Loading...
HomeMy WebLinkAboutNC0000396_Asheville Figures_20160831SrA �lUe� ' tic /%i0U11i4111 4k- NCL/FF pR 2 3 0� B 1Fl0 (J ` R/ARLV Oak Forest �� 74/ �J�yIA51DE DR DI,4� _�Q1 1 I SPRINGSIDE.R Skyland SUMMIT AVE 2700 1� ALLEN.AVE 11 OL0'A(B1NE7iF- ti pRID / P� g \ .Uc 01 POND ST BOSS R GGONPo Long �o Shoals N L 8 Bridge CIA _ g / H Long` / 25 � ��I a A' Shoals ��� (n ( -u+ �DAM SPILLWAY O W POWELL CREEK LAKE JULIAN �� c POWER PLANT CAVE/N CCRSURFACE�� IMPOUNDMENT BOUNDARY b� 12 ACRE PARCEL (NOT DUKE PROPE va �NOyTRD�.. - ake CCR SURFACE IMPOUNDMENT COMPLIANCE BOUNDARY IN Kn—) Ta, e I ( 1964 ASH BASIN _ J982 ASH BASIN" A ❑ nter I�x o NE0000 RO \- o a wFISK OR m 0 a '^ { Q,� v / / i ""` PER IA GLutheridge LENN_BRI GE" lEn Bridge r eye Camp OVAL'RD I/ u r�pP�E I Ll J1M JO L'N I 1 x� �h1CKENNA RD z WATSON RD z MOUNTA! r \ DEs1GN AVE D Y USOGSRTOPOGRAPHIC MAP OBTAINED FROM THE USGS STORE AT m�J`, $ �0� http://store.usgs.gov/b2c_usgs/b2c/start/%%%28xcm=r3standardpitrex_prd%%%29/.do FIGURE 1-1 SITE LOCATION MAP VIP DUKE ENERGY PROGRESS WINSTONSALEM• ASHEVILLE STEAM ELECTRIC PLANT Terra ASHEVILLE 200 CP&L DRIVE s� .CHARLOTTE_ ARDEN, NORTH CAROLINA BUNCOMBE COUNTY SKYLAND NC QUADRANGLE 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA DRAWN BY: JOHN CHASTAIN DATE: 08/23/2016 GRAPHIC SCALE PHONE 864-421-9999 PROJECT MANAGER: TODD PLATING CONTOUR INTERVAL: 20 FEET 1000 0 1000 2000 www.synterracorp.com LAYOUT: FIG 1-1 (SITE LOCATION MAP) MAP DATE: 2013 P: Duke Energy Pro ess.1O26 102. Asheville Ash Basin GW Assessment Plan 19.EG CSASUP DWG DE ASHEVILLE USGS TOPO MAP.dwg IN FEET 7 a� s --� 4 t �e LAKE 'qq JULIAN 1' I _ .. _ � - • � ��, rGb Apr s p0 p `LEGEND C WATER SUPPLY WELL SAMPLE[ N p �= WATER SUPPLY WELL NOT SAN ----- N111- GENERALIZED GROUNDWATER a ASH BASIN COMPLIANCE BOUNDARY HALF -MILE OFFSET FROM COM F r �^ DUKE ENERGY PROGRESS ASF = 9 rp w-WI! o zon ra C ]® MW-15BR E 12124.73 ®MW-136R 1 1 CB-08D � CB-OSBR* DRY a P-105 CB-8 2130.1,5 1 MW-09BR \ I MW-09D MW16A 1 \ I �- MW 09S 2027.95 0 1 2116.46 MW-16BR `, MW-08BR ir-,mU 1 M W-08S - 2117.13 (a 1 � r 2105.06 MW-17A GW 2 2029.58 "� 2051,35 ios - /GUARD HOUS CB-9 214b.12 .. ��Aw cares WL2 � 'tpr I 4I p I 2160.80 EWATERING PUMP i4l JOT IN USE) \ GW01BR GW-01D \\l\ a DEWATERING BASIN WATER LEVEL VARIES PZ-26 2110± IF NOT PUMPING AND 11 2141.77 �MW-01BR 2106±TYPICAL DRAW DOWN _WATERING PUMP #2 MW 01D P-103 2115.13 0 ]R ti l P-102 N w c 2112.87 ti o 1 c �,� CB 1 �Iy CB-01DQ 02162.53 .61 ` CB-01BRL 0 - CB-01BF MW-05BR Q'MW-05D 2068.50 4 7 Q APZ 30 AMN 1B �� M W-21D 2041.59 �s ` MW-22D 2045.850 MW-22BR 1 * CB-2 213872 C DGUGLAS FIR DR�'sj,`•' 1 LEGEND ASSESSMET WELL NN ELEVATION FEET (msl.) z 60.80 O(msl.)ANCE WELL EELLEVATIONDIENT IN FEET � CB-1 BACKGROUND COMPLIANCE WELL 0 2163.90 ELEVATION IN FEET (msl.) 7-1 MONITORING WELL 1 0 z 60.72 ELEVATION N FEET (msl.) WATER LEVEL CONTOUR IN FEET (msl.) - INFERRED WATER LEVEL CONTOUR (msl.) f SURFICIAL GROUNDWATER FLOW DIRECTION � o STREAM WITH FLOW DIRECTION AREA OF CONSTRUCTION AND DEWATERING 1 - - - DUKE ENERGY PROGRESS 500 ft COMPLIANCE BOUNDARY ♦ WASTE BOUNDARY /�♦ ----- PARCEL LINE (APPROXIMATE) / ``♦ WATER LEVELS: 1.) WATER LEVELS WERE COLLECTED BY SYNTERRA ON DECEMBER 17 AND 18, 2015. SOURCES: 1.) OCTOBER 16, 2015 AERIAL PHOTOGRAPH WAS OBTAINED FROM GOGGLE EARTH 2.) DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE l COORDINATE SYSTEM FIRS 3200 (NAD 83). 1 3.) PARCEL BOUNDARY WAS OBTAINED FROM BUNCOMBE COUNTY GIS DATA. 4.) NEW WELLS WERE SURVEYED BY McKIM& CREED. THE HORIZONTAL DATUM IS SET TO NAD83 AND THE VERTICAL DATUM IS SET NGVD88. 5.) COMPLIANCE MONITORING WELL LOCATIONS AND WASTE BOUNDARY FROM FCA OF ...," ` NC, SURVEY DATED MARCH 2009. COMPLIANCE WELLS CB-3R, CB-9 AND SG-1 • ` SURVEYED BY FCA OF NC, SURVEY DATED 2012-11-28. 6.) ADDITIONAL MONITORING WELL AND PIEZOMETER LOCATIONS WERE BASED ON DATA PROVIDED BY PROGRESS ENERGY. ♦ 6 �t 0.1 V - t- ��''�'� �t � _ 1 1 mod' �'� n �r ��,� '` ° � • � �, E, 2165.1A 2165. 2165.39 L� synTerra GRAPHIC SCALE 250 0 250 500 IN FEET 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com DRAWN BY: JOHN CHASTAIN DATE: 01/04/2016 PROJECT MANAGER: TODD PLATING LAYOUT: FIG 1-4 (WL MAP SURFICIAL) 1 FIGURE 1-4 SURFICIAL WATER LEVEL MAP DECEMBER 2015 ASH BASINS ASHEVILLE STEAM ELECTRIC PLANT ARDEN, NORTH CAROLINA Ash Basin GW HATER HEUROCK HOLE E PoINT\`� DRY T01944± - r ; v 1 � � 1 ' MW-14BR A ® 203.%8 I�T� WATER IN7AK 1 / i , WATER INT, JGUARD HOUSE s CB-09SL CB 9 MW-15D z � ®�+iicnTF -- MW-15BR CB-09BR zoz8.9s MW-15A ➢�� 2132.46 \ �-®MW-13BR - 2124.95 i V \ , CB-08BR CB 2092.49 ? DRY I ' �P-105 MW-12BR _ 1 0 0 00 0 0 -09BR 2114.18 P MW-09D ®2114.23 p 104 sE7ruNG POND MW-16A MW-16BR MW-08BR 2027.75 2114.39 0 DIP-1 \ �B 1 A ABM OZS BEDRDCK HOLE � 0 uRv 1020s1i DEWATERING PUMP p v B 1 ABMW-02 #1 (NOT IN USE) MW-17A Y GW 2� BEDROCK HOLE ORVTO1978, DEWATERING BASIN _ \ WATER LEVEL VARIES PZ. DEWATERING PUMP #2 2110± IF NOT PUMPING AND 2106±TYPICAL DRAW DOWN ' P-103 Q `- APD-1 MW-18BRL �� ABMW-04 ® ABMW-04BR P� ABMW-04D 2119.55 MW-18D GW-3 MW-07BR J P-1.02 10 MW 18BR 203383 \ fr 2028.38 �ti t Jr { jr 2094.14 ` PZ 17S 2100- 2MAW-19 1.9BR 28 -- 090 � PZ-19 � TCV 0 P-101 P-100 MW-06D Ip MW-06BR r 2060.72 MW-06S MW-20A 0 PZ-22 , MW-03BF 1111.92 MW-05BR C) 2069.09 MW-05D 2042.20 APZ-30 O 2091.8 a ♦ C B-4 AMW-2A AMW 113 CB 20'12/19 eEDRDl01-KHOLE " �... DRr POND POND. MW-21D ` 2062.1+ 20401+ . y' t _ ♦ fit. MW-22BR 2036.10 LEGEND MW 1sBR ASSESSMENT WELL ELEVATION IN FEET (mSIQ r 2oa2 20 EELLEVATIONDIENT IN FEET O(msIQ L)ANCE WELL Il I Q CB-1 BACKGROUND COMPLIANCE WELL ELEVATION IN FEET (mSIQ FA-M1 , NITORING WELL 21 3.6B7 ELOEVATIION N FEET (mSI.) DRDYT02050+E BOREHOLE INTO BEDROCK WHICH HAD A VERY LOW OR NO WATER YIELD WATER LEVEL CONTOUR IN FEET (msl.) /� ----- INFERRED WATER LEVEL CONTOUR (msl.) f BEDROCK GROUNDWATER FLOW DIRECTION STREAM WITH FLOW DIRECTION \ AREA OF CONSTRUCTION AND DEWATERING DUKE ENERGY PROGRESS ♦ 500 ft COMPLIANCE BOUNDARY WASTE BOUNDARY % ----- PARCEL LINE (APPROXIMATE) WATER LEVELS: 1.) WATER LEVELS WERE COLLECTED BY SYNTERRA ON DECEMBER 17, 2015. SOURCES: 1.) OCTOBER 16, 2015 AERIAL PHOTOGRAPH WAS OBTAINED FROM GOOGLE EARTH 2.) DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE l COORDINATE SYSTEM PIPS 3200 (NAD 83). 3.) PARCEL BOUNDARY WAS OBTAINED FROM BUNCOMBE COUNTY GIS DATA. 4.) NEW WELLS WERE SURVEYED BY McKIM& CREED. THE HORIZONTAL DATUM IS SET TO NAD83 AND THE VERTICAL DATUM IS SET NGVD88. .` 5.) COMPLIANCE MONITORING WELL LOCATIONS AND WASTE BOUNDARY FROM FCA OF NO, SURVEY DATED MARCH 2O09. COMPLIANCE WELLS CB-3R, CB-9 AND SG-1 } SURVEYED BY FCA OF NC, SURVEY DATED 2012-11-28. LAKE JULIAN 6.) ADDITIONAL MONITORING WELL AND PIEZOMETER LOCATIONS WERE BASED ON DATA PROVIDED BY PROGRESS ENERGY. GW-01BR ® aVIM I 2158.98 GW 01D q ♦ > 1 79 16 v 4'P s CB-01D® ©CB-1 CB-01BRL 0 CB 01BR 2158.10 \ _ \ BEDROCK HOLE - - "-` \\1^ DRY T02074_ A / GW-5 O MW-03D ONOpy • aooOP CB-3R Pg�RO �aGy' I DOUGLAS FIR DR a � -�-7 AMW-2B 2077.60 MW-238R 2065.10 MW-23DU AW-23DL - L7 synTerra GRAPHIC SCALE 250 0 250 500 IN FEET 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 DRAWN BY: JOHN CHASTAIN DATE: 01/04/2016 PROJECT MANAGER: TODD PLATING LAYOUT: FIG 1-5 (WL MAP BEDROCK) FIGURE 1-5 BEDROCK WATER LEVEL MAP DECEMBER 2015 ASH BASINS ASHEVILLE STEAM ELECTRIC PLANT ARDEN, NORTH CAROLINA �\ \ MW-11 CB-9SL ' i CB-9 ♦. J.0 `` r P-105 � IM / e .. e P-104 ;i € MW'�9S APD-7 1�:4 16A ` \ DP-1 O 9•. a \ MW-8S ` of 1964ASH �1 BASIN ABMW-2S •\ MW-17A APD-1 GW-3 PZ-27 CB-7 1� ♦'. PZ-19 P ol CB-614 ` �♦ MW 6S BMW 20A \ � o i 'o x� �t i" i '1!7. 7 Me } PZ-26 \ GW 1 , \ ABMW-5S \ P-103 I ,` CB11 1982ASH BASIN 101 P-100 �' PZ-23 PZ-24• �_ _ 5.4 \ J 1 PZ-22q-l_,_ABMW;7!Er \"cB-2��_v 1•♦ e. �_�•- ` • 100 , CB-4 ` 1 ♦ - N ram. e ♦ 'MW 24S / 71 e `�♦" LEGEND 1 pH CONCENTRATION (S.U.) Il ND NOT DETECTED ABOVE REPORTING LIMIT ♦ HIGHEST CONCENTRATION AREA CONTOUR NORTH CAROLINA 2L CONTOUR INTERMEDIATE CONTOUR APPROX. PROVISIONAL BACKGROUND CONTOUR a MONITORING WELL G PIEZOMETER WATER SUPPLY WELL s ASH BASIN BOUNDARY .--'.—_'!ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS ASHEVILLE PLANT SITE — BOUNDARY � NOTES: CONCENTRATIONS SHOWN REFLECT DATA GATHERED BETWEEN 2/18/14 AND 7/8/16. THE NORTH CAROLINA 2L FOR pH IS 6.5-8.5 S.U. PROVISIONAL BACKGROUND CONCENTRATION IS 4.4 - 6.0 S.U. AERIAL PHOTOGRAPH OBTAINED FROM GOOGLE EARTH PRO, DATED 10/18/2015. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83/2011). GRAPHIC SCALE 330 165 0 330 660 FIGURE 1-6 IN FEET ISOCONCENTRATION MAP 148 RIVER STREET, SUITE 220 pH IN SURFICIAL GROUNDWATER GREENVILLE, SOUTH CAROLINA 29601 ASHEVILLE STEAM ELECTRIC PLANT PHONE 864-421-9999 synTerra W n rr or om ARDEN, NORTH CAROLINA DRAWN BY: B. YOUNG DATE: 08/26/2016 PROJECT MANAGER: T. PLATING CHECKED BY: T. PLATING \MW-11D KAW!"I 3D ------------- Mvv-1 5D r, . % V * I CB-8 URI MW6D \MW-12D 5.3 ABMW-5D 6.1 GW-1 D 1964ASH BASIN • MW-1 D ABMW-4D MW-1 8D 5 7 1982ASH CB-lD 1% PZ-1 6 BASIN ♦ % -0000' PZ-1 7S MW-4D- --- % r.W-A GW-5 41, 44, 6 a. ! Ir N R Nh 'i F 9,1� �- -F synTerra 7, LEGEND I pH CONCENTRATION (S.U.) ND NOT DETECTED ABOVE REPORTING LIMIT HIGHEST CONCENTRATION AREA CONTOUR • NORTH CAROLINA 2L CONTOUR INTERMEDIATE CONTOUR APPROX. PROVISIONAL BACKGROUND CONTOUR sa MONITORING WELL O PIEZOMETER ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS ASHEVILLE PLANT SITE • • BOUNDARY NOTES: CONCENTRATIONS SHOWN REFLECT DATA GATHERED BETWEEN 2/20/14 AND 7/8/16. THE NORTH CAROLINA 2L FOR pH IS 6.5-8.5 S.U. PROVISIONAL BACKGROUND CONCENTRATION IS 5.6 - 6.7 S.U. AERIAL PHOTOGRAPH OBTAINED FROM GOOGLE EARTH PRO, DATED 10/18/2015. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83/2011). GRAPHIC SCALE 330 165 0 330 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 :660 FIGURE 1-7 D ISOCONCENTRATION MAP Ll pH IN TRANSITION ZONE GROUNDWATER ASHEVILLE STEAM ELECTRIC PLANT ARDEN, NORTH CAROLINA DRAWN BY: B. YOUNG DATE: 08/25/2016 PROJECT MANAGER: T. PLATING CHECKED BY: I PLATING \a 1s _ .f ' 4 ! Il �♦� a 4 ,. � -�•�r, �d� vy s e`t n. ` ' is 3• • �.. �'''" SIR r.� ru M ft N MW. ,.v 14BR CB-9BR _ . 6.9_. .�­-- �� r ----- sr %♦ y r • • : _ \ MW-13BR 5.5 0 CB-8BR _ \ MW-913R WV-16BR • �. ♦ GW-2 Fa ft 5.6 • ` _� — GW-1 BR • ABMW-5BR 1964ASH 7.2 , 1 BASIN g MW-1 BR ' MW-18BR 1982ASH 1 BASIN f 1 ` ABMW-11BR , 8.1 ` �♦ PZ-17D / MW-2BR e `� % MW-6BR %♦ / ,mow+ ,•.�•�.�. ..._ .. , . AMW-1 B CB;.4B 7.1 ' MW-22BR Rm * m - {.._ DW-6 d yu= synTerra GRAPHIC SCALE 330 165 0 330 660 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864 421 9999 wwwsvnterracorp com DRAWN BY. B. YOUNG DATE: 08/25/2016 PROJECT MANAGER: T. PLATING CHECKED BY: T. PLATING LEGEND 1 pH CONCENTRATION (S.U.) ND NOT DETECTED ABOVE REPORTING LIMIT HIGHEST CONCENTRATION AREA CONTOUR NORTH CAROLINA 2L CONTOUR INTERMEDIATE CONTOUR APPROX. PROVISIONAL BACKGROUND CONTOUR MONITORING WELL G PIEZOMETER WATER SUPPLY WELL ASH BASIN BOUNDARY 'ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS ASHEVILLE PLANT SITE — �fBOUNDARY NOTES: CONCENTRATIONS SHOWN REFLECT DATA GATHERED BETWEEN 2/9/16 AND 7/12/16. THE NORTH CAROLINA 2L FOR pH IS 6.5-8.5 S.U. PROVISIONAL BACKGROUND CONCENTRATION IS 6.1 - 8.9 S.U. AERIAL PHOTOGRAPH OBTAINED FROM GOOGLE EARTH PRO, DATED 10/18/2015. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83/2011). FIGURE 1-8 ISOCONCENTRATION MAP pH IN BEDROCK GROUNDWATER ASHEVILLE STEAM ELECTRIC PLANT ARDEN, NORTH CAROLINA MW-11 CB-9SL u' 0----- MW-15A �. CB-9 ♦. - 553 •` r P.N.■ - • : � 2.7t9 � 1 1 ` MW� 9S P-104 _ '— r r •• ••, `DP `55 - p .♦ MW 8S I \ ABMW-2S _ABMW-5S r "'GW1 •� MW-17A „u — • `1 169 1964ASIT ',• BASIN P-103 428 GW-3 125 1982 ASH a •• �CB-7 BASIN 1% • 565 CB-6 44M ♦ •� PZ-19 P-101 ' ` �• P-100 352 'e� .• ^1•' ♦• MW-6S _ 1 PZ-24 295 x " • BMW-20A \ABMW-7S- �� 29� PZ-22 .� ? ..' • `CB 5 — �. \CB=4' 245 f �-;e,��. fit► \ _r �, , . T. 1Ti-a�?� - 5 - t:� AA }Q� 4 I �l y �nTerra r 7 b" sl. LEGEND 1 Eh CONCENTRATION (mV) ND NOT DETECTED ABOVE REPORTING LIMIT R HIGHEST CONCENTRATION AREA CONTOUR STANDARD CONTOUR ■ I •` INTERMEDIATE CONTOUR APPROX. PROVISIONAL BACKGROUND CONTOUR a MONITORING WELL G PIEZOMETER WATER SUPPLY WELL s ASH BASIN BOUNDARY .--'.—_'!ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS ASHEVILLE PLANT SITE — BOUNDARY NOTES: CONCENTRATIONS SHOWN REFLECT DATA GATHERED BETWEEN 2/18/14 AND 7/8/16. NO NORTH CAROLINA21-OR INTERIM MAXIMUM ALLOWABLE bL CONCENTRATION ESTABLISHED FOR Eh. GRAPHIC SCALE 330 165 0 330 660 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 wwwsvnterracorp.com DRAWN BY: B. YOUNG DATE: 08/26/2016 PROJECT MANAGER: T. PLATING CHECKED BY: T. PLATING P-\N,kP FnP Prnn .w 1026\00 (;IS RARF I)ATA\A havill AERIAL PHOTOGRAPH OBTAINED FROM GOOGLE EARTH PRO, DATED 10/18/2015. