Loading...
HomeMy WebLinkAbout20160841 Ver 1_Riparian Buffer Authorization_20160830201 60 84DWR 1 State of North Carolina Department of Environment and Natural Resources Division of Water Resources Division of Water Resources 15A NCAC 02B.0233 (8)(b),.0243 (8)(b),.0250 (11)(b), .0259 (8)(b),.0267 (11)(c), .0607 (e)(2) - Buffer Authorization FORM: BA 10-2013 Riparian Buffer Authorization Form A. Applicant Information 1. Project Information 1 a. Name of project:IlArVeq {-testi' 'l.f 1 b. County: WA 06 CO3 1c. Nearest municipality: G .I' U i` JZA L.,e i 'I JA 1d. Subdivision name: ide r le. Is the project located in any of North Carolina's ❑ Yes No twenty coastal counties. If yes, answer 1 f below. 1f. Is the project located within a NC Division of Coastal Management Area of Environmental Concern (AEC)? ❑ Yes No 2. Owner Information 2a. Name on Recorded Deed: I oL t„ 2b. Deed Book and Page No. 3 ' a 2c. Map Book and Page No. (include a copy of the recorded map that indicates when the lot was created): 3 j C1 9 P/Ac r, 2d. Responsible Party (for Corporations): 2e. Street address: i ver Pi 2f. City, state, zip: a e /L} , (-s 2g. Telephone no.: C _ 2h. Fax no.: 2i. Email address: ark ('� i�A 6 A CCi 3. Applicant Information (if different from owner) 3a. Applicant is: ❑ Agent ❑ Other, specify: 3b. Name: 3c. Business name (if applicable): 3d. Street address: 3e. City, state, zip: 3f. Telephone no.: Q�6 3g. Fax no.: 3h. Email address: URCES 4. Agent/Consultant Information (if applicable) QA g�FFER PER 4a. Name: 4b. Business name (if applicable): 4c. Street address: 4d. City, state, zip: 4e. Telephone no.: 4f. Fax no.: 4g. Email address: FORM: BA 10-2013 Page 1 of 4 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): PIN — 1 b. Site coordinates (in decimal degrees): Latitude: 3 si ,J� Longitude:'" 7 9. -53 1c. Property size: acres Q, S �j 2. Surface Waters 2a. Name of nearest body of water to proposed project: L4 p (, j,( i ve 2b. Water Quality Classification of nearest receiving water: 2c. River basin: 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of thi application: / Alle f /�M I L /J0M � P011-1/ a i-r 4 ,S f-/ 4140 I_AfYe ?/1 3b. Attach an 8'/2 x 11 excerpt from the most recent vers' n of the USGS topographic map indicating the location of the site c$ e e QeV Q Lhe 3c. Attach an 8'/2 x 11 excerpt from the ost recent version of the p lished County NRCS Soil Survey Map depicting the project site G"p i*ei61j e 3d. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: /o/ e/- 3e. Explain the purpose of the proposed project: 3f. Describe the overall project in detail, including the type of equipment to be used: 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property/ project (including all prior phases) in the past? Yes ❑ No ❑ Unknown Comments: Imew 4b. If yes, who delineated the jurisdictional areas? Name (if known): bjel&61,,S%ell��%e 4 'S, Agency/ Consultant Company: Other: 4c. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. zo/�, 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑ Yes No ❑ Unknown 5b. If yes, explain and detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes Pf No 6b. If yes, explain. FORM: BA 10-2013 Page 2 of 4 C. Proposed Impacts Inventory Impact Justification and Mitigation 1. 