHALL BE PAID UNDER A SEPARATE UNIT PRICE BID REM AND SHALL INCLUDE ALL GROUT, MATERIALS, TOOLS AND OR REQUIRED PRESSURE GROUT LOCATIONS WILL BE DETERMINED FROM THE INITIAL VIDEO INSPECTION 4. THE CONTRACTOR SHALL BE REQUIRED TO COORDINATE WITH THE ENGINEER AND THE OWNER THE AMOUNT OF CIPP TO BE INSTALLED PRIOR TO ORDERING MATERIALS. U... 11 � � 1:1 LINDEN SIKGGI �tH'CARO... FE63. .?O � 1 F, - REHAB MANHOLE 134 STA 7+3315 S-10 Yry RIM E 126.30' INVERT IN 121.99' I INVERT OUT 121 36' IIL_JII LINDEN SIKGGI S bigitally signe� 9 1 WN n Date: 2016.08.26 � pP L3 I REHAB MANHOLE (f33 ST0. 2+80 68 5-10 IIL_JII lul ❑ �P 1 ❑ RIM ELEV 12595' INVERT IN Z I m J 1 .INVERT OUT 118.94' 118.9 ,C C W IN � WWIN Li V I I� 1 I� a 1� N WM° I °WN I 1 1 REHAB MANHOLE /35 1 STA 10+1682 S-10 RIM ELLV. 12833' INVERT OUT 122.78' 1 I PP 1 LINE S-10 ( CIPP REHABILITATION NOTES - I. BEFORE BEGINNING CIPP INSTALLA' 0 PROPOSED UNE S-8 REHAB MANHOLE /20 STA 0+0000 S-11 STA 0+00.00 S-8 RIM ELEV. 12424' INVERT IN 115 63' INVERT IN 11571' INVERT OUT 11550' VL SHALL ALL WASTEWATER, MING PROCESS SHALL TEWATER TREATMENT SHALL BE TME THE INTERIOR OF ALL SEWER SERVICE REPLACEMENTS, AND POINT REPAIRS THE QUVfl tt AN LOCATION OF CIPP INSTALLATION IS SUBJECT TO CHANGE FOLLOWING CCN INSPECTION FINDINGS 2. THE CONTRACTOR SHALL REPLACE EXISTING MANHOLES WHERE INDICATED AND WHERE DETERMINED BY THE ENGINEER THE CONTRACTOR SHALL INSTALL EITHER A NEW MANHOLE OR DOGHOUSE MANHOLE AS DIRECTED. TME CONTRACTOR SHALL INSTALL 8 LF OF NEW SANITARY SEWER MAINS TO MATCH EXISTING FOR RECONNECTION TO THE NEW MANHOLE. ALL COSTS ASSOCIATED WITH THE PIPE INSTALLATION SHALL BE INCLUDED IN THE UNIT PRICE BIO REM FOR MANHOLE INSTALLATION MY ASPHALT REPLACEMENT, IF NEEDED, SHALL BE PAID FOR SEPARATELY. THE CONTRACTOR SHALL INSTALL NEW OUTSIDE DROPS FOR INVERT DROPS OF MORE THAN 2.5 VERTICAL FEET, OUTSIDE DROPS SHALL BE PAID FOR SEPARATELY 3. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY INTERNAL PRESSURE GROUTING OF THE SEWER MAINS REQUIRED TO PROPERLY INSTALL THE CIPP INTERNAL PRESSURE GROUTING SHALL BE PAID UNDER A SEPARATE UNIT PRICE BIO REM AND SHALL INCLUDE ALL GROUT, MATERIALS, TOOLS AND LABOR REQUIRED PRESSURE GROUT LOCATIONS WILL BE DETERMINED FROM THE INITIAL VIDEO INSPECTION 4 THE CONTRACTOR SHALL BE REQUIRED TO COORDINATE WITH THE ENGINEER MD THE OWNER THE AMOUNT OF CIPP TO BE INSTALLED PRIOR TO ORDERING MATERIALS. REV610NS ] ❑ 0 0� L : ;K'��a°� Digitally signed % o�< by Mark Lacy, P.E. �+ o a , Date: 2016.08.26 1 GIR 09:36:44 -04'00' z 4= m; r � e LLA O S6 -u =cve cz 7R y L 0 mm a� 0 1 PROPOSED u Q O LL u J MMHOIE #19 1 UNE S-10 ~• O o a - STA. 5+52 8B 5-11 O SIA 0+0000 5-10 P• Z STA 0+0PROP SED 0+0000 5-12 PROPOSED RIM ELE124,38 LIS UNE 5-9 INVERT I 117.7WA7ER MIN NVER OUT 11].65' JZ PP O PPw IPP 24353' IPg__ - - -- L 30935' 8-CIPP) _I ••Cypl VQWlQa CC PP ��jj W y INAR77N LUTHER,KING DRIVE Iw �� PP W 'o RroEj Y PP MD x I \ O I I x x x x x• REHAB MANHOLE /27 I�I 1 STA 3+09.35 40' STA 0+00 00 S-9 1 RIN ELEV. 12440' INVERT IN 11908' \ 1 INVERT IN llfi ]4' PROPOSED I \ Z 1 INVERT OUT 11674' UNE S-13 1 - -- 1 I 3 jI _.—.—.— — _x_.—•_x—I az 1 I LI- LINE `LINE S-11 (CIPP REHABILITATION I N NOTES, 5 THE CONTRACTOR SHALL BE REQUIRED TO RECONDITION ALL EXISTING 1. THE CONTRACTOR SHALE CONTACT THE POWER CO.. GAS CO. MANHOLES AS INDICATED ON THE PLANS THE CONTRACTOR SHALL AN TELEPHONE CO. FOR THE EXACT LOCATION OF ALL COORDINATE WITH THE ENGINEER AND THE OWNER, PRIOR TO UNDERGROUND MAINS. CABLES. OR UNES BEFORE I INSTALLATION, FOR THE EXACT MANHOLES TO BE RECONDITIONED, THE CONSTRUCTION BEGINS. 0 Ln NUMBER MAY CHANGE DUE TO BUDGET CONSTRAINTS. 2 PIPE S E FOLLOWNG MINIMUM P IPE LLl B. THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER AND THE INC CDOT WILL BE MAINTAINED 24 INCHES VERTICAL SE ON TON O Z FOR ALL NEW MANHOLES TO BE INSTALLED IN NCDOT ROADWAYS THE BETWEEN CROSSING OF SANITARY SEWER AND STORM SEWERS O J CONTRACTOR SHALL NOTIFY NCDOT 72 HOURS PRIOR TO ANY 24 INCHES VERTICAL SEPARATION BETWEEN CROSSING OF + INSTALLATION SEWER (INCLUDING FORCE MAINS) AND WATER MAINS, AND 10 O 7. ANY BYPASS PUMPING OF WASTEWATER REQUIRED TO FACILITATE 25 0 50 FEET HORIZONTAL SEPARATION BETWEEN AIMS IF SEWER CONSTRUCTION SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR THIS (INCLUDING FORCE MAINS) AND WATER DCII IF THESE Q INCLUDES ALL WORK ASSOCIATED WITH ANY PART OF THE PROJECT. ® SEPARATIONS CANNOT BE EITHER DUCTILE IRON PIPE INCLUDING UNE CONNECTIONS. UNE REPLACEMENTS, RECONDITIONING SCALE IN FEET WILL BE USED LENGTH FEET ETHER SIDE OF CROSSING AND VI AND/OR COORDINATING AROUND EXISTING UNES DURING CONSTRUCTION ALONG ENTIREEMAI OF UNE LESS THAN S HORIZONTAL FEET FROM WATEfl MAINS THE CONTRACTOR SMALL RECEIVE APPROVAL FROM THE ENGINEERIN THE FIEBEFORE G PAYMENT WILL BE MADE AT DUCTILE IRON PRICES z 3. THE RIGHT-OF-WAYOF CONSTRUCTION SHOWN UTILITY EASEMENT SHALL DICTATE W ¢� E THE UMRS OF CONSS TRUCTION } Z 2 Q E 4 THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE H O O I COORDINATION OF THE ADJUSTMENT OF EXISTING UTILITIES. NW INCLUDING POWER POLES THE CONTRACTOR SHALL REMOVE W Q O AND REPLACE ANY EXISTING tL H LL Z 5 HEADWALLS 'AS REQUIRED FOR THE CONSTRUCTION OF THE _ pp O LLO PROJECT ANY BYPASS PUMPING OF WASTEWATER REQUIRED TO FACILITATE CONSTRUCTION SHALL BE THE RESPONSIBILITY OF LY = Z =O THE CONTRACTOR THIS INCLUDES ALL WORK ASSOCIATED WITH Q W �+ U THE CONTRACTOR SHALL LIMIT THE DISTURBED ANY PMT OF THE PROJECT. INCWDING UNE CONNECTIONS. F• Z MEA TO THE AMOUNT THAT SHALL ALLOW UNE REPLACEMENTS, AND/OR COORDINATING MOUND Z O FOR STABILIZATION OF THE DISTURBED AREA EXISTING LINES DURING CONSTRUCTION. H TO BE COMPLETED AT THE END OF EACH WOWING DAY PER NCAC REQUIREMENTS C FOR LINEAR CONSTRUCTION. 20 xRv,-u oz -azo r�xm.� \ate soauzsa0"eoo - oq �\eto _ \�ow�ezmray sr'e —a/z/1.w.. oa - in n.oroa — w , as/,s —.. o , A_sa9--\C-1-9e u.oyA N 'O N O U O `�eO bp�ix S� } '?_ o i Mal pDal - •' -STA �N 4 • •' ' ' - t00 Qo S=12 .STA. 5+5288 5-11 rD, 0• . • INV WT 117$5` • STA. 0+00.00 S+10 : STA. U+00.00 S-13 00 , - . ; INV jN 117 �5 'RIM BL£V • • , • r n mfp O 00 Q IJ -0 CL i. +. . o, ....... ....... .... ..... .............. ..... o0 afl w • •• 00 STA 3+23.27 S-12 j ' STA $+43,27 S-12 •. I +..........( . .. ... .. .. .. .. .. ._ ....H A'. .. .... . • •STa. o• ... 'INV OUT 11985 :'. _.. a+2S-17 _ • INV IN tje,95' gill F4 N + ....... .. .....:... ..;..... .: . -:........ . +............•........... ........ ...:. ........ o. • 0 o .. o• +: .... . ... ... .. ....... .... ...: .. _ ... 0. 0' .. o `0 •N' O '(Oli 'O •N O ° PHASE 2 v a g SANITARY SEWER SYSTEM IV m REHABILITATION STA 0+00 TO STA 7+98 FORTHE LINE S-12 - P TOWN OF FAIRMONT ROBESON COUNTY, NORTH CAROLINA JACKSON STREET �L unp o�$oo'o� `�eO bp�ix S� } '?