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83/2011). FIGURE 1-9 ISOCONCENTRATION MAP Eh IN SURFICIAL GROUNDWATER ASHEVILLE STEAM ELECTRIC PLANT ARDEN, NORTH CAROLINA HATER HEUROCK HOLE E PoINT\`� DRY T01944± - r ; v 1 � � 1 ' MW-14BR A ® 203.%8 I�T� WATER IN7AK 1 / i , WATER INT, JGUARD HOUSE s CB-09SL CB 9 MW-15D z � ®�+iicnTF -- MW-15BR CB-09BR zoz8.9s MW-15A ➢�� 2132.46 \ �-®MW-13BR - 2124.95 i V \ , CB-08BR CB 2092.49 ? DRY I ' �P-105 MW-12BR _ 1 0 0 00 0 0 -09BR 2114.18 P MW-09D ®2114.23 p 104 sE7ruNG POND MW-16A MW-16BR MW-08BR 2027.75 2114.39 0 DIP-1 \ �B 1 A ABM OZS BEDRDCK HOLE � 0 uRv 1020s1i DEWATERING PUMP p v B 1 ABMW-02 #1 (NOT IN USE) MW-17A Y GW 2� BEDROCK HOLE ORVTO1978, DEWATERING BASIN _ \ WATER LEVEL VARIES PZ. DEWATERING PUMP #2 2110± IF NOT PUMPING AND 2106±TYPICAL DRAW DOWN ' P-103 Q `- APD-1 MW-18BRL �� ABMW-04 ® ABMW-04BR P� ABMW-04D 2119.55 MW-18D GW-3 MW-07BR J P-1.02 10 MW 18BR 203383 \ fr 2028.38 �ti t Jr { jr 2094.14 ` PZ 17S 2100- 2MAW-19 1.9BR 28 -- 090 � PZ-19 � TCV 0 P-101 P-100 MW-06D Ip MW-06BR r 2060.72 MW-06S MW-20A 0 PZ-22 , MW-03BF 1111.92 MW-05BR C) 2069.09 MW-05D 2042.20 APZ-30 O 2091.8 a ♦ C B-4 AMW-2A AMW 113 CB 20'12/19 eEDRDl01-KHOLE " �... DRr POND POND. MW-21D ` 2062.1+ 20401+ . y' t _ ♦ fit. MW-22BR 2036.10 LEGEND MW 1sBR ASSESSMENT WELL ELEVATION IN FEET (mSIQ r 2oa2 20 EELLEVATIONDIENT IN FEET O(msIQ L)ANCE WELL Il I Q CB-1 BACKGROUND COMPLIANCE WELL ELEVATION IN FEET (mSIQ FA-M1 , NITORING WELL 21 3.6B7 ELOEVATIION N FEET (mSI.) DRDYT02050+E BOREHOLE INTO BEDROCK WHICH HAD A VERY LOW OR NO WATER YIELD WATER LEVEL CONTOUR IN FEET (msl.) /� ----- INFERRED WATER LEVEL CONTOUR (msl.) f BEDROCK GROUNDWATER FLOW DIRECTION STREAM WITH FLOW DIRECTION \ AREA OF CONSTRUCTION AND DEWATERING DUKE ENERGY PROGRESS ♦ 500 ft COMPLIANCE BOUNDARY WASTE BOUNDARY % ----- PARCEL LINE (APPROXIMATE) WATER LEVELS: 1.) WATER LEVELS WERE COLLECTED BY SYNTERRA ON DECEMBER 17, 2015. SOURCES: 1.) OCTOBER 16, 2015 AERIAL PHOTOGRAPH WAS OBTAINED FROM GOOGLE EARTH 2.) DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE l COORDINATE SYSTEM PIPS 3200 (NAD 83). 3.) PARCEL BOUNDARY WAS OBTAINED FROM BUNCOMBE COUNTY GIS DATA. 4.) NEW WELLS WERE SURVEYED BY McKIM& CREED. THE HORIZONTAL DATUM IS SET TO NAD83 AND THE VERTICAL DATUM IS SET NGVD88. .` 5.) COMPLIANCE MONITORING WELL LOCATIONS AND WASTE BOUNDARY FROM FCA OF NO, SURVEY DATED MARCH 2O09. COMPLIANCE WELLS CB-3R, CB-9 AND SG-1 } SURVEYED BY FCA OF NC, SURVEY DATED 2012-11-28. LAKE JULIAN 6.) ADDITIONAL MONITORING WELL AND PIEZOMETER LOCATIONS WERE BASED ON DATA PROVIDED BY PROGRESS ENERGY. GW-01BR ® aVIM I 2158.98 GW 01D q ♦ > 1 79 16 v 4'P s CB-01D® ©CB-1 CB-01BRL 0 CB 01BR 2158.10 \ _ \ BEDROCK HOLE - - "-` \\1^ DRY T02074_ A / GW-5 O MW-03D ONOpy • aooOP CB-3R Pg�RO �aGy' I DOUGLAS FIR DR a � -�-7 AMW-2B 2077.60 MW-238R 2065.10 MW-23DU AW-23DL - L7 synTerra GRAPHIC SCALE 250 0 250 500 IN FEET 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 DRAWN BY: JOHN CHASTAIN DATE: 01/04/2016 PROJECT MANAGER: TODD PLATING LAYOUT: FIG 1-5 (WL MAP BEDROCK) FIGURE 1-5 BEDROCK WATER LEVEL MAP DECEMBER 2015 ASH BASINS ASHEVILLE STEAM ELECTRIC PLANT ARDEN, NORTH CAROLINA ! '!! it irm MW-11 D -- -.il ,• A M1N-15D % r \ MW-13D MW-12D • CB-B / %00—s • ♦ I 1964ASH BASIN ABMW-5D • ; r MW-1 D ABMW-4D • BMW-18D 1982ASH •` PZ-17S BASIN • • 3,6^a PZ-16 % 319 ♦• .% f GW-4 2�s C >B ,1• ";�C �� 586 MW-3D x •' ` `, 254' • — .— /. 00-­7 % W=5D - — � new ��n� T •' MW 21D r#�h'd•ba4�, MW-22D/ •� 517 n: � 1- ea ` r ta�'��Fx3 n� synTerra • 1 • VVN � 1• ' � ._fit ;� •- • / I `�` �a ♦ ♦ e e III GRAPHIC SCALE 330 165 0 330 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 LEGEND 1 Eh CONCENTRATION (mV) ND NOT DETECTED ABOVE REPORTING LIMIT HIGHEST CONCENTRATION AREA CONTOUR STANDARD CONTOUR INTERMEDIATE CONTOUR APPROX. PROVISIONAL BACKGROUND CONTOUR sa MONITORING WELL O PIEZOMETER C__lI ASH BASIN BOUNDARY .'ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS ASHEVILLE PLANT SITE --'BOUNDARY NOTES: • CONCENTRATIONS SHOWN REFLECT DATA GATHERED BETWEEN 2/20/14 AND 7/8/16. NO NORTH CAROLINA 2LOR INTERIM MAXIMUM ALLOWABLE CONCENTRATION ESTABLISHED FOR Eh. AERIAL PHOTOGRAPH OBTAINED FROM GOOGLE EARTH PRO, DATED 10/18/2015. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83/2011). 660 FIGURE 1-10 ISOCONCENTRATION MAP Eh IN TRANSITION ZONE GROUNDWATER ASHEVILLE STEAM ELECTRIC PLANT ARDEN, NORTH CAROLINA DRAWN BY: B. YOUNG DATE: 08/25/2016 PROJECT MANAGER: T. PLATING CHECKED BY: T. PLATING 2_v I ■ MW-14BR / r i• CB-SBR \ MW-13BR .. 187 �_ 305 1 i MW-9BR MW-16BR� ` 82 .. • � GW-2 ♦ 1 1964ASH' ' BASIN MW-18B V \ `'6+ 0 •• `� f GtP _u'y'� �l • PZ 17D p�` •,` _ MW�613R z'AM .• � ' �"Gt'r� � mot, ., � • ^,• • � � . AS-1 3 1� � ♦�,+�'a r y MW2�2BR ' r '�AS-11 JI a'L ".d, IT" AS-1 AS-4 / AS-6 'I G DW-6 ■ 1 ♦ ♦ r �-7aw7a.• �a ♦ ♦ e �- e 1 1982ASH r ' BASIN MW-2BR 1�11 synTerra ♦ J en • 1 AMW-3B ' • �17 GRAPHIC SCALE 330 165 0 330 IN FEET 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 LEGEND 1 Eh CONCENTRATION (mV) ND NOT DETECTED ABOVE REPORTING LIMIT HIGHEST CONCENTRATION AREA CONTOUR STANDARD CONTOUR INTERMEDIATE CONTOUR APPROX. PROVISIONAL BACKGROUND CONTOUR MONITORING WELL G PIEZOMETER WATER SUPPLY WELL ASH BASIN BOUNDARY _ _ _ !ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS ASHEVILLE PLANT SITE —`BOUNDARY NOTES: CONCENTRATIONS SHOWN REFLECT DATA GATHERED BETWEEN 2/9/16 AND 7/12/16. NO NORTH CAROLINA 2LOR INTERIM MAXIMUM ALLOWABLE CONCENTRATION ESTABLISHED FOR Eh. AERIAL PHOTOGRAPH OBTAINED FROM GOOGLE EARTH PRO, DATED 10/18/2015. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83/2011). 660 FIGURE 1-11 ISOCONCENTRATION MAP Eh IN BEDROCK GROUNDWATER ASHEVILLE STEAM ELECTRIC PLANT ARDEN, NORTH CAROLINA DRAWN BY: B. YOUNG DATE: 08/25/2016 PROJECT MANAGER: T. PLATING CHECKED BY: T. PLATING �, \ MW-11 MW-15A MW-17. _ yam, a ; ���' • 1� >���"�`*"���"R' i CB-9SL MW-9.5 � — e ��!•��s..1*;- '1! it P-105 70 P-104 / APD-7 DP 1 �ABMW-2S GW-1 7PZ-2fi S a G ',� ABMW-7S PZ-24'`'_ yz�� P-too / \ � `. _ ' PZ-19 �� �• �450 PZ-23 PZ-22 CB 2`� ♦�� �. MW-26A MW 6S / .10-00 � t.r�, r e n � t IL nTerra � MW-10 1 f ` �� • , - . �' -MW 24S s P e ..1F e LEGEND = 1 SPECIFIC CONDUCTANCE CONCENTRATION (umha Illl ND NOT DETECTED ABOVE REPORTING LIMIT ` HIGHEST CONCENTRATION AREA CONTOUR " STANDARD CONTOUR INTERMEDIATE CONTOUR APPROX. PROVISIONAL BACKGROUND CONTOUR a MONITORING WELL G PIEZOMETER WATER SUPPLY WELL s ASH BASIN BOUNDARY .--'.—_'!ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS ASHEVILLE PLANT SITE — BOUNDARY NOTES: CONCENTRATIONS SHOWN REFLECT DATA GATHERED BETWEEN 2/18/14 AND 7/8/16. NO NORTH CAROLINA 2LOR INTERIM MAXIMUM ALLOWABLE CONCENTRATION ESTABLISHED FOR SPECIFIC CONDUCTANCE. GRAPHIC SCALE 330 165 0 330 660 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 W W W.SVIlt2II8C0Ip.00111 DRAWN BY: B. YOUNG DATE: 08/26/2016 PROJECT MANAGER: T. PLATING CHECKED BY: T.PLATING noF,nn cic once nnTn, n..,.,,.•.0 AERIAL PHOTOGRAPH OBTAINED FROM GOOGLE EARTH PRO, DATED 10/18/2015. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83/2011). FIGURE 1-12 ISOCONCENTRATION MAP SPECIFIC CONDUCTANCE IN SURFICIAL GROUNDWATER ASHEVILLE STEAM ELECTRIC PLANT ARDEN, NORTH CAROLINA GRAPHIC SCALE 330 165 0 330 660 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 W W W.SVIlt2II8C0Ip.00111 DRAWN BY: B. YOUNG DATE: 08/26/2016 PROJECT MANAGER: T. PLATING CHECKED BY: T.PLATING noF,nn cic once nnTn, n..,.,,.•.0 AERIAL PHOTOGRAPH OBTAINED FROM GOOGLE EARTH PRO, DATED 10/18/2015. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83/2011). FIGURE 1-12 ISOCONCENTRATION MAP SPECIFIC CONDUCTANCE IN SURFICIAL GROUNDWATER ASHEVILLE STEAM ELECTRIC PLANT ARDEN, NORTH CAROLINA 7 '!! it MW-11 D LAKE ---------------- &M -15D ♦, ' I \ MW-1313 _Al �' I• � 132 � • CB 8 / d MW-12D � 72v • MW-9D � GW-1 D j �. ♦♦ r. ABMW-5D %♦ 1964 ASH MW-1 D BASIN MW-18D ABMW-4D I 2 �, 1982ASH CB-1D i PZ-16 �BASIN NO" • • PZ-17S MW-4D' %.` GW-4 MW-6D \ �� oe � GW-5 / Is AMW-2A ' Is MW-21 D MW 22C r' I -vnTerra GRAPHIC SCALE 330 165 0 330 660 1148 RIVER STREET, SUITE 220 I GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 DRAWN BY: B. YOUNG DATE: 08/25/2016 PROJECT MANAGER: T. PLATING CHECKED BY: T. PLATING �_ ♦ s jjL IA LEGEND 1 SPECIFIC CONDUCTANCE CONCENTRATION (umhc ND NOT DETECTED ABOVE REPORTING LIMIT HIGHEST CONCENTRATION AREA CONTOUR STANDARD CONTOUR INTERMEDIATE CONTOUR APPROX. PROVISIONAL BACKGROUND CONTOUR Q� MONITORING WELL O PIEZOMETER ASH BASIN BOUNDARY BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS ASHEVILLE PLANT SITE --'BOUNDARY NOTES: CONCENTRATIONS SHOWN REFLECT DATA GATHERED BETWEEN 2/20/14 AND 7/8/16. NO NORTH CAROLINA 2LOR INTERIM MAXIMUM ALLOWABLE CONCENTRATION ESTABLISHED FOR SPECIFIC CONDUCTANCE. AERIAL PHOTOGRAPH OBTAINED FROM GOOGLE EARTH PRO, DATED 10/18/2015. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83/2011). FIGURE 1-13 ISOCONCENTRATION MAP SPECIFIC CONDUCTANCE IN TRANSITION ZONE GROUNDWATER ASHEVILLE STEAM ELECTRIC PLANT ARDEN, NORTH CAROLINA ` " 3- AS-9 6} 598 .............. VFW ` •` �.I \CB-9BR %♦ Y. 1 ` CB-8BR \ MW-13BR ♦ �- - 1 - • • Urr�= MW-9B136 R Rom' �♦ •. e \ M1N-16BR •�•�� GW-1 BR 1 1982 • \ GW-2 ASH BASIN •• 1_., 1964ASH 1 ABMW-5BR 301 MW-1 BR ABMW-11 BR I ! A 1 ■ NOW P. MW-2BR W-6BR 2II MW-5BR: i `♦. �i ' - �AMW-1 � 394' 4 ♦ u AS-11 #,AS-15AMIA , x+ * AS- �- �~ �• 47 h J + olk t n "l 1�lp synTerra • 1 • 1■ f.• • e B GRAPHIC SCALE 330 165 0 330 660 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 wwwsvnterracorp.com DRAWN BY: B. YOUNG DATE: 08/25/2016 PROJECT MANAGER: T. PLATING CHECKED BY: T. PLATING LEGEND 1 SPECIFIC CONDUCTANCE CONCENTRATION (umho: ND NOT DETECTED ABOVE REPORTING LIMIT HIGHEST CONCENTRATION AREA CONTOUR STANDARD CONTOUR INTERMEDIATE CONTOUR APPROX. PROVISIONAL BACKGROUND CONTOUR MONITORING WELL G PIEZOMETER WATER SUPPLY WELL ASH BASIN BOUNDARY 'ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS ASHEVILLE PLANT SITE — BOUNDARY NOTES: CONCENTRATIONS SHOWN REFLECT DATA GATHERED BETWEEN 2/9/16 AND 7/12/16. NO NORTH CAROLINA 2LOR INTERIM MAXIMUM ALLOWABLE CONCENTRATION ESTABLISHED FOR SPECIFIC CONDUCTANCE. AERIAL PHOTOGRAPH OBTAINED FROM GOOGLE EARTH PRO, DATED 10/18/2015. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83/2011). FIGURE 1-14 ISOCONCENTRATION MAP SPECIFIC CONDUCTANCE IN BEDROCK GROUNDWATER ASHEVILLE STEAM ELECTRIC PLANT ARDEN, NORTH CAROLINA �1 \ MW-11 CB-9SL t�rr s MW-15A (CB-9 �♦ " "*' ND i ei •, Y r : ♦j P-105 ` APD-7 _ - ■ MWc9S P-104 `\ mw 16A DP-1 WL ' � ._fit ;� •- � / I `�` f.• r . -MW 24S /71 , ♦ ♦ ABMW-2S ' GW-1 "MW17A •• , ®1 APD-1 ; / 1 ABMW-5S CB-7, PZ-26a« \P-103 I .`� LEGEND 1964ASH • BASIN 1982ASH CB-1 i C 1% ` �., GW-3 ,' Fuf�' BASIN �' G ND ABMW-7S ... ar.,. PZ-23 P-1OO ��x 1'�' "� � , . � `. • ,MW-2OA NU PZ=.22 `-- CB-2 � PZ-2�•— v® •., •. ND 1 �-•�® • CB-4 mwmlo — .t i� Y' • �, a • N , ! NOTES: o syr y. 4pi A r " AS-3 { r�177 1*tip �. y - �r!%),i �7; �� , / `♦ :..� =•ter. _ R,r. y k ' t* t M , �rP .♦ t h synTerra GRAPHIC SCALE 330 165 0 330 660 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864 421 9999 WWW synterracorp COm DRAWN BY. B YOUNG DATE: 08/26/2016 PROJECT MANAGER: T. PLATING CHECKED BY: T. PLATING FIGURE 1-15 ISOCONCENTRATION MAP ARSENIC IN SURFICIAL GROUNDWATER ASHEVILLE STEAM ELECTRIC PLANT ARDEN, NORTH CAROLINA OMW-11 D minion. M1N-15D ' . ♦, ° \ MW-13D _^'� - _ - •� V` ° I sties+ � - `'� CB-8 liaml - • ♦ !, \MW-12DND Alt • r ♦ T f�F 'ft ." 1 tlr 7- i hoc, •. x } 1. N r, t 1964 AS H 1 BASIN `ABMW-5D • MW-1 D \ ABMW-4D MW-18D • �,X D1982ASH CB-11D\ 1% BASIN �% PZ-16 ` '. PZ-17S MW-4D'�. GW-4 GW-5 — / .� ! • �� MW-5D CB 3R� e"• MW 21D $ M1N;22D MVV-23DL MW=33DU . �'' s� ern` � ► � �`�.. �. .' � • /♦ k �'' . r. •cam �,'!w �Fti � '� _ - r - . synTerra 4 LEGEND 1 ND : NOTES: 330 165 0RAPHICSC330E 660 FIGURE 1-16 N FEET ISOCONCENTRATION MAP 148 RIVER STREET, SUITE 220 ARSENIC IN TRANSITION ZONE GROUNDWATER GREENPHONE 64-42OUTH -9999 OLINA296o1 ASHEVILLE STEAM ELECTRIC PLANT PHONE 864-421-9999 WWN Brra.YNm ARDEN, NORTH CAROLINA B DATE: 08/25/2016 PROJECT MANAGER: T. PLATING CHECKED BY: T. PLATING irm L •�.. — - —- � Q41, .-r \C13-91BRNQ �♦ Y, �• �♦ : \ MW-13BR • ♦ ND_— 1 `♦ e i �CNDR- ■ `\ MW-16BR ♦ ass ;, -=- #. ., sn. �:,—'► "♦ ♦ 2 Fa GW`2 �..�- — p •III GW-1BR ♦ 1■ t.. . MY - `. a.• a �a ♦ ♦ e P 1982 ASH BASIN . r 1964ASH ABMW-5BR �% , BASIN 1 `� • 6 < < MW-1 BR - , MW-18BR ABMW-11 BR I • ♦% _ PZ-17D `♦ `• �•� 4 ' ' e MW-6BR ND ` J IND •. #, ` ♦� MW-51BR - ` C134B IN D !� ♦ �. % 1 AMW-1 B'% - -� ND'" ♦ AMW-3B e •� AS-1 7 AS-13 �.�•^' �� - .. �.,�lool , AS-11- MW, 22BR ND " ��•� � 3- � 1 }A AS-15 AS-6 ' /. ` . zNU a AS YF .. r ._ d� Zt +tA ' ' AS-2d AS-14 / D W 6 �- .. y ' shu ay Terri LEGEND 1 ► ■ NOTES: GRAPHIC SCALE 330 165 0 330 660 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 W W W.synte rra Corp. co m DRAWN BY: B. YOUNG DATE: 08/25/2017 PROJECT MANAGER: T. PLATING CHECKED BY: T. PLATING FIGURE 1-17 ISOCONCENTRATION MAP ARSENIC IN BEDROCK GROUNDWATER ASHEVILLE STEAM ELECTRIC PLANT ARDEN, NORTH CAROLINA iLAKE MW-11 • CB-9SL "- • MW-15A i CB-9 ♦ ' D Y_ ♦ ` ` , ,� t P-105-- • ` ND ■ MW-9S R MW 16A ` APD-7 �P 517 ♦♦ '. 