Loading...
HomeMy WebLinkAbout20081317 Ver 1_Figure 4A wells on AS-BUILT LIDAR HYSOMETRIC TINT_20160314• ACCESS ROAD HS -1 HS -5 HS -6 HS -3 • • • HS -7• ACCESS R • • HS -4 , HS -2 J HS -10 • HS -15 • • • • • • HS -14 HS -8 HS -9 HS -11 HS -12 HS -13 1011i I- � ° RAIN GAUGE Lia 19• I ft HS -16 - HS-2� � HS -21 HS -23 HS -25\\N • • • _• • • • • HS -17 HS -18 HS -22 HS -24 HSR1 HSR2 HS1113 HS -27 HS -29 HS -31 HS -32 HS -33 • HS HS -26 • HS 28 • • ` • • • HS -30 , HS -34 HS -36 HS -37 HS -38 HS -40 • • • HS 39 R• WINDLEY CONTROL HS -48 HS -51 FOREST • • • • HS -49 HS -50 H5 41. HS -60 HS -61 • • HS -62• HS 63 HS -72 HS -74 HS -75 HS. • • • • ISS-73 w HS -84" HS -8,5 H5-86 f HS-$ HS 96HS-0• k HS -97 9 HS-107 WF7 HS -106 • •^u.. /A WF5 WF6 / W F4 WINFIELD CONTROL FOREST WF: WF1 L WACC F2 GO CR EE K (SR 1715) ROAD PP2 PP3 � PLUM'S PIT CONTROL FOREST - t HS -45 HS -46 HS -43 HS -44 HS -47 HS -54 HS -55 HS -55 HS -58 • • • • • • HS -56 HS -57 HS -59 HS -69 S-68 'HS 90 • H 5-101 HS -10 HS -110 HS -112 19 •1<,11 • HS -11 HS -114 HS -115 • • F -116 HS -120 HS -119 HS -121 S ROAD "r HS -124 HS -1 HS -117 •HS -70 • HS -71 LEGEND 2 ,1.000 11.500 ■ z 3 1,.500 12.000 ■ 2 a tz.000 z8.000 � &;.- z N M7 ? Q ani ED OV J PROJECT BOUNDARY g z° H J CONTROL FOREST J o Q m ACCESS ROAD m Q GATE w Z a O WELL LOCATIONS N Cn = Z WELL NUMBER a O C.) Q CONTROL WELL LOCATIONS o U w RAIN GAUGE z J O j ED L-1 d' Q w J U) C' m Z „�OLL O w 0 -j � LU U) PROJ. NO.: 0701 DRAWN BY: RC DATE: 3/23/15 SHEET: 0 600' 1200' ,600' FIG .4A SCALE IN FEET Hell Swamp/Scott Creek Mitigation Site Fig -4 PCS Phosphate Company, Inc. Fifth Annual and Summary Report February 2016 Elevations Table Number Minimum Elevation Maximum Elevation Color 1 0.500 1.000 ■ 2 1.000 1.500 ■ 3 1.500 2.000 ■ 4 2.000 2.500 5 2.500 3.000 ■ 6 3.000 3.500 ■ 7 3.500 4.000 8 4.000 4.500 9 4.500 5.000 10 5.000 5.500 ■ 11 5.500 6.000 12 6.000 6.500 13 6.500 7.000 14 7.000 7.500 15 7.500 8.000 16 8.000 8.500 17 8.500 9.000 18 9.000 9.500 19 1 9.500 10.000 0 20 10.000 10.500 21 10.500 11.000 0 z 2 ,1.000 11.500 ■ z 3 1,.500 12.000 ■ 2 a tz.000 z8.000 � &;.- z N M7 ? Q ani ED OV J PROJECT BOUNDARY g z° H J CONTROL FOREST J o Q m ACCESS ROAD m Q GATE w Z a O WELL LOCATIONS N Cn = Z WELL NUMBER a O C.) Q CONTROL WELL LOCATIONS o U w RAIN GAUGE z J O j ED L-1 d' Q w J U) C' m Z „�OLL O w 0 -j � LU U) PROJ. NO.: 0701 DRAWN BY: RC DATE: 3/23/15 SHEET: 0 600' 1200' ,600' FIG .4A SCALE IN FEET Hell Swamp/Scott Creek Mitigation Site Fig -4 PCS Phosphate Company, Inc. Fifth Annual and Summary Report February 2016