1. Buffer Impacts 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Heti- f ti .3 a i- 'et, 1a. Project is in which protected basin? Neuse ❑ Randleman ❑ Tar -Pamlico ❑ Catawba ❑ Jordan ❑ Goose Creek 1b. Individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. Buffer impact number — Permanent (P) or Temporary T Reason for impact Type of impact Stream name Buffer Zone 1 Zone 2 (exempt, allowable, mitigation impact impact allowable w/ mitigation) required? (sq ft) (sq ft) Bi ❑ P ❑ T If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation and calculate the amount of mitigation required in the table below. f� [ Q ' y U `T [:1 Yes No q 2- B2 ❑ P ❑ T Zone 1 ❑ Yes ❑ No B3 ❑ P ❑ T 1.5 ❑ Yes ❑ No B4 ❑ P ❑ T Total buffer mitigation required: 2c. ❑ Yes ❑ No B5 ❑ P ❑ T 2d. If yes, attach the acceptance letter from the mitigation bank or NC EEP. ❑ Yes ❑ No B6 ❑ P ❑ T 2f. Comments: ❑ Yes ❑ No Total buffer impacts 2- 1c. 1c. Comments:"e i GS Lf f 6X iAe 0 ; A vcl 4 C 4, i Breeze t)t-y . D. Impact Justification and Mitigation 1. Avoidance and Minimization L 14ea%j e U i { E rf, F dl et f—Ek 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Heti- f ti .3 a i- 'et, 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. A^vr (-tea cl C� L4 r e f 6 L't Ff='_>_ 2. Buffer Mitigation 2a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ YesNo 2b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation and calculate the amount of mitigation required in the table below. Zone Reason for impact Total impact Multiplier Required mitigation (square feet (square feet Zone 1 3 (2 for Catawba) Zone 2 1.5 Total buffer mitigation required: 2c. If buffer mitigation is required, is payment to a mitigation bank or NC EEP proposed? ❑ Yes ❑ No 2d. If yes, attach the acceptance letter from the mitigation bank or NC EEP. 2e. If no, then discuss what type of mitigation is proposed. 2f. Comments: FORM: BA 10-2013 Page 3 of 4 r E. Diffuse Flow Plan All buffer impacts and high ground impacts require diffuse flow or other form of Diffuse flow stormwater treatment. Include a plan that fully documents how diffuse flow will be ❑ Other BMP maintained. If a Level Spreader is proposed, attach a Level Spreader Supplement Form. If due to site constraints, a BMP other than a level spreader is proposed, please provide a L /�u �� v&,6plan ❑ Yes ❑ No aP i 0a i3 for stormwater treatment as outlined in Chapter 8 of the NC Stormwater BMP Manual and attach a BMP Supplement Form. raf b4 Sk1W 4 ✓ F. Supplementary Information 1. Environmental Documentation la. Does the project involve an expenditure of public (federal/state/local) funds or the use of ❑ Yes No public (federal/state) land? 1b. If you answered "yes" to the above, does the project require preparation of an ❑ Yes ❑ No environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document been finalized by the State ❑ Yes ❑ No Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) Comments: 2. Violations 2a. Is the site in violation of DWR Wetland Rules (15A NCAC 02H .0500), Isolated Wetland ❑ Yes No Rules (15A NCAC 02H .1300), DWR Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 02B .0200)? 