_ o i Mal pDal ���r/llltt\� LKC En9lneenng, pll< Aberdeen, NC 28315Landscape Architecture O 910.420 1437F: 910 637 0096 planning kcen9lneering coin Engineering 140 Aqua Shed CourtLKC License No. P-1095 �N 4 aI2 i� lil K'2. moAFm N N d imB o F. r n mfp O 00 Q IJ -0 CL FINAL DRAWING — FOR REVIEW ONLY — NOT FOR CONSTRUCTION LKC En9lneenng, pll< Aberdeen, NC 28315Landscape Architecture O 910.420 1437F: 910 637 0096 planning kcen9lneering coin Engineering 140 Aqua Shed CourtLKC License No. P-1095 �N 4 / UI 1 P I I 1 (1 f U 0 U' I 1 1 I I U 1 _LINDEN ST_Rft7 PP �UI cR = I B4 ]6' (8 CIPP PP MANHOLE 119x— STA. 0+0000 5-13 1 °W✓ * *max STA. 5+52.88 S- 11 RIM ELEV. 12438' INVERT IN 117 1 INVERT OUT 117.67.6 5' 1 1 � FENCE 1 ' Iw Ul LINE S-13 (CIPP REHABILITATION) CIPP REHABILITATION NOTES, I BEFORE BEGINNING CIPP INSTALLATION, THE CONTRACTOR SHAUL PRESSURE CLEAN ALL UNES TO BE RECONDITIONED. ALL WASTEWATER, SLUDGE, AND SEDIMENT REMOVED DURING THE CLEANING PROCESS SHALL BE PROPERLY DISPOSED OF AT THE FAIRMONT WASTEWATER TREATMENT PUNT OR COUNTY IANDFTLL ANY DISPOSAL COSTS SHALL BE CONSIDERED INCIDENTAL TO THE PROJECT AFTER CLEANING, THE CONTRACTOR SHALL VIDEO TAPE THE INTERIOR OF THE SEWER MAIN TO DETERMINE THE LOCATION OF ALL SEWER SERVICE CONNECTIONS AND LOCATION OF MANHOLES THAT HAVE BEEN BURIED OR REPLACEMENTS. -AND POINT REPAIRS THE QUANTITY AND LOCATION OF CIPP INSTALLATION IS SUBJECT TO CHANCE FOLLOWING CCN INSPECTION FINDINGS 2. THE CONTRACTOR SHALL REPLACE EXISTING MANHOLES WHERE INDICATED AND WHERE DETERMINED BY THE ENGINEER THE CONTRACTOR SHALL INSTALL EITHER A NEW MANHOLE OR DOGHOUSE MANHOLE AS DIRECTED. THE CONTRACTOR SHALL INSTALL 8 LF OF NEW SANITARY SEWER MAINS TO MATCH EXISTING FOR RECONNECTION TO THE NEW MANHOLE ALL COSTS ASSOCIATED WITH THE PIPE INSTALLATION SHALL BE INCLUDED IN THE UNIT PRICE BID ITEM FOR MANHOLE INSTALLATION. ANY ASPHALT REPLACEMENT, IF NEEDED, SHALL BE PAID FOR SEPARATELY THE CONTRACTOR SHALL INSTALL NEW OUTSIDE DROPS FOR INVERT DROPS OF MORE THAN 2.5 VERTICAL FEET, OUTSIDE DROPS SHALL BE PAID FOR SEPARATELY 3 THE CONTRACTOR SHALL PROVIDE ALL NECESSARY INTERNAL PRESSURE GROUTING OF THE SEWER MAINS REQUIRED TO PROPERLY INSTALL THE CIPP. INTERNAL PRESSURE GROUTING SHALL BE PAID UNDER A SEPARATE UNIT PRICE BID REM AND SHALL INCLUDE ALL GROUT. MATERIALS, TOOLS AND LABOR REQUIRED PRESSURE GROUT LOCATIONS WILL BE DETERMINED FROM THE INIRAL VIDEO INSPECTION 4 THE CONTRACTOR SHALL BE REQUIRED TO COORDINATE WITH THE ENGINEER AN THE OWNER THE AMOUNT OF CIPP TO BE INSTALLED PRIOR TO ORDERING MATERIALS ouD�� REvaroNs itally P d �.! oiE811p• �•� I--• �J� We b rk La ` Da 016 .2 09:3 � '0 0 Z U mv�on �o uovaoc y f— FENCEZ PP O yJ K ? j ° ° FRII. NHOLE REHAB 137 V I ELEV26240974 Z .0 V C WATER MAIN I ERT OUT 120.39' •� _" w ___402.61'------- - O C ¢ N "PHILLIPS STREET— �c y HYDE° PP\ � ° P�' PP u1VAl °WAN HYDE W a LINDEN STREET `MANHOLE REHAB 122 Q �xJ SA 0+0000 S-14 RIM LEV'9 S-8 lY REHAB MANHOLE 136 RIM ELEV. 12450' ❑ O - RSTAIML. REV. 16 07' INVERT IN 11947' RIM ELEV. 12407' INVERT IN 11773' INVERT OUT 122.03' INVERT OUT 117.73' 3 k w^ U PP LINE S-14 (ALTERNATE #1) (CIPP REHABILITATION) o NOTES, v 5 THE CONTRACTOR SHALL BE REQUIRED TO RECONDITION ALL EXISTING 1. THE CONTRACTOR SHALL CONTACT THE POWER CO., GAS CO. MANHOLES AS INDICATED ON THE PUNS THE CONTRACTOR SHALL AND TELEPHONE CO. FOR THE EXACT LOCATION OF ALL COORDINATE WITH THE ENGINEER AND THE OWNER, PRIOR TO UNDERGROUND MAINS. CABLES. OR USES BEFORE I I INSTALLATION, FOR THE EXACT MANHOLES TO BE RECONDITIONED, THE CONSTRUCTION BEGINS. Q N G VT NUMBER MAY CHANGE DUE TO BUDGET CONSTRAINTS W F"' LL 2. PIPE L BE MTION THE FOLLOWING MINIMUM PIPE RATIO ON 6 THE F CONTRACTOR SHALL COORDINATE WITH THE ENGINEER AND THE NCDOT WILL BE MAINTAINED 24 INCHES VERTICAL SEPARATION O Z O Z FOR ALL NEW MANHOLES TO BE INSTALLED IN NCDOT ROADWAYS. THE 24BETWEENINH CROSSING OF SANITARY SEWER AND STORM SEWERS + J O J CONTRACTOR SHALL NOTIFY NCDOT 72 HOURS PRIOR TO ANY 24 INCHES VERTICAL SEPARATION BETWEEN WA CROSSING AN + + INSTALLATION. SEWER (INCLUDING FORCE MAINS) AND WATER MAINS, AND 10 O O FEET HORIZONTAL SEPARATION BETWEEN SANITARY SEWER 7. ANY BYPASS PUMPING OF WASTEWATER REQUIRED TO FACILITATE 25 0 50 (INCLUDING FORCE MAINS) AND WATER MAINS IF THESE Q Q CONSTRUCTION SHALL S THE RESPONSIBILITY RT THE HECONTRACTOR.OJECT, THIS ® SEPARATIONS CANNOT BE MAINTAINED. DUCTILE IRON PIPE INCLUDES ALL WORK ASSOCIATED LINE ANY PANT , THE PROJECT, SCALE IN FEET WILL BE USED 10 FEET ETHER SIDE OF CROSSING AND V~1 V~1 INCLUDING UNE CONNECTIONS. UNE REPLACEMENTS, RECONDITIONING ALONG ENTIRE LENGTH OF LINE LESS THAN 10 HORIZONTAL AND/OR COORDINATING MOUND EXISTING LINES DURING CONSTRUCTION FEET FROM WATEfl MAINS THE CONTRACTOR SPAL RECEIVE _ APPROVAL FROM THE ENGINEER IN THE FIELD BEFORE Q PAYMENT WILL BE MADE AT DUCTILE IRON PRICES. Z 3. THE RIGHT-OF-WAY OR SHOWN UTILITY EASEMENT SHALL DICTATE w a=O6a, F THE UMTS OF CONSTRUCTION. y Z Z U 1 4 THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE Vf O O COORDINATION OF THE ADJUSTMENT OF EXISTING UTILITIES, ry C f.. w C INCLUDING POWER POLES THE CONTRACTOR SHALL REMOVE Ml Q O AND REPLACE ANY EXISTING Q W J LL Z 5 HEADWALLS, AS REQUIRED FOR THE CONSTRUCTION OF THE PROJECT. ANY BYPASS PUMPING OF WASTEWATER REQUIRED TO Z FACILITATE CONSTRUCTION SHALL BE THE RESPONSIBILITY OF K = 0 THE CONTRACTOR THIS INCLUDES ALL WORK ASSOCIATED WITH Q Mal 3 U THE CONTRACTOR SHALL UNIT THE DISTURBED ANY PART OF THE PROJECT. INCLUDING LINE CONNECTIONS, d' o Z MEA TO THE AMOUNT THAT SHALL ALLOW LINE REPLACEMENTS, AND/OR COORDINATING MOUND Z 0 FOR STABILIZATION OF THE DISTURBED AREA EXISTING UNES DURING CONSTRUCTION. H uVI TO BE COMPLETED AT THE ENO OF EACH p WORKING DAY PER NCAC REQUIREMENTS C FOR UNEM CONSTRUCTION B BEFORE BEGINNING CIPP INSTALLATION. THE CONTRACTOR SHALL PRESSURE CLEAN ALL LINES TO BE RECONDITIONED. ALL WASTEWATER, SLUDGE. AND SEDIMENT REMOVED DURING THE CLEANING PROCESS SHALL BE PROPERLY DISPOSED OF AT THE FAIRMONT WASTEWATER TREATMENT PUNT OR COUNTY LANDFILL ANY DISPOSAL COSTS SHALL BE CONSIDERED INCIDENTAL TO THE PROJECT. AFTER CLEANING, THE CONTRACTOR SHALT. VIDEO TAPE THE INTERIOR OF THE SEWER MAIN TO DETERMINE THE LOCATION OF ALL SEWER SETMCE CONNECTIONS AND LOCATION OF MANHOLES THAT HAVE BEEN BURIED OR PAVED OVER. THE CONTRACTOR SHALL PROVIDE ALL BYPASS PUMPING REQUIRED TO PROPERLY VIDEO TAPE THE INTERIOR OF THE SEWER MAINS. THE VIDEO TAPE SHALL ALSO BE USED TO DETERMINE IF POINT REPAIRS ARE REQUIRED PRIOR TO BUNG RECONDITIONED. AFTER ALL VIDEO TAPING HAS BEEN COMPLETED AND REVIEWED, THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER AND OWNER FOR THE LOCATION OF ALL NEW MANHOLES, MANHOLE REPLACEMENTS OR MODIFICATIONS, UNE REPLACEMENTS, AND POINT REPAIRS. THE QUANTITY AND LOCATION OF CIPP INSTALLATION IS SUBJECT TO CHANGE FOLLOWING CCN INSPECTION FINDINGS 2 THE CONTRACTOR SHALL REPLACE EXISTING MANHOLES WHERE INDICATED AND WHERE DETERMINED BY THE ENGINEER. THE CONTRACTOR SHALL INSTALL EITHER A NEW MANHOLE OR DOGHOUSE MANHOLE AS DIRECTED THE CONTRACTOR SHALL INSTALL 8 LF OF NEW SANITARY SEWER MAINS TO MATCH EXISTING FOR RECONNECTION TO THE NEW MANHOLE. ALL COSTS ASSOCIATED WITH THE PIPE INSTALLATION SHALL BE INCLUDED IN THE UNIT PRICE BID BEM FOR MANHOLE INSTALLATION. ANY ASPHALT REPLACEMENT, IF NEEDED, SHALL BE PAID FOR SEPARATELY. THE CONTRACTOR SHALL INSTALL NEW OUTSIDE DROPS FOR INVERT DflOPS OF MORE THAN 25 VERTICAL FEET, OUTSIDE DROPS SHALL BE PND FOR SEPARATELY. 