Loading...
HomeMy WebLinkAbout20081317 Ver 1_Table 2a 2014 Flow Summary_20160314Table 2a. Summary of monthly 2014 visual observations (see Table B-1) from upper Scott Creek and its headwater systems (UT1-UT7) and a tributary to Smith Creek (UT8). (Numbering of flow stations starts with the most downstream station at each tributary. No flow monitoring station was installed at USC12B and 13B.) Flow station Number of months with Flow station Number of months with visual observation of flow visual observation of flow USC -1 B USC -213 USC -3B USC -413 USC -5B USC -613 USC -713 USC -813 USC -913 USC -10B USC -11B 3 5 5 8* 1 0 1 0 8* 7 1 UT4-1 B UT4-2B 1 1 UT3-3B UT5-1 B 0 UT3-4B 0 UT6-3B UT6-4B UT6-513 UT6-613 2 3 4 3 1 UT7-1 B UT7-2B UT7-3B 2 1 1 UT3-7B UT1-1B UT1-2B UT1-3B UT1-413 3 0 1 0 UT3-8B 1 UT8-1 B UT8-213 UT8-3B UT8-4B UT8-5B 7 3 4 1 2 0 UT2-1 B 0 UT3-1 B UT3-2B 3 2 UT8-6B 3 UT3-3B 2 UT3-4B 0 UT3-5B 1 UT3-6B 2 UT3-7B 3 UT3-8B 1 UT3-9B 0 *One flow event is excluded when data collected during above normal rainfall conditions are excluded. All other sites stay the same. Hell Swamp/Scott Creek T-4 PCS Phosphate Company, Inc. Fifth Annual and Summary Report February 2016