Loading...
HomeMy WebLinkAbout19930924 Ver 2_CAMA Permit Application_20160718DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: Bogue Shore Condos slip addition and docking facility re- configuration 2. LOCATION OF PROJECT SITE: 1918 West Fort Macon Road, Atlantic Beach, Carteret County Photo Index - 2000: 40-510 O&P (17) 2006: 40-8085 O (17&18) State Plane Coordinates - X: 2670762.7 Y: 353285.7 LAT 34041'59.95 LON 76046'05.39 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit — 6/29/16 Was Applicant Present —No 5. PROCESSING PROCEDURE: Pre -Application Received — 5/16/16 Application Complete- 6/20/16 Office — Morehead City 6. SITE DESCRIPTION: (A) Local Land Use Plan — Atlantic Beach Land Classification from LUP — Multifamily/Conservation (B) AEC(s) Involved: Public Trust Area, Estuarine Water (C) Water Dependent: Yes (D) Intended Use: Private/Community (E) Wastewater Treatment: Existing — N/A Planned — none (F) Type of Structures: Existing — N/A Planned — existing docking facility re -configuration (floating pier, platform and finger piers) and addition of 6 new slips (G) Estimated Annual Rate of Erosion: N/A Source — N/A HABITAT DESCRIPTION: 11 (A) Shallow Bottom ( N/A I N/A 1 6,600 ft2 INC. 11 (D) Total Area Disturbed: 6,600ft2 (E) Primary Nursery Area: No (F) Water Classification: SA/HQW Open: No PROJECT SUMMARY: The applicant is proposing to re -configure the existing 10 -slip docking facility with the removal of a section of the existing pier, the relocation and addition of floating finger piers (no tie pilings proposed), platform and access pier. They are also proposing the addition of 6 new slip areas for a total of 16. Field Investigation Bogue Shore Condos Page 02 9. Narrative Description: The Bogue Shore Condo project is located at 1918 West Fort Macon Road in Atlantic Beach, Carteret County. The project area can be found by following HWY 70 east (Arendell St) within the Town of Morehead City limit to the Atlantic Beach bridge turnoff. Continue along the bridge until the road connects with East and West Fort Macon Road at a 4 -way stoplight. Tum right and follow the road for approximately 1.78 miles (9,360'). The entrance to Bogue Shore Condos will be located on the right and along the east side of the existing building. The'subject area serves surrounding multi -family residences as well as surrounding businesses. The Division of Water Resources classifies this area as SA/HQW waters. Hoop Pole Creek is not a designated Primary Nursery Area and is closed to the taking of shellfish. The Atlantic Beach Land Use Plan certified in 2003 classifies this area as multifamily with conservation within the AEC. No shellfish resources or submerged aquatic vegetation were observed within the project area. There are multi -family homes to the east and the west of the project location. 10. Proiect Description: Bogue Shore Condos is proposing to re -configure their existing 10 -slip docking facility and install six new slip areas (total of 16 slips). The existing water depths within this area is -4'nlw with the connecting water depths at -6'NLW or greater. The applicant is proposing to remove the existing southwest fixed dock and relocate with new floating pier, platforms and fingers to the north. All portions of the docking facility re -configuration would not exceed the existing pier head length, would remain landward of the traditional navigation route within this area and would remain within the existing footprint in order to avoid additional closures within this area of Hoop Pole Creek. The applicant proposes to place a floating 8' x 100' access pier (platform) on the west side, perpendicular of the existing floating platform that extends from the "boat ramp" area fixed pier. This location would be 65' center to center and north of the existing fixed dock. There would be an 8' x 48' floating t -head platform at the terminus of the floating access pier. There would also be a total of six 4' x 20' floating finger piers that would help designate the 16 slip areas. There are currently 10 existing slips at this location. The applicant is proposing 6 additional slips for a total of 16. The Typical boat using this docking facility would be a max of 23' and of open runabout design. There are no tie pilings or any other development proposed along this property. 