3 THE CONTRACTOR SHALL PROVIDE ALL NECESSARY INTERNAL PRESSURE GROUTING OF THE SEWER MAINS REQUIRED TO PROPERLY INSTALL THE CIPP. INTERNAL PRESSURE GROUTING SHALL BE PAID UNDER A SEPARATE UNIT PRICE BID BEM AND SHALL INCLUDE ALL GROUT, MATERLAS. TOOLS AND OR REQUIRED. PRESSURE GROUT LOCATIONS WILL BE DETERMINED FROM THE INITIAL VIDEO INSPECTION 4. THE CONTRACTOR SHALL BE REQUIRED TO COORDINATE WITH THE ENGINEER AND THE OWNER THE AMOUNT OF CIPP TO BE INSTALLED PRIOR TO ORDERING MATERIALS 5 THE CONTRACTOR SHALL BE REQUIRED TO RECONDITION ALL EXISTING MANHOLES AS INDICATED ON THE PLANS. THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER AND THE OWNER, PRIOR TO INSTALLATION, FOR THE EXACT MANHOLES TO BE RECONDITIONED, THE NUMBER MAY CHANGE DUE TO BUDGET CONSTRAINTS 6. THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER AND THE NCDOT FOR ALL NEW MANHOLES TO BE INSTALLED IN NCDOT ROADWAYS THE CONTRACTOR SHALL NOTIFY NCDOT 72 HOURS PRIOR TO ANY INSTALLATION. 7. ANY BYPASS PUMPING OF WASTEWATER REQUIRED TO FACILITATE CONSTRUCTION SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR THIS INCUDES ALL WORK ASSOCIATED WITH ANY PART OF THE PROJECT. INCLUDING UNE CONNECTIONS. LINE REPLACEMENTS, RECONDITIONING AND/OR COORDINATING AROUND EXISTING LINES DURING CONSTRUCTION. Digitally signed U u by Mark Lacy, P.E. ELEV 12261'RT N� n2 IN 11480' 09:41:21 -04'00' RT OUf 114]u'PP CAD � F 4RIM BEN THE CONTRACTOR SH N N �' GRAVITY SEWER �� 161, Ir1l PP �' �7� REHAB MANHOLE 138 STA 0+0000 S -IS RIM ELI:V. 123 66' I("�I MANHOLE 139 PP INVERT IN 118.98' INVERT OUT 118.92' LREHAB STA 3+5050 5-15 RIM ELEV 120 62' WVp PP ow PP WY NYDY W. PHILLIPS STREET 35050' 8' GIPP) GE WM � B BEFORE BEGINNING CIPP INSTALLATION. THE CONTRACTOR SHALL PRESSURE CLEAN ALL LINES TO BE RECONDITIONED. ALL WASTEWATER, SLUDGE. AND SEDIMENT REMOVED DURING THE CLEANING PROCESS SHALL BE PROPERLY DISPOSED OF AT THE FAIRMONT WASTEWATER TREATMENT PUNT OR COUNTY LANDFILL ANY DISPOSAL COSTS SHALL BE CONSIDERED INCIDENTAL TO THE PROJECT. AFTER CLEANING, THE CONTRACTOR SHALT. VIDEO TAPE THE INTERIOR OF THE SEWER MAIN TO DETERMINE THE LOCATION OF ALL SEWER SETMCE CONNECTIONS AND LOCATION OF MANHOLES THAT HAVE BEEN BURIED OR PAVED OVER. THE CONTRACTOR SHALL PROVIDE ALL BYPASS PUMPING REQUIRED TO PROPERLY VIDEO TAPE THE INTERIOR OF THE SEWER MAINS. THE VIDEO TAPE SHALL ALSO BE USED TO DETERMINE IF POINT REPAIRS ARE REQUIRED PRIOR TO BUNG RECONDITIONED. AFTER ALL VIDEO TAPING HAS BEEN COMPLETED AND REVIEWED, THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER AND OWNER FOR THE LOCATION OF ALL NEW MANHOLES, MANHOLE REPLACEMENTS OR MODIFICATIONS, UNE REPLACEMENTS, AND POINT REPAIRS. THE QUANTITY AND LOCATION OF CIPP INSTALLATION IS SUBJECT TO CHANGE FOLLOWING CCN INSPECTION FINDINGS 2 THE CONTRACTOR SHALL REPLACE EXISTING MANHOLES WHERE INDICATED AND WHERE DETERMINED BY THE ENGINEER. THE CONTRACTOR SHALL INSTALL EITHER A NEW MANHOLE OR DOGHOUSE MANHOLE AS DIRECTED THE CONTRACTOR SHALL INSTALL 8 LF OF NEW SANITARY SEWER MAINS TO MATCH EXISTING FOR RECONNECTION TO THE NEW MANHOLE. ALL COSTS ASSOCIATED WITH THE PIPE INSTALLATION SHALL BE INCLUDED IN THE UNIT PRICE BID BEM FOR MANHOLE INSTALLATION. ANY ASPHALT REPLACEMENT, IF NEEDED, SHALL BE PAID FOR SEPARATELY. THE CONTRACTOR SHALL INSTALL NEW OUTSIDE DROPS FOR INVERT DflOPS OF MORE THAN 25 VERTICAL FEET, OUTSIDE DROPS SHALL BE PND FOR SEPARATELY. 3 THE CONTRACTOR SHALL PROVIDE ALL NECESSARY INTERNAL PRESSURE GROUTING OF THE SEWER MAINS REQUIRED TO PROPERLY INSTALL THE CIPP. INTERNAL PRESSURE GROUTING SHALL BE PAID UNDER A SEPARATE UNIT PRICE BID BEM AND SHALL INCLUDE ALL GROUT, MATERLAS. TOOLS AND OR REQUIRED. PRESSURE GROUT LOCATIONS WILL BE DETERMINED FROM THE INITIAL VIDEO INSPECTION 4. THE CONTRACTOR SHALL BE REQUIRED TO COORDINATE WITH THE ENGINEER AND THE OWNER THE AMOUNT OF CIPP TO BE INSTALLED PRIOR TO ORDERING MATERIALS 5 THE CONTRACTOR SHALL BE REQUIRED TO RECONDITION ALL EXISTING MANHOLES AS INDICATED ON THE PLANS. THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER AND THE OWNER, PRIOR TO INSTALLATION, FOR THE EXACT MANHOLES TO BE RECONDITIONED, THE NUMBER MAY CHANGE DUE TO BUDGET CONSTRAINTS 6. THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER AND THE NCDOT FOR ALL NEW MANHOLES TO BE INSTALLED IN NCDOT ROADWAYS THE CONTRACTOR SHALL NOTIFY NCDOT 72 HOURS PRIOR TO ANY INSTALLATION. 7. ANY BYPASS PUMPING OF WASTEWATER REQUIRED TO FACILITATE CONSTRUCTION SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR THIS INCUDES ALL WORK ASSOCIATED WITH ANY PART OF THE PROJECT. INCLUDING UNE CONNECTIONS. LINE REPLACEMENTS, RECONDITIONING AND/OR COORDINATING AROUND EXISTING LINES DURING CONSTRUCTION. 25 0 50 SCALE IN FEET Digitally signed AB 0000 E 140 S MANHOLE 5-16 by Mark Lacy, P.E. ELEV 12261'RT Date: 2016.08.26 IN 11480' 09:41:21 -04'00' RT OUf 114]u'PP CAD WMW. 4RIM BEN THE CONTRACTOR SH E DISNRBED 1: L7P❑ �� 161, Ir1l PP U JREWIREMENTS%7 FOR UNEAR CONSTRU N �7� 25 0 50 SCALE IN FEET is REHAB MANHOLE 142 STA 5+06.47 5-16 RIM ELEV. 12559' r INVERT OUT 119.97' hull u J REHAB MANHOLE 141 STA 2+48.61 5-16 RIM ELEV. 123.67' INVERT IN 118.72' INVERT OUT 11872' �\ ❑ ❑ ❑ LINE S-16 (ALTERNATE #1) (CIPP REHABILITATION) Digitally signed sop.`•fE5"o by Mark Lacy, P.E. LI Date: 2016.08.26 09:41:21 -04'00' is REHAB MANHOLE 142 STA 5+06.47 5-16 RIM ELEV. 12559' r INVERT OUT 119.97' hull u J REHAB MANHOLE 141 STA 2+48.61 5-16 RIM ELEV. 123.67' INVERT IN 118.72' INVERT OUT 11872' �\ ❑ ❑ ❑ LINE S-16 (ALTERNATE #1) (CIPP REHABILITATION) m C B 6 c`w•. "Dp� ppm Ard NOTES: 1. THE CONTRACTOR SHALL CONTACT THE POWER CO. GAS CO.. AND TELEPHONE CO FOR THE EXACT LOCATION OF ALL UNDERGROUND MAINS, CABLES, OR LINES BEFORE CONSTRUCTION BEGINS. 2. PIPE SEPARATION: THE FOLLOWING MINIMUM PIPE SEPARATION WILL BE MAINTAINED' 24 INCHES VERTICAL SEPARATION BETWEEN CROSSING OF SANITARY SEWER AND STORM SEWERS 24 INCHES VERTICAL SEPARATION BETWEEN CROSSING OF SEWER (INCLUDING FORCE MAINS) AND WATER MAINS, AND 10 FEET HORIZONTAL SEPARATION BETWEEN SANITARY SEWER (INCLUDING FORCE MAINS) AND WATER MAINS. IF THESE SEPARATIONS CANNOT BE MAINTAINED, DUCTILE IRON PIPE WILL BE USED 10 FEET EITHER SIDE OF CROSSING AND ALONG ENTIRE LENGTH OF UNE LESS THAN 10 HORIZONTAL FEET FROM WATER MAINS. THE CONTRACTOR SHALL RECEIVE APPROVAL FROM THE ENGINEER IN THE FIELD BEFORE PAYMENT WILL BE MADE AT DUCTILE IRON PRICES 3. THE RICHT-OF-WAY OR SHOWN UTILITY EASEMENT SHALL DICTATE THE LIMITS OF CONSTRUCTION 4 THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF THE ADJUSTMENT OF EXISTING UTILITIES, INCLUDING POWER POLES THE CONTRACTOR SHALL REMOVE AND REPLACE ANY EXISTING 5 HEADWALLS. AS REQUIRED FOR THE CONSTRUCTION OF THE PROJECT. ANY BYPASS PUMPING OF WASTEWATER REQUIRED TO FACILITATE CONSFRUCTION SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR THIS INCLUDES ALL WORK ASSOCIATED WITH ANY PART OF THE PROJECT, INCLUDING LINE CONNECTIONS, UNE REPLACEMENTS, AND/OR COORDINATING AROUND EXISTING LINES DURING CONSTRUCTION O LD Ln O + + m In p Ln O In ( LL � LL o Z O Z O J O J + + O O In Ln !n Ln 23 i A LI C CAD Co NQ1EL k"i THE CONTRACTOR SH E DISNRBED AREA TO THE AMOUNT A 5 ALL FOR STABIUZATION OF qW M ARQ� RBE¢AREA TO BE COMPLETED AT dNE Eo OF E WORKING DAY PEA � U JREWIREMENTS%7 FOR UNEAR CONSTRU N �7� m C B 6 c`w•. "Dp� ppm Ard NOTES: 1. THE CONTRACTOR SHALL CONTACT THE POWER CO. GAS CO.. AND TELEPHONE CO FOR THE EXACT LOCATION OF ALL UNDERGROUND MAINS, CABLES, OR LINES BEFORE CONSTRUCTION BEGINS. 