Loading...
HomeMy WebLinkAbout20061245 Ver 1_CAMA Application_2006091291 at LOMTAI4t a ^ z North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Charles S. Jones, Director William G. Ross, Jr., Secretary 11 September 2006 EXPRESS PERMIT REVIEW PROGRAM MEMORANDUM TO: FROM: SUBJECT: Applicant: Project Location Cyndi Karoly Division of Water Quality David W. Moye Express Permits Coordinator t,.? ? ? ? I ? ?Z006 CAMA/DREDGE & FILL Permit Application Review Riversound C/O Larry Bragg The project site is located on SR 1100 (Drummonds Point Road) on the Yeopim River and Middleton Creek, near Edenton in Chowan County, North Carolina. Proposed Project: The applicant proposes to subdivide the property into 224 lots and construct asphalt access roads, fill 404 wetlands for road crossings, construct a bridge, construct a boat ramp with 2 piers and associated river house on a common lot, and construct three access piers with gazebos on three additional common lots including two parking areas, and install a package wastewater treatment plant. Please indicate below your agency's position or viewpoint on the proposed project and return this form by 2 October 2006. If you have any questions regarding the proposed project, please contact David W. Moye at 252-948-3852. When appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATE 943 Washington Square Mall, Washington, North Carolina 27889 Phone: 252-946-6481 1 FAX: 252-948-0478 1 Internet: www.nccoastalmanagement.neY An Equal Opportunity 1 Affirmative Action Employer - 50% Recycled 110% Post Consumer Paper Riversound The Waterfront Group NC, LLC C/O Larry Bragg Chowan County Express Permit Review Program Project setting Atlantic Environmental Consultants, LLC, on behalf of The Waterfront Group NC, LLC (C/O Larry Bragg), has requested the attached application be processed under the Express Permit Review Program, for a planned development under the name of Riversound. The project site is located on SR 1100 (Drummonds Point Road) on the Yeopim River and Middleton Creek, near Edenton in Chowan County, North Carolina. The applicant's owns a total of ±934 acres of land and is proposing to develop ±257.7 acres as Phase I in this permit application. The project site is situated at the intersection of Middleton Creek and the Yeopim River. Approximately 9,000' of the site fronts the Yeopim River with an additional ±6,000' adjacent Middleton Creek terminating at the SR 1100 bridge crossing of the creek. The majority of the site is wooded and the upland portions are in active siviculture as a managed pine plantation. Pines and hardwoods in various growth stages along with undergrowth of vines and woody vegetation dominate this area. A large portion of the site has been delineated as 404 wetlands by Tracey Wheeler of the US Army Corps of Engineers. This 404 wetland is comprised of a large expanse of bottomland hardwood swamp adjacent the creek and the river as well as fingers of wetlands that project into the property in various locations. The bottomland hardwood area is dominated by Cypress along both waterbodies. While no submerged aquatic vegetation (SAV) was noted in the project area, sporadic areas of emergent aquatic vegetation in the form of water lilies was present on both water bodies. The property is bordered on the east (downstream side on Yeopim River) by similarly vegetated undeveloped property and to the west (opposite side of Middleton Creek) by undeveloped wooded wetlands as well as active agricultural land. The property is accessible from SR 1100 via two dirt logging roads that converge ±1,000' from the Yeopim River and terminate at the river with a makeshift boat ramp. The logging roads cross 6 areas of 404 wetlands and have existing culverts at these crossings. The site is ±10, above the normal water level (NWL). The Yeopim River in this area is classified SB by the Environmental Management Commission and is closed to shellfishing. Project description The applicant proposes to develop a large portion of the tract by creating 224 single- family lots ranging in size from 2.2 acres to 2.5 acres. The existing logging road on the west side of the site will be upgraded, widened and paved with asphalt (20' top width), and new asphalt access roads will be created throughout the project site. The existing logging road on the east side of the site will be upgraded and widened to 20' (top width) but will remain dirt. Riversound The Waterfront Group NC, LLC C/O Larry Bragg Chowan County Express Permit Review Program Page Two A community boating access area is proposed between lots 42 and 50. This common area has ±1401 of shoreline adjacent the Yeopim River. A concrete boat ramp is proposed (near the downstream lot line of lot 42) that will be ±20' wide and will project into the river ±401. The ±201 wide concrete boat ramp will extend ±30' onto the property and connect into an asphalt drive. A 6' wide by ±55' long pier is proposed adjacent the new boat ramp on the downstream side and a 6' wide by ±52' long pier with a ±12' by ±24' L- head adjacent the boat ramp on the upstream side. The existing water depth at the end of the proposed boat ramp is ±3.5' and is ±5.4' at the end of the proposed piers. The river is ±535' wide at this location. The applicant proposes to protect the boat ramp by installing ±25' of bulkhead on both sides of the ramp. The bulkhead will be placed an average of 2' below the NWL with a maximum of 21. Backfill for the new bulkhead is estimated at ±100 ft2 (4 cubic yards). As proposed, the bulkhead on the downstream (east) side will be constructed on lot 42. A ±28' by ±40' river house is proposed with a 4' wide concrete sidewalk connecting the river house to the pier on the upstream side of the boat ramp. An asphalt paved parking area is proposed adjacent the river house as well as an additional parking area for trailers that will be constructed with porous pavement and will be located adjacent lots 43 and 49. A second common lot is proposed between lots 119 and 135. This common area has ±75' of shoreline adjacent the Yeopim River. The applicant proposes to construct a 6' wide by ±50' long pier and a ±18.5' by ±18.5' octagon platform that will include a gazebo and a 4' wide walk around deck. The platform will have a railing around the perimeter to prevent boat docking. The existing water depth at the end of the proposed structure is ±5.5' and the river is ±652' wide at this location. A 6' wide by ±156' access walkway is proposed over the 404 wetland area to connect to uplands. The walkway over the 404 wetland area will be elevated a minimum of 3' measured from the wetland substrate to the bottom of the decking. A 6' wide mulch pathway will connect the walkway to the road. A third common lot is proposed between lots 157 and 158. This common area has ±75' of shoreline adjacent Middleton Creek. The applicant proposes to construct a 6' wide by ±40' long pier and a ±18.5' by ±18.5' octagon platform that will include a gazebo with a 4' wide walk around deck. The platform will have a railing around the perimeter to prevent boat docking. The existing water depth at the end of the proposed structure is ±4.9' and the creek is ±232' wide at this location. A 6' wide by ±436' access walkway is proposed over the 404 wetland area to connect to uplands. The walkway over the 404 wetland area will be elevated a minimum of 3' measured from the wetland substrate to the bottom of the decking. A 6' wide mulch pathway will connect the walkway to the road and a proposed asphalt parking area on a common lot located adjacent lots 160 and 161. A fourth common lot is proposed between lots 196 and 197. This common area has ±75' of shoreline adjacent Middleton Creek. The applicant proposes to construct a 6' wide by ±50' long pier and a ±18.5' by ±18.5' octagon platform that will include a gazebo with a 4' wide walk around deck. The platform will have a railing around the perimeter to prevent Riversound The Waterfront Group NC, LLC C/O Larry Bragg Chowan County Express Permit Review Program Page Three boat docking. The existing water depth at the end of the proposed structure is ±61 and the creek is ±2751 wide at this location. A 6' wide by ±1571 access walkway is proposed over the 404 wetland area to connect to uplands. The walkway over the 404 wetland area will be elevated a minimum of 3' measured from the wetland substrate to the bottom of the decking. A 61 wide mulch pathway will connect the walkway to the road and a proposed asphalt parking area on a common lot located adjacent lots 214 and 217. The proposed road construction will result in filling 404 wetlands at 8 separate locations on the project site. Six of the fill areas are existing culvert crossings, one is an expansion into a 404 area, and one is a new road that will cross a 404 area. A bridge over a 404 wetland area is also proposed. The breakdown of the impacts is listed below: Section "A" - replace an existing 18" diameter by 31' long culvert with three - 24" diameter by 51' long culverts and expanding the existing road to a 40' base width and a 20' paved surface. This will result in the filling of ±418 ft2 of 404 wetlands. Section "B" - Expand the existing road to a 40' base width and a 20' paved surface. This will result in the filling of ±1,178 ft2 of 404 wetlands. Section "C" - replace an existing 18" diameter by 38' long culvert with five - 36" diameter by 541 long culverts and expanding the existing road to a 40' base width and a 20' paved surface. This will result in the filling of ±5,144 ft2 of 404 wetlands. Section "D" - replace an existing 18" diameter by 38' long culvert with three - 36" diameter by 54' long culverts and expanding the existing road to a 40' base width and a 20' paved surface. This will result in the filling of ±2,664 ft2 of 404 wetlands. Section "E" - replace an existing 18" diameter by 55' long culvert with three - 24" diameter by 50' long culverts and