6P'1 \ MW-8S - 37g C ♦LAKE 1964ASHJULIAN .40 a.,00 BASIN , ABMW-2S / ABMW-SS .. GW-1 ♦, 411L MW-17A • { ■ ND ♦ � 1 a A % /9491 PZ-27 PZ 26 *.� . 2370 \ P-103 �. , ..'♦ GW-3 420 7 .. _./ i" .. C,B-7 0• { ♦ 272 `'e 1982ASH 1% BASIN74 14 ND ,y AB B MW 7S S ♦� C-6 PZ-19 P-101 789 969 1200 , i CVVY'\'\\ ♦ ♦ 1 / J �'1 : , _ �-" •' ` MW-20A C13-2 /%♦ •^V ` �. PZ-2 2/ \p.-loo ". ,:GCB 4 -�♦,� -1 MW 10 r+ *vim ,ie a +a.. �• CB-5 ` _ t _ ` �< � .- Wit► ` -' AS-3 rn� ND . /. p. ' - Y-=� , �nTerra GRAPHIC SCALE 330 165 0 330 660 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864 421 9999 WWW SVnterr3Corp COm DRAWN BY. B YOUNG DATE:08/26/2016 PROJECT MANAGER: T. PLATING CHECKED BY: T. PLATING 7 LEGEND NOTES: .MW 24S 41 D* FIGURE 1-18 ISOCONCENTRATION MAP BORON IN SURFICIAL GROUNDWATER ASHEVILLE STEAM ELECTRIC PLANT ARDEN, NORTH CAROLINA OMW-11 D i.�.--- --_ MW-15 \ %♦ ` r NU MW-13D • MVV-12D # " e--' NAn ♦ . 1964ASH BASIN ABMW-5D 106 • ♦ \ MW-18D `ABMW-4D • ,�♦ J PZ-17S 1 BASINH 1 's`' ` ♦� PZ-1,6 GW-4 GW-5 e' •� fib; MW-6D i'1 ♦r t� r ;1C •` . / MW-313 I a•� r f, MW-5D / ` ♦ ,` �1 AMW=2A` r, 00000' - ]32 MW- MW 22D IF` • - m ir , b" *GW"l D MW-1D a I CB-1D \ �r •` �-MW 4 1 '` I 1 ---' -i -23DL LEGEND 1 ND •. O NOTES: SirP�S �, 4 C4 .. ._ p . k' _ 5 �. • /r 1"' Y sso 165 oRAPHICSC3oE sso FIGURE 1-19 ISOCONCENTRATION MAP IN FEET 4'� ,, h� , t•s"I"- T.�' 148 RIVER STREET, SUITE 220 BORON IN TRANSITION ZONE GROUNDWATER PRON186 4219THcnRouNn29so1 ASHEVILLE STEAM ELECTRIC PLANT PHONE 864-421-9999 f' � . �•'�' � synTerr�[DRAWN WWWs n erra�or .�om ARDEN, NORTH CAROLINA BY: B. YOUNG DATE:08/25/2016 PROJECT MANAGER: T. PLATING CHECKED BY: T. PLATING ir , .F ♦ I •. °. 4* ' MW-1MR CB-8BR AS-9 } 3 ¢ ,; AS-17 +� ' AS-15 ND �1 MW-9BR ",00- 1 GW-2 1964ASH BASIN .;AL- _1�LAIllillik'LiWEA MW-18BR 1% % �. PZ-17D r ♦� e?; i � '`• CB-4B / AS-13 } MW-22BF AS-11 ND NQ -Mai 5 AS 20; �r AS-14 AS-4 — GW-1 BR 1982 ° ASH BASIN \ ABMW-5BR MW-1 BR ABMW-11 BR MW-6BR / MW-2BR �w DW-6 Terra 1 1 1• - ` 3' ° • - _000 GRAPHIC SCALE 330 165 0 330 660 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 W W W.synte rra Corp. co m DRAWN BY: B. YOUNG DATE: 08/25/2016 PROJECT MANAGER: T. PLATING CHECKED BY: T. PLATING LEGEND G O NOTES: 4*r . FIGURE 1-20 ISOCONCENTRATION MAP BORON IN BEDROCK GROUNDWATER ASHEVILLE STEAM ELECTRIC PLANT ARDEN, NORTH CAROLINA 4ifi.f' RTy,JJW4!7'V�ti� # Ake 1 ♦ ��. ., - vi. ♦s •—• •��`• i' �. d -.'„' �:,,Y s Ast r#':.- /ter •R _ `�'����I . ' �• ���.•�. MW-15A CB-9 ♦ . ./ -MW 245� • 41, �MW-9S� P-105 i e ` " P-104 1 i �.L_ :MW-16A MW-8S 10, 420 �\ ABMW-2S ♦ 1 1964ASH MW-17A BASIN 430 `; APD-1 • A . � \ PZ-27 CB-7 GW-3 ♦0 x ♦ CB-6 4 � jam-" x •' y MW-20A '1!7. GW-1 / `ABMW-5S ',. 7pZ-2*,- \P-103 I 1982ASH CB-1 r BASIN P-101 / ABMW-7S PZ-24• �_ P-100 / \ MW-6S _ PZ 23 ® ` CB-2 CB-5 /100 `, • s's �. rt1 1 t•M5� taAll- --,a iFx3 n� r- CB-4 ♦� / 5.2 !` rrA synTerra e `�•" LEGEND = 1 TOTAL CHLORIDE CONCENTRATION (mg/L) Illl ND NOT DETECTED ABOVE REPORTING LIMIT HIGHEST CONCENTRATION AREA CONTOUR NORTH CAROLINA 2L CONTOUR • / �` INTERMEDIATE CONTOUR APPROX. PROVISIONAL BACKGROUND CONTOUR a MONITORING WELL G PIEZOMETER WATER SUPPLY WELL s ASH BASIN BOUNDARY .--'.—_'!ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS ASHEVILLE PLANT SITE — BOUNDARY • NOTES: CONCENTRATIONS SHOWN REFLECT DATA GATHERED BETWEEN 2/18/14 AND 7/8/16. 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 THE NORTH CAROLINA 2L FOR CHLORIDE IS 250 mg/L. PROVISIONAL BACKGROUND CONCENTRATION IS 32 mg/L. AERIAL PHOTOGRAPH OBTAINED FROM GOOGLE EARTH PRO, DATED 10/18/2015. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83/2011). 660 FIGURE 1-21 ISOCONCENTRATION MAP CHLORIDE IN SURFICIAL GROUNDWATER ASHEVILLE STEAM ELECTRIC PLANT ARDEN, NORTH CAROLINA DRAWN BY: B. YOUNG DATE: 08/26/2016 PROJECT MANAGER: T. PLATING CHECKED BY: T. PLATING �\ MW-11 D 1T" S ,1t iT '1! it 'r 'BASINS GW-1 D / • 1964ASH i BASIN ABMW-4D ABMW-5D MW-1D r MW-18D PZ-17S ,. 1BASINH CB -ID PZ-16 �r � MW-46 - e .. •� MW-6D MW-3D GW-5 _ / "'oo" AMW-2A "..7 ' 1 f j {_-- . lip -.� LEGEND 1 TOTAL CHLORIDE CONCENTRATION (mg/L) � ND NOT DETECTED ABOVE REPORTING LIMIT HIGHEST CONCENTRATION AREA CONTOUR i NORTH CAROLINA 2L CONTOUR INTERMEDIATE CONTOUR APPROX. PROVISIONAL BACKGROUND CONTOUR •` sa MONITORING WELL PIEZOMETER ASH BASIN BOUNDARY IL _ -'!ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS ASHEVILLE PLANT SITE e BOUNDARY �= )fn Terra NOTES: CONCENTRATIONS SHOWN REFLECT DATA GATHERED BETWEEN 2/20/14 AND 7/8/16. THE NORTH CAROLINA 2L FOR CHLORIDE IS 250 mg/L. PROVISIONAL BACKGROUND CONCENTRATION IS 2.2 mg/L. AERIAL PHOTOGRAPH OBTAINED FROM GOOGLE EARTH PRO, DATED 10/18/2015. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83/2011). GRAPHIC SCALE 330 165 0 330 660 FIGURE 1-22 IN FEET ISOCONCENTRATION MAP 148 RIVER STREET, SUITE 220 CHLORIDE IN TRANSITION ZONE GROUNDWATER GREENPHONE 64-421- 9 CAROLINA ASHEVILLE STEAM ELECTRIC PLANT PHONE 864-421-9999 WWw. n rr or om ARDEN, NORTH CAROLINA DRAWN BY: B. YOUNG DATE: 08/25/2016 PROJECT MANAGER: T. PLATING CHECKED BY: T. PLATING AS-9 2.3 ■ ' MW-14BR _ MW nBR \ B-8B`R ���• \ C fi4 !� 6BR F GW-2 210 1964 ASH BASIN PZ-1 ♦ f CB-4B AS`13 �♦ g4g' 85 s; , mw-zztarc AS-11 r 7 b" 1416 i P ♦1 r: GW-1 BR `♦ 1982 -- ASH BASIN ♦� `..1F ABMW-5BR %, MW-1 BR ABMW-11 BR ' �I MW-2BR MW-6BR MW 5BR f - ` `® ,♦ P { n AMW-1B% AMW-3B AS-5 7.75 AS-14 A GRAPHIC SCALE R X, ,, � i tt� _ d� DW-6 330 165 0 330 660 �+ 1 IN FEET 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 Terra v`nvw n rr or om DRAWN BY: B. YOUNG DATE: 08/25/2016 PROJECT MANAGER: T. PLATING "y CHECKED BY: T. PLATING P:\Duke Ener Droo ress.1026\00 GI BASE DATA\Ashevill �• .: . LEGEND 1 TOTAL CHLORIDE CONCENTRATION (mg/L) ND NOT DETECTED ABOVE REPORTING LIMIT HIGHEST CONCENTRATION AREA CONTOUR NORTH CAROLINA 2L CONTOUR INTERMEDIATE CONTOUR APPROX. PROVISIONAL BACKGROUND CONTOUR MONITORING WELL G PIEZOMETER WATER SUPPLY WELL ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS ASHEVILLE PLANT SITE — -BOUNDARY NOTES: CONCENTRATIONS SHOWN REFLECT DATA GATHERED BETWEEN 2/9/16 AND 7/12/16. THE NORTH CAROLINA 21- FOR CHLORIDE IS 250 mg/L. PROVISIONAL BACKGROUND CONCENTRATION IS 6.4 mg/L. AERIAL PHOTOGRAPH OBTAINED FROM GOOGLE EARTH PRO, DATED 10/18/2015. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83/2011). FIGURE 1-23 ISOCONCENTRATION MAP CHLORIDE IN BEDROCK GROUNDWATER ASHEVILLE STEAM ELECTRIC PLANT ARDEN, NORTH CAROLINA \ MW-11 f t`� L��j,7..�,I ham"✓ "� gq sm ti_.r.:r�l�. �.�r�a-+5. "'k.�1i" '�i.,�'1 � M*� y ��'. ♦' •.!p .� � � r -.'AQ T. 414 Ak �a N4 1y ♦ til� �/ i'o t? ��2111 ' a may` eqi � M r �✓'�� `ii; !tnll A r♦ 0 \ ABMW-2S ♦♦ MW-17A., 1964 ASH BASIN Nil CB-7 GW-3 ,. 1982 ASH BASIN CB-1 � J _ `` �♦ CB-6 20A �♦CB-4SND �. ,10000�� ND I BMW-24S *-1■ 0.26 LEGEND ' 1 CHROMIUM (VI) CONCENTRATION (Ng/L) ND NOT DETECTED ABOVE REPORTING LIMIT '♦ +� * HIGHEST CONCENTRATION AREA CONTOUR \ NCDHHS CONTOUR °. ■ / ♦` INTERMEDIATE CONTOUR APPROX. PROVISIONAL BACKGROUND CONTOUR a MONITORING WELL G PIEZOMETER WATER SUPPLY WELL ASH BASIN BOUNDARY .--'.-_'!ASH BASIN COMPLIANCE BOUNDARY ■ DUKE ENERGY PROGRESS ASHEVILLE PLANT SITE - MW=10 BOUNDARY NOTES: ♦ CONCENTRATIONS SHOWN REFLECT DATA GATHERED BETWEEN 2/18/14 AND 7/8/16. THE NORTH CAROLINA DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH SCREENING LEVEL FOR CHROMIUM (VI) IS 0.07 Ng/L. NC DHHS MEMORANDUM, NOVEMBER 4, 2015. PROVISIONAL BACKGROUND CONCENTRATION IS 1.9 Ng/L. synTerra AERIAL PHOTOGRAPH OBTAINED FROM GOOGLE EARTH PRO, DATED 10/18/2015. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA i STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83/2011). GRAPHIC SCALE 330 165 0 330 660 FIGURE 1-24 IN FEET ISOCONCENTRATION MAP 148 RIVER STREET, SUITE 220 CHROMIUM (VI) IN SURFICIAL GROUNDWATER GREENPHONE 64-421- 9 CAROLINA ASHEVILLE STEAM ELECTRIC PLANT PHONE 864-421-9999 =w.svnterracorQ.Q0M ARDEN, NORTH CAROLINA DRAWN BY: B. YOUNG DATE: 08/26/2016 PROJECT MANAGER: T. PLATING CHECKED BY: T. PLATING PADuke Energy Progress, 1026\00 GIB BASE DATA\Asheville\MaD Docs\CSA SuDDlement\Asheville - Isoconcentration Maps Surficial,mxd ■ \MW-11D k6k. n k: �. a \ MW-1 �2 1964 ASH BASIN ABMW-4D PZ-17S i 0.12 ♦ MW 22D ; 3 1982 ASH BASIN MW-1 D y 2� GW-1 D LEGEND 1 CHROMIUM (VI) CONCENTRATION (Ng/L) CB-1D� ND NOT DETECTED ABOVE REPORTING LIMIT Fr ♦ °♦� HIGHEST CONCENTRATION AREA CONTOUR ♦ � NCDHHS CONTOUR __ '♦ / INTERMEDIATE CONTOUR APPROX. PROVISIONAL BACKGROUND CONTOUR +� � •` sa MONITORING WELL •��I .� �� '� PIEZOMETER �,iASH BASIN BOUNDARY _ —'!ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS ASHEVILLE PLANT SITE ■ --'BOUNDARY synTerra GRAPHIC SCALE 330 165 0 330 660 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 wwwsvnterracorp.com DRAWN BY: B. YOUNG DATE: 08/25/2016 PROJECT MANAGER: T. PLATING CHECKED BY: T. PLATING P-\N,kP FnP v Prnnr—, 1026\00 (;IS RARF r)ATA\A havill NOTES: CONCENTRATIONS SHOWN REFLECT DATA GATHERED BETWEEN 2/20/14 AND 7/8/16. THE NORTH CAROLINA DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH SCREENING LEVEL FOR CHROMIUM (VI) IS 0.07 Ng/L. NC DHHS MEMORANDUM, NOVEMBER 4, 2015. PROVISIONAL BACKGROUND CONCENTRATION IS 0.03 Ng/L. AERIAL PHOTOGRAPH OBTAINED FROM GOOGLE EARTH PRO, DATED 10/18/2015. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83/2011). FIGURE 1-25 ISOCONCENTRATION MAP CHROMIUM (VI) IN TRANSITION ZONE GROUNDWATER ASHEVILLE STEAM ELECTRIC PLANT ARDEN, NORTH CAROLINA AbL ILI V . r, 4 ■ \ MW-14BR CB-9BR MW-13BR''. 'CB-8BR 1'° '� '■ MW-9BR • , sue. MVV-16BR - - � \ GW-2 ' 1964ASH Ay BASIN S-9 ' ABMW-11BR ■ li,�,, MW-18BR i flitri ' • 1982ASH PZ-17DBASIN Ilk Iw - 1 • ♦ r'a 4 • , to- J a � E itIlk ,. -SBR, CB;;4BAS-1 7 !" AS-13 1100, AS MW-22BR ` v Y" D ',I- &A \ A$-11 AS-1 5 y1 �yyt y ND. -- a sa - A$-6 •I I .i t.y �-A AT LEGEND • J 1 CHROMIUM (VI) CONCENTRATION (Ng/L) • ND NOT DETECTED ABOVE REPORTING LIMIT t ?mod• �- HIGHEST CONCENTRATION AREA CONTOUR • F t� �_ NCDHHS CONTOUR INTERMEDIATE CONTOUR '� . / •` APPROX. PROVISIONAL BACKGROUND CONTOUR MONITORING WELL ` •� G PIEZOMETER .� WATER SUPPLY WELL I �•' ` ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS ASHEVILLE PLANT SITE AMW-3B — 'BOUNDARY / NOTES: CONCENTRATIONS SHOWN REFLECT DATA GATHERED BETWEEN 2/9/16 AND 7/12/16. THE NORTH CAROLINA DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH SCREENING LEVEL FOR CHROMIUM (VI) IS 0.07 Ng/L. NC DHHS MEMORANDUM, NOVEMBER 4, 2015. PROVISIONAL BACKGROUND CONCENTRATION IS 0.6 Ng/L. AERIAL PHOTOGRAPH OBTAINED FROM GOOGLE EARTH PRO, DATED 10/18/2015. ' DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA _--. STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83/2011). GRAPHIC SCALE 330 165 0 330 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 f PHONE 864-421-9999 . DATE: 08/25/20161C'nTerra tWW' BOm PROJECT MANAGER: T. PLATING CHECKED BY: T. PLATING 0: a� P:\Duke Ener Pro ress.1026\00 GIB BASE DATA\Asheville\Ma Do< FIGURE 1-26 ISOCONCENTRATION MAP CHROMIUM (VI) IN BEDROCK GROUNDWATER ASHEVILLE STEAM ELECTRIC PLANT ARDEN, NORTH CAROLINA �\ \ MW-11 .......`E ir , b" T MW-15A r \ CB-9 •` ": r ND `♦ � _- P-105 ` ,MW 9S .1.64 ANIL , 1 1OF HOT APD-7 ,,/ " MW-16A a •• -. o \ MW-8S 1964ASH ABMW 2SJULIAN ♦`r-sue A BASIN 5` - . GW-1 ,. •\ MW-17A 1 . 1 ` ABMW-5S %. 1 CB 7 \ PZ-27 PZ-26* , a,.,•� APD-1 _ \ P-103 . .. _.% ` •, 1982ASH C13-1 ` 1% • GW 3 BASIN 4 J, , ,X�CB 6%. PZ-19 P-100 - ' ♦ ABMW 7S PZ-2�� - �, - r� :ed.. .♦ MW-6S / PZ-23 \ T Via-.x •' ` , MW-20A �— PZ-22 CB_2�,� ��0v f •♦ k . '� i •, CB_4 X- Mll-li, !.h i' / ND N, a . r synTerra GRAPHIC SCALE 330 165 0 330 660 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 W W W.SVnterr3Corp.CO m DRAWN BY: B. YOUNG DATE: 08/26/2016 PROJECT MANAGER: T. PLATING CHECKED BY: T. PLATING 7 LEGEND NOTES: FIGURE 1-27 ISOCONCENTRATION MAP CHROMIUM (TOTAL) IN SURFICIAL GROUNDWATER ASHEVILLE STEAM ELECTRIC PLANT ARDEN, NORTH CAROLINA , MW-11D - e -------------- x • MW-15D ,, r • \ MW-13D MW-12D - • 10.2 CB 8 / F„ _ MW'9D/ F • . ♦ t� •E _. a 2 'ft ." 1 tlr 71 * ' �1 Na4rY ',7'.+'�'rt �'�i.-.2"a ham.•-; • 1 1964ASH 1 BASIN • ,'♦ ABMW-4D MW-18D 1 ABMW-5D N D, 1982 ASH ,• i PZ 17SBASIN %PZ-16 r` 4 GW-5 x � MW-6D/ / MW-SD • , \1 1000, , ` AMW=2A j '~ ' MW-21 D MW;22D MW-23DL or 5 +� f k ir , b" MW-1 D CB-1D \ a LEGEND 1 ND �. NOTES: Y - f• Y h� A, ark - - f ', • ,'�F ? 330 165 GRAPHIC SC30E 660 FIGURE 1-28 ISOCONCENTRATION MAP hr r'�4 `;s`%h''_'fT�'. v N PEST � 148RIVERSTREET,SUITE22o GREENVILLE, SOUTH CAR0u NA 29601 CHROMIUM (TOTAL) IN TRANSITION ZONE -. 