2. PIPE SEPARATION: THE FOLLOWING MINIMUM PIPE SEPARATION WILL BE MAINTAINED' 24 INCHES VERTICAL SEPARATION BETWEEN CROSSING OF SANITARY SEWER AND STORM SEWERS 24 INCHES VERTICAL SEPARATION BETWEEN CROSSING OF SEWER (INCLUDING FORCE MAINS) AND WATER MAINS, AND 10 FEET HORIZONTAL SEPARATION BETWEEN SANITARY SEWER (INCLUDING FORCE MAINS) AND WATER MAINS. IF THESE SEPARATIONS CANNOT BE MAINTAINED, DUCTILE IRON PIPE WILL BE USED 10 FEET EITHER SIDE OF CROSSING AND ALONG ENTIRE LENGTH OF UNE LESS THAN 10 HORIZONTAL FEET FROM WATER MAINS. THE CONTRACTOR SHALL RECEIVE APPROVAL FROM THE ENGINEER IN THE FIELD BEFORE PAYMENT WILL BE MADE AT DUCTILE IRON PRICES 3. THE RICHT-OF-WAY OR SHOWN UTILITY EASEMENT SHALL DICTATE THE LIMITS OF CONSTRUCTION 4 THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF THE ADJUSTMENT OF EXISTING UTILITIES, INCLUDING POWER POLES THE CONTRACTOR SHALL REMOVE AND REPLACE ANY EXISTING 5 HEADWALLS. AS REQUIRED FOR THE CONSTRUCTION OF THE PROJECT. ANY BYPASS PUMPING OF WASTEWATER REQUIRED TO FACILITATE CONSFRUCTION SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR THIS INCLUDES ALL WORK ASSOCIATED WITH ANY PART OF THE PROJECT, INCLUDING LINE CONNECTIONS, UNE REPLACEMENTS, AND/OR COORDINATING AROUND EXISTING LINES DURING CONSTRUCTION O LD Ln O + + m In p Ln O In ( LL � LL o Z O Z O J O J + + O O In Ln !n Ln 23 I aEVIslaNs isru moN Iy JENKINS ST. . 6r Z a NOTE-- V) = m m THE CONTRACTOR SHALL LIMIT THE DISTURBED O O AREA TO THE AMOUNT THAT SHALL ALLOW FOR STABIUZAVON OF THE DISTURBED AREA Z TO BE COMPLETED AT THE END OF EACH WORKING DAY PER NCAC REQUIREMENTS GRAVITY SEWER M EXISTING FOR LINEAR CONSTRUCTION. Digitally signed o F MANHOLE #44 v�4pFiliipy b Mark Lac P.E. Z <Q v Y STA 4+29.83 S-17 Y y° REHAB MANHOLE ♦17 ° STA 0+0000 5-17 RIM ELEV 12006' PROPOSED?!�Date: 2016.08.26 INVERT OUT 120 66' U RIM ELEV. 12594' UNE S-13 ,P. Q1 INVERT OUT 11]J2' pp MD WATER MAIN °�4�qK �. l' r����` Z L E C _ Pp PP 09:41:59 -04'00' N1 °WM C9 O Q PP ARTIN LU7NfR KING OR. I • v v PP MH 42983' (B CIPP) -- r� °---------� HYD PP CB KN WM PP PP PP � PPS � 'I �o --- o Cx U-0 PPA Z _ LINE S-17 0 --_ (CIPP REHABILITATION) z 0 N CIPP REHABILITATION NOTES, NOTES, d' 1 BEFORE BEGINNING CIPP INSTALLATION. THE CONTRACTOR SHALL 5. THE CONTRACTOR SHALL BE REQUIRED TO RECONDITION ALL EXISTING 1. THE CONTRACTOR SHALL CONTACT THE POWER CO, GAS CO., n PRESSURE CLEAN ALL ONES TO BE RECONDITIONED. ALL WASTEWATER, MANHOLES AS INDICATED ON THE PUNS THE CONTRACTOR SHALL AN TELEPHONE CO FOR THE EXACT LOCATION OF ALL SLUDGE, AND SEDIMENT REMOVED DURING THE CLEANING PROCESS SHALL COORDINATE WITH THE ENGINEER AND THE OWNER. PRIOR TO UNDERGROUND MAINS. CABLES. OR LINES BEFORE I BE PROPERLY DISPOSED OF AT THE FAIRMONT WASTEWATER TREATMENT INSTALLATION, FOR THE EXACT MANHOLES TO BE RECONDITIONED, THE CONSTRUCTION BEGINS. O VT PUNT OR COUNTY LANDFILL ANY DISPOSAL COSTS SHALL BE NUMBER MAY CHANGE DUE TO BUDGET CONSTRAINTS - LLJ CONSIDERED INCIDENTAL TO THE PROJECT. 2. PIPE SEPPAATION. THE FOLLOWING MINIMUM PIPE SEPARATION AFTER CLEANING, THE CONTRACTOR SHALL VIDEO TAPE THE INTERIOR OF 6 THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER AND THE NCDOT WILL BE MAINTAINED 24 INCHES VERTICAL SEPARATION O Z THE SEWER MAIN TO DETERMINE THE LOCATION OF ALL SEWER SERVICE FOR ALL NEW MANHOLES TO BE INSTALLED IN NCDOT ROADWAYS. THE BETWEEN CROSSING OF SANITARY SEWER AND STORM SEWERS O J CONNECTIONS AND LOCATION OF MANHOLES THAT HAVE BEEN BURIED OR CONTRACTOR SHALL NOTIFY NCDOT 72 HOURS PRIOR TO ANY 24 INCHES VERTICAL SEPARATION BETWEEN CROSSING OF -�- PAVED OVER THE CONTRACTOR SHALL PROVIDE ALL BYPASS PUMPING INSTALLATION SEWER (INCLUDING FORCE MAINS) AND WATER MAINS, AND 10 REQUIRED TO PROPERLY VIDEO TAPE THE INTERIOR OF THE SEWER MANS O THE VIDEO TAPE SHALL ALSO BE USED TO DETERMINE IF POINT REPAIRSFEET HORIZONTAL SEPARATION BETWEEN SANITARY SEWER 7 ANY BYPASS PUMPING OF WASTEWATER REQUIRED TO FACILITATE 25 0 50 ARE REQUIRED PRIOR TO BEING RECONDITIONED. AFTER ALL VIDEO CONSTRUCTION SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. THIS (INCLUDING FORCE MAINS) AND WATER MAINS IF THESE Q TAPING HAS BEEN COMPLETED AND REVIEWED. THE CONTRACTOR SHALL ® SEPARATIONS CANNOT BE MAINTAINED. DUCTILE IRON PIPE I--. COORDINATE WITH THE ENGINEER AND OWNER FOR THE LOCATION OF ALL IN ALL WORK ASSOCIATED WITH ANY PART OF THE PROJECT, SCALE IN FEET WILL BE USED 10 FEET EITHER SIDE OF CROSSING AND Ln NEW MANHOLES, WWHOLE REPLACEMENTS OR MODIFICATIONS, UNE INCLUDING LINE CONNECTIONS, LINE REPLACEMENTS. RECONDITIONING ALONG ENTIRE LENGTH OF UNE LESS THAN 10 HORIZONTAL REPLACEMENTS, AND POINT REPAIRS. THE QUANTITY AN LOCATION OF ANO/OR COORDINATING AROUND EXISTING ONES DURING CONSTRUCTION FELT FROM WATER MANS. THE CONTRACTOR SHALL RECEIVE CIPP INSTALLATION IS SUBJECT TO CHANGE FOLLOWING CCN APPROVAL FROM THE ENGINEER IN THE FIELD BEFORE INSPECTION FINDINGS PAYMENT WILL BE MADE AT DUCTILE IRON PRICES 2. THE CONTRACTOR SHALL REPLACE EXISTING MANHOLES WHERE INDICATED 3. THE RIGHT-OF-WAY OR SHOWN UTILITY EASEMENT SHALL DICTATE W QAQ AND WHERE DETERMINED BY THE ENGINEER THE CONTRACTOR SHALL THE UMITS OF CONSTRUCTION Z Z V INSTALL EITHER A NEW MANHOLE OR DOGHOUSE MANHOLE AS DIRECTED. I 1 THE CONTRACTOR SHALL INSTALL 8 LF OF NEW SANITARY SEWER MAINS 1 4 THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE 1}il O O TO MATCH EXISTING FOR RECONNECTION TO THE NEW MANHOLE ALL 1 COORDINATION OF THE ADJUSTMENT OF EXISTING UTILITIES,ry F W K COSTS ASSOCWTED WITH ME PIPE INSTALLATION SHALL BE INCLUDED IN INCLUDING POWER POLES THE CONTRACTOR SHNl REMOVE W Q O THE UNIT PRICE BID REM FOR MANHOLE INSTALLATION ANY ASPHALT AND REPLACE ANY EXISTING REPLACEMENT, IF NEEDED, SHALL BE PAID FOR SEPARATELY THE Q W J rt CONTRACTOR SHALL INSTALL NEW OUTSIDE DROPS FOR INVERT DROPS OF 5 HEADWALLS, AS REQUIRED FOR ME CONSTRUCTION OF ME 2 m O O 2 MORE THAN 25 VERTICAL FEET, OUTSIDE DROPS SMALL BE PAID FOR PROJECT. ANY BYPASS PUMPING OF WASTEWATER REQUIRED TO SEPARATELY. FACILITATE CONSTRUCTION SHALL BE THE RESPONSIBILITY OF LY = Zp THE CONTRACTOR THIS INCLUDES ALL WORK ASSOCIATED WITH Q W R+ U 3 GROUTINNHE G OF ME SEWER MAJNS REQUIRED TO PROPERLYOR HALL PROVIDE ALL NECESSARY INSTALLINSTALL THE AL PRESSURE REA TO TAE AMOUNT THAT CTOR SHALL I SHALL T THE DISTURBED � RLPIACEMENTSPMD OR PART OF THE ROJECT. ICO RDINATINGNCLUDING EMOUNDOONS Z O CIPP. INTERNAL PRESSURE GROUTING SHALL BE PAID UNDER A SEPARATE FOR STABILIZATION OF ME DISTURBED AREA EXISTING LINES DURING CONSTRUCTION. t UN B PRICE BID ITEM AND SHALL INCLUDE ALL GROUT, MATERIALS. TOOLS TO BE COMPLETED AT ME END OF EACH AND OR REQUIRED PRESSURE GROUT LOCATIONS WILL BE DETERMINED WORKING DAY PER NCAC REQUIREMENTS C FROM ME INITIAL VIDEO INSPECTION FOR LINEAR CONSTRUCTION. 