expanding the existing road to a 40' base width and a 20' paved surface. This will result in the filling of ±1,504 ft2 of 404 wetlands. Section "F" - Install three - 15" diameter by 45' long culverts and expanding the existing road to a 40' base width and a 20' paved surface. This will result in the filling of ±1,200 ft' of 404 wetlands. Section "G" - Install three -18" diameter by 52' long culverts and create a new road with a 40' base width and a 20' paved surface. This will result in the filling of ±2,302 ft2 of 404 wetlands. Section "H" - replace an existing 15" diameter by 37' long culvert with three - 18" diameter by 52' long culverts and expanding the existing road to a 401 base width and a 20' paved surface. This will result in the filling of ±1,308 ft2 of 404 wetlands. Section "I" - Construct a ±18' wide by ±50' long wooden bridge over a 404 wetland Riversound The Waterfront Group NC, LLC C/O Larry Bragg Chowan County Express Permit Review Program Page Four area associated with the construction of the new road for the sewer treatment facility. The bridge over the 404 wetland area will be elevated a minimum of 3' measured from the wetland substrate to the bottom of the decking. Approximately 53 acres (2,294,575 ft2) will be graded and/or filled as a result of the proposed development. Impervious surface within the 30, Public Trust Shoreline AEC is limited to the boat ramp access (±900 ft2). An onsite package wastewater treatment plant is proposed for sewage treatment and the plan is under review by the Division of Water Quality and the Local Government. County water will supply the drinking water to the site. Anticipated impacts The project as proposed will result in the filling of ±900 ft2 of river bottom associated with the construction of the boat ramp and bulkhead. Approximately 2,670 ft2 of river and creek bottom will be shaded by the construction of the five piers. Approximately 4,494 ft2 of 404 wetlands will be shaded as a result of the construction of the access walkways. The road construction and culvert installation will result in the filling of ±15,718 ft2 of 404 wetlands. A total of ±2,294,575 ft2 (±53 acres) of uplands will be disturbed as a result of the development activities. David W. Moye - 11 September 2006 DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1 Express Permit Review Program 1. APPLICANT'S NAME: Riversound, for The Waterfront Group NC, LLC, C/O Larry Bragg 2. LOCATION OF PROJECT SITE: Adjacent the Yeopim River and Middleton Creek off SR 1100 (Drummond's Point Road) near Edenton in Chowan County, North Carolina Photo Index - 2000: 155-1804; L-14 1984: 114-797; U-7 State Plane Coordinates - X: 2,743,700 Y: 861,200 GPS Rover File: B021515A Yeopim Quad. (upper left corner) 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 07/12/06 Was Applicant Present - No 5. PROCESSING PROCEDURE: Application Received - 11 September 2006 7 August 2006 (INC.) Office - Washington 6. SITE DESCRIPTION: (A) Local Land Use Plan - Chowan County Land Classification From LUP - Rural (land), Conservation (water, wetlands) (B) AEC(s) Involved: PTA, CS (C) Water Dependent: YES (D) Intended Use: Private (E) Wastewater Treatment: Existing - None Planned - Package wastewater treatment plant (F) Type of Structures: Existing - Dirt roads Planned - Asphalt roads and parking, culverts, boat ramp, 5 piers, and a river house (G) Estimated Annual Rate of Erosion: None Source - Applicant 7. HABITAT DESCRIPTION: [AREA] DREDGED FILLED OTHER (A) Vegetated Wetlands ±4,494 ft2 404 wetlands shaded ±900 ft2 ±2,670 ft2 (B) Non-Vegetated Wetlands ramp/bulkhead shaded River/Creek bottom (C) Other ±2,294,575 ft2 Highground (D) Total Area Disturbed: ±52.68 acres (±2,294,575 sq. ft.) (E) Primary Nursery Area: No (F) Water Classification: SB Open: No 8. PROJECT SUMMARY: The applicant proposes to subdivide the property into 224 lots and construct asphalt access roads, fill 404 wetlands for road crossings, construct a bridge, construct a boat ramp with 2 piers and associated river house on a common lot, and construct three access piers with gazebos on three additional common lots including two parking areas, and install a package wastewater treatment plant. ATLANTIC ENVIRONMENTAL CONSULTANTS, LLC P.O. Box 3266, Kitty Hawk, NC 27949 (252) 261-7707 fax (252) 261-2965 September 7, 2006 Mr. David Moye NCDENR 943 Washington Square Mall Washington, NC 27889 RE: Waterfront group - Riversound Project- Revised CAMA Major Express Permit Dear Ms. Hardison, Enclosed is a revised CAMA Major Permit Application requested by the Waterfront Group for improvements to the Riversound project a single-family residential subdivision located on the Yeopim River, in Chowan County, North Carolina. The following information address the comments made in your letter dated August 7, 2006. The following information has been submitted as part of the permit application: 1. Copies of the Revised site plan and details for the Riversound Project. 2. Revised application forms DCM-MP1, MP2, MP3, MP4, MP5 A-1 3. A revised narrative description of the project. 4. Adjacent property owner notification letters and certified mail green cards. 5. A deed for the subject property. 6. An authorization letter for Atlantic Environmental Consultants to act as agent. 7. A letter from Chowan County agreeing to provide water to the Riversound Development project. 8. An archeological assessment letter from Environmental Services, Inc. 9. A re-submittal application fee of $500.00 made payable to NCDENR. 10. A 11x17 copy of the 404 wetland plat signed by the USACOE 5/31/06. We request that you continue the review process and if have questions or need additional information please contact me at 252-261-7707. Sincerely, Dougi A. Dorman Atlantic Environmental Consultants, LLC Cc: Lyn Hardison, One Stop/Express Permit Coordinator, WARO PROJECT NARRATIVE CAMA MAJOR PERMIT - Waterfront Group NC, LLC - Riversound - Chowan County July 26, 2006 LOCATION OF PROJECT: The 924 acre project site is located off Drummonds Point Road, Fourth Township in Chowan County, adjacent to the Yeopim River (36c05'1 8.00"N 7628'48.00"W). PURPOSE and PROPOSED CONSTRUCTION: The Waterfront Group NC, LLC are proposing to improve their property for a 224 Lot residential subdivision (Riversound Phase 1). The proposed project includes: a boating facility to access the Yeopim River for traditional recreational boating purposes; shoreline stabilization to include wooden bulkhead within the proposed boat ramp area; a pavilion and parking for the boat ramp, three community piers with gazebos, a subdivision road and central wastewater system. The project site consists of 924 acres of previously forested land used for silviculture purposes since the early 40's and is currently comprised primarily of pine forest with existing logging roads, and various wetland areas. The west side of the site is bordered by Middleton Creek, the eastern and southern sides of the site are bordered by privately owned parcels (residential and farmland), and the north side by the Yeopim River. The Waterfront Group NC, LLC proposes six foot wide elevated docks and walkways on both sides of the proposed 20' x 72' concrete boat ramp (20' x 40' within public trust waters). Elevated walkways will connect to the proposed piers on both sides of the proposed boat ramp and also connect to the three proposed community piers. Boat slips are not proposed for this project. Waterfront Group NC, LLC also propose asphalt subdivision roads, including the driveway and parking for the boating facility, consistent with County and State requirements. The proposed central wastewater system located within the subject property will utilize a membrane clarification process that will provide reuse quality water to be directed to onsite infiltration ponds. The proposed stormwater plan provides roadside swales and twenty-two (22) culverts that will direct stormwater to several retention ponds and or to the adjacent 404 wetlands. Previous Clearing and Grubbing Permit issued to Waterfront Group NC, LLC on March 315`, 2006 for 4.5 acres of disturbance. FIELD MEASURMENTS: AEC met with the N.C. Division of Coastal Management on site on February 2, 2006. The platted Section 404 wetlands were delineated and approved by US Army Corp of Engineers, Tracey Wheeler on May 31, 2006. AEC staff took water depths within the areas of the proposed piers on May 9th, 2006. Water depth at the end of dock (1A) is -5.2', (1 B) is -5.4' ,(2) is -5.0' (3) is -4.9' and (4) is -6.0' . During the time of sampling, AEC staff did not identify SAV's within or outside the project area. (Project narrative - Waterfront Group, LLC - pg. 2) PROPOSED OPEN WATER IMPACTS: Open water impacts include fill for the proposed boat ramp (concrete slab), fill associated with shoreline stabilization (backfill from bulkhead). Temporary impacts include the construction of the boat docks. CONSTRUCTION: Construction of the boating facility (elevated walkways and docks) will take place using hydraulic pumps and hand tools. Prefab concrete slabs will be constructed on site and put in place using a front-end loader. DETAILS FOR OPEN WATER DISTURBANCE AND IMPACTS: Proposed structures within the Public Trust Waters: Boat ramp dock (1A) (6'x 55') .............................................................. 330 s.f. Boat ramp dock (1 B) (6' x 52') ............................................................ 312 s.f. Dock (2) (61x 501) ...................................................................................... 300 s.f. Dock (3) (6'x 40) ...................................................................................... 240 s.f. Dock (4) (6'x 50) ...................................................................................... 300 s.f. (3) Gazebos (3 x 300 s.f.) ....................................................................... 900 s.f. Total s.f. of structures proposed within Public Trust Waters..... 