Loading...
HomeMy WebLinkAbout20150938 Ver 1_NOV Response_20160816Burdette, Jennifer a From: Joel Lenk <jlenk@quible.com> Sent: Tuesday, August 16, 2016 10:27 AM To: Moore, Andrew W Cc: Burdette, Jennifer a; 'Tasha.L.Alexander@usace.army.mil'; 'William.A.Elliott@usace.army.mil'; Jones, Scott SAW; Christen Miller (cmiller@preservecommunities.com) Subject: RE: Notice of Continuing Violation, NOV-2015-CV-0003, French Broad Crossing Development, Madison County Attachments: 15017-FBC 81616 Resp to DWR NOV Ltr.PDF Andrew, On behalf of River Club Investors, LLC please find attached a response to the referenced notice. We appreciate your consideration, and apologize for the delay in this project. We are working to move it along as quickly as possible. Thank you, Joel D. Lenk, P.G. WNC Office Manager Quible & Associates, P.C. P.O. Box 87 Fairview, NC 28730 828.280.8375 www.guible.com LEGAL DISCLAIMER The information transmitted is intended solely for the individual or entity to which it is addressed and may contain confidential and/or privileged material. Any review, retransmission, dissemination or other use of or taking action in reliance upon this information by persons or entities other than the intended recipient is prohibited. If you have received this email in error please contact the sender and delete the material from any computer. From: Moore, Andrew W[mailto:andrew.w.moore@ncdenr.gov] Sent: Tuesday, August 9, 2016 4:10 PM To: Joel Lenk <jlenk@quible.com> Cc: Burdette, Jennifer a <Jennifer.Burdette@ncdenr.gov>; 'Tasha.L.Alexander@usace.army.mil' <Tasha.L.Alexander@usace.army.mil>; 'William.A.Elliott@usace.army.mil' <William.A.Elliott@usace.army.mil>; Jones, Scott SAW <Scott.Jones@usace.army.mil>; Christen Miller (cmiller@preservecommunities.com) <cmiller@preservecommunities.com> Subject: Notice of Continuing Violation, NOV-2015-CV-0003, French Broad Crossing Development, Madison County Please see the subject notice attached. Andrew W. Moore, P.G. Environmental Specialist —Asheville Regional Office Water Quality Regional Operations Section NCDEQ — Division of Water Resources 828 296 4684 office email: Andrew.W.MooreQncdenr.gov 2090 U.S. Hwy. 70 Swannanoa, N.C. 28778 Email corresponclence to and fi`om thlois address is sut-Yect to tlhe Alotill-I Carolina Public Records 'Law and may be disclosed to thloird patlies, N • - Quible & Associates, P.C. Western North Carolina Office GEOLOGY • PLANNING • ENVIRONMENTAL SCIENCES & RESTORATION August 16, 2016 Mr. Landon Davidson Regional Supervisor Water Quality Regional Operations NC DEQ — Division of Water Resources Asheville Regional Office 2070 US Highway 70 Swannanoa, NC 28778 P.O. Box 87 Fairview, NC 28730 Phone: 828-280-8375 Phone: 828-545-3219 Web: quible.com Transmitted via email: andrew. w.moorePncdenr. gov RE: Notice of Continuing Violation and Recommendation for Enforcement French Broad Crossing Development NOV-215-CV-0003 Madison County Response Deadline: August 23, 2016 Mr. Davidson, Quible & Associates, P.C. (Quible), on behalf of Mr. Fisher and River Club Investors, LLC, are in receipt of the referenced Notice of Continuing Violation and Recommendation for Enforcement (NOV) letter dated August 9, 2016. It is understood that this NOV-215-CV-0003 is associated with the French Broad Crossing development (FBC), Parcel Identification Number (PIN): 8789709094 in Madison County, North Carolina. River Club Investors, LLC has chosen and initiated Option 1 outlined in your August 9, 2016 letter and below: "Apply to USACE and receive a 404 permit, for the proposed culverts, stream modifications or fill. A 410 WQC will be required if the activities are permitted by USACE. The application process as described does not guarantee the impacts will be approved." A preliminary Jurisdictional Determination (JD) was prepared and submitted to USACE and NC DEQ - Division of Water Quality (DWQ) by Quible on October 21, 2015. The preliminary JD was approved by USACE and DWQ. Field calls and flagging delineating Waters of the US (WOTUS) made by Quible were approved by Ms. Tasha Alexander of USACE and Mr. Andrew W. Moore of NC DWQ. River Club Investors, LLC committed to obtaining a NC licensed survey of WOTUS and existing impacts flagged by Quible for a final Authorized JD. Herron Associates of Waynesville, NC was contracted on or about December 20, 2016 to survey the WOTUS and existing impacts flagged by Quible and produce drawings and plats documenting the exact volume of jurisdictional features and impacts identified within FBC for a final JD. The JD is needed before an After -the -fact, 404 Individual Permit (IP) and associated 401 WQC can be applied for existing and proposed impacts at the site. The IP application will include a mitigation plan for the impacts at the site. Existing impacts at the site were voluntarily reported by Quible to USACE and NC DWQ on behalf of River Club Investors, LLC in order to bring the site into compliance and permit additional unavoidable impacts associated with development of an in-line pond needed for storage of water for fire suppression. Fires ignited by the railroad located at the bottom of the development have burned significant portions of the property on at least two occasions. Progress by the surveyor has been slow. The site is large (600+ acres) and rugged and the field portion of the survey took place in mid -winter. The field portion of the survey work was completed in late spring 2016 and apparently Herron Associates is having staffing and production difficulties which is delaying the receipt of the needed survey and drawings. Quible has contacted and met with representatives of Herron Surveying on numerous occasions regarding both the field and office portions of the survey work. Most recently on August 4, 2016 Quible inquired with Mr. Mark Wilson of Herron Associates about the status of the survey drawings. Mr. Wilson informed Quible that he was no longer working on the project. Quible reported concerns regarding the status of the survey to The Preserve Communities and River Club Investors, LLC. in early August. Mr. J. Randy Herron, PLS for the Herron Associates contacted Quible about the status of survey drawings on August 4, 2016 and assured that he was working on the drawings and estimated that drawings would be ready for submittal "in a couple weeks". Quible Mr. Herron's response to mean that the drawings will be ready on or about August 18, 2016. Once Quible is in receipt of the survey for the JD it will submit the survey to USACE and DWQ for review. Within one week of approval of the survey by USACE Quible will submit the final JD. While the JD is being reviewed by USACE Quible will be finalizing the 404 IP application for submittal. North Carolina DWQ will be copied on all submittals to USACE regarding this NOV, the JD, 404 permitting, and mitigation for this project. Please respond with any questions or request for additional information to (828) 280-8375 or ilenk@quible.com Sin My, Quible & Associates, P.C. Joel D. Lenk, P.G. cc: Mr. Jack Fisher, River Club Investors, LLC Ms. Christen Miller, The Preserve Communities, LLC Ms. Tasha Alexander, USACE