4 THE CONTRACTOR SHALL BE REQUIRED TO COORDINATE WITH ME ENGINEER DATE AUCUZT, 2016 AND ME OWNER ME AMOUNT OF CIPP TO BE INSTALLED PRIOR TO DIZILNM BCL ORDERING MATERIALS D.- ACP GHLC[@ RGL 24 1-1 Pb• A Prof. S— 6 8' 24' B' WATER TIGHF MANHOLE RING AND COVER NOTE: ALL MANHOLES CONSTRUCTED WITHIN 50' OF AN ARMY CORPS CERTIFIED WETLAND SRAU- BE VACUUM TESTED MANHOLE WITHIN 50' OF WETLAND SHALL HAVE A FULL WATERPROOF EPDXY INTERIOR COATING (100 MILS THICK MIN) MANHOLE SHALL BE COATED AFTER VACUUM TESTING 6.6 W29.W29 SINGLE MAT RENF IN CENTER THIRD OF WALL AND IN TONGUE AND GROOVE TAPERFO 7 LIFTING CONTRACTOR SHALL HOLE D(fERNALLY SEAL ALL RISER AS REQUIRED SECTIONS OF MANHOLES WITHIN 50' OF WERPND WITH 6' WIDE MASTIC WATERPROOFING TAPE RUBBER BOOT O Z 11 W/ CLAMP r 4' MIN. 5' 6' SHAPED CONCRETE INVERT J `6" MIN SCREENED GRAVEL BASE SECTION A -A W PIPE 3�� I MANHOLE WALL 1 CAST -IN -PUCE PLASTIC STEPS O I T ( T q a BOLT CIRCLE 2" II �•{H.-7' E> NDTES S F \TILT V_ FOR VENTED COVER ONLY: I 1 FLOW SHALL BE MAINTAINED AT ALL PIPETIMES QQ Z 11 DUPING CONSTUCTION. 2. CONCRETE USED FOR BASE SUB AND FOR WATERTIGHT COVER ONLY: SHALL PROVIDE f�L PRE -CAST SECTIONS SHALL BE 3000 NOTE. P.S I MINIMUM MAKE REWIRED ROW DIRECTION 3. STONE BASE SHALL BE 6" MIMNIMUM. CHANGES IN MANHOLE BY SMOOTH TANGENTAL CURVE OF SHAPED 4 EXISTING SANITARY SEWER MAN SHALL BE SAW -CUT TO SPRING UNE AFTER MANHOLE INVERT PLAN MEW BASE CONCRETE IS PLACED AND SET PRECAST MANHOLE DETAIL N.T S. Z 4' GALV., SCREENED PIPE VENT WHERE SHOWN ON PLANS. SET VENT 2•-0' MIN ABOVE CONCRETE ANCHOR AT BOTTOM OF VENT REV6IONS B" 24' 8' WATER MG H7 MANHOLE RING ANO COVER er Z t s NON -SHRINK GROUT CAST OR CORE DRILL HOLE PER MFR. REQUIREMENTS C m P o PIPE DIAMETER AND^Q mo MATERIAL VARIES U mU ry — n c °zae-� EPDXY GROUT = 2' z CORE DRILLED a o o OR CAST HOLE w 69 VENTED MANHOLE NTS BREAK OUT EXISTING WALL AND FLOW PATCH AROUND NEW PIPE WRH O aJt ^ Q CONCRETE. APPLY BONDING Z AGENT BETWEEN NEW AND EXISTING SURFACES O..r NEW SEWER PIPE CONNEGTORt BER �JEXISTING NCRETE WALL 0 TYPICAL MANHOLE WALL C y C NEW PIPE TOI oN 4 y EXISTING MANHOLE CONNECTION INSTALL MINIMUM ONE WALL PENETRATION DETAIL W a FULL JOINT D I P FROM MJ z MJ TEE PRIOR TO N.T.S v TRANSITION TO PVC OR OTHER MATERIAL O' � 3.00D PSI MINIMUM O\ CONCRETE THRUST BLOCK �\/�✓\/�\/�\/�/i/�%r ��\/�//. �%r �I%r/�%\ COMPACTED PIPE BEDDING MATERNAL SHAPED CONCRETE INVERT 6' MIN. SCREENED GRAVEL BASE NEW PRECAST CONCRETE MANHOLE OR EXISTING MANHOLE WITH NEW OUTSIDE DROP CONNECTION N T.S 2' RAISED LEMING z 0 04N 32 3/4" (834mm) DIA O I T ( T q a BOLT CIRCLE 2" II �•{H.-7' E> S F \TILT V_ FOR VENTED COVER ONLY: J 0 MANUFACTURER SHALL PROVIDE TWO 3/4' MIN VENT HOLES QQ Z 11 4V4' 2'-3%'Y4MANUFACTURER FOR WATERTIGHT COVER ONLY: SHALL PROVIDE f�L 1Y2 2-4 7 7/8•� NEOPRENE ET SEAL EMBEDDED IN BOTTOM OF UD COVER SECTION B -B 7 N w Q. p 24' S�• 2871 -- Ln 36'61 SECTION CC Ln O TRAFFIC RATED MANHOLE RING Z AND COVER FOR BOTH WATER TIGHT AND VENTED REQUIREMENTS g N.T S W u Ln M I •�." (RECESSED FLUSH) FOR VENTED COVER ONLY: MANUFACTURER SHALL PROVIDE TWO 3/4' MIN VENT HOLES 27• vv r /2 1 /4 2" II �•{H.-7' E> Q j p COVER SECTION A -A I CAST -IN STAINLESS STEEL ROD�l N F OO ¢s LA 27'FOR WATERTIGHT COVER SECTION B -B N w Q. p 9'� • G CODER ONLY. 2% " MANUFACTURER SHALL 15iU PROVIDE NEOPRENE 11`' u1 a = 1Q/1 = -'I LL '� 0 (4) 1' DIA. HANDLING HOLES GASKET SEAL L• 5• EMBEDDED IN FRAME _ °GO C' = Z =O Q +U m I ON A 29 3/4" DIA B.C. (1) HEX HEAD 3/8'-16 X 1 3/4' LONG ZINC PLATED BOLT WITH ZINC WASHER & I 25jr4 P8 L L W F- 0C O Z ¢ m �J IT ZINC NUT FOR CUSTOMER TO ADD PADLOCK S2 FRAME SECTION A -A FiWN£SECTION B -B O Digitally signed DAT AUGUST. 2016 DIS NON TRAFFIC RATED MANHOLE RING AND COVER •;y, �;, �pEld%MAL ` by ` by FOR BOTH WATER TIGHT AND VENTED REQUIREMENTS . d Mark Lacy, P.E. NT•5 ��� Date: 2016.08.26 CiECETD 96L No 25 ``` 09:42:42-04'00' 11 NEW PAVEMENT STRUCTURE 5'OVERLAY —OR AS REQUIRED BY 5' OVERLAY OR AS REQUIRED BY ROADWAY AGENCY ROADWAY AGENCY PRIME COAT MINIMUM OF 2-1/2' 1-1/2' ASPHALT CONCRETE SURFACE TYPE 119 OB NCR TE COURSE SF9 SA 'OVE�� I 12 - MIN. CARRIER PIPE COMPACT TO 95% OF MAXIMUM DRY DENSITY AS DETERMINED BY AASHTO METHOD T-99. MECHANICAL TAMPER SHALL BE REQUIRED. 4' 1 OPEN CUT AT CROSSINGS AND INTERSECTIONS CROSSINGS AND I�RSEC�ONS N T.S. NOTES 1. WHERE EXISTING PAVEMENT IS INSUFFICIENT THICKNESS TO DEVELOP TIGHT SEAL WITH NEW SURFACE, NEW PAVEMENT SHALL LAP EXISTING WITH H AT LEAST A 1D' OVERLAP ON BOTH SIDES FOR SMOOTH TRANSITION OR AS PER ROADWAY AGENCY SPECIFICATIONS 2. 2' OVERLAY REWIRED FOR INSTALLATIONS PARALLEL TO ROADWAY VARIES EXISTING 4' 3GGO PSI CONCRETEI 12' CONCRETE 12' 3'-D' MIN COVER COMPACTED BACKFILL - -CARRIER PIPE CONCRETE DRIVEWAY OPEN CUT AND PATCH NTS VER BRASS CAP FINISHED GRADE I CLEANOUT STACK COLLAR 18• %18' X4' TERMINATE SERINES CLEANOUT )-� -�ANY 19 GAT IVE PB ENENNGINEEROR LOCATION 4'' 45' BEND n SERVICE PIPE LENGTH 4' PVC CAP (AS REQUIRED) 4' %4' %4' WYE SIZE % 4' WYE UNDISTURBED 4' PVC SANITARY SEWER EARTH SERVICE CHEDU E 40 IP 4' PJC SCHEDULE 40 PIPE PJC SEWER MAIN (SIZE VARIES) 4" SEWER SERVICE CONNECTION WITH CLEAN OUT DETAIL NTS THRUST GM 1 /4' STEEL 5. PLATE �I MIN. FOR O r N RODDING FOR ONE FULL JOINT LENGTH EACH SIDE OF BEND, MINIMUM CONCRETE THRUST BLOCK 3/4' TNREADED AT ALL 45' DEGREE BEDS S L RODS STATIC THRUST NUMBER OF NUMBER OF SIZE OF 45 BED IN POUNDS RODS REQUIRED 6' 4,328 2 8' 7.694 2 12' 17,312 4 16. 30,779 4 20' 48,091 6 24' 69,252 8 NOTES 1 ONCE INSTALLED AND TIGHT. THE STEEL RODS AND BOLTS SHALL RECIEVE 2 COATS OF BRUMINOUS MATERIAL OR SHALL BE GALVANIZED 2 CONCRETE SHALL NOT CONTACT BOLTS OR ENDS OF MECHANICAL JOINT BENDS. VERTICAL BENDS N T.S III _II=III_ = Yn qQl `n _E2 III ILII z = 12' MIN IN(fW. III I_ BACKFILL (SEE NOTE 1) III --------------- - HAUNCHING FOR __ ILII PVC PIPE #67 g SPRINGUNE III - - WASHED STONE N _ III TO 6' ABOVE ® TOP OF PIPE HAUNCHING FOR D.I.P.: /67 WASHED STONE III IIJIIlII JIitII�JIII JI011 6- B67 WASHED TO SPRINGUNE STONE BEDDING 12' PIPE 12' MAX WIDTH MAX SANITARY SEWER MAIN TRENCH N T.S. 26 Digitally signed ��r' fir?; -!Y' by Mark Lacy, P.E. Date: 2016.08.26 09:43:25 -04'00' 26 SEEDING GENERAL NOTES: PERMANENT SEEDING a vlsioNs aU�1°^o oAaz. Y (FOR BOTH TEMPORARY AND PERMANENT SEEDING) SOIL TESTING: CONSTRUCTION: GFNF a RFO iIRFMENTS, z < 1. TAKE SOIL SAMPLES FROM THE DIFFERENT MEAS OF THE PROJECT SITE THE 1 PREPARATION PRIMARY/PERMANENT STABILIZATION SHALL NOT BEGIN UNTIL ALL CONSTRUCTION AND UTIUTY WORK WITHIN THE PREPARATION AREA IS COMPLETE. SNI0Roth Digitally signed �roaoFEi9jp�'�'i 9 y 9 2 TEST AND ANALYZE TYPE(S) AND DUALITY OF THE EXISTING SOILS HOWEVER, R MAY BE NECESSARY TO PREPARE FOR NURSE CROPS PRIOR TO by Mark Lacy, P.E. 3. DISTURBED CONDITIONS ON A SITE MAY PRODUCE A VARIETY OF SOIL COMMUNITIES IDENTIFY AND TEST THE VARIOUS SOIL TYPES RESULTING FROM CONSTRUCTION ACTIVITY. COMPLETION OF CONSTRUCTION AND INSTALLATION OF UTILITIES. _ ;fir Date: 2016.08.26 O' 4, HAKE AMENDMENTS TO THE SOIL AS NECESSITY TO PROVIDE ADEQUATE DRAINAGE, MOISTURE 2. A NORTH CAROLINA DEPARTMENT OF AGRICULTURE SOILS TEST (OR EQUAL) SHALL BE OBTAINED FOR ALL AREAS TO BE SEEDED, SPRIGGED. SODDED OR PLANTED. hd 0hhq !:: I- fn RETENTION, AND NUTRIENT RETENTION. RECOMMENDED FERTILIZER AND PH ADJUSTING PRODUCTS SHALL BE INCORPORATED 1`v.