4� f PHONE 864-421-9999 GROUNDWATER .,. f' J �4 * - A nTerr� WRAW n erracor .com DATE:08/25/2016 ASHEVILLE STEAM ELECTRIC PLANT ARDEN NORTH CAROLINA PROJECT N CHECKED BY: T. PLATING MW 14BR _ , �r �• , `•00 �, ' ::•�!^ems `' . •' \CB-9BR ♦' \ MW-13BR • • 4* MW-16BR MW-9BR ♦ ♦ �. • . e ND n• - _; , -4NU' i • �. . �••� GW-1BR + \ 1982 • ASH BASIN ♦ GW-2 1964ASH ABMW-5BR BASIN g MW-18`BR MW-1 BR 4_ \ AS-9_ ♦ ` ' ♦ I 3 1% ♦ `_ ABMW 11 BR 4 ,p ♦ - .- - 911111. N U ' 1 ♦• �� PZ-17D / MW-21BR �� • ' s MW-51BR I ' ♦ C04B e �� AMW-1 B'% 000l', AMW..-3ft:B ' -13 Aim AS-1 7 AS .00001 / * MW,-22BR / AS-11 �- 1Ti-a J AS-15 AS-6 n N L7 AS-4 / - ..._ dit �• AS-14 '!!7. w4 AS 20 N . � v DW-6 I �ynTerra LEGEND 1 lr ND —.q NOTES: 330 165 ORAPHICS330E 660 FIGURE 1-29 IN PEST ISOCONCENTRATION MAP 148 RIVER STREET, SUITE 220 CHROMIUM (TOTAL) IN BEDROCK GROUNDWATER GREENPHONE 64-42OUTH -9999 OLINA29601 ASHEVILLE STEAM ELECTRIC PLANT PHONE 864-421-9999 ARDEN, NORTH CAROLINA DRAWN BY: B. YOUNG DATE: 08/25/2016 PROJECT MANAGER: T. PLATING CHECKED BY: T. PLATING % \ MW-11 � . a. C13-9SL dfi - wwt MW-15A (CB-9 �f ' ,/ W 24S P-105 9 MW`9S . • . 9 `` MW`16A P-104 DP-1 1 r 2V. F r MW 8S�✓ ABMW-2S 1 p •`♦ .' y,;: `♦ , APD-7 ` ABMW-5S GW 1 MW-.17A` 1964ASH 16.7 BASIN a ®. PZ-26�;*.� CB 7 • APD-1 PZ-27 \ P-103 ' . ♦. — 20 %• `GW-3 1982ASH C13-1 ' 1% BASIN F `• �� 14.3 ABMW-7S� PZ 24 .' ��• P-100 ar.,. A. PZ 19;. 35.9 3.5 - %4, N(3 MW 6S qr •` MW-2OA PZ-22 _ RF �.— �� ., •. Y , f 28; I ♦� .�.. CB 2 PZ 23 �♦ a CB- ip "w AS .� h synTerra �"v 9 GRAPHIC SCALE 330 165 0 330 660 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 W W W.SVnte"aCOrp.Com DRAWN BY: B. YOUNG DATE: 08/26/2016 PROJECT MANAGER: T. PLATING CHECKED BY: T. PLATING LEGEND NOTES: FIGURE 1-30 ISOCONCENTRATION MAP COBALT IN SURFICIAL GROUNDWATER ASHEVILLE STEAM ELECTRIC PLANT ARDEN, NORTH CAROLINA MW-11 D / I r� p \ MW-13D 4.69 1:23 a 2.7 WOU O t 1*_ •■fit• l �� �. �. .. _ r it • : M�!;`�i Jh e�!'H I 1964 AS H BASIN ABMW-4D 3.4 • 1 �`, y /, r n ` ` GW-1 D ABMW-5D % h.-7.1 D � a ` s 1982ASH �� a� PZ-161% BASIN '% `PZ-17S GW-4 �. �. GW-5 MW-3D CB-3R - •� MW-6D / � r i� ♦��r t •� BMW-5D / `�• MW �AMW=2;4 MW-21 D 4.4 s.;. r,y 4 k�4ptrA A MVV�22D �✓ ! � ,jib �r !� 4: A � h,l.>. � � � �''• " /♦ - n r `�` �a ♦ ♦ e P e LEGEND 1 ND O NOTES: GRAPHIC SCALE 330 165 0 330 660 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 W W W.SVnte"aCOrp.Com DRAWN BY: B. YOUNG DATE: 08/25/2016 PROJECT MANAGER: T. PLATING CHECKED BY: T. PLATING Pow;,. , ava" P.. FIGURE 1-31 ISOCONCENTRATION MAP COBALT IN TRANSITION ZONE GROUNDWATER ASHEVILLE STEAM ELECTRIC PLANT ARDEN, NORTH CAROLINA AS-9 ND 4 y-51 N U - Nn.„' #r 7 '!}� • +4"" k+� h "�qua iWi IL MW-14BR ' .0 - — - — - — - — - — - — • _ — � • • - ND_- 1 �. i \ CB-BBR ■ MWIN \ MW-16BR ND e GW-1 BR •� � -- 1982 - - ` • f • \ GW-2 ASH BASIN . r • ; 1964ASH `1 BASIN ABMW-5BR / 4.21 `MW-1 BR ,1No�. ,,i _ �� yvt H \ MW-1813R I •, �. ABMW-11 BR 1 ■ %1% S ` • PZ-17D , VoV ' 1 • MW-21BR - MW-6BR �. MW 5BR /� �VV, e 1 CB-4B �• AMW-1%.a AMW-3AS-1 3 B,, ' AS-17 / 10000 •, MW-22BR ASS , AS-11 D AS-15 / AS-6 : 4 /1 Ail AS-4 128 '!! it / DW-6 synTerra r LEGEND 1 R ND NOTES: 330 165 ORAPHICS330E 660 FIGURE 1-32 IN PEST ISOCONCENTRATION MAP 148 RIVER STREET, SUITE 220 COBALT IN BEDROCK GROUNDWATER GREENPHONE 64-42OUTH -9999 OLINA29601 ASHEVILLE STEAM ELECTRIC PLANT PHONE 864-421-9999 ARDEN, NORTH CAROLINA DRAWN BY: B. YOUNG DATE: 08/25/2016 PROJECT MANAGER: T. PLATING CHECKED BY: T. PLATING \ MW-11 CB-9SL MW-15A CB-9 �f •' ` 1 P-05 ♦ i — �a� \ P-104, "R„4 MW-9S • . !, i MW-16A f ` APD-7 171 ` • ; DP-1 ; MW-8S . 1964ASH „-, ,v° *4 BASIN . \ ABMW-2S ABMW-SS ' GW •1� -- PZ-27 4800 , MW-17A \ 35500 APD-1 PZ-26 / CB-7 / P-103 340 GW-3 C. 1 H 595 BASIN a — 4 , 7r,A* �. �.: F 2 �400� 471 tiS ar.,. ' ♦ 545 AB13 MW Y Y -100 ]� •� PZ 22iPZ-23 a. ,�`"��'. •� MW-20A `�� 23Q± / \, • � :- `� `' � ':. �, _Cg4 _ MW-6S^fi1/ L a' ti P tea. .ry y� .�, w`' ..,,.-.�'r �'Y �` :�s•-�� JF �+1.' 569. 130 �^yi,,� • ''asp -. �"`�- '4 '�'�� k''� '� P! � � e.'^ -, P� i'., d a. 1 ._ 4 -MW 2_2 s ^ AMP ..� LEGEND MW-10 NOTES: 31 GRAPHIC SCALE 330 165 0 330 660 IN FEET 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864 421 9999 n er com S Term DRAW DRAWN BY B B. - YOUNG DATE 08/26/2016 PROJECT MANAGER: T. PLATING CHECKED BY: T. PLATING FIGURE 1-33 ISOCONCENTRATION MAP IRON IN SURFICIAL GROUNDWATER ASHEVILLE STEAM ELECTRIC PLANT ARDEN, NORTH CAROLINA \ MW-11 D Lr 'A mom MVV-15D ♦ CB MW-12D - - 41,LAKE r . • �` ' • _ �'; r 1 JULIAN • 1964ASH s' BASIN ABMW-5D MW-1D —_ • 19000 - :; LEGEND t ,. , ♦ _ ABMW-4D •MW-18D 7630 CB-1© ! ., 1 • 1982ASH ` 3 �: ` `• PZ-16 BASIN /. ` , ND 4 1%N x •877 ♦ , , GW 5 7hS . � PZ-'I , ♦ MW-313 44 -3 ,�.MW 5D v , MW 21D •�+'� .. 11600 . �,��, .. ¢ ��w�a# .�+M �i.j���`'.� !+h"y ..+ •�. f ��.,__ ` �I a"r'; . . - _v.. .. .. • Ji NOTES. 1 1 MW`22D ._ - MW=33U r 7Fo— r Y , GRAPHIC SCALE *l 330 165 o sso 660 FIGURE 1-34 n /r''" v ISOCONCENTRATION MAP IN FEET `. 1asRIVERSTREET,suITE22o IRON IN TRANSITION ZONE GROUNDWATER GREENVILLE, SOUTH CAROLINA 29601 PHONE864-421-9999 ASHEVILLE STEAM ELECTRIC PLANT Term wwws n erracor com ARDEN, NORTH CAROLINA DRAWN BY: B. YOUNG DATE: 08/25/2016 I PROJECT MANAGER: T. PLATING CHECKED BY: T. PLATING ir , f wr LAKE JULIAN rvF . n I _ MW=1�4BR \ i \ CB 9BR •... .._ , CB 813R \ MW22 BR 'f: -t ► 897_ - ; •� � MV11-9BR •Yr MW-16BR C ♦ Br KE ABMW-5x - .. " •�, , 1964ASH ! , BASIN p -•� ; ,_ ' , `MW-1 BR ' J _.� ;r,,,•�-ems I ' �� AS-9,_ _ ABMW-11 BR / I 12 •� �. MW-18BR ,� 766 1982 H BASIN1 3 ♦ _ND - ` �♦ G PZ-17D 63 ♦.A� _ `� ♦`♦ MW-613R `. `J1:.. T s� x a. ` ♦_ .. , . MW-2BRl• ' �.. �. +`",�s ^.; AMW 3 13 e "zsi( c► `:�", AS-13 �' .. AMW-16 i 0, AS-17 110 MIN221 84 wM 4r x 7. At.» "25' AS 6 ' NU 24'S0AL AS-14 In DW-6 Term GRAPHIC SCALE 330 165 0 330 660 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 W W W.synte rra Corp. co m DRAWN BY: B. YOUNG DATE: 08/25/2017 PROJECT MANAGER: T. PLATING CHECKED BY: T. PLATING LEGEND 0 0 c.-- --! 1m= NOTES: FIGURE 1-35 ISOCONCENTRATION MAP IRON IN BEDROCK GROUNDWATER ASHEVILLE STEAM ELECTRIC PLANT ARDEN, NORTH CAROLINA ate^- ,1¢ ,., kF- �\ \ MW-11 All -15A �•�•! rob-, i •e 4 MW-9S WV-16A �•';j •` • MW-8S 1964ASH 2920 BASIN am P-104 P-105 1150 APD-7 w i •r.-ad..�lr71 ir , b" t, y JEW. `MW 245 �•MW 17A ABMAI \ W 2SI GW-1 ♦ L 1 --5040 18400 �PZ-27 P-103 •♦ , 84 ABMW-5S CB-7,6, -• PZ 26 •� �. - GW-3 APD-1 3200 1982ASH C13-147,20 = ' BASIN ♦, �, a �, P-101 ♦♦ ' 2320 PZ-23 .,. _ �. 0B® 3640 PZ-242000 1 MW-2OA ♦ S PZ-19 \ 0, 8930 ` �, 212 �' ' ° ♦ MW-6S �, 763 `,' CB 2 •, 0970 �' PZ-22A a `. ♦� 223` ,� 2750 k • `� -7 `�'A+4p ir��'� Mr 1,' • 54r AS-;` � ..�� c-r a�; mot. r-. ,-..t-t>.� , a a �k�' ° ♦ 0 r'iW" +^ r 4Y r 'X_ M1.1i, / x synTerra GRAPHIC SCALE 330 165 0 330 660 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864 421 9999 www svnterracorp com DRAWN BY. B YOUNG DATE:08/26/2016 PROJECT MANAGER: T. PLATING CHECKED BY: T. PLATING LEGEND NOTES: FIGURE 1-36 ISOCONCENTRATION MAP MANGANESE IN SURFICIAL GROUNDWATER ASHEVILLE STEAM ELECTRIC PLANT ARDEN, NORTH CAROLINA �k Tr• \ MW-11 D s 6 r -• i \ MW-130, � i CB-8 /• : \ MW-1a2D — 4 ,` ♦ 123 F� r iMW r 3660 r • �ft :1 1 tY^ MW-1 D + 33 \ '`; 1964ASH 1 BASIN ABMW-5D oMW-18D ABMW-4D / ' PZ-16 BASIN ty� '% PZ-17S / MW-4D-_� ♦ GW-4 GW-5 87 e€t�:, `' ♦., MW-6D 363 zc B-3R AMW.'2A MW 21D MW-23DL �� �rn,;.r-�'._ ��• ;, ,� � BY MW -22D V I_ N2. _ synTerra p LEGEND 1 NID .. O NOTES: GRAPHIC SCALE 330 165 0 330 660 1148 RIVER STREET, SUITE 220 I GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 DRAWN BY: B. YOUNG DATE: 08/25/2016 PROJECT MANAGER: T. PLATING CHECKED BY: T. PLATING FIGURE 1-37 ISOCONCENTRATION MAP MANGANESE IN TRANSITION ZONE GROUNDWATER ASHEVILLE STEAM ELECTRIC PLANT ARDEN, NORTH CAROLINA ' MW-146R \ MW-13BR .4* CB-86R 25 452Do r r. `MW-913R MW-16BR cw-2 ' 1 AS-9 �m MW 1813R. AlL 9� s re. - ♦ ♦y AS-1 3 � AS-17 %AKJ - •' AS 11 v m� _iV r i AS-15 AS-14 AS-2014 / 1964 ASH BASIN B-96R - 1 �2 Lr ..,. r.. . r - 1982 ASH BASIN mq 1 ABMW-5BR 157 ABMW-11 BR AS-4 • DW-6 MW-2BR --'-1 I� Y ynTerra AMVIL3B LEGEND - 0 e NOTES: GRAPHIC SCALE 330 165 0 330 660 IN FEET 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.svnterracorp.co m DRAWN BY: B. YOUNG DATE: 08/25/2016 PROJECT MANAGER: T. PLATING CHECKED BY: T. PLATING FIGURE 1-38 ISOCONCENTRATION MAP MANGANESE IN BEDROCK GROUNDWATER ASHEVILLE STEAM ELECTRIC PLANT ARDEN, NORTH CAROLINA MW-11 C S L — W-1 5A (-C—B - ♦ , P-105 N M 1 'j r 3 \ AP.D-7�_ MW-16A y 1.13 ND � C 1964ASH 1982 MW-17A _ ABMW-2S �, BASIN ASH BASIN 2.48 r ND . 1 ABMW-5S tie "4' ,,�i-*'4� , dam.- - —4e .,., kF- }' - w 4 �eF'� Y'•d,l am C APD-1 PZ-26•, - ' ND PZ-27 �. \ P 103 . _. 0 3.54 GW-3 ' CND7 1.17 d I P-100 ° CB-6 PZ-19 P-101 ABMW-7S +� ` PZ-23 \ .4 MW 20A •- �. CB' j4 � .PZ 22�� _� MWm10 I 13 -1. d idhpv � ;• k y y� ¢qi synTerra GRAPHIC SCALE 330 165 0 330 660 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864 421 9999 www svnterracorp com DRAWN BY. B YOUNG DATE: 08/26/2016 PROJECT MANAGER: T. PLATING CHECKED BY: T. PLATING `MW ' W LEGEND L —^ NOTES.. FIGURE 1-39 ISOCONCENTRATION MAP SELENIUM IN SURFICIAL GROUNDWATER ASHEVILLE STEAM ELECTRIC PLANT ARDEN, NORTH CAROLINA T .F hb �� L W-11 D oil MVV-15D . - % ■ MW-12D \ MW-13D w` ND `, 1 `CB-B 20.7 ♦ �`'2 -� 1 1964ASH BASIN ABMW-5D • 3ti-o ♦ ABMW-4D ,�♦ ND MW-18D ` X; 1982ASH ,•11 PZ-17S BASIN "ram A \ PZ 16 GW_5 ,s #7cp ed �♦ CB-3R GW-4 `it`s" 1���a1 :�'�,' 1�► x ` � MW-51) AMW 71 AV il' ti„Fc '► may`°'lba #. y �El■' p �' / ` MW-23DL / r �✓ n ,Jy, �. ,es r A a,,,i., „7`• C �j,�. .' MW 22DIVA w4l Ali: ,� 1 r rr..`. Ot"l D "!- MW-1D _,. � , C13-1D MW-4D-_—. ND \ GRAPHIC SCALE 330 165 0 330 IN FEET •. r� 660 01 ATE: 08/25/2016 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 296 PHONE 864-421-9999 www.s n erracor .com DRAWN BY: B. YOUNG D PROJECT MANAGER: T. PLATING CHECKED BY: T. PLATING LEGEND 1 ND NOTES: FIGURE 1-40 ISOCONCENTRATION MAP SELENIUM IN TRANSITION ZONE GROUNDWATER ASHEVILLE STEAM ELECTRIC PLANT ARDEN, NORTH CAROLINA ` " 3- 9 MW-14BR L . *--— -— - —- VA .��•. CB-96R *♦ , \MW-13BR NQ • • ND_- i �CNDR- ■ `■ `■ � MW-9$R • ♦ sue. - _-_��. .• e `\ WV-1613R •aL GW-1 BR , �a ♦ ♦ e P s, 1982 • \ GW-2 ASH BASIN . r 1964ASH BASIN 1 ABMW-5BR MW-1 BR •� � Ot MW-1813R; , ABMW-11 BR I 1% % V % -- ar.,. ,PZ-17D ,MW-2BR ... fit e�. � -� MW-61BR 101, e�'�; ;� . ■ `., �• � / �'� .- eI' ♦. MW-513R ,`.`� AMW-1 B'1 o ' -7 AMW-313 . AS-17 / `• • , - MW.22BR AS 5 AS-11 i . 9 • In "- SAS-15 AS-6 `5 ♦ ��r i YF: • AS-14 '• s '' `0,4 AA S-20 + x /- �+ � ,M �✓'.� yy'+afti. ^�+n5�r' ' e ie i.P �i± v � ne � _if ,■ , .�ynTerra LEGEND 1 71 . . c• — Q ► ■ NOTES: GRAPHIC SCALE 330 165 0 330 660 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 W W W.SVnterr3Corp.CO m DRAWN BY: B. YOUNG DATE: 08/25/2016 PROJECT MANAGER: T. PLATING CHECKED BY: T. PLATING FIGURE 1-41 ISOCONCENTRATION MAP SELENIUM IN BEDROCK GROUNDWATER ASHEVILLE STEAM ELECTRIC PLANT ARDEN, NORTH CAROLINA - �wa.*,a "'k; ti �•e�i M*� �_' �' "4 �; A � 1 r ' AS-3 '1!7, 1. !',9j��x3 CB-9SL •�• (CB-9 _���` - �' - .'�'. tie; s Ast.. r$'-'- tt 11-9r - P-105 W �JSE: P 104HOT 88 DP 1•: POND MW-8S 3540 - AB 83 .ems \ABMW-2S P253 GW-1 / '��, PZ-26 1964 ASH 11 " .I ` BASIN �t • CB-7 *. - ': GW-3 ` 1982ASH CB-1 �. BASIN CB-6 P-101 P-100 %' lllmPZ_19 ABMW-7S PZ-24 565 ♦ / 202dl \ MW 20A / CB 2� PZ 22 / ,PZ-23 _ ., •� �/`•/ ,' , 111,. CB-5 ra` ;0000• CB-4, r • . 3 i synTerra pw ram•° � a.• ■ - a �' ♦ •MW-24S /71 LEGEND 0' 1 STRONTIUM CONCENTRATION (pg/L) ND NOT DETECTED ABOVE REPORTING LIMIT R HIGHEST CONCENTRATION AREA CONTOUR STANDARD CONTOUR r • �` INTERMEDIATE CONTOUR APPROX. PROVISIONAL BACKGROUND CONTOUR a MONITORING WELL G PIEZOMETER WATER SUPPLY WELL s ASH BASIN BOUNDARY .--'.-_'!ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS ASHEVILLE PLANT SITE — BOUNDARY NOTES: CONCENTRATIONS SHOWN REFLECT DATA GATHERED BETWEEN 2/18/14 AND 7/8/16. NO NORTH CAROLINA21_OR INTERIM MAXIMUM ALLOWABLE CONCENTRATION ESTABLISHED FOR STRONTIUM. PROVISIONAL BACKGROUND CONCENTRATION IS 37 Ng/L. AERIAL PHOTOGRAPH OBTAINED FROM GOOGLE EARTH PRO, DATED 10/18/2015. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83/2011). GRAPHIC SCALE 330 165 0 330 660 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 wwwsvnterracorp.com DRAWN BY: B. YOUNG DATE: 08/26/2016 PROJECT MANAGER: T. PLATING CHECKED BY: T. PLATING FIGURE 1-42 ISOCONCENTRATION MAP STRONTIUM IN SURFICIAL GROUNDWATER ASHEVILLE STEAM ELECTRIC PLANT ARDEN, NORTH CAROLINA MW-11 D MW-1,3D• MVV-15D �.�' �%,. • ICB-8 fillr ♦ �� 21 � y 2 MW-9D . •� 1964ASH BASIN ABMW-5D MW-1 D ,\ ABMW-4D I MW-18D • ♦ZZ4, CB-1D ' 1% BASIN PZ-16 !ae ♦ •% �- ♦♦ ♦% ` ♦ PZ-17S GW-4 �• �� s:, e' . �♦ tl"ex r ;, ♦` / . MW 6D MW-3D ♦�' /0000k4. �. MW-4D /.— \I® •. ♦ % MW-5D n '` ,♦� AMW-2A % 40 /rM� e ��• '♦a y i ` MVV, 22D \ MW 23DL , . 524% '!! it 3 synTerra ' 1 ♦ � 1♦ a.