11. Anticipated Impacts: The platform, pier and finger pier placement would incorporate and shade 6,600 ft2 of open water area. The placement of the new floating components would result in minor impacts due to turbidity; impacts would not expect to be significant due to water depths within the area(-4'nlw). There should be no undue interference to navigation from the Field Investigation Bogue Shore Condos Page 03 proposed development due to the fact that.all proposed work would not exceed a maximum distance of 155' from the existing bulkhead (nhw) in a water body with a width of approximately 665'. All proposed development would also be located a minimum of 15' from riparian access lines and would not extend beyond the existing docking facility footprint in order to avoid additional shellfish closure within this area of Hoop Pole Creek. There will be no impact to SAV or shellfish. HEATHER STYRON Morehead City July 11, 2016 Dom MP -1 APPLICATION for Motor Dovolopmont Pormit (last revised 12127/06) North Carolina DIVISION OF COASTAL MANAGEMENT 9. Primary Applicant/ LandownerInformation Business Name P /,� /+ - f 0 Ul 1 J i 0�. E.s L �WPDX - Project Name Name (if applicable) y �/��ic9 � J11,r9 ,5 pf' cx y- 140PL`n Applicant 1: First Na a MI ��®® Last Name �f` - Applicant 2: First Name MI )/ Last Name MI Last Name F A VA q �- 1 V L' If additional applicantsi, please attach an additional page(s)iwith names listed. .Mailing Address - Sas 0 ;.f s� U PO Box � Cit Y �e ire State �c ZIP Country - Phon�/eNo//. ,,*^ / 9=r _ 4 . SIM ext. FAX No. IVIA Street Address (if different from above) Ci- State ZIP Email IV - JJ, jj, ''q°� /} ! 3 3 btu , 2Li�B ✓I .. ZIP 2. AgentlContractorinformation Business Name - NIA Agent/ Contractor 1: First Name - MI Last Name llelzec l L' 111z C_ Agent/ Contractor 2: First Name MI Last Name tUl� - /V Mailing Address _ PO Bo City State IV K,6 471r A/c' ZIP - Phone No. 1 - Phone No. 2 .27"r...r S -f' 010' .�YO ext. !. i1 ext. FAX No. . Contractor # N fu; Street Address (if different -from above) - City State ZIP A A) - Email ga <Form continues on back>ECEIVED Art�C 3 (7iDe JUN 2 ® 2616 ®CM- MHD CITY Form DCM MP -1 (Page 2 of 4) APPLICATION for Major Development Permit 3. Project Location a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.))yy County. be multiple) f b"®f '7'EE `"-kx F ti^ Street Address q/ Vm-,� 10JE ¢i. a - ✓„ad o/� 3NC_ State Rd. # 156 Subdivision Name tt� J /city r"I 6 - V B-"_5 a g 9.72' -" kir (€ �J6 k r - State. State Zip p Phone No. I. Man-made features and uses now on tract Lat N .(s) (if many, attach additional page with list) 2_�'z-726 70 7 i ext. N ; � ;fig,, a. In which NC river basin is the project located? (Attach zoning compliance certificate, If applicable) b. Name of body of water nearest to proposed project j' 4 a ' o x'� °m'. k. Has a professional archaeological assessment been done for the tract? If yes, attach a copy. []Yes ZN.0 [INA D I/ OZZ 'F c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. natural ❑Manmade ❑Unknown 800 W 6 e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed - es . ❑No - - work falls within. ATMAYZ1C- 946"74Ht IVC, 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.))yy * mm [ q _ {� D c. Size of-indivi al.lot(s) d. Approximate.elevation of tract above NHW (normal high waler) or NWL (normal water.level) (If many lot'sizes, please attach, additional page with a list) - ZNHW or ❑NWL a. Vegetation on tract �.I�s� �^,,33A� p+ 7a G. gl i11 u GAO 4^ a7f. �e4,.1 , I. Man-made features and uses now on tract 7-1-196-f N0-3 A104(514-, /0 C0A100.5 Fi�04 a 7 - do BO g. Identify and desc/,rube the existing land uses adlacent to the proposeddd projectsite. �I F� I Te� �r.%O�J4�V�V %r��V�T S/S°.���Yf�iF fi't".""f�T�) 01m C 4y C.o a; oly 1f4 195% rIp'.4 D/ O LjV h, How does local government zone the tract? I. Is the proposed project consistent with the applicable zoning? (Attach zoning compliance certificate, If applicable) &✓ 61Z ;�U - klYes ❑No ❑NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes 99No k. Has a professional archaeological assessment been done for the tract? If yes, attach a copy. []Yes ZN.0 [INA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or doesitinvolve a ❑Yes jgNo [INA National Register listed or eligible property? - <Form continues on next p age> REIVSD JUN 2 0 2016 Form DCM MP -1 (Page 3 of 4) APPLICATION for Major Development Penmit m. (i) Are there wetlands on the site? Dyes %No (ii) Are there coastal wetlands on the site? �� G; ri "r &a VIA! T -t' y yJr�l , It - t&Yes ❑No _ (iii) If yes to either (i) or (ii) above, has a delineation been conducted? Dyes INNo QV0 p l q.. kdVQVVN (Attach documentation, if available) - n. Describe existing wastewater treatment facilities. o. Describe existing drinking water supply source, TX WA r p Describe ex;. tin storm water management or treatme t systems , r - � fy t Cyt nJ9 — `h i°�4:��e'U vi .