• '4oKryi 09:44:23 -04'00' z = C m E. - _ ^ m 5 IF THE NECESSARY AMENDMENT RECOMMENDATIONS ARE NOT INCLUDED THE SOIL TEST REPORT THE INTO THE PREPARED AREAS AND BACKFILL MATERIAL PER THE TEST 11 CONSTRUCTION SPECIFICATIONS: O av rmri v o m2 CONTRACTOR SHALL OBTAIN THE SERVICES OF A SOIL PROFESSIONAL TO MAKE THE SOIL AMENDMENT RECOMMENDATIONS. 3 ALL MEAS TO BE SEEDED OR PLANTED SHALL BE TILED OR RIPPED TO A DEPTH OF 4'. RIPPING CONSISTS OF CREATING FISSURES IN A CRISS-CROSS PATTERN CLEAR THE AREA OF ALL DEBRIS THAT MIGHT HINDER EXCAVATION AND DISPOSAL OF SPOIL c) = d u R m — o. r Z 6 THE NG, H CAROLINA DEPARTMENT AGRICULTURE AND CONSUMER SERVICES PROVIDES SOIL OVER THE ENTIRE SURFACE AREA, UTILIZING AN IMPLEMENT THAT WILL NOT GLAZE INSTALL THE CUSS B OR CLASS I RIPRAP IN A SEMI -CIRCLE MOUND THE PIPE INLET. THE c TESTING, HOWEVER, TROT TURNAROUND TIME FOR SOIL TESTS 15 TYPICALLY ONE TO 1Y/0 WEEKS T N THE SIDE WALLS OF THE FISSURES. SITE PREPARATION THAT DOES NOT COMPLY STONE SHOULD BE BUILT UP HIGHER ON EACH END WHERE R TES IMO THE EMBANKMENT, O d m an m $ ] R IS IMPERATIVE THAT SOIL TESTS BE CONDUCTED AND REQUIRED AMENDMENTS BE SPECIFIED PRIOR TO SEEDBED PREPARATION AND THAT SEEDING BE ACCOMPLISHED ACCORDING TO THE SEEDING WITH THESE DOCUMENTS SHALL NOT BE ACCEPTABLE 4 ALL STONES LARGER THAN THREE (3) INCHES ON SIDE, STICKS, ROOTS, AND THE MINIMUM CREST WIDTH OF THE RIPRAP SHOULD BE 3 Fr.. WITH A MINIMUM BOTTOM WIDTH OF 11 Fr. THE MINIMUM HEIGHT SHOULD BE 2 Fr, BUT ALSO 1 Fr. LOWER THAT THE F- 6 w 4 ` O LL Ova Y j SCHEDULE INH' OTHER EXTRANEOUS MATERIALS THAT SURFACE DURING THE BED PREPARATION SHOULDER OF THE EMBANKMENT OR DIVERSIONS 8 THE CONTRACTOR SHALL AD QUATELY PIM TO HAVE SOIL TESTS RESULTS MD REQUIRED AMENDMENTS RETURNED IN SUFFICIENT TIME FOR USE IN SEEDBED PREPARATION ACCORDING TO SHALL BE REMOVED. AREAS To R1 c m D, A 1 FT THICK LAYER OF NCDOT /5 OR #57 STONE SHOULD BE PLACED ON THE OUTSIDE SLOPE OF THE RIPRAP z SCHEDULE 1. PLLDISTHE PREPARED MEAS TO BE SEEDED TO A MINIMUM DEPTH OF FOUR C THE SEDIMENT STORAGE AREA SHOULD BE EXCAVATED MOUND THE OUTSIDE OF THE STONE I a �+ 9 THE CONTRACTOR MAY NEED TO EMPLOY A PRIVATE FIRM FOR SOIL TESTING AND AMENDMENT (4) IOR NCHES REMOVE STONES LARGER THAN THREE (3) INCHES ON ANY SIDE, HORSESHOE IB INCHES BELOW NATURAL GRADE } ti SPECIFICATION TO ACCOMPLISH SEEDING ACCORDING TO SCHEDULE STICKS, ROOTS AND OTHER EXTRANEOUS MATERIALS THAT SURFACE IF NOT WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED. FILL DEPRESSION AND RESPONSIBILITY: INCORPORATED DURING THE SOIL PREPARATION PROCESS, ADD PH MODIFIER AND ESTMUSH FINAL GRADING E EVATIONS. COMPACT MEA PROPERLY. AND STABILIZE WITH Z ` V C MOBILIZATION UNTO ESTABLISHMENT PERMANENTS ON T 1, FROM THE TIME OF PROJECTCONTRACTOR'S FERTILIZERS AT THE RATE SPECIFIED IN THE SOIL TEST REPORT GROUND COVER O ¢ C OS MEASURES SHALL BE THE CONiRALTOR'S RESPONSIBILITY TO PROVIDE ALL EROSION CONTROL MFISURES CKER ROLLER. ME FINISHED PANE THE AR GSU 2 RE-COMPSHALL MAINTENANCE: INDICATED ON TIE DRAWINGS AND IN THE SPECIFICATIONS MD AS MAY BE DIRECTED BY THE Ek5 BEAA SMOOTH EVEN SOILSURFACEWITHA LOOSE, UNIFORMLY FINE TEXTURE. ALL RIDGES MO DEPRESSIONS SHALL BE REMOVED AND FILLED TO 3 a 4 C C INSPECTOR 2. AFTER ESTABLISHMENT OF PERMANENT STABILIZATION AND FOR ONE YEAR THEREAFTER R 19 THE PROVIDE THE APPROVED SURFACE DRAINAGE. SEEDING OF GRADED MEAS IS TO BE DONE IMMEDIATELY AFTER FINISHED GRADES ME OBTAINED AND SEEDBED INSPECT ROCK PIPE INLET PROTECTION AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1/2 INCH OR GREATER RAINFALL EVENT AND REPAIR IMMEDATELY. REMOVE SEDIMENT MD RESTORE THE SEDIMENT STORAGE MFA TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT LLJ N W N CONTRACTOR'S RESPONSIBILITY TO REPAIR EROSION THAT OCCURS WITHIN THE CONTRACT AREA AND PREPARATION IS COMPLETED HAS ACCUMULATED TO 1/2 THE DESIGN DEPTH OF THE TRAP PUCE THE SEDIMENT THAT IS � C THAT IS THE RESULT OF PROJECT CONSTRUCTION ACTIVITIES OR NATURAL CAUSES 3 SOILS TEST DURING AND/OR AFTER INITIAL GRADING IS COMPLETE SHALL BE REMOVED IN TIE DESIGNATED DISPOSAL AREA AND REPLACE THE CONTAMINATED PMT OF THE o 3 REPAIR OF ANY AFTER ONE YEAR BEYOND PERMANENT ATOM IS THE OWNER'S OBTAINED PRIOR TO, AND FOR USE IN, SEEDBED PREPARATION GRAVEL (ACING. lY UNLESS IN TH RESPONSIBILITY UNLESS OTHERWISE INDICATED ON THE PLANS OR IN THE SPECIFICATIONS. 4. REPAIR OF ANY PERSISTENT RECURRENCE OF EROSION THAT BEGINS UNDER THE CONTRACTOR'S ` CHECK THE STRUCTURE FOR DRAINAGE. ANY RIPRAP DISPLACED FOR THE STONE HORSESHOE MUST BE REPLACED IMMEDIATELY Q La_ - RESPONSIBILITY SHALL REMAIN THE RESPONSIBILITY OF THE CONTRACTOR UNTIL R CEASES TO RECUR 1 IMMEDIATELY RESEED AND MULCH MEAS ACCORDING TO THE SEEDING SCHEDULE AFTER ALL THE SEDIMENT -PRODUCING MEAS HAVE BEEN PERMANENTLY STABILIZED. REMOVE i 5 THE CONTRACTOR SHALL NOT BE RESPONSIBLE FOR REPAIRING ANY EROSION OCCURRING AFTER WHERE SEEDLING EMERGENCE IS POOR. OR WHERE EROSION OCCURS DO NOT MOW UNTIL WELL ESTABLISHED OR AVERAGE HEIGHT REACHES 6 INCHES PROTECT FROM THE STRUCTURE AND ALL THE UNSTABLE SEDIMENT. SMOOTH THE ME TO BLEND WITH THE I COMPLETION OF THE PROJECT THAT IS THE RESULT OF ACTIVATES OF OTHERS AND NOT THE RESULT TRAFFIC AS MUCH AS POSSIBLE UNTIL WELL ESTABLISHED MINIMIZE TRAFFIC ADJOINING MEAS MD PROVIDE PERMANENT GROUND COVER (.7 j OF THE CONTRACTOR'S ACTIVITIES OR NATURAL CAUSES REPAIR OF SUCH EROSION SHALL BE THE THEREAFTER TO THAT NECESSARY FOR THE INTENDED LAND USE Z RESPONSIBIUIY OF THE PROPERTY OWNER 2. IF SEEDLING EMERGENCE CONTINUES TO BE POOR OBTAIN A NEW SOIL TEST FOR ), W TEMPORARY SEEDING THE AFFECTED AREA AND APPLY AMENDMENTS NECESSARY TO PROMOTE GOOD GROWTH AND RESEED AND MULCH ACCORDING TO THE SEEDING SCHEDULE. / ✓ CONSTRUCTION: 3 IF AT ANY TIME THEIR EXISTS INADEQUATE MOISTURE IN THE SOIL FOR COMPLETE GRPDING BEFORE PREPARING SEEDBEDS, AND INSTALL ALL NECESSARY EROSION CONTROL ESTMUSHMENT AND GROWTH. APPLY IRRIGATION TO PROVIDE ADEQUATE MOISTURE ( PRACTICES IF SOILS BECOME COMPACTED DURING GRADING, LOOSEN THEM TO A DEPTH OF 6-8 I INCHES USING A RIPPER, HARROW, OR CHISEL PLOW. DO NOT SATURATE THE SOIL OR USE AN EXCESSIVE RATE OF APPLICATION CAUSING EROSION —1 [�A 1, SEEDBED PREPARATION 4 IF EVIDENCE IS