EcoScience
March 21, 2008
11(11 [Iayncs Street Suite 1O1 Ralci~h, NC 270(1-4 Tclc~ih~mc: Vl').ti2~`t.3-~33 Fas: ')1'1.525.;1;1ti
Cyndi Karoly
North Carolina Division of Water Quality
Wetlands Unit
Mail Service Center 1650
Raleigh, NC 27699-1650
~~~~n~~a
MAR 2 4 2008
DENR -WATER (]UAUTY
WETLANDS AND STORMNIATER BkAN~
Re: Request for More Information (February 28, 2008) 07-378
Section 404 Permit for Austin Creek Sewer Line Connector, Wake County
DWQ Project # OS-1480, Ver. 2
Dear Ms. Karoly,
Please find enclosed documentation and figures pertaining to your Request for More Information
dated February 28, 2008 for the above-mentioned project (attached). We have spoken with Ian
McMillan of your office and we believe we have supplied the materials necessary to respond to
your request. We will address each point in your letter herein.
On March 10, 2008, Jamie Shern of the USACE stated that he would approve the sewer
project under a Nationwide Permit 12, and then approve the housing development later
under a Nationwide >;ermit 29. The project has logical termini and can be considered a
single and complete project. However, jurisdictional area impacts will be considered
cumulative when the housing development permit is applied for
2. Our original site plans, depicting jurisdictional area impacts associated with the sewer
alignment, were submitted at a scale of 1" = 50'. However, we have submitted additional
plans attached to this letter at various scales, with detail sheets at the requested scale or
larger. The additional plans are described below.
3. Although we do not have finalized plans for the entire housing subdivision project, we
have supplied those elements that are available.
a) Cross section detail for culvert crossings are not available at this time.
b) The plans for two stormwater retention ponds and other stormwater management
practices arP~ included in the enclosed Drawings CS through C8, C19, and E1.
c) Plans and profiles for stormwater management devices are enclosed in the enclosed
Drawings CS through C8, C19, and E1.
Ms. Cyndi Karoly
March 21, 2008
Page 2 of 3
EcoScience: a Division of PBS&J
d) Stormwater inlets, outfalls, and drainage areas are shown in the enclosed Drawings
C7 and C8.
e) An inventory of proposed project imperviousness is not available at this time.
f) Building envelopes for all lots are not available at this time. Some proposed
footprints for townhomes are depicted on Drawing C2.
g) Proposed lot layouts are shown in the enclosed Drawings C 1 and C2.
h) Detailed drawings of stream impacts throughout the proposed subdivision are not
available at this time. A generalized depiction of impacts is shown in Figure 1
and Drawings C2 and C4A.
i) Detailed drawings of wetland impacts throughout the proposed subdivision are not
available at this time. A generalized depiction of impacts is shown in Figure 1
and Drawings C2 and C4A.
j) Detailed drawings of riparian buffer impacts throughout the proposed subdivision
are not available at this time. A generalized depiction of impacts is shown in
Figure 1 and Drawings C2 and C4A.
k) Isolated and non-isolated wetlands, streams, and other waters are shown in the
overview in Figure 1. They are also depicted throughout the construction
drawings.
1) Riparian buffers are shown in the overview in Figure 1. They are also depicted
throughout the construction drawings.
m) For diffuse flow provision measures, plans, worksheets, please see Drawings CS
and C6. The Town of Wake Forest is the review and approval authority for
Stormwater management for the project. Diffuse flow provision worksheets and
an Operations and Maintenance Agreement are not required and are not available.
Please note that a large impact to Austin Creek and adjacent wetlands is depicted on the
construction drawings at the western edge of the proposed development. This roadway crossing
is still under review.
We hope that this information is sufficient to address your questions. If you need any additional
information, please let me know. Thank you for your attention.
