Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20120107 Ver 1_PUM191-PUM198 - 2015_20160620
2015 P Lands Wells Phase 3 1745.59.32.3 Date Rainfall PUM191 PUM192 PUM193 PUM194 PUM195 PUM196 PUM197 PUM198 1 -Jan -15 0.437 -2.144 0.09 -5.255 -12.668 1.449 5.957 -0.934 2 -Jan -15 0.259 -4.139 0.026 -5.354 -13.509 1.331 5.82 -1.062 3 -Jan -15 0.12 0.176 -3.725 0.022 -5.293 -13.342 1.247 5.71 -1.092 4 -Jan -15 0.82 3.206 1.009 1.204 -3.441 -1.654 3.004 7.29 2.214 5 -Jan -15 1.475 -0.22 0.432 -5.043 -8.531 1.86 6.813 0.042 6 -Jan -15 0.981 -2.126 0.274 -5.161 -9.993 1.687 6.483 -0.553 7 -Jan -15 0.343 -8.461 0.764 -5.436 -12.528 0.772 6.551 -1.732 8 -Jan -15 -0.503 -14.843 0.544 -5.83 -16.041 -0.177 5.952 -2.206 9 -Jan -15 -0.768 -17.064 0.553 -5.53 -14.939 -0.128 5.762 -2.146 10 -Jan -15 -0.493 -16.915 0.514 -5.875 -17.162 0.05 5.8 -2.259 11 -Jan -15 -1.052 -18.726 0.508 -5.592 -17.139 -0.28 5.577 -2.235 12 -Jan -15 0.7 0.264 -10.069 0.759 -3.941 -7.662 0.955 6.325 -1.471 13 -Jan -15 0.27 1.24 -3.108 0.999 -5.005 -8.243 1.138 6.931 -0.904 14 -Jan -15 0.11 1.571 -2.875 1.086 -4.791 -6.311 1.405 7.217 -0.358 15 -Jan -15 0.01 0.984 -3.124 0.916 -5.123 -9.202 1.061 6.961 -1.247 16 -Jan -15 0.672 -3.562 0.842 -5.225 -10.459 0.934 6.767 -1.563 17 -Jan -15 0.01 0.3 -5.429 0.709 -5.4 -12.936 0.707 6.554 -1.822 18 -Jan -15 0.54 1.549 -2.572 1.362 -3.765 -3.650 1.559 7.128 -0.763 19 -Jan -15 0.01 1.029 -3.322 0.933 -5.106 -9.027 1.039 6.898 -1.173 20 -Jan -15 0.618 -5.126 0.796 -5.214 -10.772 0.854 6.709 -1.554 21 -Jan -15 0.309 -7.295 0.734 -5.31 -12.073 0.676 6.566 -1.733 22 -Jan -15 0.001 -9.805 0.62 -5.461 -13.998 0.496 6.361 -1.883 23 -Jan -15 0.52 -0.171 -12.52 0.573 -5.566 -14.169 0.326 6.228 -2.001 24 -Jan -15 0.9 3.636 -2.59 1.721 -3.541 -3.021 2.362 8.227 1.798 25 -Jan -15 0.01 1.194 -3.255 0.979 -5.061 -8.949 1.248 7.334 -0.853 26 -Jan -15 0.02 0.762 -3.79 0.915 -5.125 -9.731 1.029 6.998 -1.354 27 -Jan -15 0.01 0.518 -4.237 0.838 -5.308 -11.771 0.892 6.797 -1.592 28 -Jan -15 0.115 -5.647 0.711 -5.525 -14.058 0.721 6.58 -1.844 29 -Jan -15 0.01 -0.394 -9.03 0.606 -5.278 -14.502 0.544 6.336 -1.888 30 -Jan -15 0.01 -0.216 -8.266 0.617 -5.619 -13.866 0.549 6.304 -2.029 31 -Jan -15 -0.458 -14.16 0.531 -5.915 -16.866 0.246 6.106 -2.195 Note: PUM190 and PUM199 are in P Lands Phase 4 1 of 12 2015 P Lands Wells Phase 3 1745.59.32.3 Date Rainfall PUM191 PUM192 PUM193 PUM194 PUM195 PUM196 PUM197 PUM198 1 -Feb -15 0.07 -0.601 -16.222 0.515 -5.899 -16.535 0.148 5.967 -2.248 2 -Feb -15 0.77 1.982 -2.543 1.488 -2.39 -1.016 1.774 7.214 -0.044 3 -Feb -15 1.06 -4.119 0.911 -5.185 -9.863 1.009 7.063 -0.929 4 -Feb -15 0.25 0.283 -3.777 0.738 -5.311 -10.955 0.747 6.856 -1.545 5 -Feb -15 0.3 1.436 -1.351 1.04 -4.582 -5.533 1.444 7.391 0.003 6 -Feb -15 0.473 -4.2 0.783 -5.176 -10.103 0.878 6.989 -1.285 7 -Feb -15 0.184 -4.286 0.716 -5.25 -10.841 0.78 6.843 -1.624 8 -Feb -15 -0.096 -7.413 0.628 -5.481 -11.780 0.622 6.667 -1.871 9 -Feb -15 -0.363 -10.788 0.55 -5.494 -12.081 0.482 6.533 -1.992 10 -Feb -15 0.25 -0.135 -7.804 0.739 -4.448 -8.003 0.706 6.649 -1.73 11 -Feb -15 0.096 -7.384 0.666 -5.34 -11.491 0.588 6.59 -1.778 12 -Feb -15 0.01 -0.273 -9.294 0.601 -5.353 -11.467 0.484 6.444 -1.944 13 -Feb -15 -0.541 -13.941 0.49 -5.752 -14.994 0.208 6.263 -2.181 14 -Feb -15 -0.874 -16.188 0.442 -5.228 -13.533 0.09 6.112 -2.054 15 -Feb -15 -1.279 -17.777 0.411 -6.243 -17.057 -0.537 5.719 -2.499 16 -Feb -15 -2.047 -18.801 0.568 -6.692 -17.034 -1.065 5.219 -2.936 17 -Feb -15 0.05 1.739 -1.053 1.22 -4.261 -5.077 1.423 7.143 -0.047 18 -Feb -15 0.02 1.036 -1.408 1.127 -2.479 -3.659 1.229 7.255 -0.638 19 -Feb -15 0.423 -4.205 0.788 -5.17 -9.700 0.731 6.857 -1.312 20 -Feb -15 -0.688 -11.457 0.465 -6.273 -14.598 -0.443 6.141 -2.183 21 -Feb -15 0.02 -0.909 -12.909 0.75 -6.32 -15.537 -0.576 6.056 -2.061 22 -Feb -15 0.35 0.78 -2.525 0.71 -4.659 -6.995 0.662 7.028 -1.242 23 -Feb -15 0.45 1.721 -1.137 1.137 -3.573 -3.482 1.259 7.53 0.017 24 -Feb -15 0.01 0.914 -2.708 0.78 -4.942 -7.565 0.682 7.235 -0.879 25 -Feb -15 1.01 0.988 -1.075 0.986 -3.24 -5.668 0.971 7.353 -0.846 26 -Feb -15 0.64 8.117 -1.163 1.288 -3.615 -3.610 8.564 8.797 1.521 27 -Feb -15 1.437 -1.562 0.761 -5.004 -8.944 2.088 7.636 -0.716 28 -Feb -15 0.418 -2.994 0.625 -5.325 -11.366 0.769 7.238 -1.46 Note: PUM190 and PUM199 are in P Lands Phase 4 2 of 12 2015 P Lands Wells Phase 3 1745.59.32.3 Date Rainfall PUM191 PUM192 PUM193 PUM194 PUM195 PUM196 PUM197 PUM198 1 -Mar -15 0.14 0.053 -4.421 0.542 -5.286 -10.960 0.584 6.982 -1.789 2 -Mar -15 0.427 -2.01 0.637 -4.982 -8.933 0.655 7.009 -1.586 3 -Mar -15 0.01 0.025 -3.755 0.524 -5.25 -11.426 0.415 6.812 -1.81 4 -Mar -15 0.01 -0.133 -3.431 0.563 -5.107 -9.879 0.561 6.725 -1.549 5 -Mar -15 0.42 -0.277 -5.769 0.486 -5.235 -10.718 0.492 6.619 -1.643 6 -Mar -15 0.716 -2.399 0.741 -4.962 -8.057 0.854 6.981 -0.719 7 -Mar -15 0.186 -4.074 0.613 -5.218 -10.336 0.566 6.819 -1.319 8 -Mar -15 -0.224 -8.04 0.495 -5.35 -11.550 0.383 6.636 -1.652 9 -Mar -15 -0.434 -12.437 0.399 -5.428 -12.776 0.262 6.506 -1.828 10 -Mar -15 0.01 -0.59 -14.899 0.341 -5.491 -12.993 0.17 6.407 -1.955 11 -Mar -15 0.08 -0.632 -15.678 0.287 -5.52 -12.166 0.142 6.336 -1.987 12 -Mar -15 0.02 -0.616 -16.507 0.304 -5.636 -12.499 0.061 6.327 -1.956 13 -Mar -15 -0.915 -18.204 0.173 -5.892 -14.517 -0.231 6.126 -2.114 14 -Mar -15 0.99 -0.692 -18.639 0.363 -4.713 -11.171 0.078 6.165 -1.297 15 -Mar -15 0.958 -2.572 0.745 -5.038 -7.860 0.894 7.366 -0.114 16 -Mar -15 0.201 -6.543 0.569 -5.341 -10.247 0.607 6.99 -1.154 17 -Mar -15 -0.308 -10.62 0.445 -5.538 -11.134 0.492 6.797 -1.563 18 -Mar -15 -0.705 -15.161 0.288 -5.963 -14.679 0.183 6.526 -1.908 19 -Mar -15 0.18 -0.937 -17.541 0.185 -6.06 -16.017 -0.038 6.355 -2.081 20 -Mar -15 0.65 2.173 -1.353 1.192 -3.563 -3.925 1.728 7.791 1.383 21 -Mar -15 0.688 -3.117 0.668 -5.134 -8.747 0.916 7.351 -0.443 22 -Mar -15 0.15 -5.882 0.558 -5.319 -10.659 0.713 7.072 -1.166 23 -Mar -15 -0.283 -9.211 0.467 -5.534 -12.391 0.63 6.882 -1.528 24 -Mar -15 -0.576 -12.677 0.341 -5.689 -13.928 0.452 6.703 -1.79 25 -Mar -15 -0.75 -15.546 0.211 -5.817 -14.822 0.256 6.554 -1.952 26 -Mar -15 0.02 -0.677 -16.999 0.311 -5.349 -11.731 0.294 6.533 -1.906 27 -Mar -15 0.85 -0.574 -17.604 0.314 -5.435 -11.223 0.267 6.552 -1.893 28 -Mar -15 0.804 -3.717 0.657 -5.028 -8.410 0.908 7.358 -0.281 29 -Mar -15 0.111 -7.567 0.474 -5.574 -11.864 0.626 7.062 -1.218 30 -Mar -15 0.11 -0.214 -10.272 0.526 -3.933 -10.830 0.685 7.001 -0.709 31 -Mar -15 -0.195 -10.432 0.412 -5.471 -11.333 0.599 6.907 -1.532 Note: PUM190 and PUM199 are in P Lands Phase 4 3 of 12 2015 P Lands Wells Phase 3 1745.59.32.3 Date Rainfall PUM191 PUM192 PUM193 PUM194 PUM195 PUM196 PUM197 PUM198 1 -Apr -15 -0.54 -14.327 0.27 -5.891 -14.464 0.339 6.709 -1.803 2 -Apr -15 -0.835 -17.073 0.142 -6.163 -16.363 -0.172 6.485 -2.027 3 -Apr -15 -1.066 -18.257 0.034 -6.264 -16.290 -0.404 6.33 -2.189 4 -Apr -15 0.01 -1.2 -18.684 0.014 -6.432 -17.146 -0.569 6.175 -2.309 5 -Apr -15 0.01 -1.708 -18.755 -0.205 -7.031 -17.076 -0.882 5.906 -2.535 6 -Apr -15 -2.101 -18.746 -0.386 -7.395 -17.067 -1.107 5.701 -2.706 7 -Apr -15 -2.302 -18.737 -0.302 -7.44 -17.065 -1.192 5.566 -2.897 8 -Apr -15 0.04 -2.41 -18.736 -0.259 -7.496 -17.081 -1.057 5.443 -3.042 9 -Apr -15 0.24 -0.798 -18.75 0.379 -4.956 -12.182 -0.278 5.934 -2.306 10 -Apr -15 -0.975 -18.744 -0.06 -6.325 -14.954 -0.627 5.796 -2.481 11 -Apr -15 0.06 -1.053 -18.716 0.091 -6.393 -16.546 -0.693 5.724 -2.446 12 -Apr -15 -1.631 -18.733 -1.16 -7.444 -17.099 -1.186 5.467 -2.815 13 -Apr -15 -2.084 -18.728 -1.735 -8.066 -17.088 -1.456 5.237 -2.927 14 -Apr -15 0.66 -1.543 -18.738 -0.51 -7.51 -17.075 -0.943 5.156 -2.452 15 -Apr -15 0.02 -1.075 -18.717 -0.783 -6.977 -17.117 -0.758 5.524 -2.679 16 -Apr -15 0.01 -1.437 -18.728 -1.984 -7.71 -17.101 -0.978 5.35 -2.824 17 -Apr -15 0.01 -1.663 -18.704 -2.216 -8.03 -17.069 -1.04 5.181 -2.833 18 -Apr -15 -1.771 -18.702 -2.408 -7.941 -17.071 -1.069 5.154 -2.859 19 -Apr -15 1.04 -2.032 -18.69 -3.354 -8.514 -17.063 -1.281 5.007 -3.031 20 -Apr -15 0.26 1.242 -2.605 0.769 -4.549 -6.472 1.073 7.401 0.129 21 -Apr -15 0.239 -7.691 0.502 -5.758 -10.945 0.558 7.009 -1.318 22 -Apr -15 -0.616 -13.112 0.319 -6.271 -14.347 0.14 6.646 -1.982 23 -Apr -15 -0.968 -16.635 0.149 -6.848 -17.105 -0.297 6.336 -2.298 24 -Apr -15 -1.508 -17.968 -0.201 -7.484 -17.082 -0.833 6.007 -2.608 25 -Apr -15 0.05 -1.785 -18.713 0.227 -7.234 -17.042 -0.946 5.771 -2.67 26 -Apr -15 0.14 -1.321 -19.086 0.332 -5.786 -17.102 -0.622 5.911 -2.436 27 -Apr -15 -1.7 -18.786 -0.117 -7.086 -16.985 -0.979 5.74 -2.693 28 -Apr -15 -2.358 -18.778 -0.932 -8.134 -17.006 -1.379 5.46 -3.051 29 -Apr -15 -2.79 -18.755 -1.155 -8.478 -17.000 -1.521 5.255 -3.188 30 -Apr -15 0.01 -2.886 -18.781 -1.144 -8.418 -17.024 -1.603 5.11 -3.263 Note: PUM190 and PUM199 are in P Lands Phase 4 4 of 12 2015 P Lands Wells Phase 3 1745.59.32.3 Date Rainfall PUM191 PUM192 PUM193 PUM194 PUM195 PUM196 PUM197 PUM198 1 -May -15 0.07 -3.164 -18.753 -1.666 -8.748 -17.159 -1.777 4.977 -3.385 2 -May -15 -3.498 -18.765 -2.927 -9.396 -17.027 -2.094 4.827 -3.628 3 -May -15 -4.101 -18.765 -4.829 -10.814 -17.143 -2.573 4.546 -3.968 4 -May -15 -4.726 -18.756 -6.382 -12.237 -17.174 -3.196 4.195 -4.385 5 -May -15 -5.309 -18.753 -8.158 -14.077 -17.124 -3.879 3.823 -4.777 6 -May -15 -5.346 -18.846 -9.513 -15.501 -17.095 -4.131 3.534 -4.791 7 -May -15 -5.739 -18.747 -10.776 -16.572 -17.081 -4.602 3.219 -5.175 8 -May -15 0.01 -5.715 -18.744 -12.109 -17.7 -17.083 -4.752 2.909 -5.259 9 -May -15 0.14 -6.626 -18.728 -13.858 -17.734 -17.087 -5.75 2.475 -5.774 10 -May -15 1.04 -0.396 -18.739 -0.122 -6.765 -17.088 -0.527 3.953 -3.18 11 -May -15 0.79 1.459 -3.478 0.505 -4.269 -7.719 0.824 6.276 -0.675 12 -May -15 -0.036 -7.301 0.349 -6.451 -11.501 0.363 6.479 -1.701 13 -May -15 -0.563 -13.306 0.137 -7.192 -16.440 -0.081 6.153 -2.239 14 -May -15 -1.05 -16.893 -0.144 -7.843 -17.105 -0.752 5.74 -2.637 15 -May -15 -1.585 -18.261 -0.388 -8.394 -17.108 -1.175 5.453 -2.88 16 -May -15 -2.147 -19.061 -0.755 -9.156 -17.094 -1.522 5.184 -3.197 17 -May -15 -3.065 -18.799 -2.507 -10.15 -17.106 -2.009 4.849 -3.594 18 -May -15 -3.822 -18.788 -4.243 -10.962 -17.085 -2.439 4.515 -3.999 19 -May -15 0.47 -4.547 -18.796 -6.821 -12.177 -17.097 -3 4.13 -4.469 20 -May -15 0.01 -1.281 -18.762 -2.431 -8.787 -17.090 -1.308 4.897 -3.19 21 -May -15 0.68 -2.218 -18.737 -4.607 -10.09 -17.096 -1.766 4.602 -3.339 22 -May -15 -0.58 -16.103 -0.473 -6.915 -17.081 -0.975 5.341 -2.491 23 -May -15 -1.143 -18.009 -1.465 -8.166 -17.090 -1.593 4.975 -2.912 24 -May -15 -1.991 -19.137 -3.241 -9.606 -17.085 -2.141 4.577 -3.326 25 -May -15 -3.101 -18.771 -5.854 -10.792 -17.073 -2.858 4.103 -3.823 26 -May -15 -3.922 -18.766 -7.972 -12.247 -17.089 -3.749 3.611 -4.222 27 -May -15 -4.631 -18.757 -9.209 -14.01 -17.078 -4.655 3.082 -4.535 28 -May -15 -5.423 -18.755 -11.144 -15.898 -17.063 -5.844 2.424 -5.146 29 -May -15 -6.33 -18.732 -13.221 -17.876 -17.063 -7.234 1.342 -5.744 30 -May -15 -7.29 -18.72 -15.021 -17.444 -17.058 -8.543 -0.11 -6.347 31 -May -15 -7.929 -18.705 -16.383 -17.433 -17.062 -9.645 -1.725 -7.098 Note: PUM190 and PUM199 are in P Lands Phase 4 5 of 12 2015 P Lands Wells Phase 3 1745.59.32.3 Date Rainfall PUM191 PUM192 PUM193 PUM194 PUM195 PUM196 PUM197 PUM198 1 -Jun -15 -9.33 -18.685 -16.522 -17.431 -17.066 -10.774 -3.661 -8.051 2 -Jun -15 0.19 -10.894 -18.678 -16.513 -17.139 -17.046 -11.889 -5.156 -8.868 3 -Jun -15 3.05 -1.19 -14.966 -1.775 -8.165 -17.050 -1.911 1.086 -4.012 4 -Jun -15 1.56 0.533 -5.735 0.204 -4.566 -17.039 -0.52 4.827 -1.537 5 -Jun -15 0.898 -5.056 0.441 -4.891 -11.865 0.018 5.809 -1.328 6 -Jun -15 0.04 0.053 -9.85 0.237 -6.402 -15.673 -0.366 5.71 -2.046 7 -Jun -15 0.26 -8.995 0.251 -6.302 -14.503 -0.356 5.912 -1.967 8 -Jun -15 -0.631 -15.605 0.072 -4.758 -17.034 -1.074 5.495 -2.595 9 -Jun -15 0.48 -1.299 -18.319 -0.064 -7.262 -17.041 -1.591 5.13 -2.926 10 -Jun -15 0.559 -9.669 0.322 -5.128 -12.196 -0.004 6.218 -1.552 11 -Jun -15 -0.486 -15.586 0.08 -6.377 -17.169 -0.535 5.785 -2.378 12 -Jun -15 0.79 -1.242 -18.354 -0.2 -7.482 -17.243 -1.411 5.366 -2.903 13 -Jun -15 0.01 0.967 -6.292 0.452 -5.537 -10.759 0.394 6.69 -0.904 14 -Jun -15 -0.204 -13.528 0.133 -5.826 -16.751 -0.325 6.135 -2.148 15 -Jun -15 -0.734 -16.812 -0.123 -7.155 -17.260 -0.876 5.771 -2.578 16 -Jun -15 -1.917 -18.718 -0.874 -8.026 -17.309 -1.901 5.291 -3.314 17 -Jun -15 -3.595 -18.826 -1.86 -10.301 -17.409 -2.914 4.734 -3.881 18 -Jun -15 0.1 -3.578 -18.802 -1.807 -10.68 -17.086 -2.93 4.517 -3.547 19 -Jun -15 0.03 -4.905 -18.754 -4.344 -12.947 -17.085 -4.272 4.006 -4.3 20 -Jun -15 1.01 -5.911 -18.732 -6.824 -15.07 -17.100 -5.775 3.38 -4.929 21 -Jun -15 -6.824 -18.72 -8.691 -16.958 -17.081 -6.934 2.844 -5.309 22 -Jun -15 -8.385 -18.715 -10.989 -16.654 -17.067 -9.156 1.652 -6.253 23 -Jun -15 -9.804 -18.697 -12.758 -16.132 -17.057 -11.023 -0.48 -7.186 24 -Jun -15 0.04 -11.24 -18.697 -14.448 -16.389 -17.029 -12.766 -3.355 -7.926 25 -Jun -15 -12.085 -18.698 -16.04 -16.201 -17.018 -13.354 -5.07 -8.47 26 -Jun -15 1.38 -14.196 -18.718 -16.546 -16.271 -16.993 -14.571 -6.811 -9.689 27 -Jun -15 0.07 -7.646 -18.685 -14.542 -15.874 -17.006 -7.987 -2.977 -6.621 28 -Jun -15 -9.623 -18.715 -15.912 -16.681 -16.993 -9.372 -4.759 -7.515 29 -Jun -15 -13.188 -18.698 -16.574 -16.41 -16.991 -11.99 -6.893 -9.496 30 -Jun -15 -15.641 -18.7 -16.538 -16.621 -16.981 -13.96 -8.766 -11.592 Note: PUM190 and PUM199 are in P Lands Phase 4 6 of 12 2015 P Lands Wells Phase 3 1745.59.32.3 Date Rainfall PUM191 PUM192 PUM193 PUM194 PUM195 PUM196 PUM197 PUM198 1 -Jul -15 -17.256 -18.702 -16.529 -17.419 -16.974 -16.068 -10.273 -14.396 2 -Jul -15 0.04 -17.265 -18.696 -16.543 -17.428 -16.979 -17.179 -11.498 -16.529 3 -Jul -15 0.22 -17.241 -18.694 -16.618 -17.428 -16.982 -17.877 -12.325 -17.367 4 -Jul -15 0.01 -16.022 -18.701 -16.608 -17.422 -16.962 -15.685 -11.378 -11.053 5 -Jul -15 -17.257 -18.703 -16.526 -17.395 -16.982 -18.232 -13.206 -15.169 6 -Jul -15 0.05 -17.255 -18.699 -16.49 -17.366 -16.990 -19.391 -14.135 -18.643 7 -Jul -15 0.01 -17.254 -18.692 -16.493 -17.421 -16.974 -19.509 -15.24 -18.63 8 -Jul -15 -17.223 -18.705 -16.483 -17.397 -16.993 -19.525 -16.383 -18.65 9 -Jul -15 -17.07 -18.453 -16.313 -16.894 -16.979 -19.338 -16.659 -18.405 10 -Jul -15 -16.923 -18.43 -16.146 -16.38 -16.197 -19.185 -17.817 -18.188 11 -Jul -15 0.81 -16.921 -18.429 -16.157 -16.376 -16.188 -19.152 -18.653 -18.18 12 -Jul -15 0.01 -14.829 -18.442 -15.385 -16.527 -16.195 -16.186 -14.335 -13.9 13 -Jul -15 0.26 -12.99 -18.43 -16.207 -16.492 -16.194 -15.466 -11.732 -13.471 14 -Jul -15 -14.65 -18.424 -16.193 -16.489 -16.181 -14.814 -13.908 -12.063 15 -Jul -15 -17.023 -18.438 -16.147 -16.448 -16.188 -16.912 -15.571 -15.524 16 -Jul -15 -17.012 -18.429 -16.138 -16.449 -16.179 -18.924 -16.778 -18.231 17 -Jul -15 -17.005 -18.447 -16.111 -16.448 -16.181 -19.462 -17.851 -18.211 18 -Jul -15 0.05 -16.988 -18.431 -16.119 -16.439 -16.181 -19.279 -18.955 -18.232 19 -Jul -15 0.01 -16.992 -18.422 -16.138 -16.42 -16.194 -19.188 -19.552 -18.217 20 -Jul -15 -16.982 -18.432 -16.12 -16.421 -16.175 -19.189 -19.695 -18.243 21 -Jul -15 0.85 -16.958 -18.436 -16.119 -16.434 -16.185 -19.19 -19.698 -18.22 22 -Jul -15 -16.13 -18.446 -16.104 -16.468 -16.205 -19.131 -17.38 -15.752 23 -Jul -15 0.63 -17.041 -18.416 -16.122 -16.452 -16.171 -19.236 -18.318 -18.294 24 -Jul -15 -14.174 -18.433 -14.797 -16.782 -16.183 -15.782 -16.007 -11.996 25 -Jul -15 -17.356 -18.406 -16.105 -16.666 -16.185 -17.944 -17.49 -15.989 26 -Jul -15 -16.979 -18.29 -16.114 -16.671 -16.185 -19.614 -18.665 -18.291 27 -Jul -15 -16.977 -18.358 -16.106 -16.47 -16.179 -19.205 -19.543 -18.299 28 -Jul -15 -16.959 -18.445 -16.101 -16.456 -16.163 -19.203 -19.68 -18.292 29 -Jul -15 -16.979 -18.463 -16.118 -16.443 -16.193 -19.197 -19.678 -18.282 30 -Jul -15 0.07 -16.971 -18.451 -16.102 -16.447 -16.175 -19.22 -19.664 -18.261 31 -Jul -15 0.01 -16.956 -18.482 -16.096 -16.444 -16.177 -19.218 -19.671 -18.278 Note: PUM190 and PUM199 are in P Lands Phase 4 7 of 12 2015 P Lands Wells Phase 3 1745.59.32.3 Date Rainfall PUM191 PUM192 PUM193 PUM194 PUM195 PUM196 PUM197 PUM198 1 -Aug -15 -16.955 -18.512 -16.097 -16.441 -16.210 -19.195 -19.68 -18.254 2 -Aug -15 0.01 -16.95 -18.537 -16.103 -16.405 -16.191 -19.173 -19.656 -18.252 3 -Aug -15 -16.941 -18.427 -16.116 -16.42 -16.179 -19.196 -19.635 -18.248 4 -Aug -15 0.08 -16.932 -18.419 -16.091 -16.406 -16.197 -19.192 -19.655 -18.232 5 -Aug -15 -16.92 -18.425 -16.094 -16.403 -16.179 -19.163 -19.649 -18.231 6 -Aug -15 0.18 -16.902 -18.422 -16.111 -16.423 -16.180 -19.176 -19.631 -18.223 7 -Aug -15 0.17 -16.895 -18.425 -16.126 -16.41 -16.177 -19.177 -19.629 -18.244 8 -Aug -15 0.24 -16.894 -18.429 -16.108 -16.42 -16.188 -19.182 -19.647 -18.216 9 -Aug -15 0.03 -16.895 -18.42 -16.111 -16.414 -16.204 -19.017 -19.628 -18.228 10 -Aug -15 -16.889 -18.419 -16.104 -16.385 -16.181 -19.092 -19.626 -18.224 11 -Aug -15 0.48 -16.892 -18.408 -16.098 -16.414 -16.183 -19.182 -19.624 -18.214 12 -Aug -15 0.01 -16.988 -18.778 -16.115 -16.413 -16.172 -19.251 -19.622 -18.195 13 -Aug -15 0.01 -16.982 -18.418 -16.109 -16.405 -16.169 -19.276 -19.619 -18.188 14 -Aug -15 -16.969 -18.416 -16.101 -16.38 -16.161 -19.267 -19.623 -18.195 15 -Aug -15 0.01 -16.978 -18.413 -16.096 -16.399 -16.169 -19.249 -19.618 -18.17 16 -Aug -15 -16.969 -18.412 -16.095 -16.37 -16.146 -19.159 -19.585 -18.179 17 -Aug -15 -16.973 -18.422 -16.088 -16.417 -16.168 -19.146 -19.619 -18.169 18 -Aug -15 0.03 -16.98 -18.422 -16.087 -16.403 -16.149 -19.204 -19.589 -18.165 19 -Aug -15 -16.976 -18.427 -16.101 -16.402 -16.176 -19.256 -19.578 -18.172 20 -Aug -15 0.12 -16.955 -18.419 -16.099 -16.401 -16.160 -19.289 -19.588 -18.156 21 -Aug -15 -16.976 -18.413 -16.092 -16.417 -16.166 -19.375 -19.59 -18.198 22 -Aug -15 -16.954 -18.41 -16.094 -16.356 -16.158 -19.162 -19.574 -18.152 23 -Aug -15 -16.963 -18.404 -16.102 -16.345 -16.178 -19.157 -19.58 -18.157 24 -Aug -15 -16.957 -18.413 -16.067 -16.363 -16.149 -19.147 -19.573 -18.155 25 -Aug -15 0.98 -16.941 -18.402 -16.085 -16.341 -16.147 -19.146 -19.554 -18.129 26 -Aug -15 0.25 -15.405 -18.588 -16.078 -16.384 -16.180 -19.146 -19.566 -18.155 27 -Aug -15 0.13 -16.579 -18.767 -16.099 -16.377 -16.168 -19.124 -19.553 -18.151 28 -Aug -15 -16.995 -18.755 -16.086 -16.383 -16.157 -19.153 -19.553 -18.165 29 -Aug -15 -17.011 -18.725 -16.081 -16.374 -16.157 -19.135 -19.555 -18.162 30 -Aug -15 -16.991 -18.725 -16.086 -16.377 -16.156 -19.13 -19.556 -18.159 31 -Aug -15 1.22 -17.003 -18.72 -16.079 -16.369 -16.168 -19.128 -19.54 -18.13 Note: PUM190 and PUM199 are in P Lands Phase 4 8 of 12 2015 P Lands Wells Phase 3 1745.59.32.3 Date Rainfall PUM191 PUM192 PUM193 PUM194 PUM195 PUM196 PUM197 PUM198 1 -Sep -15 0.01 -15.26 -18.744 -9.012 -13.894 -16.145 -19.124 -18.878 -11.73 2 -Sep -15 -17.001 -18.755 -11.536 -16.474 -16.148 -19.127 -19.627 -14.759 3 -Sep -15 0.25 -15.636 -18.709 -10.21 -16.467 -16.158 -19.129 -18.923 -13.925 4 -Sep -15 -17.019 -18.636 -15.919 -16.375 -16.166 -19.142 -19.587 -18.503 5 -Sep -15 -17.02 -18.692 -16.085 -16.425 -16.147 -19.131 -19.563 -18.262 6 -Sep -15 0.12 -15.708 -17.629 -8.402 -16.31 -16.149 -19.126 -19.785 -15.116 7 -Sep -15 0.11 -16.686 -18.787 -9.698 -16.458 -16.168 -19.127 -19.454 -14.393 8 -Sep -15 -17 -18.729 -11.122 -16.435 -16.167 -19.122 -19.797 -16.416 9 -Sep -15 0.47 -17.022 -18.725 -15.354 -16.426 -16.146 -19.1 -19.571 -18.255 10 -Sep -15 0.02 -17.024 -18.717 -15.347 -16.421 -16.169 -19.111 -19.571 -18.27 11 -Sep -15 0.05 -17.028 -18.764 -16.085 -16.411 -16.152 -19.103 -19.564 -18.268 12 -Sep -15 0.4 -17.022 -18.775 -16.075 -16.406 -16.154 -19.109 -19.572 -18.247 13 -Sep -15 -17.039 -18.793 -12.387 -16.532 -16.149 -19.099 -19.902 -18.138 14 -Sep -15 -17.024 -18.726 -16.34 -16.422 -16.162 -19.083 -19.566 -18.252 15 -Sep -15 0.01 -17.001 -18.701 -16.229 -16.415 -16.144 -19.076 -19.551 -18.255 16 -Sep -15 0.01 -16.991 -18.687 -16.266 -16.429 -16.134 -19.087 -19.549 -18.237 17 -Sep -15 -16.982 -18.716 -16.246 -16.359 -16.155 -19.06 -19.557 -18.218 18 -Sep -15 0.01 -16.970 -18.467 -16.069 -16.43 -16.171 -19.069 -19.529 -18.226 19 -Sep -15 -16.982 -18.476 -16.082 -16.393 -16.146 -19.067 -19.534 -18.243 20 -Sep -15 0.01 -17.000 -18.471 -16.080 -16.327 -16.162 -19.060 -19.525 -18.211 21 -Sep -15 -16.985 -18.484 -16.085 -16.374 -16.147 -19.075 -19.551 -18.237 22 -Sep -15 0.03 -16.990 -18.456 -16.079 -16.401 -16.138 -19.083 -19.553 -18.226 23 -Sep -15 -16.985 -18.506 -16.068 -16.244 -16.153 -19.084 -19.548 -18.233 24 -Sep -15 0.29 -16.984 -18.493 -16.082 -16.384 -16.144 -19.060 -19.556 -18.215 25 -Sep -15 1.35 -11.103 -4.878 -2.328 -7.424 -16.144 -19.065 -19.555 -7.449 26 -Sep -15 0.18 -9.349 -8.137 -3.695 -7.765 -16.139 -13.292 -16.835 -7.922 27 -Sep -15 0.47 -7.530 -4.027 -1.898 -7.153 -16.145 -10.569 -15.295 -7.539 28 -Sep -15 0.89 -5.445 -2.594 -0.796 -6.589 -16.166 -9.899 -14.526 -6.654 29 -Sep -15 0.27 1.373 -1.015 1.225 -4.498 -9.675 -2.064 -6.912 -1.869 30 -Sep -15 0.1 0.751 -1.578 0.824 -11.812 -2.437 -6.229 -1.860 Note: PUM190 and PUM199 are in P Lands Phase 4 9 of 12 2015 P Lands Wells Phase 3 1745.59.32.3 Date Rainfall PUM191 PUM192 PUM193 PUM194 PUM195 PUM196 PUM197 PUM198 1 -Oct -15 0.24 0.101 -1.774 0.691 -15.130 -2.877 -6.951 -2.101 2 -Oct -15 3.08 8.228 -0.088 2.957 -1.554 8.746 8.345 4.252 3 -Oct -15 0.61 17.158 -0.918 1.445 -7.361 17.893 8.543 1.174 4 -Oct -15 0.62 11.753 -0.941 1.199 -7.259 12.462 7.094 -0.463 5 -Oct -15 0.38 9.082 -0.572 2.032 -1.429 9.865 7.588 1.006 6 -Oct -15 6.236 -1.206 1.119 -9.065 6.985 6.925 -0.395 7 -Oct -15 0.495 -2.356 0.859 -12.255 1.205 6.247 -1.407 8 -Oct -15 -0.182 -3.177 0.742 -4.999 -15.060 0.606 5.672 -1.811 9 -Oct -15 -0.926 -3.884 0.682 -5.449 -16.523 0.286 5.169 -2.295 10 -Oct -15 0.01 -1.466 -4.031 0.660 -5.723 -16.504 -0.039 4.815 -2.468 11 -Oct -15 0.01 -1.905 -4.522 0.583 -6.052 -16.499 -0.377 4.527 -2.685 12 -Oct -15 0.07 -1.521 -2.444 0.628 -5.544 -16.464 -0.391 4.536 -2.312 13 -Oct -15 0.01 -2.239 -4.275 0.455 -6.315 -16.467 -0.645 4.280 -2.605 14 -Oct -15 -3.074 -6.091 0.107 -6.884 -16.510 -0.954 3.875 -2.898 15 -Oct -15 -3.894 -8.325 -0.470 -7.705 -16.432 -1.247 3.371 -3.322 16 -Oct -15 -4.628 -10.253 -1.159 -8.350 -16.475 -1.574 2.789 -3.766 17 -Oct -15 -5.149 -12.019 -1.934 -9.206 -16.485 -1.882 2.189 -4.185 18 -Oct -15 -6.073 -14.745 -3.208 -10.685 -16.501 -2.344 1.263 -4.795 19 -Oct -15 -6.638 -17.263 -4.202 -12.322 -16.523 -2.801 0.161 -5.266 20 -Oct -15 -7.294 -18.628 -5.125 -14.046 -16.224 -3.154 -0.700 -5.759 21 -Oct -15 -8.029 -18.733 -6.293 -15.911 -16.223 -3.543 -1.477 -6.296 22 -Oct -15 -8.814 -18.701 -7.728 -15.564 -16.227 -3.914 -2.156 -6.895 23 -Oct -15 0.01 -9.505 -18.746 -9.325 -15.568 -16.203 -4.205 -2.725 -7.427 24 -Oct -15 -10.415 -18.812 -11.803 -15.567 -16.214 -4.746 -3.440 -8.066 25 -Oct -15 -10.823 -18.782 -14.075 -15.505 -16.210 -5.001 -3.926 -8.512 26 -Oct -15 -11.966 -18.788 -16.215 -15.561 -16.215 -5.567 -4.501 -9.159 27 -Oct -15 0.08 -12.245 -18.837 -16.122 -15.546 -16.211 -5.625 -4.861 -9.452 28 -Oct -15 0.3 -9.387 -18.777 -13.835 -15.449 -16.221 -4.078 -3.765 -8.407 29 -Oct -15 0.02 -9.134 -18.828 -9.372 -15.608 -16.230 -3.719 -3.347 -8.582 30 -Oct -15 -11.036 -18.790 -13.893 -15.742 -16.236 -4.670 -4.466 -9.769 31 -Oct -15 -12.619 -18.823 -16.143 -15.614 -16.235 -5.639 -5.248 -10.568 Note: PUM190 and PUM199 are in P Lands Phase 4 10 of 12 2015 P Lands Wells Phase 3 1745.59.32.3 Date Rainfall PUM191 PUM192 PUM193 PUM194 PUM195 PUM196 PUM197 PUM198 1 -Nov -15 0.02 -13.382 -18.792 -16.110 -15.608 -16.215 -5.832 -5.573 -11.128 2 -Nov -15 0.99 -1.389 -18.788 -3.083 -15.601 -16.200 -0.655 -1.014 -1.900 3 -Nov -15 0.31 -0.368 -1.384 0.333 -4.829 -14.881 -0.145 3.438 -2.625 4 -Nov -15 0.04 -0.595 -3.433 0.309 -5.492 -16.508 -0.286 3.489 -2.274 5 -Nov -15 0.8 1.476 -1.140 1.225 -3.375 -7.083 1.307 6.090 -0.278 6 -Nov -15 0.657 -1.646 0.917 -4.056 -10.008 0.573 5.978 -1.304 7 -Nov -15 0.38 0.185 -2.258 0.789 -4.449 -12.200 0.288 5.637 -1.795 8 -Nov -15 0.05 0.799 -1.455 1.041 -3.954 -9.389 0.559 5.888 -1.169 9 -Nov -15 0.75 0.966 -1.010 1.206 -3.620 -5.874 0.720 5.988 -0.881 10 -Nov -15 0.24 1.639 -0.953 1.418 -3.374 -4.981 1.246 6.921 0.430 11 -Nov -15 0.01 0.769 -1.577 1.060 -4.069 -9.105 0.706 6.448 -0.867 12 -Nov -15 0.01 0.249 -2.481 0.879 -4.354 -11.398 0.450 6.011 -1.535 13 -Nov -15 0.01 -0.259 -3.018 0.843 -4.757 -13.656 0.217 5.603 -1.947 14 -Nov -15 -0.941 -4.102 0.778 -5.131 -16.314 -0.247 5.205 -2.315 15 -Nov -15 -1.506 -4.533 0.693 -5.547 -16.302 -0.497 4.877 -2.537 16 -Nov -15 -1.958 -4.852 0.552 -5.918 -16.233 -0.619 4.595 -2.742 17 -Nov -15 -2.241 -5.427 0.730 -6.516 -16.223 -0.481 4.324 -2.700 18 -Nov -15 0.02 -2.560 -5.385 0.585 -6.673 -16.141 -0.632 4.081 -2.845 19 -Nov -15 1.78 -1.129 -1.562 0.992 -5.270 -16.174 -0.232 4.184 -0.037 20 -Nov -15 0.01 1.428 -1.255 1.585 -3.975 -8.131 1.447 7.211 0.218 21 -Nov -15 0.669 -2.211 1.241 -4.518 -10.672 0.968 6.476 -1.073 22 -Nov -15 0.84 1.188 -0.970 1.750 -3.458 -3.783 1.470 6.714 -0.514 23 -Nov -15 1.151 -1.459 1.440 -4.259 -8.630 1.301 6.781 -0.277 24 -Nov -15 0.01 0.524 -2.613 1.216 -4.637 -11.506 0.894 6.283 -1.223 25 -Nov -15 0.073 -3.035 1.071 -4.990 -13.459 0.671 5.878 -1.665 26 -Nov -15 -0.402 -2.799 1.055 -5.148 -14.324 0.413 5.560 -1.945 27 -Nov -15 -0.730 -2.842 1.074 -5.283 -14.624 0.165 5.318 -2.122 28 -Nov -15 0.01 -1.010 -3.081 1.085 -5.428 -15.143 0.016 5.099 -2.226 29 -Nov -15 -1.263 -3.399 1.049 -5.684 -15.914 -0.161 4.885 -2.350 30 -Nov -15 0.05 -1.436 -3.307 1.011 -5.820 -16.309 -0.264 4.707 -2.363 Note: PUM190 and PUM199 are in P Lands Phase 4 11 of 12 2015 P Lands Wells Phase 3 1745.59.32.3 Date Rainfall PUM191 PUM192 PUM193 PUM194 PUM195 PUM196 PUM197 PUM198 1 -Dec -15 0.06 -1.071 -2.197 1.039 -5.490 -15.513 -0.197 4.631 -2.165 2 -Dec -15 0.22 -0.824 -1.797 1.029 -5.488 -12.889 -0.204 4.676 -2.077 3 -Dec -15 -0.237 -1.643 1.143 -5.202 -12.054 0.110 4.889 -1.765 4 -Dec -15 -0.543 -3.520 1.122 -5.572 -15.497 -0.235 4.606 -2.088 5 -Dec -15 0.01 -0.990 -4.030 1.063 -5.875 -16.182 -0.445 4.353 -2.261 6 -Dec -15 0.01 -1.292 -3.840 1.010 -5.958 -16.166 -0.528 4.170 -2.311 7 -Dec -15 1.42 -0.108 -0.833 1.223 -3.033 -9.447 0.297 4.589 -0.011 8 -Dec -15 1.410 -1.217 1.602 -3.963 -7.391 1.395 6.961 0.334 9 -Dec -15 0.736 -1.671 1.328 -4.365 -9.570 0.938 6.444 -0.961 10 -Dec -15 0.07 0.446 -1.606 1.231 -4.569 -10.346 0.714 6.102 -1.332 11 -Dec -15 0.075 -2.429 1.156 -4.850 -11.814 0.482 5.790 -1.657 12 -Dec -15 0.01 -0.404 -2.663 1.122 -5.029 -13.024 0.224 5.487 -1.887 13 -Dec -15 -0.655 -2.897 1.097 -5.239 -13.820 0.014 5.216 -2.034 14 -Dec -15 0.07 -0.836 -2.615 1.135 -5.275 -13.223 -0.114 5.061 -2.111 15 -Dec -15 -0.641 -1.944 1.170 -5.229 -12.673 -0.084 4.999 -2.093 16 -Dec -15 0.01 -0.968 -3.651 1.130 -5.532 -15.278 -0.340 4.763 -2.284 17 -Dec -15 0.03 -0.747 -2.683 0.967 -5.337 -14.586 -0.282 4.639 -2.251 18 -Dec -15 0.23 0.127 -1.027 1.042 -4.149 -7.370 0.229 5.005 -1.596 19 -Dec -15 0.272 -2.851 1.050 -5.053 -13.366 -0.140 4.780 -1.886 20 -Dec -15 -0.353 -4.153 1.043 -5.375 -15.687 -0.353 4.525 -2.144 21 -Dec -15 -0.645 -3.612 0.957 -5.505 -15.895 -0.437 4.358 -2.241 22 -Dec -15 0.56 -0.804 -3.102 0.898 -5.537 -15.501 -0.507 4.198 -2.284 23 -Dec -15 0.16 1.634 -1.063 1.438 -3.689 -6.001 1.158 5.880 -0.232 24 -Dec -15 1.6 8.367 -0.939 1.972 -3.282 -5.416 9.097 8.370 2.054 25 -Dec -15 2.829 -1.256 1.307 -3.994 -8.219 3.647 7.110 -0.415 26 -Dec -15 0.01 0.843 -1.475 1.123 -4.298 -9.793 1.239 6.518 -1.152 27 -Dec -15 0.02 0.554 -1.585 1.053 -4.386 -10.162 0.908 6.156 -1.494 28 -Dec -15 0.11 0.348 -1.536 1.084 -4.302 -11.217 0.713 5.896 -1.459 29 -Dec -15 0.27 1.319 -1.094 1.355 -3.728 -5.746 1.172 6.265 -0.742 30 -Dec -15 1.24 1.450 -0.915 1.743 -2.709 -2.145 1.377 6.621 -0.243 31 -Dec -15 0.22 1.983 -0.946 1.662 -3.045 -5.352 1.913 7.527 0.837 Note: PUM190 and PUM199 are in P Lands Phase 4 12 of 12