FOUND OF DISEASE OR INSECTS AFFECTING ESTABLISHMENT AND A A z PREPARE SEEDBED SO THAT IT IS WELL PULVERIZED, LOOSE, AND UNIFORM WHERE HYDROSEEDING METHODS ARE USED, THE SURFACE MAY BE LEFT WITH A MORE IRREGULAR SURFACE OF LARGE GROWTH. DETERMINE THE CORRECTIVE MEASURES NECESSARY AND ACCEPTABLE TO NC ENR AND APPLY THEM. RESEED AND MULCH ACCORDING TO THE SEEDING - I CLODS AND STONES. SCHEDULE IF NECESSARY 2. UUM 5 AFTER THE PERMANENT SEEDING IS WELL ESTMUSHED, MOW OR OTHERWISE CUT APPLY UME ACCORDING TO SOIL TEST RECOMMENDATIONS APPLY LIMESTONE UNIFORMLY AND I INCORPORATE INTO THE TOP 4-6 INCHES OF SOIL SOILS WITH A PH OF 6 OR HIGHER NEED NOT THE GROWTH 90 THAT SEED DOES NOT FORM MD THE GROWTH IS CONTAINED WITHIN THE AREA TO WHICH R WAS INITIALLY APPUED ROW BE UMED I FRnli 3, D s B/5E APPLICATION RATES ON SOIL TESTS BOTH FERTILIZER AND LIME SHALL BE INCORPORATED INTO t 4 - STORM DRAIN 0 ' THE TOP 4-6 INCHES OF SOIL IF A HYDRAULIC SEEDER IS USED, DO NOT MIX SEED AND FERTILIZER MORE THAN 3D MINUTES BEFORE APPLICATION TEMPORARY AND PERMANENT SEEDING SCHEDULE - F I 4. SURFACE ROUGHENING L IF RECENT TILLAGE OPERATIONS HAVE RESULTED IN A LOOSE SURFACE, ADDITIONAL ROUGHENING MAY Seeding mixture _ 12' OF d57 ` CLASS B RIP RAP STONE STONE FILTER z L� v NOT BE REQUIRED, EXCEPT TO BREW( UP LARGE CLODS IF RAINFALL CAUSES THE SURFACE TO$PQCIe9 Rote �Ib�OCfe� , O — BECOME SEALED OR CRUSTED, LOOSEN IT JUST PRIOR TO SEEDING BY DISKING, RAKING, HARROWING, OR OTHER SUITABLE METHODS GROOVE OR FURROW SLOPES STEEPER MAN 31 ON THE CONTOUR Tail Fe.we (KY -31 or o 50-50 t) Q II--... I BEFORE SEEDING (PRACTICE 603, SURFACE ROUGHENING) blend of two tuff -type loll fescue.) 200-250 ^� z (1J 5. $EEDIBG KY Blue Gras. or a 50-50 mix of O p EVENLY APPLY SEED USING A CYCLONE SEEDER (BROADCAST). DRILL, CULTIPACKER SEEDER, OR two Improved blue grass vanebe. 25-50 N ' HYDROSEEDER USE SEEDING RATES GIVEN IN TABLES 6.10A-6.IOC BROADCAST SEEDING AND Seeding Dates O HYDROSEEDING ME APPROPRIATE FOR STEEP SLOPES WHERE EQUIPMENT CANNOT BE DRIVEN HMD ONERSION PLAN i BROADCASTING SHALL NOT BE DONE SMALL GMINS SHOUID BE PARTIED NO MORE THAN I INCH DEEP, MD GRASSES AND LEGUMES NO Best Possible Below 2500 ft: Aug. 15 - Sept, 1 July 25 -Sept. 15 POINT 1p• QP M57 SHOULDER LLL MORE THAN 1/2 INCH. BROADCAST SEED MUST BE COVERED BY RAKING OR CHAIN DRAGGING, AND y THEN UGHMY FIRMED WITH A ROLLER OR CULTIPACKER HYDROSEEDED MIXTURES SHALL INCLUDE A Mor. 1 - Apr. 1 Mar I -May 10 STONE FILTER CIMS B RIP RAP STONE (P WOOD FIBER (CELLULOSE) MULCH Above 2500 fl July 25 - Aug 15 Jut 15 - Aug 30 _ 6 MULCH Mar 20 - Apr 20 Nar 5 - May 15 i 18• z /) ' '- M APPROPRIATE MULCH WILL HELP ENSURE ESTABLISHMENT UNDER NORMAL Soil Amendments _ MIN _ _s`K-^' i i CONDITIONS, MD IS ESSENTIAL TO SEEDING SUCCESS UNDER HARSH SITE CONDITIONS (PRACTICE Appy lime and fertilizer accordmg to sod testi rt j W O 6.14, MULCHING). HARSH SITE CONDITIONS INCLUDE. Mulch `•� mS ,J y 6.1.SEEDING IN FALL FOR WINTER COVER (WOOD FIBER MULCHES ARE NOT CONSIDERED ADEQUATE a For sloop.. 2h.1v. or les. apply 3,000-4,000 Ib/acre grin straw or equivalent /a /�-�)_ # FLOW } FOR THIS USE) 6.2. SLOPES STEEPER THAN 3:1, co r f a Cher sortable mulch Anchor mulch by lackng wdh asphalt, ng.4 tl r by r Iling and watenng Far slopes greater than 2h:1v apply Es..I.Ior O o 2 F N 10 Q �° 61.E%CESSIVELY HOT OR DRY WEATHER. Mat RECP according to drawings and ep— i.bns ]'-6' MIN STORM DRAIN W Mad w 25 6.4.ADVERSE SOILS (SHALLOW, ROCKY. OR HIGH IN CLAY OR WD), AND MEAS CONCENTRATED FLOW Maintenance ~ LL Z zi z LL H — A TO BE L IF THE AREA TO BE MULCHED IS SUBJECT 70 CONCENTRATED WATERFLOW, M IN CHANNELS, IF 8 RefeHilize accordmg b soA tests annually in late ..ad and again in fall. Beed, /ertdiza, and mulch bare spot. Immedialeiy, and reseed elands with the sa SECTION A—A = m P O �' Q So ANCHOR MULCH WITH NETTING (PRACTICE 6.14, MULCHING) poor In, d°r° '^ "°'°" TEMPORARY CULVERT PROTECTION DETAIL Z = O a MJ 3 GREATER THAN 2H 1V SHALL HAVE A DOUBLE NET BLANKET TYPE RECP INSTALLED AS Permanent Permanent , = E OF MALL ULCHING. ` seeding containment NOT TO SCALE 2 Z O " MAINTENANCE: New or otherwise cut grass regularly o that se d does not form and gra.. s Q m 1. ELY RESEED AND MULCH Mils WHERE SEEDLING EMERGENCE IS POOR, OR WHERE EROSION contained Ma. the areae o1 application Keep height of grass to lass than 6 Inches tall on estabrisned yl O I OCCURS DO NOT MOW PROTECT FROM TRAFFIC AS MUCH AS POSSIBLE OCCURS � B 2 IP SEEOUNG EMERGENCE CONTINUES TO BE POOR OBTAIN A NEW SOIL TEST FOR THE AFFECTED AREA AND APPLY AMENDMENTS NECESSARY TO PROMOTE GOOD GROWN AND RESEED AND MULCH qutUST• 2016 3 IF AT ANY TIME THEIR EXISTS INADEQUATE MOISTURE IN THE SOIL FOR ESTABLISHMENT AND GROWTH. �} p6mx6a MAL APPLY IRRIGATION TO PROVIDE ADEQUATE MOISTURE DO NOT SATURATE THE SOIL OR USE AN EXCESSIVE RATE OF APPLICATION CAUSING EROSION — ACF CHECKLD 6GL 4. IF EVIDENCE IS FOUND OF DISEASE OR INSECTS AFFECTING ESTMUSMMENT AND GROWTH. DETERMINE Ho. THE CORRECTIVE MEASURES NECESSARY AND ACCEPTABLE TO NCDENR AND APPLY THEM RESEED AND MULCH IF NECESSARY. 27 BOG DEWATERING 0 SIDEWALK OR GRASS AREA 15 OR 157 STONE GR SLOPE EL FILTER COMASONRYGRAV NCRETE MASONRY BLOCK 2 COURSES 16' HIGH (MIN) ` EDGE OF CURB & GUTTER NOTES 1. POSITION 1 BLOCK PER SIDE ON BOTTOM COURSE TO ALLOW FOR DEWATERING. WRAP DEWATERING BLOCK WITH 1/4' MESH WIRE TO PREVENT STONES FROM WASHING INTO INLET. CURB INLET PROTECTION N.T S -� 2'X4' WOO*�EHER EXCESCORNERS MINETIC FABRIC TEMPORARY FABRIC PROTECTION FOR DROP INLETS fONRRDOTMR SPECIFIC TONS• 1. M SYNTHETIC FABRIC, USE A PERVIOUS SHEET OF NYLON, POLYESTER, OR ETHYLENE YARN - EXTRA STRENGTH (50M/1' MIN) - THAT CONTAINS ULTRAVIOLET RAY INHIBITORS AND STMIUZERS FABRIC SHOULD BE SUFFICIENTLY POROUS TO PROVIDE ADEQUATE DRAINAGE OF THE TEMPORARY SEDIMENT POOL 2. CUT FABRIC FROM A CONTINUOUS ROLL TO ELIMINATE JOINTS 3 FOR STAKES, USE 2'X4' WOOD (PREFERRED) OR EQUIVALENT METAL WITH A MINIMUM LENGTH OF 3 FEET. 4 SPACE STAKES EVENLY MOUND THE PERIMETER OF THE INLET A MAXIMUM OF 3 FEET MART. AND SECURELY DRIVE THEM INTO THE GROUND APPROXIMATELY 18' DEEP. 5 TO PROVIDE NEEDED STABILITY TO THE INSTALLATION. FRAME WITH 2'X4' WOOD STRIPS MOUND THE CREST OF THE OVERFLOW AREA AT A MAXIMUM OF 1 1/2 FEET ABOVE THE DROP INLET CREST. 