2,432 s.f. Fill within Public Trust Waters: Boat ramp (concrete) (20'x 40' within open water) ................ (15 c.yds.) Bulkhead Backfill (50'x 2'x 1' = 27) ......................................(4 c. yds.) Total fill,within Public Trust Waters ...................................... 19 c.yds. Shading within Public Trust Waters: Boat docks (5) and gazebos (3) ............................................ 2,432 s.f. Proposed construction/disturbance within the 30' Buffer: Elevated walkways ................................................................................. 1,146 s.f. Boat Ramp (30 x 30') .............................................................................................900 s.f. Total proposed construction/disturbance within the 30' Buffer ... 2,046s_f. WETLAND IMPACTS: No Impacts proposed within coastal wetlands (no coastal wetlands within or adjacent to project site) Shading Impacts include elevated walkways (elevated min. 3 feet) ................4,494 s.f. Fill Impacts proposed in Section 404 wetlands (till for road crossings) ...............0.36 acres Temporary Impacts include construction of elevated docks and walkways MITIGATION PROPOSED. The purchase of wetland credits from NCEEP & Conservation easement - responsible party NCEEP Conservation easement on remaining wetlands excluding 20' vegetation trimming buffer within lots containing wetlands and 10 foot easement to access the shoreline. (Project narrative - Waterfront Group, LLC - pg. 3) PROPOSED LAND DISTURBANCE: Proposed construction/disturbance on highground: Land disturbance associated with development as determined by Shield Engineering in the Sedimentation Erosion Control Plans Roadway & culverts - 52 acres....... 2,265,120 sf Boat ramp (highground portion) - 640 s.f. Walkway - 252 s.f. River House -1,120 s.f. Parking Area for boating facility - 16,760 s.f. Parking areas for common access's - 9,683 sf Disturbance Behind Bulkhead -1,000 s.f. Total land disturbance ...................................................... 2,294,575s_f. CONSTRUCTION: Construction of the road and spoil containment area will take place using a dump truck, bull dozier, frontend loader with a box blade. Construction of the road will meet county and state requirements. Silt fence will be placed along areas of land disturbance, and special precautions will be made in areas adjacent to wetlands and within the 30 foot buffer. Form DCM-MP-1 0 A-PFLICA'to N",',' Q D (To be completed by all applicants) - -----1.- APPLICANT a. Landowner: Name The Waterfront Group, N.C., LLC C/O Larry Braga Address 17505 West Catawba Avenue, Suite 350 City Cornelius State NC Zip 28031 Day Phone 704-896-2690 Fax 704-896-2967 b. Authorized Agent: Name Atlantic Environmental Consultants, LLC Address P.O. Box 3266 City Kitty Hawk State NC Zip 27949 Day Phone 252-261-7707 Fax 252-261-2965 c. Project name (if any) Riversound NOTE. Permit will be issued in name of landowner(s), and/or project name. r s ? 1005 b. City, town, community or landmark Yeopim Community c. Street address or secondary road number Drummond's Point Road, SRI 100 d. Is proposed work within city limits or planning jurisdiction? Yes X No e. Name of body of water nearest project (e.g. river, creek, sound, bay) Yeopim River 3. DESCRIPTION AND PLANNED USE OF PROPOSED PROJECT a. List all development activities you propose (e.g. building a home, motel, marina, bulkhead, pier, and excavation and/or filling activities. 224 lot single family development, access roads, central sewer system and Boating facility to include: elevated walkways decking/dock with a boat ramp, River House parking and three additional community piers with gazebos. b. Is the proposed activity maintenance of an existing project, new work, or both? New work c. Will the project be for public, private or commercial use? Private use d. Give a brief description of purpose, use, methods of construction and daily operations of proposed project. If more space is needed, please attach additional pages. See attached project narrative 2. LOCATION OF PROPOSED PROJECT a. County Chowan Countv Revised 03/95 Form DCM-MP-1 (To be completed by all applicants) 4. LAND AND WATER CHARACTERISTICS a. Size of entire tract 934 acres (Phase 1-257.7 acres) b. Size of individual lot(s) 224 single-family residential lots - lot sizes vary 2.2 acres to 2.5 acres c. Approximate elevation of tract above MHW or NWL 10 feet d. Soil type(s) and texture(s) of tract Roanoke silt loam, Chowan silt loam, Wahee fine sandy loam e. Vegetation on tract Loblolly pine, bald cypress, Tulip poplar, Red Maple, giant cane f. Man-made features now on tract logging roads and associated culverts g. What is the CAMA Land Use Plan land classification of the site? (Consult the local land use plan.) Conservation Transitional Developed X Community Rural Other h. How is the tract zoned by local government? Agricultural AFLw1CA"70H P1. Are there wetlands on the site? X Yes _ No Coastal (marsh) Other 404 wetlands If yes, has a delineation been conducted? yes (Attach documentation, if available) 404 wetland delineation completed and approval by USACOE , Tracy Wheeler 5131106 m. Describe existing wastewater treatment facilities. None n. Describe location and type of discharges to waters of the state. (For example, surface runoff, sanitary wastewater, industrial/commercial effluent, "wash down" and residential discharges.) Surface runoff o. Describe existing drinking water supply source. None at this time 5. ADDITIONAL INFORMATION In addition to the completed application form, the following items must be submitted: © A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. If the applicant is not claiming to be the owner of said property, then forward a copy of the deed or other instrument under which the owner claims title, plus written permission from the owner to carry out the project. i. Is the proposed project consistent with the applicable zoning? X Yes No (Attach zoning compliance certificate, if applicable) There is no zoning for this property. j• Has a professional done for the tract? If yes, by whom? _ archaeological assessment been Yes X No k. Is the project located in a National Registered Historic District or does it involve a National Register listed or eligible property? Yes X No O An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale in black ink on an 8 1/2" by 11" white paper. (Refer to Coastal Resources Commission Rule 7J.0203 for a detailed description.) Please note that original drawings are preferred and only high quality copies will be accepted. Blue-line Revised 03/95 Form DCM-MP-1 prints or other larger plats are acceptable only if an adequate number of quality copies are provided by applicant. (Contact the U.S. Army Corps of Engineers regarding that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency personnel unfamiliarwith the area to the site. Include highway or secondary road (SR) numbers, landmarks, and the like. OA Stormwater Certification, if one is necessary. OA list of the names and complete addresses of the adjacent. waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Upon signing this form, the applicant further certifies that such notice has been provided. Name NC DOT c/o Gretchen Byrum Address 1929 North Road Street Phone Elizabeth Cites NC 27909 Name Mr. Lesley L Kersey Address P.Q. Box 623 Phone Edenton NC 27932 Name Address Phone 0 A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. Clearing and Grubbing Permit issued to Waterfront Group NC LLC on March 31, 2006. 0 A check for $250 made payable to the Department of Environment, Health, and Natural Resources (DEHNR) to cover the costs of processing the application. 0 A signed AEC hazard notice for projects in oceanfront and inlet areas. 0 A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A - 1 to 10) If the project involves the expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 6. CERTIFICATION AND PERMISSION TO ENTER ON LAND I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to conditions and restrictions contained in the permit. I certify that to the best of my knowledge, the proposed activity complies with the State of North Carolina's approved Coastal Management Program and will be conducted in a manner consistent with such program. I certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. This is the 27th day of July , 2006 Print Name Douglas A Dorman Signature Landoti ier or Autl'zed Agent Please indicate attachments pertaining to your proposed project. X DCM MP-2 Excavation and Fill Information X DCM MP-3 Upland Development X DCM MP-4 Structures Information • DCM MP-5 Bridges and Culverts DCM MP-6 Marina Development NOTE. Please sign and date each attachment in the space provided at the bottom of each form. Revised 03195 Form DCM -MP-2 I-ON EXCAVAT'y AND FILL (Except bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Describe below the purpose of proposed excavation or fill activities. All values to be given in feet. Average Final Existing Project Leneth Width Depth Depth Access channel (MLW) (N WI .) Canal Boat Basin (20'x 72') Boat ramp Rock groin N/A ------ N/A N/A (portion In pen water) 40' (portion in open water) 20' ----- ------- N/A ------ ------ ------ N/A ------- N/A __--- 01 Rock Breakwater Other (Excluding shoreline stabilization) 1. EXCAVATION a. Amount of material to be excavated from below MHW or NWL in cubic yards N/A b. Type of material to be excavated N/A c. L)oes the area to oe excavatea lncluae coastal wetlands? Yes X No d. Highground excavation in cubic yards: N/A 2. DISPOSAL OF EXCAVATED MATERIAL a. Location of disposal area N/A b. Dimensions of disposal area N/A c. Do you claim title to disposal area? N/A Yes No If no, attach a letter granting permission from the owner. d. Will a disposal area be available for future N/A maintenance? Yes No If yes, where? N/A Revised 03/95 Form DCM-NIP-2 