`~i'..i 3;� ,a. 1.4€") I p' i 5. Activities and Impacts a.. Will the project be for commercial, public, or private use? ❑Commercial ❑Public/Government _ - }Private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. - - Pifoid k- 4bW i" %6 A, . DOc( ' `ter c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where if is to bestored. t _,,, �� p, ly O C �!„ 4,0 d. List all development activities you propos pr 7, r,»4-70 A04 X'/V9 if e/fir F W/,r# a. Are the proposed activities maintenance of an existing project, new work, or both? 7). f. What is the approximate total disturbed la �area resultiny from the progosefl project? l ❑Sq.Ft oG ❑A res A10f by f € `\ -"J ' if — 1,JkJ g. Will the proposed project encroach on ak,2ublic easement, public accessway or her area Dyes KNo EINA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. i. Will. wastewater or stormwater be discharged into a wetland? t (;' ❑Yes No DNA If yes, will this discharged water be of the same salinity as the receiving water? - Dyes ❑No *A j. Is there any mitigation proposed? Dyes HNo DNA - If yes, attach a mitigation proposal. <Form continues on back> RECENED :Fakm DCM MP -1 (Page 4 of 4) APPLICATION for Major Development Permit 6. Additional Information In addition to this completed application form, (MP -1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) — (f) are always applicable to any major development application. Please consult the application instruction booklet on how to properly prepare the required items below. a. A project narrative. - b. An accurate, dated work plat (includIng plan view and cross-sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e., The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name Phone No TV oVI A 7749 Address i �s (� 'W5. 55' 6a ®"& 6 ��,�. ®va )8 Y Name Cop& Copc li/ Q� _ CC� �q ®®�� Phone No. Address `jqP 1i Ef"'1 ,FA1+ d r P, agig— &+.t? 4r,:T ®sr 85f7 Name - Phone No. Address `g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. ur h. Signed consultanhor agent authorization form, if applicable. IVIA- I. Wetland delineation, if necessary. - j. A signed AEC hazard notice for projects in o anfront and inlet areas. (Must be signed by property owner)- k. A statement of compliance with the N.C. Environmental Policy Act (N.C.U. 3. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. x 7. Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify. thhattthe information provided in this application® its truthful to the best of my knowledge. Date O!/ Print Name ! ie z� / Signature /✓ Please indicate application attachments pertaining to your proposed project. ❑DCM MP -2 Excavation and Fill Information ❑DCM MP -5 Bridges and Culverts ❑DCM MP -3 Upland Development _ INDCM M'P-4 Structures Information E JUN 2 0 2016 wx� F" try (COnstruction within Public creast Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. a. (i) Is the docking facility/marina: b. (i) Will the facility be open to the general public? ❑Commercial ❑Public/Government I&Private/Community ❑Yes XNo c. (i) Dock(s) and/or pier(s) - d. (i) Are Finger Piers included? []No (H)Number I JOYes If yes: (iii) Length �-- �^i"'s ' (ii) Number 6 (iv) Width; �i 1 '� (iii) Length 22'. (v) Floating ®Yes [--]No; �s'�GY � I � � f.'�. (iv) Width �� _4___ (v) Floating ®Yes []No e. (i) Are Platforms included? ❑Yes )gNo f. (i) Are Boatlifts included? ❑Yes ZNo If yes: If yes: 6 (ii) Number g - (iii) Length, (ii) Number (iii) Length (iv) Width (iv) Width (v) Floating [t]Yes ❑No Note: Roofed areas are calculated from.dripline dimensions. g. (i) mber of slips proposed�r - -0A h. Check all the types of services to be provided. /_ P /i rp �, ?