6. PLACE THE BOTTOM 12' OF THE FABRIC IN A TRENCH AND BACK FILL THE TRENCH WITH AT LEAST 4' OF CRUSHED STONE OR 12' OF COMPACTED SOIL 7. FASTEN FABRIC SECURELY TO THE STAKES AND FRAME. JOINTS MUST BE OVERLAPPED TO THE NEXT STAKE GROUND STABILIZATION REQUIREMENTS CONTRACTOR SHALL BE REQUIRED TO ESTABUSH GROUND STABILIZATION AS PER FOLLOWING CHART. SITE AREA STABILIZATION STABILIZATION TIME DESCRIPTION TIME FRAME FRAME EXCEPTIONS PERIMETER DIKES. SWALES, DITCHES AND 7 DAYS NONE SLOPES HIGH QUAUTY 15'PREPARE �,IYIT N 0' AS SPECIRED WATER (HOW) 7 DAYS NONE ZONES IFSLOPES ME 10' OR SLOPES STEEPER THAN 31 7 DAYS LESS IN LENGTH AND ME NOT STEEPER THAN 2.1, 14 DAYS ME ALLOWED SLOPES 3:1 OR 7 DAYS FOR SLOPES FLATTER 14 DAYS GREATER THAN 50 FEET IN LENGTH ALL OTHER MEASNONE WITH SLOPES 14 DAYS (EXCEPT FOR PERIMETERS FLATTER THAN 4:1 AND HOW ZONES) ICAL GROUND COVER STMIUZATION TYPES - r.7..EC MS AND OR SOD. WHEAT STMW, MULCH. RADABLE STRAW MATTING, SYNTHETIC MATTING, ETC. SYNTHETIC MAT SWALE 3 '4AX I UMNG EXCELSOR MAT 2' DEPRf OVERLAP AT SEAMS STABLES 2' DG 1 n• BGIN DIRECTIONS f=1 NOTE PREPARE, SEEO,MD INSTALL SOIL EROSION CONTROL BLANKET ON DIMMED AREA OF DITCH EXCELSIOR MAT SWALE �3 cII _I II — 1— DEPTH ^nu=�- SEED AND MULCH SHOULDER SEED & MULCH GRASS SWALE SWALE DETAILS NOT TO SCALE CONSTRUCTION SPECIFICATIONS: Digitally signed by Mark Lacy, P.E. Date: 2016.08.26 09:45:08 -04'00' CLEAR THE AREA OF ALL DEBRIS THAT MIGHT, HINDER EXCAVATION AND DISPOSAL OF SPOIL INSTAL. THE CLASS B OR CLASS I RIPRAP IN A SEMI -CIRCLE MOUND THE PIPE INLET. THE STONE SHOULD BE BUILT UP HIGHER ON EACH END WHERE IT TIES INTO THE EMBANKMENT THE MINIMUM CREST WIDTH OF THE RIPRM SHOULD BE 3 FT.. WITH A MINIMUM BOTTOM WIDTH OF 11 FT THE MINIMUM HEIGHT SHOULD BE 2 FT. BUT ALSO 1 FF. LOWER THAT THE SHOULDER OF THE EMBANKMENT OR DIVERSIONS A 1 FF THICK LAYER OF NCDOT 15 OR 157 STONE SHOULD BE PLACED ON THE OUTSIDE SLOPE OF THE RIPRM THE SEDIMENT STORAGE AREA SHOULD BE EXCAVATED MOUND THE OUTSIDE OF THE STONE HORSESHOE 18 INCHES BELOW NATURAL GRADE WHEN THE CONTRIBUTING ORAINAGE AREA RAS BEEN STMIUZED. FILL DEPRESSION AND ESTABLISH FINAL GRADING ELEVATIONS, COMPACT AREA PROPERLY, AND STABILIZE WITH GROUND COVER. MAINTENANCE: INSPECT ROCK PIPE INLET PROTECTION AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1/2 INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY REMOVE SEDIMENT AND RESTORE THE SEDIMENT STORAGE AREA TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO 1/2 THE DESIGN DEPTH OF THE TRAP. PLACE THE SEDIMENT THAT IS REMOVED IN THE DESIGNATED DISPOSAL AREA AND REPLACE THE CONTAMINATED PART OF THE GRAVEL FACING CHECK THE STRUCTURE FOR DRAINAGE. MY RIPRM DISPLACED FOR THE STONE HORSESHOE MUST BE REPLACED IMMEDIATELY AFTER ALL THE SEDIMENT -PRODUCING MF/5 HAVE BEEN PERMANENTLY STABILIZED. REMOVE THE STRUCTURE AND ALL THE UNSTABLE SEDIMENT SMOOTH THE ARE TO BLEND WITH THE ADJOINING MEM AND PROVIDE PERMANENT GROUND COVER J O Z In OJ U Q Z t 00 N O Cr LLI z w aoa } Z Z V u O O Vw1wa W �O S I^mOp� HDDe Oz Z H 0 Q L'1 H 0 z 28 `.�LHIC�{Q �✓/i e FILL FABRIC W/ TOPSOIL 6' MIN. AND SEED & uULCH 31/I MAK I is 15'PREPARE �,IYIT N 0' AS SPECIRED NOTE: OVERLAP SMALL BE 2' MIN AND BE LAD W1. OVERLAP OCCU,RING ON DOWNSLOPE SYNTHETIC MAT SWALE 3 '4AX I UMNG EXCELSOR MAT 2' DEPRf OVERLAP AT SEAMS STABLES 2' DG 1 n• BGIN DIRECTIONS f=1 NOTE PREPARE, SEEO,MD INSTALL SOIL EROSION CONTROL BLANKET ON DIMMED AREA OF DITCH EXCELSIOR MAT SWALE �3 cII _I II — 1— DEPTH ^nu=�- SEED AND MULCH SHOULDER SEED & MULCH GRASS SWALE SWALE DETAILS NOT TO SCALE CONSTRUCTION SPECIFICATIONS: Digitally signed by Mark Lacy, P.E. Date: 2016.08.26 09:45:08 -04'00' CLEAR THE AREA OF ALL DEBRIS THAT MIGHT, HINDER EXCAVATION AND DISPOSAL OF SPOIL INSTAL. THE CLASS B OR CLASS I RIPRAP IN A SEMI -CIRCLE MOUND THE PIPE INLET. THE STONE SHOULD BE BUILT UP HIGHER ON EACH END WHERE IT TIES INTO THE EMBANKMENT THE MINIMUM CREST WIDTH OF THE RIPRM SHOULD BE 3 FT.. WITH A MINIMUM BOTTOM WIDTH OF 11 FT THE MINIMUM HEIGHT SHOULD BE 2 FT. BUT ALSO 1 FF. LOWER THAT THE SHOULDER OF THE EMBANKMENT OR DIVERSIONS A 1 FF THICK LAYER OF NCDOT 15 OR 157 STONE SHOULD BE PLACED ON THE OUTSIDE SLOPE OF THE RIPRM THE SEDIMENT STORAGE AREA SHOULD BE EXCAVATED MOUND THE OUTSIDE OF THE STONE HORSESHOE 18 INCHES BELOW NATURAL GRADE WHEN THE CONTRIBUTING ORAINAGE AREA RAS BEEN STMIUZED. FILL DEPRESSION AND ESTABLISH FINAL GRADING ELEVATIONS, COMPACT AREA PROPERLY, AND STABILIZE WITH GROUND COVER. MAINTENANCE: INSPECT ROCK PIPE INLET PROTECTION AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1/2 INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY REMOVE SEDIMENT AND RESTORE THE SEDIMENT STORAGE AREA TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO 1/2 THE DESIGN DEPTH OF THE TRAP. PLACE THE SEDIMENT THAT IS REMOVED IN THE DESIGNATED DISPOSAL AREA AND REPLACE THE CONTAMINATED PART OF THE GRAVEL FACING CHECK THE STRUCTURE FOR DRAINAGE. MY RIPRM DISPLACED FOR THE STONE HORSESHOE MUST BE REPLACED IMMEDIATELY AFTER ALL THE SEDIMENT -PRODUCING MF/5 HAVE BEEN PERMANENTLY STABILIZED. REMOVE THE STRUCTURE AND ALL THE UNSTABLE SEDIMENT SMOOTH THE ARE TO BLEND WITH THE ADJOINING MEM AND PROVIDE PERMANENT GROUND COVER J O Z In OJ U Q Z t 00 N O Cr LLI z w aoa } Z Z V u O O Vw1wa W �O S I^mOp� HDDe Oz Z H 0 Q L'1 H 0 z 28 II NTS I SILT FENCE INSTALLATION: 1 THE SSE OF BOTH END POSTS SHOULD BE AT LEAST ONE FOOT HIGHER THAN THE MIDDLE OF THE FENCE CHECK WITH A LEVEL IF NECESSARY. e 2. INSTALL POSTS 4 FEET APART IN CRITICAL MEAS AND 6 FEET APART ON STANDARD FR APPLICATIONS 4 3 INSTAL. POSTS 2 FEET DEEP ON THE DOWNSTREAM SIOE OF THE SILT FENCE, AND AS CLOSE AS POSSIBLE TO THE FABRIC, ENABUNG POSTS TO SUPPORT THE FABRIC 'yy FROM UPSTREAM WATER PRESSURE. 3a 4INSTALL POSTS WITH THE NIPPLES FACING AWAY FROM THE SILT FABRIC q 5 ATTACH THE FABRIC TO EACH POST WITH THREE PES. ALL SPACED WITHIN THE TOP 8 INCHES OF THE FABRIC ATTACH EACH TIE DIAGONALLY 45 DEGREES THROUGH l9 THE FABRIC, WITH EACH PUNCTURE AT LEAST 1 INCH VERTICALLY APART ALSO, EACH TIE SHOULD BE POSITIONED TO RANG ON A POST NIPPLE WHEN TIGHTENED TO PREVENT SAGGING IV 6 WRAP MPRO%IMATELY 6 INCHES OF FABRIC MOUND WE END POSTS AND SECURE 1 j WITH 3 TIES i 7. NO MORE THAN 24 INCHES OF A 36 INCH FABRIC IS ALLOWED MOVE GROUND EVEL ;B 8. THE INSTAUAPON SHOULD BE CHECKED AND CORRECTED FOR ANY DEVIATIONS BEFORE COMPACTION RR 9 COMPACTION IS VITALLY IMPORTANT FOR EFFECTIVE RESULTS. COMPACT THE SOIL f 5 IMMEDIATELY NEXT TO THE SILT FENCE FABRIC WITH THE FRONT WHEEL OF THE TRACTOR, SKID STEER, OR ROLLER EXERRNG AT LEAST 60 POUNDS PER SQUARE § d INCH COMPACT THE UPSTREAM SIDE FIRST, AND THEN EACH SIDE TWICE FOR A ._ TOTAL OF 4 TRIPS. FENCE MAINTENANCE: 1. INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL 2. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. 3. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE TEM. DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. 4 REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAN AND TO REDUCE PRESSURE ON THE FENCE 5.TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. 6. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBU71NG DRAINAGE AREA RAS BEEN PROPERLY STMWZED 12' THICK SEDIMENT Digitally signed by Mark Lacy, P.E. r -i--1-18' MIN 2 Date: 2016.08.26 �44Rk'� 41•`\\ 09:47:16 -04'00' 12' THICK SEDIMENT I I I CONTROL STONE r -i--1-18' MIN 2 1. RAL STONE SHALL BE STRUCTURAL CV55 'A' STONE FOR EROSION STONE CONTROL PURPOSES SEDIMENT CONTROL SHALL BE CROSS SECTION 857 STE 8E. 2. OUTLETS TO BE PLACED AT LOW POINTS ALONG SILT FENCE �I SILT FENCE SILT FENCE TOP VIEW SILT FENCE (TYP) } 12 MAX FRONT VIEW STONE OUTLET DETAIL NOT TO SCALE 0 C'^ mom cZae `6 �Z wQEOu_�a Vow s� K Z !n OQ Z 20 N O F6 W