e. Does the disposal area include any wetlands(marsh), SAVs or other wetlands? Yes No N/A coastal 4. OTHER FILL ACTIVITIES (Excluding Shoreline Stabilization) f. Does the disposal include any area in the water? Yes No N/A 3. SHORELINE STABILIZATION a. Type of shoreline stabilization X Bulkhead Riprap b. Length 50 linear feet c. Average distance waterward of MHW or NWL Ave. 2 feet d. Maximum distance water-ward of MHW or NWL Max. 2 feet e. Shoreline erosion during preceding 12 months Less than 1' (Source information) of Field observation f. Type of bulkhead or riprap material Wooden bulkhead g. Amount of fill in cubic yards to be placed below water level (1) Riprap N/A (2) Bulkhead fill 4 cubic yards h. Type of fill material Clean upland source of sand 1. Source of fill material_ On site upland soil source from construction of the proposed stormwater retention basins a. Will fill material be brought to site? N/A Yes No If yes, (1) Amount of material to be placed in the water. N/A (2) Dimensions of fill area. N/A (3) Purpose of fill N/A b. Will fill material be placed in coastal wetlands (marsh), SAVs or other wetlands? X Yes No If yes, (I)Dimensions of fill area 0.36 acres (2)Purpose of fill fill for road crossings 5.GENERAL a. How will excavated fill material be kept on site and erosion controlled? Silt fence will be placed in areas where construction/disturbance is proposed adjacent to the Yeopim River. b. What type of construction equipment will be used (for example, dragline, backhoe, hydraulic dredge)? Bulldozers, backhoe, pans, hydraulic pump and hand tools. C. Will wetlands be crossed in transporting equipment? X Yes No If yes, explain steps that will be taken to lessen environmental impacts. For section G and I. Wood mats will be used to cross the wetlands during road construction in order to reduce impacts to the wetlands while culverts and bridge are installed. Riversound Applicant or Project Name S-ti- gna`ure ?? q1-21,7,)4- Date Revised 03/95 Form DCM-MP-3 UPLAND DEVELOPMENT (Construction and/or land disturbing activities) Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. a. Type and number of buildings, facilities, units or structures proposed: Boating acility -boat ramp, pavilion with sidewalk and associated parking, and three common area piers. b. Number of lots or parcels One tract (224 residential lots) and four common access lots. c. Density (give the number of residential units and the units per acre) 1.15 DU Acre (257.7 acres)/(224 residential lots - Phase 1) =1.15 d. Size of area to be graded, filled or disturbed including roads, ditches, etc. All Roadways & culverts - 52 acres. Boat ramp (highground portion) - 640 s.f. Walkway - 252 s.f. River House - 1,120 s.f. Parking Area for boating facility - 16,760 s.f. Parking areas for common access's - 9,683 sf Disturbance Behind Bulkhead - 1,000 s.f. Total disturbance = 2,294,575 s.f. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan at least 30 days before land disturbing activity begins. If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? X Yes No If Yes, date submitted Fast Tract 7/28/06 e. f. List the materials (such as marl, paver stone, asphalt, or or concrete) to be used for paved surfaces. Asphalt road, concrete boat ramp, and turfstone pavers g. Give the percentage of the tract within 75 feet of MHW or NWL, or within 575 feet in the case of an Outstanding Resource Water, to be covered by impervious and/or built- upon surfaces, such as pavement, buildings, rooftops, or to be used for vehicular driveways or parking 0.14% In the 30' Public Trust Shoreline. h. Projects that require a CAMA Major Development Permit may also require a Stormwater Certification. Has a site development plan been submitted to the Division of Environmental Management for review? X Yes No If yes, date submitted FAST TRACT Submitted 7/28/06 i. Describe proposed method of sewage disposal. On site central wastewater system j• Have the facilities described in Item i. above received state or local approval? No (Attach appropriate documentation) k. Describe location and type of proposed discharges to waters of the state (for example, surface runoff, sanitary wastewater, industrial/commercial effluent, "wash down" and residential discharges). Surface runoff 1. Describe proposed drinking water supply source (e.g. well, community, public system, etc.) Public water supply (see attached sheet) in. Will water be impounded? X Yes If yes, how many acres? 16.84 acres n. If the project is an oceanfront development, when was the lot(s) platted and recorded? N/A No Riversound Applicant or Project Name Signa l g&& 6 Date Form DCM-MP-4 S ?RLTCiTS (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, e. Form DCM-MP-1. Be sure to complete all other sections of the Joint Application which relate to this proposed project. a. Dock(s) and/or Pier(s) (1) Commercial Private X Community (2) Number 5 (3) Length (IA) - 55' (2) - 50' (3) - 40' (1B)-52' (4)-50' (4) Width (1A) - 6' (2) - 6' (3) - 6' (1B)-6' (4)-6' (5) Finger Yes , No X Piers (i) Number N/A (ii) Length N/A (iii) Width N/A (6) Platform(s) X Yes _ No (3 gazebos) (i) Number 4 + (luncov.platfm) (ii) Length (1) 24' (3) 18.5' (2) 18.5' (4) 18.5' (iii) Width (1) 12' (3) 18.5' (2) 18.5' (4) 18.5' (7) Number of slips proposed N/A (8) Proximity of structure to adjacent riparian property lines (9) Width of water body Min. 232' Max. 652' (10) Water depth at waterward end of pier at MLW or NWL (lA)-5.2' (113) -5.4' (2)-5.0' (3)-4.9'&(4)6.0' b. Boathouse (including covered lifts) N/A (1) Commercial Private (2) Length N/A (3) Width N/A C. Groin (e.g. wood, sheetpile, etc.) N/A (1) Number N/A (2) Length N/A d. Breakwater (e.g. wood, sheetpile, etc.) N/A (1) Length N/A (2) Average distance from MHW, NWL, or wetlands N/A (3) Maximum distance beyond MHW, NWL or wetlands N/A Mooring buoys N/A (1) Commercial _ Private- Community (2) Number N/A (3) Description of buoy (Color, inscription, size, anchor, etc. N/A (4) Width of water body N/A (5) Distance buoy(s) to be placed beyond shoreline N/A f. Mooring structure (boatlift, mooring pilings, etc.) N/A (1) Commercial Community Private (2) Number N/A (3) Length N/A (4) Width N/A g. Other (Give complete description) Riversound Applicant of Project Name Signatu e gl?r/oG Date Form DCM-MP-5 BRID(`31ES AND CULVERTS Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-1. Be sure to complete all other sections of the Joint Application that relate to this (4) Will all, or a part of, the existing culvert be pro posed project. removed? (Explain) N/A Section A 1. BRIDGES g. Length of proposed bridge N/A h. Width of proposed bridge N/A a. Public Private X i. Height of proposed bridge above wetlands b. Type of bridge (construction material) N/A N/A N/A j. Will the proposed bridge affect existing water flow? Yes X No N/A c. Water body to be crossed by bridge N/A If yes, explain N/A N/A d. Water depth at the proposed crossing at MLW or NWL N/A k. Navigation clearance underneath proposed bridge e. Will proposed bridge replace an existing bridge? N/A Yes No if yes, 1. Will the proposed bridge affect navigation by (1) Length of existing bridge N/A reducing or increasing the existing navigable (2) Width of existing bridge N/A opening? Yes X No N/A (3) Navigation clearance underneath existing If yes, explain bridge N/A (4) Will all, or a part of, the existing bridge m. Will the proposed bridge cross wetlands containing be removed? (Explain) bridge N/A no navigable waters? Yes X No N/A If yes, explain N/A f. Will proposed bridge replace an existing culvert(s)? Yes X No N/A If yes, n. Have you contacted the U.S. Coast Guard concerning (1) Length of existing culvert N/A their approval? (2) Width of existing culvert N/A Yes X No (3) Height of the top of the existing culvert above If yes, please provide record of their action. the MHW or NWL N/A 2. CULVERTS a. Water body in which culvert is to be placed Tributaries of Middleton Creek & Yeopim River Revised 03/95 Form DCM-MP-5 Section A b. Number of culverts proposed 3 culverts c. Type of culvert (construction material, style) Corregated aluminum Pipe (CAP) d. Will proposed culvert replace an existing bridge? Yes X No If Yes, (1) Length of existing bridge N/A (2) Width of existing bridge N/A (3) Navigation clearance underneath existing bridge N/A (4) Will all, or a part of, the existing bridge be removed? (Explain) N/A e. Will proposed culvert replace an existing culvert? X Yes _ No if yes, (1) Length of existing culverts 31' (2) Width of existing culvert 18" (3) Height of the top of the existing culvert above the MHW or NWL 0.5' (4) Will all, or a part of, the existing culvert be removed? (Explain) All existing culverts will be removed and upgraded to improved culverts f. Length of proposed culvert 51' each g. Width of proposed culvert 24" each h. Height of the top of the proposed culvert above the MHW or NWL 0.9' i. Will the proposed culvert affect existing water flow? X Yes No If yes, explain Replacing existing culverts will restore Natural flow of existing wetlands. Existing culverts Do not function properly j. Will the proposed culvert affect existing navigation potential? Yes X No If yes, explain existing wetlands not navigable 3. EXCAVATION AND FILL a. Will the placement of the proposed bridge or culvert require any excavation below the MHW or NWL? X Yes No If yes, (1) Length of area to be excavated 55' (2) Width of area to be excavated 10' (3) Depth of area to be excavated 2' (4) Amount of material to be excavated in cubic yards 41 cubic yards b. Will the placement of the proposed bridge or culvert require any excavation within: Yes _ Coastal Wetlands _ SAVs X Other Wetlands If yes, (1) Length of area to be excavated 11' (2) Width of area to be excavated 30' (3) Amount of material to be excavated in cubic yards 12 cubic yards c. Will the placement of the proposed bridge or culvert require any highground excavation? X Yes No If yes, (1) Length of area to be excavated 14' (2) Width of area to be excavated 28' (3) Amount of material to be excavated in cubic yards 51 cubic yards d. If the placement of the bridge or culvert involves any excavation, please complete the following: (1) Location of the spoil disposal area On existing uplands adjacent to crossing. (2) Dimensions of spoil disposal area 30' x 100' (3) Do you claim title to the disposal area? X Yes No If no, attach a letter granting permission from the owner. (4)Will the disposal area be available for future maintenance? X Yes No (5)Does the disposal area include any coastal wetlands (marsh), SAVs, or other wetlands? Yes X No If yes, give dimensions if different from (2) above. (6)Does the disposal area include any area below the MHW or NWL? Yes X No If yes, give dimension if different from No. 2 above. e. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed below MHW or NWL? X Yes No If yes, (1) Length of area to be filled 35' Revised 03/95 Form DCM-MP-S Section A (2) Width of area to be filled 2' (3) Purpose of fill To place material in location of existing culvert to be replaced. f. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed within: Coastal Wetlands _ SAVs X Other Wetlands If yes, 418 sf (1) Length of area to be filled 12' avg. (2) Width of area to be filled 17' avg. (3) Purpose of fill For a road to cross from uplands to uplands. g. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed on highground? X Yes No If yes, (1) Length of area to be filled 40' (2) Width of area to be filled 48' (3) Purpose of fill To elevate road base above the proposed culverts. 4. GENERAL a. Will the proposed project involve any mitigation? X Yes No if yes, explain in detail The purchase of wetland Credits from NCEEP and conservation of wetlands onsite. b. Will the proposed project require any existing utility lines? Yes If yes, explain in detail c. Will the proposed project require the construction of any temporary detour structures? Yes X No If yes, explain in detail d. Will the proposed project require any work channels? Yes X No If yes, complete Form DCM-MP-2 the relocation of X No e. How will excavated or fill material be kept on site and erosion controlled? Any excavated or fill material will be stabilized as stated in the Sedimentation and Erosion control plan submitted to the state. f. What type of construction equipment will be used (for example, dragline, backhoe or hydraulic dredge)? Excavator, backhoe and grader g. Will wetlands be crossed in transporting equipment to project site? Yes X No If yes, explain steps that will be taken to lessen environmental impacts. li. Will the placement of the proposed bridge or culvert require any shoreline stabilization? Yes X No If yes, explain in detail u/31.SnLJv Applicant or Project Name Signa?_ I-A Z Date Revised 03/95 Form DCM-MP-5 ]0'3I81[DG]ES AND CULVERTS Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-1. Be sure to complete all other sections of the Joint Application that relate to this (4) Will all, or a part of, the existing culvert be proposed project. removed? (Explain) N/A Section C 1. BRIDGES g. Length of proposed bridge N/A h. Width of proposed bridge N/A a. Public Private X i. Height of proposed bridge above wetlands b. Type of bridge (construction material) N/A N/A N/A j. Will the proposed bridge affect existing water flow? Yes X No N/A c. Water body to be crossed by bridge N/A If yes, explain N/A N/A d. Water depth at the proposed crossing at MLW or NWL N/A k. Navigation clearance underneath proposed bridge e. Will proposed bridge replace an existing bridge? N/A Yes No if yes, 1. Will the proposed bridge affect navigation by (1) Length of existing bridge N/A reducing or increasing the existing navigable (2) Width of existing bridge N/A opening? Yes X No N/A (3) Navigation clearance underneath existing If yes, explain bridge N/A (4) Will all, or a part of, the existing bridge m. Will the proposed bridge cross wetlands containing be removed? (Explain) bridge N/A no navigable waters? Yes X No N/A If yes, explain N/A f. Will proposed bridge replace an existing culvert(s)? Yes X No N/A If yes, n. Have you contacted the U.S. Coast Guard concerning (1) Length of existing culvert N/A their approval? (2) Width of existing culvert N/A Yes X No (3) Height of the top of the existing culvert above If yes, please provide record of their action. the MHW or NWL N/A 2. CULVERTS a. Water body in which culvert is to be placed Tributaries of Middleton Creek & Yeopim River Revised 03/95 Form DCM-MP-5 Section C If yes, (1) Length of area to be excavated 58' b. Number of culverts proposed 5 culverts (2) Width of area to be excavated 22' (3) Depth of area to be excavated 2' c. Type of culvert (construction material, style) (4) Amount of material to be excavated in cubic Corregated aluminum Pipe (CAP) yards 95 cubic yards d. Will proposed culvert replace an existing bridge? b. Will the placement of the proposed bridge or culvert Yes X No require any excavation within: Yes if yes, - Coastal Wetlands - SAVs X Other Wetlands (1) Length of existing bridge N/A If yes, (2) Width of existing bridge N/A (1) Length of area to be excavated 20' (3) Navigation clearance underneath existing (2) Width of area to be excavated 32' bridge N/A (3) Amount of material to be excavated in cubic (4) Will all, or a part of, the existing bridge be yards 35cubic yards removed? (Explain) N/A c. Will the placement of the proposed bridge or culvert require any highground excavation? e. Will proposed culvert replace an existing culvert? X Yes No X Yes No If yes, _ if yes, (1) Length of area to be excavated 22' (1) Length of existing culverts 38' (2) Width of area to be excavated 30' (2) Width of existing culvert 18" (3) Amount of material to be excavated in cubic (3) Height of the top of the existing culvert above yards. 25 cubic yards the MHW or NWL 3 5' _ (4) Will all, or a part of, the existing culvert be d. If the placement of the bridge or culvert involves any removed? (Explain) All existing culverts will excavation, please complete the following: improved culverts be removed and upgraded to (1) Location of the spoil disposal area _ _ On existing uplands adjacent to crossing. (2) Dimensions of spoil disposal area f. Length of proposed culvert 54' each 30' x 150' (3) Do you claim title to the disposal area? g. Width of proposed culvert 36" each X Yes No If no, attach a letter granting permission from h. Height of the top of the proposed culvert above the the owner. MHW or NWL 1.5' (4)Will the disposal area be available for future i. Will the proposed culvert affect existing water flow? maintenance? X Yes No X Yes No (5)Does the disposal area include any coastal If yes, explain Replacing existing culverts will restore wetlands (marsh), SAVs, or other wetlands? Natural flow of existing wetlands. Existing culverts Yes X No Do not function properly If yes, give dimensions if different from (2) above. (6)Does the disposal area include any area below j. Will the proposed culvert affect existing navigation the MHW or NWL? Yes X No potential? Yes X No If yes, give dimension if different from No. 2 above. If yes, explain existing wetlands not navigable e. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material 3. EXCAVATION AND FILL described in Item d. above) to be placed below MHW or NWL? Yes X No If yes, a. Will the placement of the proposed bridge or culvert (1) Length of area to be filled N/A require any excavation below the MHW or NWL? X Yes No Revised 03195 Form DCM-MP-S Section C (2) Width of area to be filled N/A (3) Purpose of fill N/A f. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed within: - Coastal Wetlands - SAVs X Other Wetlands If yes, 5,144 sf (1) Length of area to be filled 166' max. (2) Width of area to be filled 32' max (3) Purpose of fill For the proposed road to cross 404 wetlands and meet NCDOT road design standards g. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed on highground? X Yes No If yes, (1) Length of area to be filled 110' (2) Width of area to be filled 30' (3) Purpose of fill To elevate road base above the proposed culverts. 4. GENERAL a. Will the proposed project involve any mitigation? X Yes No If yes, explain in detail The purchase of wetland Credits from NCFEP and conservation of wetlands onsite. b. Will the proposed project any existing utility lines? If yes, explain in detail _ c. Will the proposed project require the construction of any temporary detour structures? Yes X No If yes, explain in detail d. Will the proposed project require any work channels? Yes X No If yes, complete Form DCM-MP-2 require the relocation of Yes X No e. How will excavated or fill material be kept on site and erosion controlled? Any excavated or fill material will be stabilized as stated in the Sedimentation and Erosion control plan submitted to the state. f. What type of construction equipment will be used (for example, dragline, backhoe or hydraulic dredge)? Excavator, backhoe and grader g. Will wetlands be crossed in transporting equipment to project site? Yes X No If yes, explain steps that will be taken to lessen environmental impacts. h. Will the placement of the proposed bridge or culvert require any shoreline stabilization? Yes X No If yes, explain in detail Applicant or Project Name Signature 3/2s'/nom' Date Revised 03/95 Form DCM-MP-5 ID ?I?D GES AN CULVERTS Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. (4) Will all, or a part of, the existing culvert be removed? (Explain) N/A Section D 1. BRIDGES a. Public Private X b. Type of bridge (construction material) N/A N/A c. Water body to be crossed by bridge N/A N/A d. Water depth at the proposed crossing at MLW or NWL N/A e. Will proposed bridge replace an existing bridge? Yes No If Yes, (1) Length of existing bridge N/A (2) Width of existing bridge N/A (3) Navigation clearance underneath existing bridge N/A (4) Will all, or