Loading...
HomeMy WebLinkAbout20160752 Ver 1_FW Multi-use path in Leland_20160829 Carpenter,Kristi From:Steenhuis, Joanne Sent:Monday, August 29, 2016 3:27 PM To:'rwaring@townofleland.com' Subject:FW: Multi-use path in Leland Mr. Waring, Just wanted to let you know that I have reviewed your application and need a couple of clarifications from your consultant (see below). As soon as I get the information from Paul, I will continue the review. Please contact me at 910.796.7306 or via email if you have any questions. Joanne From: Steenhuis, Joanne Sent: Monday, August 29, 2016 3:18 PM To: 'paul.masten@aecom.com' <paul.masten@aecom.com> Cc: brad.e.shaver@usace.army.mil; Policarpo, John N SAW <John.N.Policarpo@usace.army.mil> Subject: Multi-use path in Leland Paul, I have reviewed the application and need a couple of additional items and have a couple of questions. For the drawings, I need cross sections (profiles) of the fill in wetlands to determine the slope and how the material will be retained on the slope. For stream ‘A’ and ‘B’ impacts. I have a question about if you may need to request some temporary impact to put in the pipe extensions and the headwall systems. Normally, we see that there are temporary impacts requested to put in pipes and headwalls, as they have to over excavate to get them installed. Please check with the engineer to see if you will need to add temporary impacts to the application. Thanks! 1