HomeMy WebLinkAboutNC0000396_App C Errata_20160831PROJECT: Asheville Steam Plant
WELL / BORING NO: MW-08S
PROJECT NO: 1026.102
STARTED: 3/3/15 COMPLETED: 3/3/15
DRILLING COMPANY: Cascade Drilling
NORTHING: 644584.03 EASTING: 943389.913
DRILLING METHOD: Rotary Sonic
G.S. ELEV: 2123.457 ft MSL M.P. ELEV: 2123.343 ft MSL
BOREHOLE DIAMETER: 6 IN
DEPTH TO WATER: ft TOC TOTAL DEPTH: 40.0 ft BGS
NOTES:
LOGGED BY: S. Wixon CHECKED BY: T. Platin
U
O
O
W
p
DESCRIPTION
J p
a
CONSTRUCTION
p
Of
0
m0
Protective casino with
locking cap
MIL
FILL, medium, red (2.5 YR, 4/6), moist to dry with
depth, non plastic, silt with some fine sand.
5
10
Grout
15
2" Sch. 40 threaded PVC
riser
20
SAPROLITE, medium brown to very dark brown (7.5
YR, 5/4 to 7.5 YR, 2.5/2), relic structure apparent
throughout, highly ozidized zones, nearly black at 21'.
25
�— Bentonite seal
30
—Sand Pack
35
2" pre -packed well screen
CLIENT: Duke Energy Progress, LLC.
SynTerra
148 River Street, Suite 220 PROJECT LOCATION: Arden, NC
Greenvlle, South Carolina 29601
s mTerra Phone:l864 421 9999 PAGE 1 OF 2
PROJECT: Asheville Steam Plant
WELL / BORING NO: MW-08S
PROJECT NO: 1026.102
STARTED: 3/3/15 COMPLETED: 3/3/15
DRILLING COMPANY: Cascade Drilling
NORTHING: 644584.03 EASTING: 943389.913
DRILLING METHOD: Rotary Sonic
G.S. ELEV: 2123.457 ft MSL M.P. ELEV: 2123.343 ft MSL
BOREHOLE DIAMETER: 6 IN
DEPTH TO WATER: ft TOC TOTAL DEPTH: 40.0 ft BGS
NOTES:
LOGGED BY: S. Wixon CHECKED BY: T. Platin
U
O
�
2
OJ
WELL
w
Q
p
DESCRIPTION
0
p
a Q
CONSTRUCTION
p
of
CD
<
Q�
m0
45
50
55
60
65
70
75
CLIENT: Duke Energy Progress, LLC.
SynTerra
148 River Street, Suite 220 PROJECT LOCATION: Arden, NC
South Carolina 29601
Ter
Phone:l864 421 99lle,
9 PAGE 2 OF 2
PROJECT: Asheville Steam Plant
WELL / BORING NO: MW-08BR
PROJECT NO: 1026.102
STARTED: 2/27/15 COMPLETED: 3/2/15
DRILLING COMPANY: Cascade Drilling
NORTHING: 644588.011 EASTING: 943388.961
DRILLING METHOD: Rotary Sonic
G.S. ELEV: 2123.896 ft MSL M.P. ELEV: 2123.885 ft MSL
BOREHOLE DIAMETER: 10 and 6 IN
DEPTH TO WATER: ft TOC TOTAL DEPTH: 97.0 ft BGS
NOTES:
LOGGED BY: S. Wixon CHECKED BY: T. Platin
U
OWQ
DESCRIPTIONU
Om
FL
p
p
Q
J0
CONSTRUCTION
0
0
U17
—Protective casino with
x
Px
locking cap
MIL
FILL, medium, red (2.5 YR, 4/6), moist to dry with
depth, non plastic, silt with some fine sand.
5
10
15
20
SAPROLITE, medium brown to very dark brown (7.5
YR, 5/4 to 7.5 YR, 2.5/2), relic structure apparent
throughout, highly ozidized zones, nearly black at 21'.
j
25
30
Grout
35
6" PVC surface casing
2" Sch. 40 threaded PVC
riser
CLIENT: Duke Energy Progress, LLC.