• M �a ♦ ♦ e LEGEND 1 STRONTIUM CONCENTRATION (pg/L) ND NOT DETECTED ABOVE REPORTING LIMIT HIGHEST CONCENTRATION AREA CONTOUR STANDARD CONTOUR INTERMEDIATE CONTOUR APPROX. PROVISIONAL BACKGROUND CONTOUR �. Q� MONITORING WELL O PIEZOMETER ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS ASHEVILLE PLANT SITE --'BOUNDARY NOTES: CONCENTRATIONS SHOWN REFLECT DATA GATHERED BETWEEN 2/20/14 AND 7/8/16. NO NORTH CAROLINA 2LOR INTERIM MAXIMUM ALLOWABLE CONCENTRATION ESTABLISHED FOR STRONTIUM. PROVISIONAL BACKGROUND CONCENTRATION IS 41 Ng/L AERIAL PHOTOGRAPH OBTAINED FROM GOOGLE EARTH PRO, DATED 10/18/2015. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83/2011). GRAPHIC SCALE 330 165 0 330 660 FIGURE 1-43 IN FEET ISOCONCENTRATION MAP 148 RIVER STREET, SUITE 220 STRONTIUM IN TRANSITION ZONE GROUNDWATER GREENPHONE 64-421- 9 CAROLINA ASHEVILLE STEAM ELECTRIC PLANT PHONE 864-421-9999 WWw. n rr or om ARDEN, NORTH CAROLINA DRAWN BY: B. YOUNG DATE: 08/26/201G PROJECT MANAGER: T. PLATING CHECKED BY: T. PLATING , to J� 01 " MW-14BR / � ' \ CB-91BR •% �• �• ♦CB-8BR \MW-13BR 65 • • 148 - 16 ' '• '• `MW-91BR �. • . e MW-16BR f \ GW-2 ABMW-5BR 1982 - �� `•. • 1964ASH ASH BASIN ' . BASIN �R • • MW-1 BR �, M 4BR 19ABMW-11 BR ,: MW-2BR £� �. MW-6BR .- ` r•. CB-4B / �. .� S. T / , �. �' •t _ AMW-1 B AS-11 M` 22BR AS-6 5� AS-4� i AS'-14 AS 20 J '' 480 1 •, r ':4 ni-$ AS-11 3 DW-6 nTerra � 1■ t.. P� lIr LEGEND 1 R ND NOTES: GRAPHIC SCALE 330 165 0 330 660 FIGURE 1-44 IN PEST ISOCONCENTRATION MAP 148 RIVER STREET, SUITE 220 STRONTIUM IN BEDROCK GROUNDWATER GREENPHONE 64-42OUTH -9999 OLINA29601 ASHEVILLE STEAM ELECTRIC PLANT PHONE 864-421-9999 ARDEN, NORTH CAROLINA DRAWN BY: B. YOUNG DATE: 08/25/2016 PROJECT MANAGER: T. PLATING CHECKED BY: T. PLATING ;3, r ,!7, \ MW-11 CB-9SL ' MW 15A CB-g '♦ 0. J 1 ' �11f u` ♦ e G. BMW-9S P-105 1 /P10 4 MW--8S •` APD-7 t DP-1 •` ' ' ABMW-2S F y� 630: �� ••�--�� _ 1964ASW WZ-26 BASIN NU •\ MW-17A ABMW-5S,' APD-1 20 ;.� P=103 i GW 3 PZ-27 150 T )� •� �� r : 50 300 1982 ASH BASIN t vkv P 100 ` PZ-19 r P-101 ,: 4 ..:10 's i ABMW-7S /+ 13�6 I 7 I % MW'6S CB-2 • ` MW-20A 130 PZ-22 ----- .000, „fin,r,�I T , • �.. .. e // 3 • 1 • • �i r 4 r • 1• • ram.Id•�. -MW 24S / 71 s f 7 LEGEND 1 TOTAL SULFATE CONCENTRATION (mg/L) ND NOT DETECTED ABOVE REPORTING LIMIT HIGHEST CONCENTRATION AREA CONTOUR NORTH CAROLINA 2L CONTOUR INTERMEDIATE CONTOUR APPROX. PROVISIONAL BACKGROUND CONTOUR a MONITORING WELL G PIEZOMETER WATER SUPPLY WELL ASH BASIN BOUNDARY -'.—_'!ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS ASHEVILLE PLANT SITE — -BOUNDARY NOTES: CONCENTRATIONS SHOWN REFLECT DATA GATHERED BETWEEN 2/18/14 AND 7/8/16. THE NORTH CAROLINA 2L FOR SULFATE IS 250 mg/L. PROVISIONAL BACKGROUND CONCENTRATION IS 1.3 mg/L. AERIAL PHOTOGRAPH OBTAINED FROM GOOGLE EARTH PRO, DATED 10/18/2015. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83/2011). Y4 f ;- GRAPHIC SCALE 330 165 0 330 660 FIGURE 1-45 ISOCONCENTRATION MAP 'e IN FEET to l •' •' 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 SULFATE IN SURFICIAL GROUNDWATER �''� y ASHEVILLE STEAM ELECTRIC PLANT ^ *, w �',C'' � ���� PHONE864-421-9999 n rr or om DRAWN BY: B. YOUNG DATE: 08/26/2016 DRAWN ARDEN, NORTH CAROLINA ����j///�■�■/�■■� PROJECT MANAGER: T. PLATING CHECKED BY: T. PLATING I \ MW-11 D ♦ I - . r . Iw I e. If MW-13D ��, r I CB-8' 1 ` MW-9D 280` ;,A 2 i ABMW-4D • sy 1982ASH ,•�� PZ-16 BASIN •. �� PZ-17S 14 i GW-4 MW-6D , MW-3D ,_�-. � ��• MV1l-5D� CB-3R %"00' •• �%$ \ AM �2A� :. . MW-21 D f�' `•• MV11-22D � -i�: + . ,�•.'� ate-' I MW-4D'r--.r �J -vnTerra r 7 b" GRAPHIC SCALE 330 165 0 330 660 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 wwwsvnterracorp.com DRAWN BY: B. YOUNG DATE: 08/25/2016 PROJECT MANAGER: T. PLATING CHECKED BY: T. PLATING LEGEND 1 TOTAL SULFATE CONCENTRATION (mg/L) ND NOT DETECTED ABOVE REPORTING LIMIT HIGHEST CONCENTRATION AREA CONTOUR NORTH CAROLINA 2L CONTOUR INTERMEDIATE CONTOUR APPROX. PROVISIONAL BACKGROUND CONTOUR sa MONITORING WELL O PIEZOMETER ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS ASHEVILLE PLANT SITE --'BOUNDARY NOTES: CONCENTRATIONS SHOWN REFLECT DATA GATHERED BETWEEN 2/20/14 AND 7/8/16. THE NORTH CAROLINA 2L FOR SULFATE IS 250 mg/L. PROVISIONAL BACKGROUND CONCENTRATION IS 8.5 mg/L. AERIAL PHOTOGRAPH OBTAINED FROM GOOGLE EARTH PRO, DATED 10/18/2015. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83/2011). FIGURE 1-46 ISOCONCENTRATION MAP SULFATE IN TRANSITION ZONE GROUNDWATER ASHEVILLE STEAM ELECTRIC PLANT ARDEN, NORTH CAROLINA e • 4 MW-1B 90 •_ -. � aeLL • ,'ram• ,�.`, - 1' ��e. ♦ a5 .. f$+.� • \ CB-9BR �f ` �• �. ,� \ MW-13BR 1. • ■ ■ •CB-8BR • ` MW-9BR' _ t {A `\ MW-16BR G BR i • � '�� F•- - , F� � -yet » ` : r `_l •, \ GW-2 �• iB MW 1BR 1964 ASH % , W-1 BR BASIN ABMW-56R 1982 • '' LEGEND EGEND 300 �°V ASH w BASIN AS-9 •� `'a' �� 1 TOTAL SULFATE CONCENTRATION (mg/L) ABMW-11 BR •� ND NOT DETECTED ABOVE REPORTING LIMIT ,� •• �, Gin � . '�: ' s• 1+i ` y4y �` HIGHEST CONCENTRATION AREA CONTOUR 3 " • » > PZ-17�U k, °�' •, NORTH CAROLINA 2L CONTOUR kc-`, �`. • s �l ^ F •` 1 I 'Y INTERMEDIATE CONTOUR ` � _ ' • ,• APPROX. PROVISIONAL BACKGROUND CONTOUR A* - s — % � MW-2BR ��`� � MONITORING WELL MW 6BR O PIEZOMETER WATER SUPPLY WELL .' } i' , ,' MW-5BR ` -v ®,. ASH BASIN BOUNDARY " �• �'/ a"� s —,—'!ASH BASIN COMPLIANCE BOUNDARY r `• 4B DUKE ENERGY PROGRESS ASHEVILLE PLANT SITE CB • `�- `% AMW-313 e BOUNDARY .�• NOTES: • .� AMW-1B Wlh;ANO _ $.1.7._ AS-1.3' �a ._ _ , ' `• �� T ". CONCENTRATIONS SHOWN REFLECT DATA GATHERED BETWEEN will, 420 V r S .� 2/9/16 AND 7/12/16. �V47 AS-11 MW,722BR AS-5 o THE NORTH CAROLINA 2L FOR SULFATE IS 250 mg/L. " +4r:, PROVISIONAL BACKGROUND CONCENTRATION IS 4.4 mg/L. 1 .p v m•,g, {_ 2 1 AERIAL PHOTOGRAPH OBTAINED FROM GOOGLE EARTH PRO, it DATED 10/18/2015. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83/2011). - r M .; e1�+',r 15U y� -•r ' GRAPHIC SCALE FIGURE 1-47 sso 16e o sso 66o ISOCONCENTRATION MAP 1 } 7 w '' IN FEET _ 148 RIVER STREET, SUITE220 SULFATE IN BEDROCK GROUNDWATER 250 �' GREENVILLE, SOUTH CAROLINA 29601 PHONE ASHEVILLE STEAM ELECTRIC PLANT TerraW n rr or om ARDEN, NORTH CAROLINA DRNNN BY: PROJECT MANAGER: T. PLATING DATE: 0s�m8/25/201G CHECKED BY: T. PLATING �v ,} ` r,-°�'�"�'�-'fit .��4..,•�� 11:-� V� V. YS, �: �� "j•* _'.''#ems A*9 '1!7. 'wo" MW-11 kia N*W- I , 71 13 CB-9SL ♦�..._ (CB-9 ND r P-105 ASINS 140 . • i MW=8S 1964 bP-1 -2 ASH i C `�♦ BASIN r` • ABMW 2S / GW-1 ?� \ABMWm5S ,. `a. APD-1 PZ-260 :♦ / PZ-27 P-103 r 60 120 ' CB-7 � 1982ASH BASIN • CB 6 840 - r P-101 260 ABMW-7S pZ 'BMW-20A PZ 22 CB-2 12;'�.— �I • ' : MW-6S �. • %.— CB_5/:ram � � I �a synTerra i ♦ MW-24S F ` 52 LEGEND 1 TOTAL DISSOLVED SOLIDS CONCENTRATION (mg/L) ND NOT DETECTED ABOVE REPORTING LIMIT ♦ R HIGHEST CONCENTRATION AREA CONTOUR NORTH CAROLINA 2L CONTOUR ♦ '` INTERMEDIATE CONTOUR APPROX. PROVISIONAL BACKGROUND CONTOUR a MONITORING WELL G PIEZOMETER WATER SUPPLY WELL s ASH BASIN BOUNDARY .--'.—_'!ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS ASHEVILLE PLANT SITE — BOUNDARY NOTES: CONCENTRATIONS SHOWN REFLECT DATA GATHERED BETWEEN 2/18/14 AND 7/8/16. THE NORTH CAROLINA 2L FOR TOTAL DISSOLVED SOLIDS IS 500 mg/L. PROVISIONAL BACKGROUND CONCENTRATION IS 275 mg/L. AERIAL PHOTOGRAPH OBTAINED FROM GOOGLE EARTH PRO, DATED 10/18/2015. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83/2011). GRAPHIC SCALE 330 165 0 330 660 1148 RIVER STREET, SUITE 220 I GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 DRAWN BY: B. YOUNG DATE: 08/26/2016 PROJECT MANAGER: T. PLATING CHECKED BY: T. PLATING FIGURE 1-48 ISOCONCENTRATION MAP TOTAL DISSOLVED SOLIDS IN SURFICIAL GROUNDWATER ASHEVILLE STEAM ELECTRIC PLANT ARDEN, NORTH CAROLINA 1 f I a �I MW-15D CB-8 ; MW-13D Al ft"TOR ` ,11` . MW-9D 1 �ABMW-51D ♦. 1964ASH i l ,,- MW-1 D ♦ BASIN o, 37 �t MW-18D ABMW-4D 240 ' 1982ASH CB-1D PZ-17S PZ-16 BASIN �, y, as MW-4D-��.� GW_4 e? . �♦ MIN-6D GW"5 .eg ' ow MW-5D CB-3R MVV-22D MV r � MW-21D100 / .� �. rIt F'�„ '!! it a !'.9j��x3 n� 1r � �a synTerra GRAPHIC SCALE 330 165 0 330 660 1148 RIVER STREET, SUITE 220 I GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 DRAWN BY: B. YOUNG DATE: 08/25/2016 PROJECT MANAGER: T. PLATING CHECKED BY: T. PLATING LEGEND 1 TOTAL DISSOLVED SOLIDS CONCENTRATION (mg/L) ND NOT DETECTED ABOVE REPORTING LIMIT HIGHEST CONCENTRATION AREA CONTOUR NORTH CAROLINA 2L CONTOUR INTERMEDIATE CONTOUR APPROX. PROVISIONAL BACKGROUND CONTOUR sa MONITORING WELL O PIEZOMETER ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS ASHEVILLE PLANT SITE --'BOUNDARY NOTES: CONCENTRATIONS SHOWN REFLECT DATA GATHERED BETWEEN 2/20/14 AND 7/8/16. THE NORTH CAROLINA 2L FOR TOTAL DISSOLVED SOLIDS IS 500 mg/L. PROVISIONAL BACKGROUND CONCENTRATION IS 196 mg/L. AERIAL PHOTOGRAPH OBTAINED FROM GOOGLE EARTH PRO, DATED 10/18/2015. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83/2011). FIGURE 1-49 ISOCONCENTRATION MAP TOTAL DISSOLVED SOLIDS IN TRANSITION ZONE GROUNDWATER ASHEVILLE STEAM ELECTRIC PLANT ARDEN, NORTH CAROLINA S+ 'I J MW-13BR , ........ \CB-9BR ♦•. J* 67 ♦ r 1 . )_ • ; m� \ MW-9BR _ � �. • . r Ir MW-16BR ` .♦ •• __N GW-1 BR '. 1982 • \ GW-2 ASH BASIN •` ; 1964 ASH '♦ , BASIN ABMW-5BR. 4 1 �. 1 180 MW-1 BR / MW-18BR 5,3 ♦ ABMW-11 BR • MW-6BR MW-2BR ��`� • . -� t" ' CB-4B MW-5BR • �� :. AMW 1 B� , . AM /W 3B, ' _1� 2 AS-13 MW-22BR ` AS-5 i :;Yy�;AS-17 AS-4 AS-15 ° • ' elt, 7 AS 6 / AS-14 AS-20 / GRAPHIC SCALE •w. DW-6 330 165 0 330 660 �A ��L- IN FEET STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 -. - �/ ■M■ P■Y PHONE 864-421-9999 ---� � ■�` ■ RO ECT MANAGER: T PLATING DATE: 08/25/2016 CHECKED BY: T. PLATING - PADuke Energy Progress, 1026\00 GIB BASE DATA\Asheville\I LEGEND 1 TOTAL DISSOLVED SOLIDS CONCENTRATION (mg/L) ND NOT DETECTED ABOVE REPORTING LIMIT HIGHEST CONCENTRATION AREA CONTOUR NORTH CAROLINA 2L CONTOUR INTERMEDIATE CONTOUR APPROX. PROVISIONAL BACKGROUND CONTOUR MONITORING WELL G PIEZOMETER WATER SUPPLY WELL ASH BASIN BOUNDARY ASH BASIN COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS ASHEVILLE PLANT SITE - -BOUNDARY NOTES: CONCENTRATIONS SHOWN REFLECT DATA GATHERED BETWEEN 2/9/16 AND 7/12/16. THE NORTH CAROLINA 2L FOR TOTAL DISSOLVED SOLIDS IS 500 mg/L. PROVISIONAL BACKGROUND CONCENTRATION IS 151 mg/L. AERIAL PHOTOGRAPH OBTAINED FROM GOOGLE EARTH PRO, DATED 10/18/2015. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83/2011). FIGURE 1-50 ISOCONCENTRATION MAP TOTAL DISSOLVED SOLIDS IN BEDROCK GROUNDWATER ASHEVILLE STEAM ELECTRIC PLANT ARDEN, NORTH CAROLINA t -q0,17� �hw \ MW-11 CB-9SL _ y' 0:501Al `' ` ♦` .� P-105 1 mwcgs a a ND ` • �` ¢ MW-16A ND ♦ ` \ MW-8S 2 Fa N® 3.12 1 - �• `MVN 24S a' \ABMW-2S GW-1 MW-17A a .f.JVW - °ABMW-5S . a 1964 ASH' _ PZ-26-- ` BASIN Ot \ C13-7 GW-3 ' . ♦ a 1982ASH C13-1 ° 1% BASIN \ ` % C13-6 PZ 19 P-100 ` ��` ♦ P-101 PZ-23 �• / ABMW-7S *e� ♦. �. MW-6S' .�� ♦♦ x •1•'� ` BMW-20A �PZ-22 Cg_2`/♦ ��•\.� � . _ , ,. PZ-24 e ., CB-4 000- •� P l y Syr k y ¢ V-4. �.!.r`',� F"J �' e♦►�'. a 7e3 �nTerra LEGEND 1 Q a a NOTES: 330 165 0RAPHICSC330E 660 FIGURE 1-51 N FEET ISOCONCENTRATION MAP 148 RIVER STREET, SUITE 220 VANADIUM IN SURFICIAL GROUNDWATER GREENPHONE 64-42OUTH -9999 OLINA296o1 ASHEVILLE STEAM ELECTRIC PLANT PHONE 864 421 9999 WWW s n erracor com ARDEN, NORTH CAROLINA DRAWN BY. B. YOUNG DATE: 08/26/2016 PROJECT MANAGER: T. PLATING CHECKED BY: T. PLATING T .F ,\ MW-11 D •---------- -. MV11-15D y \ ," 0.639 • • ; MW-13D • " ° 4* MW-12D 1 CB-8 MW-9D ° 1964ASH BASIN ABMW-5D • • t t_ ,. ,•� ABMW-4D �• � M NDBD 0.603 r _ _ �" • 1982 ASH 1%BASIN '�`1 `'� H • • ND / 1.29 1 • 4/ - ... . �� % '♦ GW 4 MW-6D tNi ` e ND ND r3 • �� 'o' rmW %71 AM e: �+ ., ^r Sri �1^ v, h ,,��, T • MW-21D Ilk MW`22D MW-23DL / ' q fY�� 4i.-#may �'.�rYr�-•�'TM+ 'ti`��r P � ��q �.,(.�YIi1��JF ��,'�,�-� _�• ;/ '` - j� i �Mt q✓`rt�� �+ '!!7. ' -. L t - Ri 1 ♦ '.YJULIAN GW 1 D MW-1 D - . C13-1D ND GRAPHIC SCALE 330 165 0 330 IN FEET ,. r� 660 01 ATE: 08/25/2016 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 296 PHONE 864-421-9999 www.s n erracor .com DRAWN BY: B. YOUNG D PROJECT MANAGER: T. PLATING CHECKED BY: T. PLATING LEGEND 1 ND e NOTES: FIGURE 1-52 ISOCONCENTRATION MAP VANADIUM IN TRANSITION ZONE GROUNDWATER ASHEVILLE STEAM ELECTRIC PLANT ARDEN, NORTH CAROLINA \ MW-14BR # i r ' , � . � ... � `' ` - ' ' '� - '�'. Vie; ♦ a5 .. f $ e� \ MW-13BR • ; "" _ • • I 1 i �CNDR •• •• MW-9$R • ♦ sue. _ - _ �. .• e `\ MW-16BR ` ND' ' • • • a� Fa ♦ 1• t.. �a ♦ ♦ e P 1982 GW-2 ASH BASIN . r 1 0.581 1964ASH •� BASIN 1 ABMW-5BR , MW-1 BR � MW-1813R ABMW-11 BR ' Il. >tT't H ♦ .% i ii �� •♦� '.. V ar.,.. MW-21BR 1 s: • ` 1 ' e'' � '� MW-6BR � •• e • MW-513R .41 - ` CB 4B AMW-1 B% r ', AMW-313No e lool AS-11 MW-22BR p AS-1 5 AS-4 AS-6 VAN �4k AS-20 AS-14 n DW-6 �-f -ynTerra LEGEND 1 ► , NOTES: GRAPHIC SCALE 330 165 0 330 660 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 W W W.SVnt"'aCorp.CO m DRAWN BY: B. YOUNG DATE: 08/25/2016 PROJECT MANAGER: T. PLATING CHECKED BY: T. PLATING FIGURE 1-53 ISOCONCENTRATION MAP VANADIUM IN BEDROCK GROUNDWATER ASHEVILLE STEAM ELECTRIC PLANT ARDEN, NORTH CAROLINA Cross Section A -A' A A' (NORTH) (SOUTH) DUKE ENERGY ASHEVILLE PLANT BOUNDARY GEOLOGIC DATA IS INFERRED FROM MONITORING WELL TO PRIVATE WELL AS-14 COMPLIANCE BOUNDARY 00 _00 ♦���♦ ■e i� ® ® ..