Ms. Cyndi Karoly
March 21, 2008
Page 3 of 3
Sincerely,
EcoScience: u Division ofPI3S&J
/,~a~
Elizabeth Scherrer
EcoScience: a Division of PBS&J
Attachments
Cc: Jonathan Skinner, McCale Development Corporation
FWArF
~O 9Q Michael F. Easley, Governor
~ William G. Ross Jr., Secretary
r- North Carolina Department of Environment and Natural Resources
~ ~
~ 'C Coleen H. Sullins, Director
Division of Water Quality
February 28, 2008
DWQ Project # OS-1480, Ver. 2
Wake County
CERTIFIED .MAIL: RETURN RECEIPT REQUESTED
Mr. Jonathan Skinner
McCale Development Corporation
729 Thimble Shoals Boulevard, Suite 6-C
Newport News, VA 23606
Subject Property: Austin Creek Sewer Line Conector
Ut to Austin Creek [030402, 27-23-3, C, NSW)
REQUEST FOR MORE INFORMATION
Dear Mr. Skinner:
On February 20, 2008, the Division of Water Quality (DWQ) received your application dated January 18,
2008, to fill or otherwise impact 0.2121 acres of 404/wetland, 51 linear feet of intermittent stream, and
0.00 square feet of Zone 1 Neuse River basin protected riparian buffers and 0.00 square feet of Zone 2
Neuse River basin protected riparian buffers to construct a residential subdivision. The DWQ has
determined that your application was incomplete and/or provided inaccurate information as discussed
below. The DWQ will require additional information in order to process your application to impact
protected wetlands and/or streams on the subject property. Therefore, unless we receive five copies of the
additional information requested below, we will have to move toward denial of your application as
required by 15A NCAC 2H .0506 and will place this project on hold as incomplete until we receive this
additional information. Please provide the following information so that we may continue to review your
project.
Additional Information Requested:
1. Please provide verification from the USACE that they will be permitting your project first under a
NW 12 and then later under a NW29.
2. Please re-submit your site plans on full plan sheets at a scale of no smaller than 1 "=50' with
topographic contours.
3. Ultimately it appears your project will be a residential subdivision, therefore, please address the
following:
a) For any crossing(s) for which a culvert is proposed please provide cross section details
showing the provisions for aquatic life passage.
b) Please provide the location of any proposed stormwater management practices as
required by GC3705.
401 Oversight/Express Review Permitting Unit
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604
Phone: 919-733-1786 /FAX 919-733-6893 /Internet: http://h2o enr state nc us/ncwetlands
Nose hCarolina
~aturally
An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper
McCale Development Corporation
Page 2 of 2
February 28, 2008
c) Please provide plans and profiles for all the stormwater management devices as required
by GC3705.
d) Please indicate all stormwater inlets and outfalls on the site plan.
e) Please provide an inventory of proposed project imperviousness area based on the
estimated built-out conditions. Please include all proposed building footprints, roads,
driveways, sidewalks, grauel-surfaced areas, amenity areas, etc.
f) Please provide building envelopes for all lots with wetlands, streams or buffers on the site
plans.
g) Please indicate proposed lot layout as overlays on the site plan.
h) Please indicate all stream impacts including all fill slopes, dissipaters, and bank
stabilization on the site plan.
i) Please indicate all wetland impacts including fill slopes on the site plan.
j) Please indicate all riparian buffer impacts on the site plan and clearly label impacts
(Buffer Impact 1, etc.).
k) Please locate all isolated or non-isolated wetlands, streams, and other waters of the State
as overlays on the site plan.
1) Please locate all of the protected riparian buffers as overlays bn the site plan, clearly
showing Zone 1 and Zone 2.
m) Please indicate the diffuse flow provision measures on the site plan and submit diffuse
flow provision measure worksheets and signed and a notarized Operations and
Maintenance Agreement.
Please submit this information within 30 calendar days of the date of this letter. If we do not receive this
requested information within 30 calendar days of the date of this letter, your project will be withdrawn
and you will need to reapply with a new application and a new fee.
This-letter only addresses the application review and does not authorize any impacts to wetlands, waters
or protected buffers. Please be aware that any impacts requested within your application are not
authorized (at this time) by the DWQ. Please call Ms. Cyndi Karoly or Mr. Ian McMillan at 919-733-
1786 if you have any questions regarding or would like to set up a meeting to discuss this matter.
i
Si rely,
//
rCyndi Karoly, Supervisor
401 Oversight/Express Review Permitting Unit
CBKlijm
cc: Lauren Witherspoon, DWQ Raleigh Regional Office
USACE Raleigh Regulatory Field Office
File Copy
Central Files
Elizabeth Scherrer, EcoScience Corporation, 1101 Haynes Street, Suite 101, Raleigh, NC 27604
Filename: 051480Ver2AustinCreekSewerLineCon nector(W ake)On_Hold