^^'�r ❑ Full service, including travel lift and/or rail, repair or (ii) Number of slips existing maintenance service /0 ❑ Dockage, fuel, and marine supplies ® Dockage ("wet slips") only, number of slips: 1� ❑ Dry storage; number of boats: Q Boat ramp(s); number of boat ramps: ❑ Other, please describe: I. Check the proposed type of siting: ❑ Land cut and access channel ❑Open water; dredging for basin and/or channel NOpen water; no dredging required ❑Other; please describe: j. k. Typical boat length: s� ✓�';{ M. (!)Will the facility have tie pilings? []Yes j$No (ii) If yes number of tie pilings? j. Describe thetypical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). Via/ ANIN400 t 7 I. (i) Will the facility be open to the general public? ❑Yes 93No RECENED J.UN 2 0 2016 ,4S,2 -a08 -2S0- ;; 1%46584RCOASTas r r n s ai ar n a astzm t DC M-44TV-2 o s 2.DocIqyCafAC1L11°YINTARINA.OPERA FIOM� (]Thisseetionnotapplicable. a. Check. each of the following sanitary facilities that will be included in the proposed project. ❑ Office Toilets ❑ Toilets for patrons; Number: _; Location: No Aja ❑ Showers ❑ Boatholding tank pumpout; Give type and location: 1'D b. Describe treatment type and disposal location for all sanitary wastewater. c. Describe the disposal of solid waste, fish offal and trash. d. How will overboard discharge of sewage from boats be controlled? e.. (i) Give the location and number of "No Sewage Discharge" signs proposed. (ii) Give the location and number of "Pumpout Available" signs proposed. f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. hl mrs, g. Where will residue from vessel maintenance be disposed of? t " N � a h. Give the number of channel markers and "No Wake" signs proposed. I. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. - j. What will be the marina policy on overnight and live -aboard dockage? A �� 1 r °f k. Describe design measures that promote boat basin flushing? c, W il�"i Ct I tAlea J U I. If this project is an expansion of an existing marina, what types of services. are currently provided?1 � K i IR E JUN 2 0 2016 QQ HD CB`s° 252-OOZ-1838 -- 14884RCO AS ' revilsed, 12127,106 m. Is the marin docking facility proposed within a primary or secondary nursery area? ❑Yes No n.(S Zhe marina/docking facility proposed within or adjacent to any shellfish harvesting area? 60 Yes ❑No o. Is the marinaldocking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the nurTlbier of square feet affected , CW ❑SAV ❑BB p �eF 2 r �_. e ,� WL ❑None l ev a,.v? r e lis` � � i 1Cs / A t' -r q�) / 0r`�/r•. , P. Is the proposed marina/docking facility located within or within c�E proximity to any shellfish leases? []Yes ❑No '" + If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. a. (i) Is the boathouse structure(s): ❑Commercial ❑Public/Government ❑Private/Comm unity (ii) Number _ (iii) Length - (iv) Width _ Note: Roofed areas are calculated from dripline dimensions. a. (i) Number _ (ii) Length (iii) Width a. Length_ c. Maximum distance beyond NHW, NWL or wetlands b. Average distance from NHW, NWL, or wetlands 6 7(/1Q14 1!$IPl�lflasnf��� ®¢d�. hFsseottsnnP F CapPllcad(e; ,. ❑Commercial ❑public/Government ❑Private/Comm unity C. Distance to be placed beyond shoreline _ Note: This should be measured from marsh edge, if present. e. Arc of the swing b• Number d. Description of buoy (color, inscription, size, anchor, etc.) RECEIVED JUN 2 0 2096 7fl-.OT ;:-Eii-4Za,S"t' a: vxurusr�a»:s,,,ts�9maa;,:c.^,afi:ss? ruas d: 4(Tlti:S a. Proximity of structure(s) to adjacent riparian property lines -2 di .: Note: For buoy or mooring piling, use arc of swing including length of vessel. c. Width of water {body e. (i) Will navigational aids be required as a result of the project? ❑Yes 14No ❑NA (ii) If yes, explain what type and how they will be implemented. a. Give complete description: b. Proximity of structure(s) to adjacent docking facilities. 6 n �= d. Water depth at waterward end of structure at NLW or NWL flk-MO ' RECEIVE JUN 2 p 2016 DCBM- MHD CITY ��:�-£its.�«'?�;9�:e'f_��33���%�m'���'a. tnrwr,�v_sa���•;as�aa�sre�ta�s�::-�a�t?5��2 s2vas:aa�: 'f %?i.�'�It3�a J1 .CME Mapper 2.1 - 4.6 km WxSW of Morehead City NC F ( aure,----------------------------------- http://mapper.acme.com/ 1--1 daft: Ewsi i'"ji Dac k : I R 18 W, Fovt7/4aeoN Rd, REC ND $ojuee S6on- 5Lk&4e5 JUN 2 ®2016 Begr k A/c. ®CM- iU9H® CITY u ti HOOP Nolte Cre,-K, ya • \l iyl 0 0 rf�i a► oi k� Al e r �An Lu A., CIA o, v 4 -&Aug. SAores pock 113 /a Ford" MaC611i Rd J ,4-Kaa+',G Beady NC w (Dac k EX�a,Nsr©N) RECOVE® JUN 2 0 2016 IV ®CM- SIH® CITYc a m F m ® � .. d& w8 .$ 7 Ilk, < w zz'� v . � . ¥ . RECEIVED .JUN ##3$ DCk.NHD CITY ` rz- y\�/ � / i ell H � 2 � $ � - m 'P4, —1.uu RECEIVED JUN 2 0 2016