Loading...
HomeMy WebLinkAbout20160728 Ver 1_Bridges 132 & 221 Orange Co_20160822 Wrenn, Brian L From:Thomson, Nicole J Sent:Monday, August 22, 2016 12:05 PM To:Wrenn, Brian L Cc:David.E.Bailey2@usace.army.mil; Powers, Tim; Parker, Jerry A Subject:Bridges 132 & 221, Orange Co. Good morning Brian! Just trying to circle around and close the loop with respect to your concerns raised regarding the design and armoring related to both these bridges. I forwarded to you the design teams rationale for the stream bank armoring (which you deferred to their and DOT Hydro’s expertise) on Bridge 132, the revised plans (redlines) for the floodplain design on bridge 221 (which included the typical that showed the placement of coir fiber matting in the bench) and Galen’s email regarding the design of the ditch on bridge 132. I believe this addresses all your concerns? These 2 bridges have had many discussions over many issues the past 2 weeks and I’m honestly trying to make sure that I’ve resolved all the issues (and that nothing is slipping through the cracks). Please let me know if there is anything else that concerns you with respect to these bridges. Thank you so much! Nikki Nicole J. Thomson Division Environmental Supervisor Assistant Division Environmental Office 919-754-7806 Mobile Njthomson2@ncdot.gov PO Box 14996 Greensboro, NC 27415-4996 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 1