SynTerra
148 River Street, Suite 220 PROJECT LOCATION: Arden, NC
South Carolina 29601
Ter
Phone:l864 421 99lle,
9 PAGE 1 OF 3
PROJECT: Asheville Steam Plant
WELL / BORING NO: MW-08BR
PROJECT NO: 1026.102
STARTED: 2/27/15 COMPLETED: 3/2/15
DRILLING COMPANY: Cascade Drilling
NORTHING: 644588.011 EASTING: 943388.961
DRILLING METHOD: Rotary Sonic
G.S. ELEV: 2123.896 ft MSL M.P. ELEV: 2123.885 ft MSL
BOREHOLE DIAMETER: 10 and 6 IN
DEPTH TO WATER: ft TOC TOTAL DEPTH: 97.0 ft BGS
NOTES:
LOGGED BY: S. Wixon CHECKED BY: T. Platin
U
O
�
2
OJ
WELL
W
Q
p
DESCRIPTION
0
p
a Q
CONSTRUCTION
p
of
(D
<
Q�
m0
SAPROLITE, medium brown to very dark brown (7.5
YR, 5/4 to 7.5 YR, 2.5/2), relic structure apparent
throughout, highly ozidized zones, nearly black at 21'.
continued
Transition zone, partially weathered rock, thin rock
fragments broken along foliation,.
4' recovery, competent bedrock. Amphibolite gneiss,
45
minor garnets and pyrite present.
50
-"
GNEISS, gray to dark gray, fresh, slightly decomposed,
secondary mineralization observed in fractures.
55
-
60
Amphibolite gneiss, strong gray to black, greenish
black at 61'.
65
Bentonite seal
70
Same as above, greenish black at 67-72', white, garnet
rich interval, slight weathering at 72-77'.
—Sand Pack
75
2" pre -packed well screen
Same as above, light greenish gray 77-78'.
CLIENT: Duke Energy Progress, LLC.
SynTerra
148 River Street, Suite 220 PROJECT LOCATION: Arden, NC
Greenvlle, South Carolina 29601
.synTerra Phone:l864 421 9999 PAGE 2 OF 3
PROJECT: Asheville Steam Plant
WELL / BORING NO: MW-08BR
PROJECT NO: 1026.102
STARTED: 2/27/15 COMPLETED: 3/2/15
DRILLING COMPANY: Cascade Drilling
NORTHING: 644588.011 EASTING: 943388.961
DRILLING METHOD: Rotary Sonic
G.S. ELEV: 2123.896 ft MSL M.P. ELEV: 2123.885 ft MSL
BOREHOLE DIAMETER: 10 and 6 IN
DEPTH TO WATER: ft TOC TOTAL DEPTH: 97.0 ft BGS
NOTES:
LOGGED BY: S. Wixon CHECKED BY: T. Platin
U
O
�
2
OJ
WELL
W
Q
p
DESCRIPTION
0
p
a Q
CONSTRUCTION
p
of
CD
<
Q�
mO
Same as above, light greenish gray 77-78'. (continued)
85
90
Same as above, black 87-90', light gray to white 90-92'.
95
Boring terminated at 97' bgs. Bentonite chips placed in
borehole to a depth of 84' bgs to facilitate well
placement.
100
105
110
115
CLIENT: Duke Energy Progress, LLC.
SynTerra
148 River Street, Suite 220 PROJECT LOCATION: Arden, NC
South Carolina 29601
Ter
Phone:l864 421 99lle,
9 PAGE 3 OF 3
Duke - Asheville
Water
Well ID
Elevation
MSL
MW-9BR
2113.51
MW-16BR
1 2026.74
MSL - Feet Above Mean Sea Level
Depth measurements in feet
MW-91311 to MW-16BR
DISTANCE CHANGE IN LEVEL GRADIENT
810 86.77 0.10712
HORIZONTAL GRADIENT (i): 0.1071
Average Groundwater Velocity (V)* Phase I
*Based on the Darcy Equation where velocity equals (K x i) / n
Hydraulic Conductivity values (units of ft/day) from Table 6-8
MW-09BR
Slug Out
Test 1
8.38E-02
8,22E-02
Test 2
8.06E-02
MW-16BR
PK-SI
Test 1
3.23E+01
2.84E+01
PK-SI
Test 2
1.54E+01
PK-SO
Test 1
3.72E+01
PK-SO
Test 2
3.50E+01
Hydraulic Conductivity (K) 4.0452 foot/day
(Geometric Mean of K for MW-9BR and MW-16BR)
Average Horizontal Gradient (i) 0.1071 foot/foot
Porosity (n) 34 percent
Velocity = 1.27450 foot/day 465 foot/year
Monitoring Event:
June 2015
ASSUMPTIONS:
1. K of 4.0452 ft/day based on in -situ slug and packer tests
2. Porosity based on values from Morris and Johnson 1967 crystalline rocks. Range from 34% to 57%. 34% used
based on geologic conditions at the site.
Prepared by: BDW Date: 7/11/2016
Checked: TDP Date: 7/11/2016
P:\Duke Energy Progress. 1 026\1 02. Asheville Ash Basin GW Assessment Plan\19.EG_CSASUP\Errata\MW-9BR to MW-16BR REVISED.xls