a part of, the existing bridge be removed? (Explain) bridge N/A f. Will proposed bridge replace an existing culvert(s)? Yes X No N/A If yes, (1) Length of existing culvert N/A (2) Width of existing culvert N/A (3) Height of the top of the existing culvert above the MHW or N WL N/A 2. CULVERTS a. Water body in which culvert is to be placed Tributaries of Middleton Creek & Yeopim River g. Length of proposed bridge N/A h. Width of proposed bridge N/A i. Height of proposed bridge above wetlands N/A j. Will the proposed bridge affect existing water flow? Yes X No N/A If yes, explain N/A k. Navigation clearance underneath proposed bridge N/A 1. Will the proposed bridge affect navigation by reducing or increasing the existing navigable opening? Yes X No N/A If yes, explain m. Will the proposed bridge cross wetlands containing no navigable waters? Yes X No N/A If yes, explain N/A n. Have you contacted the U.S. Coast Guard concerning their approval? Yes X No If yes, please provide record of their action. Revised 03/95 Form DCM-MRS Section D (2) Width of area to be excavated N/A (3) Depth of area to be excavated N/A b. Number of culverts proposed 3 culverts (4) Amount of material to be excavated in cubic yards N/A c. Type of culvert (construction material, style) Corregated aluminum Pipe (CAP) b. Will the placement of the proposed bridge or culvert require any excavation within: d. Will proposed culvert replace an existing bridge? - Coastal. Wetlands - SAVs X Other Wetlands Yes X No If yes, if yes, (1) Length of area to be excavated 12' ' (1) Length of existing bridge N/A (2) Width of area to be excavated 36 (2) Width of existing bridge N/A (3) Amount of material to be excavated in cubic (3) Navigation clearance underneath existing yards 24 cubic yards bridge N/A (4) Will all, or a part of, the existing bridge be c. Will the placement of the proposed bridge or culvert removed? (Explain) N/A require any highground excavation? X Yes No If yes, e. Will proposed culvert replace an existing culvert? (1) Length of area to be excavated 12' X Yes No (2) Width of area to be excavated 18' _ If yes, (3) Amount of material to be excavated in cubic (1) Length of existing culverts 38' yards. 37 cubic yards (2) Width of existing culvert 18" (3) Height of the top of the existing culvert above d. If the placement of the bridge or culvert involves any the MHW or NWL N/A excavation, please complete the following: (4) Will. all, or a part of, the existing culvert be (1) Location of the spoil disposal area removed? (Explain) All existing culverts will On existing uplands adjacent to crossing, be removed and upgraded to improved culverts (2) Dimensions of spoil disposal area 30' x 40' (3) Do you claim title to the disposal area? f. Length of proposed culvert 54' each X Yes No If no, attach a letter granting permission from g. Width of proposed culvert 36" each the owner. h. Height of the top of the proposed culvert above the (4)Will the disposal area be available for future MHW or NWL N/A maintenance? X Yes No i. Will the proposed culvert affect existing water flow? (5)Does the disposal area include any coastal Yes X No wetlands (marsh), SAVs, or other wetlands? If yes, explain Yes X No If yes, give dimensions if different from (2) above. j. Will the proposed culvert affect existing navigation (6)Does the disposal area include any area below potential? Yes X No the MHW orNWL? Yes X No If yes, explain existing wetlands not navigable If yes, give dimension if different from No. 2 above. e. Will the placement of the proposed bridge or culvert 3. EXCAVATION AND FILL result in any fill (other than excavated material described in Item d. above) to be placed below MHW or NWL? Yes X No a. Will the placement of the proposed bridge or culvert If yes, require any excavation below the MHW or NWL? (1) Length of area to be filled N/A _ Yes X No If yes, (1) Length of area to be excavated N/A Revised 03/95 Form DCM-MP-S Section D (2) Width of area to be filled N/A (3) Purpose of fill N/A f. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed within: _ Coastal Wetlands _ SAVs X Other Wetlands If yes, 2,664 sf (1) Length of area to be filled 74' max. (2) Width of area to be filled 26' max (3) Purpose of fill For the proposed road to cross 404 wetlands and meet NCDOT road design standards g. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed on highground? X Yes No If yes, (1) Length of area to be filled 50' (2) Width of area to be filled 18' (3) Purpose of fill To elevate road base above the proposed culverts. 4. GENERAL a. Will the proposed project involve any mitigation? X Yes No if yes, explain in detail The purchase of wetland Credits from NCEEP and conservation of wetlands onsite. b. Will the proposed project any existing utility lines? . If yes, explain in detail c. Will the proposed project require the construction of any temporary detour structures? Yes X No If yes, explain in detail d. Will the proposed project require any work channels? Yes X No If yes, complete Form DCM-MP-2 require the relocation of _ Yes X No e. How will excavated or fill material be kept on site and erosion controlled? Any excavated or fill material will be stabilized as stated in the Sedimentation and Erosion control plan submitted to the state. f. What type of construction equipment will be used (for example, dragline, backhoe or hydraulic dredge)? Excavator, backhoe and grader g. Will wetlands be crossed in transporting equipment to project site? Yes X No If yes, explain steps that will be taken to lessen environmental impacts. h. Will the placement of the proposed bridge or culvert require any shoreline stabilization? Yes X No If yes, explain in detail 2iUE/LSa?c?N?? Applicant or Project Name Signatur Date Revised 03/95 Form DCM-MP-S BRIDGES AND CULVERTS Attach this form to Joint Application for CAMA Major Permit; Form DCM-MP-I. Be sure to complete all other sections of the Joint Application that relate to this (4) Will all, or a part of, the existing culvert be proposed project. removed? (Explain) N/A Section E 1. BRIDGES g. Length of proposed bridge N/A h. Width of proposed bridge N/A a. Public Private X - i. Height of proposed bridge above wetlands b. Type of bridge (construction material) N/A N/A N/A j. Will the proposed bridge affect existing water flow? Yes X No N/A c. Water body to be crossed by bridge N/A If yes, explain N/A N/A d. Water depth at the proposed crossing at MLW or N WL N/A k. Navigation clearance underneath proposed bridge e. Will proposed bridge replace an existing bridge? N/A Yes No if yes, 1. Will the proposed bridge affect navigation by (1) Length of existing bridge N/A reducing or increasing the existing navigable (2) Width of existing bridge N/A opening? Yes X No N/A (3) Navigation clearance underneath existing If yes, explain bridge N/A (4) Will all, or a part of, the existing bridge m. Will the proposed bridge cross wetlands containing be removed? (Explain) bridge N/A no navigable waters? Yes X No N/A If yes, explain N/A f. Will proposed bridge replace an existing culvert(s)? Yes X No N/A If yes, n. Have you contacted the U.S. Coast Guard concerning (1) Length of existing culvert N/A their approval? (2) Width of existing culvert N/A Yes X No (3) Height of the top of the existing culvert above If yes, please provide record of their action. the MHW or NWL N/A 2. CULVERTS a. Water body in which culvert is to be placed Tributaries of Middleton Creek & Yeopim River Revised 03/95 Form DCM-MP-5 Section E If yes, (1) Length of area to be excavated 60' b. Number of culverts proposed 3 culverts (2) Width of area to be excavated 12' (3) Depth of area to be excavated 2.2' c. Type of culvert (construction material, style) (4) Amount of material to be excavated in cubic Corregated aluminum Pipe (CAP) yards 59 Cubic Yards d. Will proposed culvert replace an existing bridge? b. Will the placement of the proposed bridge or culvert Yes X No require any excavation within: yes If yes, _ Coastal Wetlands _ SAVs X Other Wetlands (1) Length of existing bridge N/A If yes, (2) Width of existing bridge N/A (1) Length of area to be excavated 12' (3) Navigation clearance underneath existing (2) Width of area to be excavated 10' bridge N/A (3) Amount of material to be excavated in cubic (4) Will all, or a part of, the existing bridge be yards 9 cubic yards removed? (Explain) N/A c. Will the placement of the proposed bridge or culvert require any highground excavation? e. Will proposed culvert replace an existing culvert? X Yes No X Yes No If yes, _ if yes, (1) Length of area to be excavated 12' (1) Length of existing culverts 55' (2) Width of area to be excavated 46' (2) Width of existing culvert 18" (3) Amount of material to be excavated in cubic (3) Height of the top of the existing culvert above yards. 65 cubic yards the MHW or NWL Below NWL -0.5 (4) Will all, or a part of, the existing culvert be d. If the placement of the bridge or culvert involves any removed? (Explain) All existing culverts will excavation, please complete the following: be removed and upgraded to improved culverts (1) Location of the spoil disposal area On existing uplands adiacent to crossing. (2) Dimensions of spoil disposal area f. Length of proposed culvert 50' each 30' x 120' (3) Do you claim title to the disposal area? g. Width of proposed culvert 24"each X Yes No If no, attach a letter granting permission from h. Height of the top of the proposed culvert above the the owner. i. MHW or NWL 0.9' Will the proposed culvert affect existing water flow? (4)Will the disposal area be available for future X Yes No maintenance? X Yes No if yes, explain Rep] acin existing xisting culverts will restore (5)Does the disposal area include any coastal Natural flow of existing wetlands. Existing culverts wetlands (marsh), SAVs, or other wetlands? Do not function properly Yes X No If yes, give dimensions if different from (2) above. j. Will the proposed culvert affect existing navigation (6)Does the disposal area include any area below potential? Yes X No the MHW or NWL? Yes X No If yes, explain existing wetlands not navigable If yes, give dimension if different from No. 2 above. e. Will the placement of the proposed bridge or culvert 3. EXCAVATION AND FILL result in any fill (other than excavated material described in Item d. above) to be placed below MHW or NWL? X Yes No a. Will the placement of the proposed bridge or culvert If yes, require any excavation below the MHW or NAT? (1) Length of area to be filled 60' X Yes No Revised 03/95 Form DCM-MP-S d. Will the proposed project require any work channels? Section E Yes X No If yes, complete Form DCM-MP-2 (2) Width of area to be filled 2' How will excavated or fill material be kept on site e (3) Purpose of fill To replace material after . and erosion controlled? Any excavated or fill material removal of existing culvert. will be stabilized as stated in the Sedimentation and Erosion control plan submitted to the state, f. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed within: What type of construction equipment will be used f _ Coastal Wetlands _ SAVs X Other Wetlands . dragline, backhoe or hydraulic dredge)? (for example If yes, 1,504 sf (1) Length of area to be filled 82' max. , Excavator, backhoe and grader (2) Width of area to be filled 22' max (3) Purpose of fill For the proposed road to cross 404 wetlands and meet NCDOT road design standards g. Will wetlands be crossed in transporting equipment to project site? Yes X No g. Will the placement of the proposed bridge or culvert If yes, explain steps that will be taken to lessen result in any fill (other than excavated material environmental impacts. described in Item d. above) to be placed on highground? X Yes No If yes, (1) Length of area to be filled 52' h. Will the placement of the proposed bridge or culvert (2) Width. ofarea_tabe filled 42' require any shoreline stabilization? (3) Purpose offill To elevate road base above the Yes X No nronosed culverts. If yes, explain in detail 4. GENERAL a. Will the proposed project involve any mitigation? X Yes No If yes, explain in detail The purchase of wetland Credits from NCEEP and conservation of wetlands onsite. b. Will the proposed project any existing utility lines? . If yes, explain in detail c. Will the proposed project require the construction of any temporary detour structures? Yes X No If yes, explain in detail require the relocation of _ Yes X No rU ?-wND Applicant or Project Name Signature Rl4L< Date Revised 03/95 Form DCM-MP-5 lB1tIDGES AlvD CULVERTS Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-I. Be sure to complete all other sections of the Joint Application that relate to this proposed project. (4) Will all, or a part of, the existing culvert be removed? (Explain) N/A Section F 1. BRIDGES a. Public Private X b. Type of bridge (construction material) N/A N/A c. Water body to be crossed by bridge N/A d. Water depth at the proposed crossing at MLW or NWL N/A e. Will proposed bridge replace an existing bridge? Yes No If yes, (1) Length of existing bridge N/A (2) Width of existing bridge N/A (3) Navigation clearance underneath existing bridge N/A (4) Will all, or a part of, the existing bridge be removed? (Explain) bridge N/A f. Will proposed bridge replace an existing culvert(s)? Yes X No N/A If yes, (1) Length of existing culvert N/A (2) Width of existing culvert N/A (3) Height of the top of the existing culvert above the MHW or NWL N/A 2. CULVERTS a. Water body in which culvert is to be placed Tributaries of Middleton Creek & Yeopim River g. Length of proposed bridge N/A h. Width of proposed bridge N/A i. Height of proposed bridge above wetlands N/A j. Will the proposed bridge affect existing water flow? Yes X No N/A If yes, explain N/A k. Navigation clearance underneath proposed bridge N/A 1. Will the proposed bridge affect navigation by reducing or increasing the existing navigable opening? Yes X No N/A If yes, explain m. Will the proposed bridge cross wetlands containing no navigable waters? Yes X No N/A If yes, explain N/A n. Have you contacted the U.S. Coast Guard concerning their approval? Yes X No If yes, please provide record of their action. Revised 03/95 Form DCM-M -5 Section F b. Number of culverts proposed 3 culverts c. Type of culvert (construction material, style) Corregated aluminum Pipe (CAP) d. Will proposed culvert replace an existing bridge? Yes X No If Yes, (1) Length of existing bridge N/A (2) Width of existing bridge N/A (3) Navigation clearance underneath existing bridge N/A (4) Will all, or a part of, the existing bridge be removed? (Explain) N/A e. Will proposed culvert replace an existing culvert? Yes X No If Yes, (1) Length of existing culverts N/A (2) Width of existing culvert N/A (3) Height of the top of the existing culvert above the MHW or NWL N/A (4) Will all, or a part of, the existing culvert be removed? (Explain) f. Length of proposed culvert 45' each g. Width of proposed culvert 15" each h. Height of the top of the proposed culvert above the MHW or NWL N/A i. Will the proposed culvert affect existing water flow? Yes No N/A If yes, explain Will the proposed culvert affect existing navigation potential? Yes X No If yes, explain existing wetlands not navigable 3. EXCAVATION AND FILL a. Will the placement of the proposed bridge or culvert require any excavation below the MHW or NWL? _ Yes X No If yes, (1) Length of area to be excavated N/A (2) Width of area to be excavated N/A (3) Depth of area to be excavated N/A (4) Amount of material to be excavated in cubic yards N/A b. Will the placement of the proposed bridge or culvert require any excavation within: Yes _ Coastal Wetlands - SAVs X Other Wetlands If yes, (1) Length of area to be excavated 28' (2) Width of area to be excavated 8' (3) Amount of material to be excavated in cubic yards 17 cubic yards c. Will the placement of the proposed bridge or culvert require any highground excavation? X Yes No If yes, (1) Length of area to be excavated 12' (2) Width of area to be excavated 21' (3) Amount of material to be excavated in cubic yards. 10 cubic yards d. If the placement of the bridge or culvert involves any excavation, please complete the following: (1) Location of the spoil disposal area On existing uplands adiacent to crossing. (2) Dimensions of spoil disposal area 30' x 20' (3) Do you claim title to the disposal area? X Yes No If no, attach a letter granting permission from the owner. (4)Will the disposal area be available for future maintenance? X Yes No (5)Does the disposal area include any coastal wetlands (marsh), SAVs, or other wetlands? Yes X No If yes, give dimensions if different from (2) above. (6)Does the disposal area include any area below the MHW or NWL? Yes X No If yes, give dimension if different from No. 2 above. e. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed below MHW or NWL? Yes X No If yes, (1) Length of area to be filled N/A Revised 03/95 Form DCM-MP-5 Section F e. How will excavated or fill material be kept on site and erosion controlled? Any excavated or fill material (2) Width of area to be filled N/A will be stabilized as stated in the Sedimentation and (3) Purpose of fill N/A Erosion control plan submitted to the state. f. Will the placement of the proposed bridge or culvert result in any fill. (other than excavated material f. What type of construction equipment will be used described in Item d. above) to be placed within: (for example, dragline, backhoe or hydraulic dredge)? _ Coastal Wetlands _ SAVs X Other Wetlands Excavator, backhoe and grader If yes, 1,200 sf (1) Length of area to be filled 45' max. (2) Width of area to be filled 21' max (3) Purpose of fill For the proposed road to cross g• Will wetlands be crossed in transporting equipment to 404 wetlands and meet NCDOT road design project site? Yes X No standards If yes, explain steps that will be taken to lessen environmental impacts. g. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed on highground? X Yes No h. Will the placement of the proposed bridge or culvert If yes, require any shoreline stabilization? (1) Length of area to be filled 40' Yes X No (2) Width of area to be filled 20' If yes, explain in detail (3) Purpose of fill To elevate road base above the proposed culverts 4. GENERAL a. Will the proposed project involve any mitigation? X Yes No if yes, explain in detail The purchase of wetland Credits from NCEEP and conservation of wetlands onsite. b. Will the proposed project any existing utility lines? If yes, explain in detail _ c. Will the proposed project require the construction of any temporary detour structures? Yes X No If yes, explain in detail d. Will the proposed project require any work channels? Yes X No If yes, complete Form DCM-MP-2 require the relocation of Yes X No A?