�:.: yam= ii■ is i��� FRENCH BROAD ♦� LEGEND NOTES: A ,..� „ L� 0 v ' ♦ 3 � III 17% FIGURE 1-54 A CONCEPTUAL CROSS-SECTION A -A' ARSENIC ISOCONCENTRATIONS p►' I J B.B.Y01NG ASHEVILLE STEAM ELECTRIC PLANT msynTerra [RAWNY ATEDRDAWN 8/29/2016 ARDEN, NORTH CAROLINA Cross Section A -A' 21 21 A A' (NORTH) (SOUTH) m DUKE ENERGY ASHEVILLE PLANT BOUNDARY COMPLIANCE BOUNDARY N 7 ❑D _— -- 974 GEOLOGIC DATA IS INFERRED FROM MONITORING WELL TO PRIVATE WELL AS-14 FRENCH BROAD RIVER 2034' MSL.� -- ---- ---- ---- ---- ---- --- — WATER LEVELS AT AS-11 AND AS-14 WERE -- _ _ —_ — -- MEASURED ON 5/9/16 AND 5/11/16, RESPECTIVELY. — — -- THESE WATER LEVELS REPRESENT A COMPOSITE OF — — -- HYDRAULIC HEADS FROM MULTIPLE FRACTURES — — -- WITHIN EACH WELL. STATIC CONDITIONS ARE NOT _ -- ASSUMED AS PUMPING AT EACH WELL IS ROUTINE. _ _ _- �. LEGEND NOTES: � r ASH SURFACE CASING . SURFICIAL WATER LEVEL �` ♦ NCDEQID VERTICAL EXAGGERATION SET AT 5:1. AS-14 + . CONCENTRATIONS SHOWN REFLECT DATA GATHERED BETWEEN REGOLITH ® WELL SCREEN . TRANSITION WATER LEVEL MONITORING WELL 2/18/14 AND 7/12/16. SAPROLITE GENERALIZED FRACTURE ZONE BEDROCK WATER LEVEL BORON ISOCONCENTRATIONS DERIVED FROM FIGURES 1-18, 1-19, 1-20. �'� -- I ♦ �♦ , �„�:. ® 99 CONCENTRATION (Ug/L) THE NORTH CAROLINA 2L FOR BORON IS 700 Ng/L. ♦ • TRANSITION ZONE ij� WELL- SELECTED FOR CROSS-SECTION 2000 MSL. WATER LEVEL ELEVATION �D DRY s , DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA ♦ • STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83/2011). ♦ ^ ''f 1 i '♦ COMPETENT ROCK / BEDROCK — — - CROSS-SECTION GENERALIZED • , ° . 1 GROUNDWATER FLOW DIRECTION ♦ ,'�. �✓ ♦�� FILL GENERALIZED WATER LEVEL - SURFICIAL FIGURE 1-55 4, PROJECTED LAND SURFACE CONCEPTUAL CROSS-SECTION A -A' <' BORON ISOCONCENTRATIONS A, GROUNDWATER CONCENTRATION AREA 375 187.5 0 375 750 ASHEVILLE STEAM ELECTRIC PLANT DRAWN BY: B. YOUNG CONTOUR INTERVAL (ug/L) ynTerra HEOKEDBY S:T.PLATING ARDEN, NORTH CAROLINA IIN FEFTI 7' ' DATE DRAWN: 8/29/2016 2034' MSL.' 339 CONSTITUENT CONCENTRATIONS WEST OF FRENCH - BROAD RIVER CANNOT BE CONTOURED DUE TO - OPEN BOREHOLE WELL CONSTRUCTION. - 50 00 Cross Section A -A' 21 21 A A' (NORTH) (SOUTH) DUKE ENERGY ASHEVILLE PLANT BOUNDARY COMPLIANCE BOUNDARY E 111I 1 1 ; i iTBJ --------- ---------- GEOLOGIC DATA IS INFERRED FROM MONITORING WELL TO PRIVATE WELL AS-14 FRENCH BROAD RIVER 2034' MSL.' r_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _- WATER LEVELS AT AS-11 AND AS-14 WERE _ = -- MEASURED ON 5/9/16 AND 5/11/16, RESPECTIVELY. THESE WATER LEVELS REPRESENT A COMPOSITE OF - = _-- HYDRAULIC HEADS FROM MULTIPLE FRACTURES - = _-- _ WITHIN EACH WELL. STATIC CONDITIONS ARE NOT - = _-- ASSUMED AS PUMPING AT EACH WELL IS ROUTINE. - LEGEND • ` \ A ,'� r - ASH SURFACE CASING ` REGOLITH Ell] WELLSCREEN ®\ ' r' I SAPROLITE GENERALIZED FRACTURE ZONE TRANSITION ZONE ij� WELL - SELECTED FOR CROSS-SECTION R. COMPETENT ROCK /BEDROCK — - CROSS-SECTION © FILL � GENERALIZED WATER LEVEL - SURFICIAL .. + i a a PROJECTED LAND SURFACE AWWWWRINFIRI, "um. GROUNDWATER CONCENTRATION AREA m CONTOUR INTERVAL (mg/L) - SURFICIAL WATER LEVEL AS-14 NCDEQ ID . TRANSITION WATER LEVEL CB_8 MONITORING WELL BEDROCK WATER LEVEL gg CONCENTRATION (mg/L) 2000 MSL. WATER LEVEL ELEVATION �D DRY GENERALIZED GROUNDWATER FLOW DIRECTION 375 187.5 0 375 750 141/ DRAWN BY: B. YOUNG S)/tlTerra HECKED BY: T. PLATING IIN FFFTI DATE DRAWN: 8/29/2016 2034' MSL. NOTES: VERTICAL EXAGGERATION SET AT 5:1. CONCENTRATIONS SHOWN REFLECT DATA GATHERED BETWEEN 2/18/14 AND 7/12/16. CHLORIDE ISOCONCENTRATIONS DERIVED FROM FIGURES 1-21, 1-22, 1-23. THE NORTH CAROLINA 2L FOR CHLORIDE IS 250 mg/L. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83/2011). FIGURE 1-56 CONCEPTUAL CROSS-SECTION A -A' CHLORIDE ISOCONCENTRATIONS ASHEVILLE STEAM ELECTRIC PLANT ARDEN, NORTH CAROLINA 50 Cross Section A -A' 21 21 A A' (NORTH) (SOUTH) DUKE ENERGY ASHEVILLE PLANT BOUNDARY COMPLIANCE BOUNDARY GEOLOGIC DATA IS INFERRED FROM MONITORING WELL TO PRIVATE WELL AS-14 FRENCH BROAD RIVER 2034' MSL.' ------------------------ 0.03 WATER LEVELS AT AS-11 AND AS-14 WERE _ = -- MEASURED ON 5/9/16 AND 5/11/16, RESPECTIVELY. THESE WATER LEVELS REPRESENT A COMPOSITE OF - = _-- __- HYDRAULIC HEADS FROM MULTIPLE FRACTURES - = _-- _ WITHIN EACH WELL. STATIC CONDITIONS ARE NOT - = _-- = ASSUMED AS PUMPING AT EACH WELL IS ROUTINE. - 2034' MSL. <0.03 = LEGEND L y NOTES: VERTICAL EXAGGERATION SET AT 5:1. r - - ASH SURFACE CASING - SURFICIAL WATER LEVEL d A ♦ � AS-14 NCDEO ID CONCENTRATIONS SHOWN REFLECT DATA GATHERED BETWEEN 2/18/14 n� ♦♦ `� .. AND 7/12/16. REGOLITH WELL SCREEN WITH . TRANSITION WATER LEVEL Ell]CB-8 MONITORING WELL CHROMIUM (VI) ISOCONCENTRATIONS DERIVED FROM FIGURES 1-24, 1-25, 1-26. SAPROLITE ® GENERALIZED FRACTURE ZONE BEDROCK WATER LEVEL 'J 99 CONCENTRATION (ug/L) THE NORTH CAROLINA DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH SCREENING LEVEL FOR CHROMIUM (VI) IS 0.07 Ng/L. NC DHHS ♦ TRANSITION ZONE ij� WELL- SELECTED FOR CROSS-SECTION 2000 MSL. WATER LEVEL ELEVATION �D DRY MEMORANDUM, NOVEMBER 4, 2015. S DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE R r ♦ ® PLANE COORDINATE SYSTEM FIPS 3200 (NAD83/2011). COMPETENT ROCK / BEDROCK — - CROSS-SECTION GENERALIZED GROUNDWATER FLOW DIRECTION © FILL GENERALIZED WATER LEVEL - SURFICIAL %': FIGURE 1-57 PROJECTED LAND SURFACE CONCEPTUAL CROSS-SECTION A -A' CHROMIUM (VI) ISOCONCENTRATIONS A, GROUNDWATER CONCENTRATION AREA 375 187.5 0 375 750 `� ASHEVILLE STEAM ELECTRIC PLANT c-y 'Nr ,M; DRAWN BY: B. YOUNG Ip. m CONTOUR INTERVAL (u9/L) SynTerra HECKEDBY:T.PLATING ARDEN, NORTH CAROLINA II N FFFTI DATE DRAWN: 8/29/2016 50 Cross Section A -A' A A' (NORTH) (SOUTH) DUKE ENERGY ASHEVILLE PLANT BOUNDARY COMPLIANCE BOUNDARY ii■ ji, `��\� GEOLOGIC DATA IS INFERRED FROM MONITORING WELL TO PRIVATE WELL AS-14 FRENCH BROAD RIVER �� F ♦� LEGEND NOTES: A ,..� „ L� 0 v • ' ♦ 3 � III 17% FIGURE 1-58 CONCEPTUAL CROSS-SECTION A -A' CHROMIUM (TOTAL) ISOCONCENTRATIONS p►' I ASHEVILLE STEAM ELECTRIC PLANT m [RAWNBY.B.Ya�NG SynTerraAT DR°WN 8;Z9;Zoi6 ARDEN, NORTH CAROLINA Cross Section A -A' A A' (NORTH) (SOUTH) DUKE ENERGY ASHEVILLE PLANT BOUNDARY COMPLIANCE BOUNDARY N MW-18BRL GEOLOGIC DATA IS INFERRED FROM MONITORING WELL TO PRIVATE WELL AS-14 FRENCH BROAD RIVER �� F ♦� LEGEND NOTES: A ,..� „ L� 0 v • ' ♦ 3 � III 17% FIGURE 1-59 CONCEPTUAL CROSS-SECTION A -A' COBALT ISOCONCENTRATIONS p►' I J BY. B.YOUNG ASHEVILLE STEAM ELECTRIC PLANT m [ATERAWN S)/t1T2Crd HECKEDRDB :T. PLATING AWN:8/29/2016 ARDEN, NORTH CAROLINA Cross Section A -A' A A' (NORTH) (SOUTH) DUKE ENERGY ASHEVILLE PLANT BOUNDARY COMPLIANCE BOUNDARY GEOLOGIC DATA IS INFERRED FROM MONITORING WELL TO PRIVATE WELL AS-14 FRENCH BROAD RIVER �� F " i . ■ ♦� LEGEND NOTES: A ,..� „ L� 0 v • ' ♦ 3 � III 17% FIGURE 1-60 A CONCEPTUAL CROSS-SECTION A -A' IRON ISOCONCENTRATIONS p►' I J .B.YGUNG ASHEVILLE STEAM ELECTRIC PLANT mSynTerra [RAWN' lECKE°WN .PLATING ATE ARDEN, NORTH CAROLINA Cross Section A -A' A A' (NORTH) (SOUTH) DUKE ENERGY ASHEVILLE PLANT BOUNDARY GEOLOGIC DATA IS INFERRED FROM MONITORING WELL TO PRIVATE WELL AS-14 COMPLIANCE BOUNDARY CB-8D, BR CB-8 MW-9S, D, BR MW-8S, BR S.T1' ❑ ❑ ,, ❑ 04 N MW-18BRL MW-18D, BR - - - - FRENCH BROAD RIVER : LEGEND NOTES: ;;; •� r • ❑ .►, I� ❑ v ❑ ' , - ❑ ® ❑ i' •� = FIGURE 1-61 CONCEPTUAL CROSS-SECTION A -A' MANGANESE ISOCONCENTRATIONS p►' ;A ❑J [HECKED RAWNBY:B.YOUNG ASHEVILLE STEAM ELECTRIC PLANT m S)/tlTerraBY:T.PLATING ARDEN, NORTH CAROLINA ATE DRAWN: 8/29/201G Cross Section A -A' A A' (NORTH) (SOUTH) DUKE ENERGY ASHEVILLE PLANT BOUNDARY GEOLOGIC DATA IS INFERRED FROM MONITORING WELL TO PRIVATE WELL AS-14 COMPLIANCE BOUNDARY u :�■ �'•� ®� �\00 LEGEND NOTES: • ' ♦ 3 � III 17% FIGURE 1-62 A CONCEPTUAL CROSS-SECTION A -A' SELENIUM ISOCONCENTRATIONS p►' I J .B.YGUNG ASHEVILLE STEAM ELECTRIC PLANT mSynTerra [RAWN' lECKE°WN .PLATING ATE ARDEN, NORTH CAROLINA Cross Section A -A' 21 21 A A' (NORTH) (SOUTH) DUKE ENERGY ASHEVILLE PLANT BOUNDARY COMPLIANCE BOUNDARY r��i� IIi_i.Z•] 11 � 1000 i i�•� 2000 a.. GEOLOGIC DATA IS INFERRED FROM MONITORING WELL TO PRIVATE WELL AS-14 FRENCH BROAD RIVER 2034' MSL.' --------------------- 350 WATER LEVELS AT AS-11 AND AS-14 WERE MEASURED ON 5/9/16 AND 5/11/16, RESPECTIVELY. THESE WATER LEVELS REPRESENT A COMPOSITE OF - = _-- HYDRAULIC HEADS FROM MULTIPLE FRACTURES - = _-- _ WITHIN EACH WELL. STATIC CONDITIONS ARE NOT - = _-- ASSUMED AS PUMPING AT EACH WELL IS ROUTINE. - LEGEND • ` \ A ,'•'� '� r - ASH SURFACE CASING ` ®\ ' REGOLITH Ell] WELLSCREEN r' I ... -...:::.,, SAPROLITE GENERALIZED FRACTURE ZONE �♦ ' � 1 fir.` TRANSITION ZONE ij� WELL - SELECTED FOR CROSS-SECTION R. COMPETENT ROCK /BEDROCK — - CROSS-SECTION © FILL GENERALIZED WATER LEVEL - SURFICIAL a PROJECTED LAND SURFACE GROUNDWATER CONCENTRATION AREA _ I m CONTOUR INTERVAL (ug/L) - SURFICIAL WATER LEVEL AS-14 NCDEQ ID . TRANSITION WATER LEVEL CB_8 MONITORING WELL BEDROCK WATER LEVEL gg CONCENTRATION (Ug/L) 2000 MSL. WATER LEVEL ELEVATION �D DRY GENERALIZED GROUNDWATER FLOW DIRECTION 375 187.5 0 375 750 141/ DRAWN BY: B. YOUNG S)/tlTerra HECKED BY: T. PLATING IIN FFFTI DATE DRAWN: 8/29/2016 2034' MSL. ICE NOTES: VERTICAL EXAGGERATION SET AT 5:1 CONCENTRATIONS SHOWN REFLECT DATA GATHERED BETWEEN 2/18/14 AND 7/12/16. STRONTIUM ISOCONCENTRATIONS DERIVED FROM FIGURES 1-42, 1-43, 1- 44. NO NORTH CAROLINA 2LOR INTERIM MAXIMUM ALLOWABLE CONCENTRATION ESTABLISHED FOR STRONTIUM. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83/2011). FIGURE 1-63 CONCEPTUAL CROSS-SECTION A -A' STRONTIUM ISOCONCENTRATIONS ASHEVILLE STEAM ELECTRIC PLANT ARDEN, NORTH CAROLINA 50 Cross Section A -A' 21 A A' (NORTH) (SOUTH) DUKE ENERGY ASHEVILLE PLANT BOUNDARY COMPLIANCE BOUNDARY ��iI ���! MW-18B _= 26 GEOLOGIC DATA IS INFERRED FROM MONITORING WELL TO PRIVATE WELL AS-14 FRENCH BROAD RIVER 290 EM 60 2034' MSL.' - WATER LEVELS AT AS-11 AND AS-14 WERE - MEASURED ON 5/9/16 AND 5/11/16, RESPECTIVELY. THESE WATER LEVELS REPRESENT A COMPOSITE OF - = _-- HYDRAULIC HEADS FROM MULTIPLE FRACTURES - = _-- _ WITHIN EACH WELL. STATIC CONDITIONS ARE NOT - = _-- ASSUMED AS PUMPING AT EACH WELL IS ROUTINE. - LEGEND • ` \ A ,'•'� '� r - ASH SURFACE CASING ` REGOLITH Ell] WELLSCREEN ®\ ' r' I SAPROLITE GENERALIZED FRACTURE ZONE TRANSITION ZONE ij� WELL - SELECTED FOR CROSS-SECTION R. COMPETENT ROCK /BEDROCK — - CROSS-SECTION © FILL � GENERALIZED WATER LEVEL - SURFICIAL .. i a a PROJECTED LAND SURFACE GROUNDWATER CONCENTRATION AREA m CONTOUR INTERVAL (mg/L) - SURFICIAL WATER LEVEL AS-14 NCDEQ ID . TRANSITION WATER LEVEL CB_8 MONITORING WELL BEDROCK WATER LEVEL gg CONCENTRATION (mg/L) 2000 MSL. WATER LEVEL ELEVATION �D DRY 2034' MSL. -- CONSTITUENT CONCENTRATIONS WEST OF FRENCH BROAD RIVER CANNOT BE CONTOURED DUE TO - OPEN BOREHOLE WELL CONSTRUCTION. - GENERALIZED GROUNDWATER FLOW DIRECTION 375 187.5 0 375 750 141/ DRAWN BY: B. YOUNG S)/tlTerra HECKED BY: T. PLATING IIN FFFTI DATE DRAWN: 8/29/2016 NOTES: VERTICAL EXAGGERATION SET AT 5:1. CONCENTRATIONS SHOWN REFLECT DATA GATHERED BETWEEN 2/18/14 AND 7/12/16. SULFATE ISOCONCENTRATIONS DERIVED FROM FIGURES 1-45, 1-46, 1- 47. THE NORTH CAROLINA 2L FOR SULFATE IS 250 mg/L. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83/2011). FIGURE 1-64 CONCEPTUAL CROSS-SECTION A -A' SULFATE ISOCONCENTRATIONS ASHEVILLE STEAM ELECTRIC PLANT ARDEN, NORTH CAROLINA 50 Cross Section A -A' 21 21 A A' (NORTH) (SOUTH) DUKE ENERGY ASHEVILLE PLANT BOUNDARY COMPLIANCE BOUNDARY 1400 — — _ 560 890 � � � 13 00 _ = N MW-186 == 18 = == a == GEOLOGIC DATA IS INFERRED FROM MONITORING WELL TO PRIVATE WELL AS-14 FRENCH BROAD RIVER 2034' MSL.' WATER LEVELS AT AS-11 AND AS-14 WERE MEASURED ON 5/9/16 AND 5/11/16, RESPECTIVELY. THESE WATER LEVELS REPRESENT A COMPOSITE OF - = _-- HYDRAULIC HEADS FROM MULTIPLE FRACTURES = = _-- _ WITHIN EACH WELL. STATIC CONDITIONS ARE NOT - = _-- ASSUMED AS PUMPING AT EACH WELL IS ROUTINE. — LEGEND • ` \ A ,'•'� '� r - ASH SURFACE CASING ` ®\ ' REGOLITH Ell] WELLSCREEN r' I �c SAPROLITE GENERALIZED FRACTURE ZONE TRANSITION ZONE ij� WELL - SELECTED FOR CROSS-SECTION R. COMPETENT ROCK /BEDROCK — - CROSS-SECTION © FILL GENERALIZED WATER LEVEL - SURFICIAL a PROJECTED LAND SURFACE GROUNDWATER CONCENTRATION AREA m CONTOUR INTERVAL (mg/L) - SURFICIAL WATER LEVEL AS-14 NCDEQ ID . TRANSITION WATER LEVEL CB_8 MONITORING WELL BEDROCK WATER LEVEL gg CONCENTRATION (mg/L) 2000 MSL. WATER LEVEL ELEVATION �D DRY 375 187.5 0 375 750 2034' MSL. CONSTITUENT CONCENTRATIONS WEST OF FRENCH BROAD RIVER CANNOT BE CONTOURED DUE TO = OPEN BOREHOLE WELL CONSTRUCTION. _ GENERALIZED GROUNDWATER FLOW DIRECTION NOTES: VERTICAL EXAGGERATION SET AT 5:1. CONCENTRATIONS SHOWN REFLECT DATA GATHERED BETWEEN 2/18/14 AND 7/12/16. TOTAL DISSOLVED SOLIDS ISOCONCENTRATIONS DERIVED FROM FIGURES 1-48, 1-49, 1-50. THE NORTH CAROLINA 2L FOR TOTAL DISSOLVED SOLIDS IS 500 mg/L. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83/2011). FIGURE 1-65 CONCEPTUAL CROSS-SECTION A -A' [RAWNEBY�yB:.TY.0UNG:TOTAL DISSOLVED SOLIDS ISOCONCENTRATIONS �\/,67ASHEVILLE STEAM ELECTRIC PLANT HE "j"�erl� EDRDAWN:8/29/2 PLATING ARDEN, NORTH CAROLINA 50 Cross Section A -A' A A' (NORTH) (SOUTH) DUKE ENERGY ASHEVILLE PLANT BOUNDARY COMPLIANCE BOUNDARY GEOLOGIC DATA IS INFERRED FROM MONITORING WELL TO PRIVATE WELL AS-14 ®� BROAD00 FRENCH :., ♦: LEGEND NOTES: A - L� 0 v � III 17% FIGURE 1-66 A CONCEPTUAL CROSS-SECTION A -A' VANADIUM ISOCONCENTRATIONS p►' I J DRAWN BY: B.YOUNG ASHEVILLE STEAM ELECTRIC PLANT m j synTerra pAT°oR°WN 8;29;2oi6 ARDEN, NORTH CAROLINA Cross Section B-B' B B' (SOUTHWEST) (NORTHEAST) GEOLOGIC DATA IS INFERRED FROM MONITORING WELL TO PRIVATE WELL AS-14 COMPLIANCE BOUNDARY III WASTE BOUNDARY LAKE JULIAN 2,160' msl. _ ■� I;': ���_ •�rt���iiiiiii - ■�ii ■���� 0 �.40 ■ ���f�������������or Trti/ ,�,`ii �go Ow i r - ���O� :r FRENCH • -� l'im i RIVER r� Elm ONCE LEGEND El 4 d - �• �" FIGURE 1-67 • f 99 CONCEPTUAL CROSS-SECTION ARSENIC ISOCONCENTRATIONS ASHEVILLE STEAM ELECTRIC PLANT DRAWN BY: B. YOUNG •. CHECKED BY: T. PLATING • ■ NORTH • • •.. Cross Section B-B' 21 21 B Bw (SOUTHWEST) (NORTHEAST) GEOLOGIC DATA IS INFERRED FROM MONITORING WELL TO PRIVATE WELL AS-14 COMPLIANCE BOUNDARY MW-7, S, B WASTE BOUNDARY LAKE JULIAN 2,160' msl. APZ-30 icy <50 760 639 W I MW-21D — ---- ---- ---- ---- ---- _ -- FRENCH Lu D RIVER — i�— — — — -- -- — — — — -- — — — -- — — — -- -- — — — — — -- 2034'MSL.* m 378 _ =—®_- 360 5 393 --------------- 339 _____ ____ ____ ________ ____ ____ ____ ____ ____ ____ ____ ____ __ WATER LEVELS AT AS-14 WERE MEASURED ON - 5/11/16. THESE WATER LEVELS REPRESENT A — COMPOSITE OF HYDRAULIC HEADS FROM MULTIPLE — -- —= = CONSTITUENT CONCENTRATIONS WEST OF — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — = FRACTURES WITHIN EACH WELL. STATIC CONDITIONS — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — =- _ FRENCH BROAD RIVER CANNOT BE CONTOURED ====================================== = ARE NOT ASSUMED AS PUMPING AT EACH WELL IS — DUE TO OPEN BOREHOLE WELL CONSTRUCTION. — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — _ ROUTINE. — LEGEND v L ♦ y NOTES: 41, 1 " ~ I ASH WELL - SELECTED FOR CROSS-SECTION F I � " Q NCDEQ ID VERTICAL EXAGGERATION SET AT 5:1. ` , AS 14 13' REGOLITH -- CROSS-SECTION CONCENTRATIONS SHOWN REFLECT DATA GATHERED BETWEEN CB-8 MONITORING WELL 2/18/14 AND 7/12/16. re "' •` , i ��, - O SAPROLITE GENERALIZED WATERLEVEL- SURFICIAL ❑ CONCENTRATION (ug/L) BORON ISOCONCENTRATIONS DERIVED FROM FIGURES 1-18, 1-19, 1-20. + ��� ► "_ - �, TRANSITION ZONE . SURFICIAL WATER LEVEL 0DRY THE NORTH CAROLINA 2L FOR BORON IS 700 Ng/L. ` I® ` % , DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA �, S . �% COMPETENT ROCK I BEDROCK . TRANSITION WATER LEVEL mm=I GENERALIZED GROUNDWATER STATE PLANE COORDINATE SYSTEM RIPS 3200 (NAD83/2011). j ♦ .% FLOW DIRECTION SURFACE CASING s S BEDROCK WATER LEVEL ZOOO MSL. WATER LEVEL ELEVATION %♦�♦; WELL SCREEN CONTOUR INTERVAL (Ng/L) FIGURE 1-68 'm' GENERALIZED FRACTURE ZONE CONCEPTUAL CROSS-SECTION B-B' B �~ BORON ISOCONCENTRATIONS GROUNDWATER CONCENTRATION AREA _ .. L DRAWN BY:B.YGUNG ASH ARD STEAM ELECTRIC PLANT 350 175 0 350 700 EVILLE er� HECKEDBY:T.PLATING EN, NORTH CAROLINA (IN FFFTI "7' ' DATE DRAWN: 8/25/2016 50 Cross Section B-B' 21 21 B B+ (SOUTHWEST) (NORTHEAST) GEOLOGIC DATA IS INFERRED FROM MONITORING WELL TO PRIVATE WELL AS-14 COMPLIANCE BOUNDARY MW-7, S, B WASTE BOUNDARY LAKE JULIAN 2,160' msl. J APZ-30 I S 6.7 10 1.5====— J ==- 2034'MSL.` FRENCH BROAD m _ RIVER__- 9 _6.6 9.8 WATER LEVELS AT AS-14 WERE MEASURED ON - — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — _____ 5/11/16. THESE WATER LEVELS REPRESENT A — COMPOSITE OF HYDRAULIC HEADS FROM MULTIPLE — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — FRACTURES WITHIN EACH WELL. STATIC CONDITIONS — =—�====================================================== = ARE NOT ASSUMED AS PUMPING AT EACH WELL IS —_ ROUTINE. — - LEGEND + ♦ y NOTES: ASH WELL - SELECTED FOR CROSS-SECTION NCDEQ ID VERTICAL EXAGGERATION SET AT 5:1. + REGOLITH CROSS-SECTION CONCENTRATIONS SHOWN REFLECT DATA GATHERED BETWEEN 1 *ft-- CB$ ^• B, . � O MONITORING WELL 2/18/14 AND 7/12/16. SAPROLITE GENERALIZED WATER LEVEL- SURFICIAL CHLORIDE ISOCONCENTRATIONS DERIVED FROM FIGURES 1-21, 1-22, r y ✓ 99 CONCENTRATION (mg/L) 1-23. 1 ��+ TRANSITION ZONE SURFICIAL WATER LEVEL THE NORTH CAROLINA 2L FOR CHLORIDE IS 250 mg/L. . + �® + ♦ ❑D DRY `� 1 - '� 1 •,• BEDROCK COMPETENT ROCK I DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA .. .-% TRANSITION WATER LEVEL STATE PLANE COORDINATE SYSTEM RIPS 3200 (NAD83/2011). . GENERALIZED GROUNDWATER SURFACE CASING FLOW DIRECTION -''= ,•w.,. �♦ ':';, t � � + BEDROCK WATER LEVEL %�• '' ® WELLSCREEN 2000 MSL. WATER LEVEL ELEVATION FIGURE 1-69 CONTOUR INTERVAL (mg/L) CONCEPTUAL CROSS-SECTION B-B' GENERALIZED FRACTURE ZONE CHLORIDE ISOCONCENTRATIONS ASHEVILLE STEAM ELECTRIC PLANT 350 175 0 350 700 `� DRAWN BY. B. YOUNG +, GROUNDWATER CONCENTRATION AREA Ong _ / Terra ARDEN, NORTH CAROLINA "7' ' DATE DRAWN: 8/25/2016 5g•. �sn ... .. .iln !IN FFFTI 50 Cross Section B-B' 21 21 B Bw (SOUTHWEST) (NORTHEAST) GEOLOGIC DATA IS INFERRED FROM MONITORING WELL TO PRIVATE WELL AS-14 COMPLIANCE BOUNDARY MW-7, S, B WASTE BOUNDARY LAKE JULIAN 2,160' msl. � ����_■I��f��ff�.iiiiiii+iii�i���������y■i if����f�y i;�ii� ,♦fm NNE ®'IF,�ff•F r 4f��f■Fil 1 1 FRENCH BROAD UMJ RIVER IN ■Fi�fff 2�' r %\ *ft B Y � '.• '� III i -♦ B :A• ai. ._xa- ._jai i'Qdasi?.�e5.a 1 5' ... r w� LEGEND ASH !� REGOLITH SAPROLITE TRANSITION ZONE '.� COMPETENT ROCK/BEDROCK SURFACE CASING ® WELL SCREEN ® GENERALIZED FRACTURE ZONE WELL - SELECTED FOR CROSS-SECTION CROSS-SECTION GENERALIZED WATER LEVEL- SURFICIAL . SURFICIAL WATER LEVEL . TRANSITION WATER LEVEL BEDROCK WATER LEVEL m CONTOUR INTERVAL (Ng/L) AS-14 NCDEQ ID CB-8 MONITORING WELL g9 CONCENTRATION (gg/L) 10 DRY NS NOT SAMPLED GENERALIZED GROUNDWATER FLOW DIRECTION 2000 MSL. WATER LEVEL ELEVATION GROUNDWATER CONCENTRATION AREA 350 175 0 350 700 `i� DRAWN BY8: B. YOUNG S)/tlTerra HEEDEDBY: PLATING !IN FFFTI DATE DRAWN: /25/2015 NOTES: VERTICAL EXAGGERATION SET AT 5:1. CONCENTRATIONS SHOWN REFLECT DATA GATHERED BETWEEN 2/18/14 AND 7/12/16. CHROMIUM (VI) ISOCONCENTRATIONS DERIVED FROM FIGURES 1-24, 1-25, 1-26. THE NORTH CAROLINA DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH SCREENING LEVEL FOR CHROMIUM (VI) IS 0.07 Ng/L. NC DHHS MEMORANDUM, NOVEMBER 4, 2015. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83/2011). FIGURE 1-70 CONCEPTUAL CROSS-SECTION B-B' CHROMIUM (VI) ISOCONCENTRATIONS ASHEVILLE STEAM ELECTRIC PLANT ARDEN, NORTH CAROLINA 50 Cross Section B-B' B B' (SOUTHWEST) (NORTHEAST) COMPLIANCE BOUNDARY WASTE BOUNDARY GEOLOGIC DATA IS INFERRED FROM MONITORING WELL TO PRIVATE WELL AS-14 J LAKE JULIAN 2,160' msl. - 4 t1� - �������� • f����� f _ _��■�f�■iiiiii �■Ffffrf ��� �ff•F - r ■F+�fff��+' Lu FRENCH BROAD RIVER ■ e■ e ■ ♦ y LEGEND NOTES: ,♦ - T El .� ❑ • . � 0 ® m FIGURE 1-71 CONCEPTUAL CROSS-SECTION B-B' CHROMIUM (TOTAL) ISOCONCENTRATIONS DRAWN BY:B.YDUNG RAWN ASHEVILLE STEAM ELECTRIC PLANT •;""'Nctl.w,a ,, `N,-,,;,,. _ Ong B :T.PG S)/tlTerra DATE DRAWN: 8/25/2016 ARDEN, NORTH CAROLINA Cross Section B-B' B B' (SOUTHWEST) (NORTHEAST) GEOLOGIC DATA IS INFERRED FROM MONITORING WELL TO PRIVATE WELL AS-14 J COMPLIANCE BOUNDARY III WASTE BOUNDARY Gfff ■, LAKE JULIAN 2,160' msl. - y LEGEND NOTES: � gyp" I . f e ,♦ - T i El � ® m FIGURE 1-72 CONCEPTUAL CROSS-SECTION B-B' COBALT ISOCONCENTRATIONS BY: B. YOUNG ASHEVILLE STEAM ELECTRIC PLANT [RAWN SynTerra ATEOR°WN;$;ZS;Zoi6 ARDEN, NORTH CAROLINA Cross Section B-B' B B' (SOUTHWEST) (NORTHEAST) GEOLOGIC DATA IS INFERRED FROM MONITORING WELL TO PRIVATE WELL AS-14 Y COMPLIANCE BOUNDARY WASTE BOUNDARY LAKE JULIAN 2,160' msl. ����04W . � . i _ 1ow umm 04&P Ow Nib ON I go ow • iii `i 1000 ♦ y LEGEND NOTES: r ,• _ H � ❑ 1 ♦ ❑ FIGURE 1-73 •1 ® m CONCEPTUAL CROSS-SECTION B-B' IRON ISOCONCENTRATIONS z . ' DRAWN BY: B.YOUNG ASHEVILLE STEAM ELECTRIC PLANT =°Lkr.w,e , $Yrd•'•4,7 .,,.. ,, SynTerra HECKEDBY:T.PLATING DATEDRAWN:8/25/201G ARDEN, NORTH CAROLINA Cross Section B-B' B B' (SOUTHWEST) (NORTHEAST) GEOLOGIC DATA IS INFERRED FROM MONITORING WELL TO PRIVATE WELL AS-14 Y COMPLIANCE BOUNDARY WASTE BOUNDARY 50 350 ■ - i� -1 LAKE JULIAN 2,160' msl. --. - L ♦ � y LEGEND NOTES: i ❑ '+ FIGURE 1-74 ♦� ® m B ` ® CONCEPTUAL CROSS-SECTION B-B' MANGANESE ISOCONCENTRATIONS z . ' STEAM ELECTRIC PLANT [RAWNBY:B.YOUNGASHEVILLE synTerra ArEOR°WN;8;25;2016 ARDEN, NORTH CAROLINA Cross Section B-B' B B' (SOUTHWEST) (NORTHEAST) GEOLOGIC DATA IS INFERRED FROM MONITORING WELL TO PRIVATE WELL AS-14 DO COMPLIANCE BOUNDARY WASTE BOUNDARY oil ablow �!Gffff. mb �ff•F - r off El FRENCH ■ F+�fff �' • • RIVER I'% HE e■ J LAKE JULIAN 2,160' msl. ■ ♦ y LEGEND NOTES: gyp" �• ,♦ — T r �,� El d , ' �♦ '+ ♦� ® m FIGURE 1-75 ` CONCEPTUAL CROSS-SECTION B-B' B ® SELENIUM ISOCONCENTRATIONS z . ' ASHEVILLE STEAM ELECTRIC PLANT FRTAWNEBY�'B:.TY.OUNG: S)/tlTerraCKDRLATING E DRAWN: 8/25/2016 ARDEN, NORTH CAROLINA Cross Section B-B' 21 21 B Bw (SOUTHWEST) (NORTHEAST) GEOLOGIC DATA IS INFERRED FROM MONITORING WELL TO PRIVATE WELL AS-14 COMPLIANCE BOUNDARY MW-7, S, B WASTE BOUNDARY LAKE JULIAN 2,160' msl. 42 _ _ _ _ _ _ _ _ _ _ _ _ _ _ g 723 C646 W I MW-21D 305— _ _--- --- ---- ---- --_-- ---- ---- ---- — -- 0034'MSL.' FRENCH BROAD m 136 _ 211 D RIVER__— __ 129 3 WATER LEVELS AT AS-14 WERE MEASURED ON - --- ---- ------------ ---- ---- ---- ---- ---- ---- ---- ---- -- 5/11/16. THESE WATER LEVELS REPRESENT A — —_ -------------------------------------------------- ------ COMPOSITE OF HYDRAULIC HEADS FROM MULTIPLE — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — FRACTURES WITHIN EACH WELL. STATIC CONDITIONS — =—�====================================================== = ARE NOT ASSUMED AS PUMPING AT EACH WELL IS —_ ROUTINE. — - LEGEND y NOTES: �I . I ASH WELL- SELECTED FOR CROSS-SECTION NCDEQ ID VERTICAL EXAGGERATION SET AT 5:1. REGOLITH CROSS-SECTION 1 °�. __ CONCENTRATIONS SHOWN REFLECT DATA GATHERED BETWEEN 2/18/14 ♦ v. ,gipj �,� A BCB-8 MONITORING WELL AND 7/12/16. Ww �• sAPRou(Ng CONCENTRATION /LrE GENERALIZED WATER LEVEL- O ) 44 RONTIUM ISOCONCENTRATIONS DERIVED FROM FIGURES 1-42, 1-43, 1- Y y�P TRANSITION ZONE . SURFICIAL WATER LEVEL ap DRY NO NORTH CAROLINA 2L OR INTERIM MAXIMUM ALLOWABLE i • CONCENTRATION ESTABLISHED FOR STRONTIUM. `� � S '� 1 •,� COMPETENTROCK/ . TRANSITION WATER LEVEL mm=mlmo� GENERALIZED GROUNDWATER DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA .% FLOW DIRECTION STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83/2011). SURFACE CASING BEDROCK WATER LEVEL 2000 MSL. WATER LEVEL ELEVATION WELL SCREEN m' CONTOUR INTERVAL (Ng/L) FIGURE 1-76 CONCEPTUAL CROSS-SECTION B-B' GENERALIZED FRACTURE ,a. STRONTIUM ISOCONCENTRATIONS 7 'I 350 175 0 350 700 ASHEVILLE STEAM ELECTRIC PLANT GROUNDWATER CONCENTRATION AREA �' DRAWN BY. B. YOUNG Ong HECKED BY: T. PLATING ARDEN NORTH CAROLINA (INFFFTI "7 "��r� DATE DRAAWN: 8/25/2016 50 Cross Section B-B' 21 21 B Bw (SOUTHWEST) (NORTHEAST) GEOLOGIC DATA IS INFERRED FROM MONITORING WELL TO PRIVATE WELL AS-14 COMPLIANCE BOUNDARY MW-7, S, B WASTE BOUNDARY LAKE JULIAN 2,160' msl. iAPZ-30 14v 190 — — 120== = = = == = = = == = = � = = = == = = = 5.2= = == W MW-21D 2034'MSL.' FRENCH BROAD m a 100 190 RIVER__— __gg 120 EM- 250 = ==== ==== ============ ==== ==== ==== ===— --== ==== ==== ==== == WATER LEVELS AT AS-14 WERE MEASURED ON = 5/11/16. THESE WATER LEVELS REPRESENT A = _______________________ ____ ____ ____ ____ ____ ____ ____ ____ __ COMPOSITE OF HYDRAULIC HEADS FROM MULTIPLE _ CONSTITUENT CONCENTRATIONS WEST OF — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — = FRACTURES WITHIN EACH WELL. STATIC CONDITIONS = — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — FRENCH BROAD RIVER CANNOT BE CONTOURED ====================================== = ARE NOT ASSUMED AS PUMPING AT EACH WELL IS = DUE TO OPEN BOREHOLE WELL CONSTRUCTION. — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — _ ROUTINE. _ LEGEND v L ♦ y NOTES: 1 •� `♦ ASH WELL- SELECTED FOR CROSS-SECTION NCDEQ ID VERTICAL EXAGGERATION SET AT 5:1. ��' REGOLITH — — CROSS-SECTION CONCENTRATIONS SHOWN REFLECT DATA GATHERED BETWEEN ,¢p ] , A B CB-8 MONITORING WELL 2/18/14 AND 7/12/16. SAPROLITE GENERALIZED WATER LEVEL- SURFICIAL SULFATE ISOCONCENTRATIONS DERIVED FROM FIGURES 1-45, 1-46, 1- T CONCENTRATION (mg/L) 47. TRANSITION ZONE SURFICIAL WATER LEVEL . ❑D DRY THE NORTH CAROLINA 2L FOR SULFATE IS 250 mg/L. i �% 1 �• COMPETENT ROCK/ BEDROCK TRANSITION WATER LEVEL DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA _.% . �� GENERALIZED GROUNDWATER STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83/2011). 11 '' ♦ � ,� Y FLOW DIRECTION SURFACE CASING BEDROCK WATER LEVEL WATER LEVEL ELEVATION %�• '' ® WELLSCREEN m CONTOUR INTERVAL(mg/L) FIGURE 1-77 GENERALIZED FRACTURE ZONE CONCEPTUAL CROSS-SECTION B-B' SULFATE ISOCONCENTRATIONS . IsGROUNDWATER CONCENTRATION AREA 350 175 0 350 700 BY: T. PLATING Ong �/�`�i DRAWN BY: B. YOUNG ASHEVILLE STEAM ELECTRIC PLANT HECKE„j• er� DATE DRDAWN: 8/25/2016 ARDEN, NORTH CAROLINA `•X"n"3`. .. .,a !IN FFFTI 50 Cross Section B-B' 21 21 B Bw (SOUTHWEST) (NORTHEAST) GEOLOGIC DATA IS INFERRED FROM MONITORING WELL TO PRIVATE WELL AS-14 COMPLIANCE BOUNDARY MW-7, S, B WASTE BOUNDARY LAKE JULIAN 2,160' msl. APZ-30 '/" 200 110 310 Lu Q a 120 240 2034'MSL.' FRENCH BROAD m — RIVER__— __ _ _ — 280 =_ 250 510 = ==== ==== ============ ==== ==== ==== ==== ==== ==== ==== ==== == WATER LEVELS AT AS-14 WERE MEASURED ON - 5/11/16. THESE WATER LEVELS REPRESENT A — COMPOSITE OF HYDRAULIC HEADS FROM MULTIPLE — -- —= = CONSTITUENT CONCENTRATIONS WEST OF — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — = FRACTURES WITHIN EACH WELL. STATIC CONDITIONS — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — =- _ FRENCH BROAD RIVER CANNOT BE CONTOURED ====================================== = ARE NOT ASSUMED AS PUMPING AT EACH WELL IS — DUE TO OPEN BOREHOLE WELL CONSTRUCTION. — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — _ ROUTINE. — � v L ♦ � y LEGEND NOTES: 1 1 '~ 'I ASH WELL- SELECTED FOR CROSS-SECTION NCDEQ ID VERTICAL EXAGGERATION SET AT 5:1. ��' ... REGOLITH CROSS-SECTION CONCENTRATIONS SHOWN REFLECT DATA GATHERED BETWEEN ,¢p ] , A B CB-8 MONITORING WELL 2/18/14 AND 7/12/16. SAPROLITE GENERALIZED WATER LEVEL - SURFICIAL ��' " e p ��'�. - -y-- � ss CONCENTRATION (mg/L) TOTAL DISSOLVED SOLIDS ISOCONCENTRATIONS DERIVED FROM P. T '� ,✓ � ( '... FIGURES 1-48, 1-49, 1-50. TRANSITION ZONE . SURFICIAL WATER LEVEL p❑ DRY THE NORTH CAROLINA 2L FOR TOTAL DISSOLVED SOLIDS IS 500 mg/L. `� S "+ '� 1 •,� COMPETENT ROCK I BEDROCK TRANSITION WATER LEVEL GENERALIZED GROUNDWATER DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA . •' . • .,% FLOW DIRECTION STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83/2011). SURFACE CASING BEDROCK WATER LEVEL -r': .,... � '; •;, � � � ZOOO MSL. WATER LEVEL ELEVATION % I� '� ® WELL SCREEN m CONTOUR INTERVAL (mg/L) FIGURE 1-78 CONCEPTUAL CROSS-SECTION B-B B ® GENERALIZED FRACTURE ZONE TOTAL DISSOLVED SOLIDS ISOCONCENTRATIONS f , GROUNDWATER CONCENTRATION AREA 350 175 0 350 700�' DRAWN BY: B.YOUNG ASHEVILLE STEAM ELECTRIC PLANT ARDEN, NORTH CAROLINA �/��Terra HECKED BY: T. PLATING :+ N FEET "7' ' DATE DRAWN: 8/25/2016 P:\Duke Energy Progress. 1 026\00 GIB BASE DATAWsheville\Map_Docs\CSA_Supplement\CrossSection_BWsheville_CROSS-SECTION B-B'_TDS.mxd 50 Cross Section B-B' B B' (SOUTHWEST) (NORTHEAST) GEOLOGIC DATA IS INFERRED FROM MONITORING WELL TO PRIVATE WELL AS-14 IN i� FRENCH BROAD RIVER r/f f fft- COMPLIANCE BOUNDARY WASTE BOUNDARY J -1 LAKE JULIAN 2,160' msl. - LEGEND NOTES: ,♦ - T El .� . • ♦ . ® m FIGURE 1-79 B i ' CONCEPTUAL CROSS-SECTION B-B' VANADIUM ISOCONCENTRATIONS ' BY: B. YOUNG ASHEVILLE STEAM ELECTRIC PLANT 1'.ilr [RAWN S)/t1T2Crd ATE DRDAWN: 8/25/201G ARDEN, NORTH CAROLINA 2,180 2,170 2,160 2,1 0 a 2,140 ai 2,130 a a 2,120 2,110 2,100 2,090 GCB-01 GCB-02 CB-3R —GW-01 CB-8 CB-1 and GW-1 are not influenced by basin dewatering. 21 2.08 ------ - - --- --- • • • • . Cove excavation early 2016 ••''•••./� 2,140.7 _ _ CB-2 -11.33 feet decrease in water level elevation • r-I b-0 a� N ON z,112.39 CB-3R - 8.7 feet decrease in water level elevation ------------------- 0 b-0 2,103.69 — — — — — — — — — — — — — — — — — — — - 3 (� CB-8 - Not influenced by 1982 basin ewatering O r-I —1 -A N N N m m m d' dt C' lD �.o U0 1.0 l0 c-I c-I r-I N r-I i--I O r-I O ri O —1 O —1 ri ri r-I ri r-I r-I r-I r-1 r-I r-1 r-I r-1 r-I O O O O O O O O O O O O O O r-I r'4 (V r 4 rV r1i r-4 N lV fV lV fV r1i N fV fV rV fV r 4 r-4 O 1.0 r r-I\ m r-I t9 rn M I, l0 M 00 O W 01 r-Ir-1r-I \ \ r-I \ \ \ \ \ O fV 0 fV r-1 \ I -1 N4 O O r�i FIGURE 1-80 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 WATER ELEVATIONS TIME SERIES PLOT PHONE 864-421-9999 www.synterracorp.com COMPLIANCE BOUNDARY WELLS DRAWN BY: B.WILKER DATE: JULY2016 PROJECT MANAGER: T.PLATING ASHEVILLE STEAM ELECTRIC PLANT synGW ���� LAYOUT: 200 CP&L DRIVE \Duke Energy Progress.1026\102. Asheville Ash Basin [P:Assessment Plan\19.EG_CSASUP\FINALAshevil le ARDEN NORTH CAROLINA 28704 CSA Supp 1\Figures -o x O a Amk o ,,o o\° o GCB-5 ryo 1982 Basin o ` P 80% N ri 80"% � x ,Zp 60% 6 0 % d'Q O 40°l0 \° 1101. �. 0 20% CB-5 CB-7 200/c I-11 MW-15A CP 0. Adana�Oh°\° �v 0 0 0 0 �Ca— —CIS! 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.s nterracor .com ,tip DRAWN BY: T. PLATING DATE: JULY 2016 synTerra PROJECT MANAGER: T. PLATING r"AYOUT.'Progress.1026\102. Asheville AshBasin GW Assessment Plan\ P\Slalls[ics\Piper Diagrams ,964 Basin Background Well ID % Difference ABMW-02S 27.6 • CB-01 17.6 C B-04 7.4 • CB-09 18.1 • CB-09SL 8.12 GW-01 20.6 GW-03 9.91 MW-08S 0.396 MW-09S 3.37 • MW-24S 9.37 • CB-05 12.9 • CB-06 9.30 • CB-07 6.23 • MW-10 7.98 MW-11 3.12 MW-15A 3.82 MW-16A 6.2 MW-17A 4.57 MW-20A 12.7 Notes: • Background 1982 Basin 1964 Basin Red text indicates ion charge balance percent difference greater than 10%. Data included for analysis from Round 4 sam lin event(January 2016. FIGURE 1-81 PIPER DIAGRAM — SURFICIAL ZONE ASHEVILLE STEAM ELECTRIC PLANT 200 CP&L DRIVE ARDEN, NORTH CAROLINA 1� O I` 80% N� �/ �d� 80% 60% Z� ABMW-04D 60% �O 40% q 0%\ cP zo% a% Boron <50 µg/l10 MW-22D y CP 0 17 r3 op oo a8 0o 'o 4— Ca Background CI --ip- 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.s nterracor .com DRAWN BY: T. PLATING DATE: JULY 2016 Terra PROJECT MANAGER T. PLATING LAYOUT: synFI LEu ATH: 19 E ke Energy Progreti .\Pi 6, Dj Asheville Ash Basin GW Assessment Plan\ 19 EG_CSASUP\Slalls[ics\Piper Diagrams Well ID % Difference ABMW-04D 9.46 AMW-02A 16.9 • CB-01 D 6.40 CB-08 1.01 • GW-01 D 11.4 • MW-01 D 13.1 • MW-03D 5.8 • MW-05D 16.3 • MW-09D 2.18 • MW-11 D 2.73 • MW-12D 16.3 • MW-13D 6.75 • MW-15D 7.51 • MW-18D 8.43 • MW-21 D 3.38 • MW-22D 0.408 • MW-23DL 7.93 • MW-23DU 2.38 Notes: • Background 1982 Basin 1964 Basin Red text indicates ion charge balance percent difference greater than 10%. Data included for analysis from Round 4 sampling event (January 2016). FIGURE 1-82 PIPER DIAGRAM — TRANSITION ZONE ASHEVILLE STEAM ELECTRIC PLANT 200 CP&L DRIVE ARDEN, NORTH CAROLINA 80% 60% 40% 20% — 1Do 70. 0 0 �Ca' r T2 A U� ° • 1% O� moo° 60% 00 a° 40% Background -' ICIP synTerra MW-22BR CB-08BR 4, M W-13BR CI —� 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.svInterracorip.com DRAWN BY: T. PLATING DATE: JULY 2016 PROJECT MANAGER: T. PLATING FILEPATH: P'.\Duke Energy P,gressAOM102. Asheville Ash Basin GW Assessment Plan\ 19 EG_GSASUP\Slallstic \Piper Dlaq—, 1964 Basin Well ID % Difference AMW-01 B 2.50 • AMW-03B 11.6 CB-04B 1.47 CB-08BR 3.83 • CB-09BR 8.41 • GW-01 BR 7.85 GW-02 0.549 MW-01 BR 6.82 MW-05BR 13.1 MB-09BR 0.033 MW-13BR 9.80 MW-14BR 0.796 MW-16BR 30.7 MW-18BR 1.16 MW-22BR 10.6 PZ-17D 2.15 PZ-17S 7.41 • AS-09 9.92 • AS-11 2.10 • AS-13 4.55 • AS-14 3.02 • AS-20 0.568 Notes: • Background • 1982 Basin f 1964 Basin • Private Water Supply Well Red text indicates ion charge balance percent difference greater than 10% Data included for analysis from Round 4 sampling event (January 2016). FIGURE 1-83 PIPER DIAGRAM - BEDROCK ZONE ASHEVILLE STEAM ELECTRIC PLANT 200 CP&L DRIVE ARDEN, NORTH CAROLINA 0 D W-35 O O FDW-1 O DW 10 AS9 HOYT RD pp O DW-2 Y ws " " O PRW 5 r ri r r .��_. .. s ,J/ u. '�" • J>,if1C. `3-',r�' 4 °""'fit �t : '' i''•,ti. 't:. h, 't. � rf ' '>c . _,� rid �y�I a?-' ,,a^ y.�• '�, a4... _ �' CAR'``,, v :. r. �:.- ., ':�' :k�•,, , „_ � ,.+ ,`�.n': r a ^# a, ^ y `�'• 'fit y rr y, { xj ,.. •x .. , / ✓.:rr' 'i/ ,:: y-v. .; / « _..la `'}�', :: x.a�:'. r3• / rC' 3.t ieii. "j'.'3..d�•'C*" �r' f //F" y�,, 1}•y -/ '>:,�x; F'r , /.. � !: s� r �.r sir_ �� _ "a'r,, ,. iF..� / h ' a. •�., LL N r �.♦� 1 � A '`'',�: w• �• A B. y Tf ✓ +u'' �' ''fir;• F a v� r //� - 's,,�. .ate '�•. "'tr%��'pp �;^/� YY '�K�`.` '�,�y.. �,6f,.. -. 1,.,. ��/ " ,�ly//_/,y�" ,F / +.< � 'i,� � -� �; .. ,y ��' ,�7f 'f ': 'L✓ } '.S.A/ ('' L'��� �f / t!, � V VVI �: dR Am- ,/ J ^ �1. .�-"1', a3 t•( �_ 7' ���l�A jy .. ,�eY ,'a^?' ''he .Or , y ig«^�y'y..i' P.`.'�(. Awl x Y � PRW 10 O 1 1 sw 101 SG F� > R 1964 ASH BASIN Y- -, G P-103 C 02 r V= rri' �ti MW-7BR GW-3 � ABMW-11BR P-102 ('' d 0 v� 2 y� F � 1982 ASH BASIN LEGEND DUKE ENERGY PROGRESS PARCEL LINE ---- CCR SURFACE IMPOUNDMENT COMPLIANCE BOUNDARY a CCR SURFACE IMPOUNDMENT = O DW-23 WATER SUPPLY WELL NOT SAMPLED BY NCDEQ O FAS15 WATER SUPPLY WELL SAMPLED BY NCDEQ CONSTITUENT CONCENTRATIONS BELOW NC21- STANDARDS w OAS 17 WATER SUPPLY WELL SAMPLED BY NCDEQ CONSTITUENT CONCENTRATIONS ABOVE NC2L STANDARDS CB 8D CSA MONITORING WELL (SURVEYED) CB 8 COMPLIANCE MONITORING WELL (SURVEYED) Q� Fc-B-11 BACKGROUND COMPLIANCE MONITORING WELL (SURVEYED) GW-4 MONITORING WELL (SURVEYED) C P-101 PIEZOMETER (SURVEYED) DW-6 ABANDONED WELL AL SW 101 SURFACE WATER LOCATION (APPROXIMATE) - — STREAM APPROXIMATE — — STORM WATER DITCH APPROXIMATE SHEAR ZONE J ROSE DIAGRAM OF DOMINATE WATER PRODUCING FRACTURES N RED SHADING INDICATES THE m�NozL PZ 17 �. Pz 16 1''� I p ORIENTATION OF FRACTURES GROUPED INTO 10- INC AND LENGTH RE RES NR HENTS /� PZ-17S PERCANTAGE OF TOTAL OBSERVED FRACTURES. MW 19BR'', CB 6 E \\ W 1 PZ 19 I 1 P 101 DIP ANGLE STRIKE AZIMUTH �\,I. 4tia: / g \ ` \ I Oolo O / l P 100 0 a I �ABW-7� w.; rlO�S J Jivivv �Bri'I / GW-4 I ' 8CB 2 EACH CIRCLE REPRESENTS 10% OF o Mw 65Mw-6s THE TOTAL NUMBER OF FRACTURES � OBSERVED IN THE WELL MW 6BR (' PZ 22 ` 100 \` CB 3 & S GW-5 FRACTURE DATA COLLECTED USING MAGNETIC NORTH. DATA ADJUST TO REFLECT ORIENTATION OF THE FIGURE WHICH IS BASED CB 3R 1' o� ` ON NORTH CAROLINA STATE PLANE (1983) DOUGLgS\0000 FIR DF? P SOURCES: T - I 1. MARCH 16, 2015 AERIAL PHOTOGRAPH OBTAINED FROM NC GEOSPATIAL 0 PORTAL AThttp*.//data.nconemap.gov/geoportaI/catalog/main/home.page Zn CB 4B APZ-30 r O AS1/DW 9 �F�� 2.) DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE Z SYSTEM FIPS 3200 (NAD 83). 3.) PARCEL BOUNDARY WAS OBTAINED FROM BUNCOMBE COUNTY GIS DATA. vQ ...... AMW-2A 4.) COMPLIANCE MONITORING WELL LOCATIONS AND WASTE BOUNDARY FROM FCA OF NC, SURVEY DATED MARCH 2O09. COMPLIANCE WELLS CB 3R, CB-9 AND SG-1 SURVEYED BY FCA OF NC, SURVEY DATED 2012 11 28. I 5.) ADDITIONAL MONITORING WELL AND PIEZOMETER LOCATIONS WERE BASED ON DATA PROVIDED BY PROGRESS ENERGY. 6.) SHEAR - a MW 23DL j. F FROM ZONE BASED QUADRANGLE OSKYLAND OBTAINED OM THE NC D NR G S IMAGES RVERAT htttp://gs. nEst tte.nc s/sid� �' 1 AMW 1B MW-23DU Sr WO CB 5 *N f 4 MW-21D NO SIGNIFICANT WATER PRODUCING FRACTURES IDENTIFIED IN DW7. FA S-51 O GRAPHIC SCALE 200 0 100 200 400 (IN FEET) s " erra 148 River Street, Suite 220 Greenville South Carolina 29601 864-421-9999 www.synterracorp.com DRAWN BY: JOHN CHASTAIN DATE: 08/08/2016 CHECKED BY: TODD PLATING DATE: 08/08/2016 PROJECT MANAGER: KATHY WEBB LAYOUT NAME: FIG 3-1 (WATER PROD FRACS) DUKE ENERGY PROGRESS ASHEVILLE PLANT 200 CP & L DRIVE ARDEN, NORTH CAROLINA FIGURE 3-1 SUMMARY OF WATER PRODUCING FRACTURES aPF a _;� ••�r�nt. �� �$+'��,�+•Lz y�5- tee _� �.v. ��.j,. � l ,'�V. •.yr���5k't :�e a• x'g,r Ij�' '{ 1 wit r�_�i ,� • , '� ' �.,,� �, � z .,��y .�`ax r `-'mac � ".x �"iR A\!1i\ � ::� . �':�'�°a _ arty' _i�� .. . ,.. _. �•_�.� :.� � =��k . EXT-2� B-1 ..y B1-A G2 MW-17A Ga: fo 1964 BASIN SEEP COLLECTION SYSTEM (PLANNED DISCHARGE POINT FOR PUMP TEST) \110111h APD 1 MW-18BRL�, GW3 MW-7BR MW MW-18BR I LEGEND TOPO DUKE ENERGY PROGRESS \ COMPLIANCE BOUNDARY \\ WASTE BOUNDARY PUMPING WELL \' \OBSERVATION WELL (MONITORED BY o \ LEVELOGGER) \ MONITORING WELL OR PIEZOMETER (MANUALLY GAUGED) + MAP SOURCES: t htip //earth gogg.AERIAL e RI L PHOTOGRAPH OBTAINED FROM GOOGLE EARTH AT ' - > ,y , ^•., • .r.. ' - 2. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD 83, NAVD88). " vR 3. PARCEL BOUNDARY WAS OBTAINED FROM BUNCOMBE COUNTY GIS DATA AT uncom ecou unco m http://gis.b b nty.org/b map/Map_All.ht I { GRAPHIC SCALE 41 100 0 100 200 IN FEET FIGURE 5-1 148 RIVER STREET, SUITE 220 AQUIFER TEST -SITE LAYOUT \ Y� GREENVILLE, SOUTH CAROLINA 29601 PHONE864-421-9999 ASHEVILLE STEAM ELECTRIC PLANT \ www.fletchergroup.com ARDEN, NORTH CAROLINA �� DRAWN BY: PROJECT A MANAGER: TODDT PLATING DATE: 8/2/2016 LAYOUT T 08 25 2016 8:33 PM PADuke Energy Pro ress.1026 102. Asheville Ash Basin GW Assessment Plan 19.EG CSASUP DWG DE ASHEVILLE CSASUP AQUIFER TEST.dw