2b. Is this an after -the -fact permit application? ❑ Yes ❑ No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): (ifX� J r,Gc- g 2 Applicant/Agent's Printed Name Applicant/Agent's Signature D e (Agent's signature is valid only if an authorization letter from the applicant is provided.) Send 3 complete sets of this form and accompanying documents to the following: For government transportation projects sent For government transportation projects sent by First Class Mail via the US Postal Service: by delivery service (UPS, FedEx, etc.): NC DWR, Transportation Permitting Unit OR NC DWR, Transportation Permitting Unit 1617 Mail Service Center 512 N. Salisbury Street Raleigh, NC 27699 - 1617 Raleigh, NC 27604 For all other projects sent by First Class Mail W 7igg t "ervice ins 401 & Buffer Permitting Unit ervice Center 27699 - 1617 For all other projects sent by delivery service (UPS, FedEx, etc.): OR Karen Higgins NCDWR — 401 & Buffer Permitting Unit 512 N. Salisbury Street Raleigh, NC 27604 FORM: BA 10-2013 Page 4 of 4 16-275: 6204 River Landings Drive SORN.f" FOR CARLTON SILVER LOT 44. RIMER LANDINCS SUBDIVISION Ch 6204 RIVER LANDINGS DRIVE PIN# 1736,04-82-2862 CL Rd D.B. 13374, PAGE 2629 Ch B.I. 1985. PAGE 1974 3j >m CITY OF RALEIGH A WAKE COUNTY, NORTH CARO(.IN A AUGUST 22, 2015 REVISED AUGUST 29, 2016 CL 0 34 _ 1:5 0 30 60 4 N DTT: SCALE 1 "= 30' PR1014pE FL VENTING CARACE-539 S.F. 539 SCUARE INCHES OF FLOOO VENTING REWIRE). INSTALL FLOOD VENTS WITHIN I' OF EXIS' NU GRADE. ant v I--pq \1y rs Ir R u _ rr '� u MCAINITY VAP LEGEND: EIP — EXISTING IRON PIPE EIA - EXISTING IRON BAR EPK ExiSTING PK NAIL NIP - NEW IRON PIPE SET R/W — RIGHT OF WAY 'CATV - CABLE TV BOX EB - ELECTRIC BGx TEL TELEPHONE PEDESTAL FP - P€ VOER POLE µ1A WATER METER WV 4 WATER VALVE CO - SEWER CLEAN-OUT C8 - CATCH BASIN IAB — NEUSE RIVER BUFFER MA. B.S. - IMINIMLIM SLOWING S1.IBA,CK RIVER LANDINGS DRIVE 510' P L T£ t0 �+f 1NTEE�C'�l+w CO- Fd%ffT LANDIP"'s OR w W ti sls%" CDCs 0 ONH rn 20' OAAIMACE - s LASEA YT 2CL9'— n45 I calhKIIIIETE 3NIVEWY a If AmET1 I, T lial .5 � CA: V rL4C$ ot41a E43 - —_ is ox`~- CiF F� 11,242 sq.ft. Jrr'V s.s 11 =n " 0.258 AC. � - — FENCE L*E is, aa• EAST 0 Cw P PL of PORCH=4 51F17 C ,q Cr ft IDD YEAR FEMA EXfslkc F MW (AE1 wfOTrf SANITARY � ��EAa 4. 9140 0 L�F(Aw PRN 4 IWA EAKI"T ty ~"- 41 4-- r, ti@L RLMUI+ED PAWLi J73Af 7_MM Kit Dw 1 PAG[ e974 a ��.� ___j EFFECinY£ WRY 4 30M --— _s r -M-•- �.. TOP SAM I MP'FRVIOUS SURFACE 'ABLE- `~ -.. ` �� „� ®_ �, rte • �'� -..�r h ^101JISE f,QSB-�.'�d SCIKEM/CoA tf7 pgwpim 37U �' $ X I f� ORIYEI"'r/ SIDEN11"i6E SJF. OVA (ID61 1a a me 5,} S:/. T SE.�t, � tiSG/tITfUTIES 33 SF. 1 10 -131 SuFr of TME GARAGE �- or CARA"A"EMAIAY 5341 S/• AND B9EELE1WiY r5 LOCATED ' �� ��'� �?,►' fh9DE OF TSE 304E 3 MEUSE � � •` � i A�Q Ct7 E AW 110 S.F. R1YER BR1FFIUL. •h'• w i� •J � '.f` 91EA TQ�E AE1A11HEti -144 5f.�.. TOTAL ARTA ZVI7 if. ,PA%A ��.►1e>ti3� TOTAL LOT MICA 11.243 S.F. PERCENTAGE OF IWISMu5 WA 2&IWX Ch i,STHORNEI MOSS CIELAlit TA P HIS 'i17 P Y INCE IES VAIH VI G, H'I* f"r YY [[ Q CARQLIM,A STANDARDS OF PRACTICE FOR SgJR�'E'IM�r ��� CI�1 \ �7 Pr �• (�C-1 r]hl i6pQ'f FpEi Q A!ii'S A SURifE Yui AMID 7HJIT TT41 CALCULATED RATIO OF PRECISION BEI­O:�E ADWSTMENT'S S 1:'D,DOD+. FURTWRMAORIF, PTKFERTY CORNEAS SHCWIN (''4`H55fC1nal L.�+'d _.Irwtx;:� ARE PRIMARY CONTROL WMIJIM+tiENTATION FOR THE RE_ ESt EIF PFtCPMfY CCRNERS 11111 TkE ABSENCE C:-1 °'•2 i OF CR NTS AND OTHER SLIOD ASTON PROKRTY 333 S. ftiiIm `.Strlit3t CMV&& TMI SURVEY IS NQ9E .RECORDED "TM - DLI IK TORI Ali OleCIF THE SURtiEI'T]R Post Office Bax 1253 'Atoka Forest. N.C. 2758$ (9i9}555-314 ROFESSIONAL LAND SURVEYOR L-