=(- Out-'o - Applicant or Project Name Signature r Spa s/a-? Date Revised 03/95 Form DCM-M -5 I?R ff 13 G E`? A N D CULVERTS Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-1. Be sure to complete all other sections of the Joint Application that relate to this (4) Will all, or a part of, the existing culvert be proposed project. removed? (Explain) N/A Section G 1. BRIDGES g. Length of proposed bridge N/A h. Width of proposed bridge N/A a. Public Private X i. Height of proposed bridge above wetlands b. Type of bridge (construction material) N/A N/A N/A j. Will the proposed bridge affect existing water flow? Yes X No N/A c. Water body to be crossed by bridge N/A If yes, explain N/A N/A d. Water depth at the proposed crossing at MLW or NWL N/A k. Navigation clearance underneath proposed bridge e. Will proposed bridge replace an existing bridge? N/A Yes No if yes, 1. Will the proposed bridge affect navigation by (1) Length of existing bridge N/A reducing or increasing the existing navigable (2) Width of existing bridge N/A opening? Yes X No N/A (3) Navigation clearance underneath existing If yes, explain bridge N/A (4) Will all, or a part of, the existing bridge m. Will the proposed bridge cross wetlands containing be removed? (Explain) bridge N/A no navigable waters? Yes X No N/A If yes, explain N/A f. Will proposed bridge replace an existing culvert(s)? Yes X No N/A If yes, n. Have you contacted the U.S. Coast Guard concerning (1) Length of existing culvert N/A their approval? (2) Width of existing culvert N/A Yes X No (3) Height of the top of the existing culvert above if yes, please provide record of their action. the MHW or NVVL N/A 2. CULVERTS a. Water body in which culvert is to be placed Tributaries of Middleton Creek & Yeopim River Revised 03195 Form DCM-MP-5 Section G b. Number of culverts proposed 3 culverts c. Type of culvert (construction material, style) Corregated aluminum Pipe (CAP) d. Will proposed culvert replace an existing bridge? Yes X No If Yes, (1) Length of existing bridge N/A (2) Width of existing bridge N/A (3) Navigation clearance underneath existing bridge N/A (4) Will all, or a part of, the existing bridge be removed? (Explain) N/A e. Will proposed culvert replace an existing culvert? Yes X No If Yes, (1) Length of existing culverts N/A (2) Width of existing culvert N/A (3) Height of the top of the existing culvert above the MHW or NWL N/A (4) Will all, or a part of, the existing culvert be removed? (Explain) f. Length of proposed culvert 52' each g. Width of proposed culvert 18"each h. Height of the top of the proposed culvert above the MHW or NWL N/A i. Will the proposed culvert affect existing water flow? _ Yes X No if yes, explain j. Will the proposed culvert affect existing navigation potential? Yes X No If yes, explain existing wetlands not navigable 3. EXCAVATION AND FILL a. Will the placement of the proposed bridge or culvert require any excavation below the MHW or NWL? _ Yes X No If yes, (1) Length of area to be excavated N/A (2) Width of area to be excavated N/A (3) Depth of area to be excavated N/A (4) Amount of material to be excavated in cubic yards N/A b. Will the placement of the proposed bridge or culvert require any excavation within: Yes _ Coastal Wetlands _ SAVs X Other Wetlands If yes, (1) Length of area to be excavated 52' (2) Width of area to be excavated 8' (3) Amount of material to be excavated in cubic yards 15 cubicyards c. Will the placement of the proposed bridge or culvert require any highground excavation? _ Yes X No If yes, (1) Length of area to be excavated N/A (2) Width of area to be excavated N/A (3) Amount of material to be excavated in cubic yards. N/A d. If the placement of the bridge or culvert involves any excavation, please complete the following: (1) Location of the spoil disposal area N/A (2) Dimensions of spoil disposal area N/A (3) Do you claim title to the disposal area? N/A Yes No If no, attach a letter granting permission from the owner. (4)Will the disposal area be available for future maintenance? Yes No N/A (5)Does the disposal area include any coastal wetlands (marsh), SAVs, or other wetlands? Yes No N/A If yes, give dimensions if different from (2) above. (6)Does the disposal area include any area below the MHW or NWL? Yes X No If yes, give dimension if different from No. 2 above. e. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed below MHW or NWL? _ Yes No N/A If yes, (1) Length of area to be filled N/A Revised 03/95 Form DCM-MP-S Section G (2) Width of area to be filled N/A (3) Purpose of fill f. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed within: _ Coastal Wetlands _ SAVs X Other Wetlands If yes, 2,302 (1) Length of area to be filled 32' max. (2) Width of area to be filled 60'max (3) Purpose of fill For the proposed road to cross 404 wetlands and meet NCDOT road design standards g. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed on highground? X Yes No If yes, (1) Length of area to be filled 40' (2) Width of area to be filled 45' (3) Purpose of fill To elevate road base above the proposed culverts. 4. GENERAL a. Will the proposed project involve any mitigation? X Yes No If yes, explain in detail The purchase of wetland Credits from NCEEP and conservation of wetlands onsite. b Will the proposed project any existing utility lines? . If yes, explain in detail c. Will the proposed project require the construction of any temporary detour structures? Yes X No If yes, explain in detail d. Will the proposed project require any work channels? Yes X No If yes, complete Form DCM-MP-2 require the relocation of Yes X No e. How will excavated or fill material be kept on site and erosion controlled? Any excavated or fill material will be stabilized as stated in the Sedimentation and Erosion control plan submitted to the state. f. What type of construction equipment will be used (for example, dragline, backhoe or hydraulic dredge)? Excavator, backhoe and grader g. Will wetlands be crossed in transporting equipment to project site? Yes X No If yes, explain steps that will be taken to lessen environmental impacts. h. Will the placement of the proposed bridge or culvert require any shoreline stabilization? Yes X No If yes, explain in detail AL&'Z, 5?r-D Applicant or Project Name Signature/--,' Date Revised 03/95 Form DCM-MP-5 ]BRIDGES AND CULVERTS Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Section H 1. BRIDGES a. Public Private X b. Type of bridge (construction material) N/A c. Water body to be crossed by bridge N/A d. Water depth at the proposed crossing at MLW or NWL N/A e. Will proposed bridge replace an existing bridge? Yes No if yes, (1) Length of existing bridge N/A (2) Width of existing bridge N/A (3) Navigation clearance underneath existing bridge N/A (4) Will all, or a part of, the existing bridge be removed? (Explain) bridge N/A f. Will proposed bridge replace an existing culvert(s)? Yes X No N/A If yes, (1) Length of existing culvert N/A (2) Width of existing culvert N/A (3) Height of the top of the existing culvert above the NOW or NWL N/A 2. CULVERTS a. Water body in which culvert is to be placed Tributaries of Middleton Creek & Yeopim River (4) Will all, or a part of, the existing culvert be removed? (Explain) N/A g. Length of proposed bridge N/A h. Width of proposed bridge N/A i. Height of proposed bridge above wetlands N/A i. Will the proposed bridge affect existing water flow? Yes X No N/A If yes, explain N/A k. Navigation clearance underneath proposed bridge N/A 1. Will the proposed bridge affect navigation by reducing or increasing the existing navigable opening? Yes X No N/A If yes, explain m. Will the proposed bridge cross wetlands containing no navigable waters? Yes X No N/A If yes, explain N/A n. Have you contacted the U.S. Coast Guard concerning their approval? Yes X No If yes, please provide record of their action. Revised 03/95 Form DCM-MP-5 Section H b. Number of culverts proposed 3 culverts c. Type of culvert (construction material, style) Corregated aluminum Pipe (CAP) d. Will proposed culvert replace an existing bridge? Yes X No If Yes, (1) Length of existing bridge N/A (2) Width of existing bridge N/A (3) Navigation clearance underneath existing bridge N/A (4) Will all, or a part of, the existing bridge be removed? (Explain) N/A (3) Depth of area to be excavated N/A (4) Amount of material to be excavated in cubic yards N/A b. C. e. Will proposed culvert replace an existing culvert? Yes X No If Yes, (1) Length of existing culverts 37' (2) Width of existing culvert 15" (3) Height of the top of the existing culvert above d. the MW or NWL No NWL, N/A (4) Will all, or a part of, the existing culvert be removed? (Explain) All exfstfng culverts will be removed and upgraded to improved culverts £ Length of proposed culvert 54' each g. Width of proposed culvert 27" each h. Height of the top of the proposed culvert above the MHW or N WL N/A i. Will the proposed culvert affect existing water flow? _ Yes X No If yes, explain j. Will the proposed culvert affect existing navigation potential? Yes X No If yes, explain existing wetlands not navigable 3. EXCAVATION AND FILL a. Will the placement of the proposed bridge or culvert require any excavation below the MHW or NWL? _ Yes X No If yes, (1) Length of area to be excavated N/A (2) Width of area to be excavated N/A Will the placement of the proposed bridge or culvert require any excavation within: Yes _ Coastal Wetlands _ SAVs X Other Wetlands If yes, (1) Length of area to be excavated 54' (2) Width of area to be excavated 8' (3) Amount of material to be excavated in cubic yards 16 cubic yards Will the placement of the proposed bridge or culvert require any highground excavation? X Yes -No If yes, (1) Length of area to be excavated 10' (2) Width of area to be excavated 50' (3) Amount of material to be excavated in cubic yards. 75 cubic yards If the placement of the bridge or culvert involves any excavation, please complete the following: (1) Location of the spoil disposal area On existing uplands adjacent to crossing (2) Dimensions of spoil disposal area 40' x 65' (3) Do you claim title to the disposal area? X Yes No if no, attach a letter granting permission from the owner. (4)Will the disposal area be available for future maintenance? X Yes No (5)Does the disposal area include any coastal wetlands (marsh), SAVs, or other wetlands? Yes X No If yes, give dimensions if different from (2) above. (6)Does the disposal area include any area below the NMW or NWL? X Yes _ No If yes, give dimension if different from No. 2 above. e. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed below MHW or NWL? _ Yes X No If yes, (1) Length of area to be filled N/A Revised 03195 Form DCM-MP-S Section H (2) Width of area to be filled N/A (3) Purpose of fill N/A f. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed within: _ Coastal Wetlands _ SAVs X Other Wetlands If yes, 1,308 sf (1) Length of area to be filled 27'max. (2) Width of area to be filled 62'max (3) Purpose of fill For the proposed road to cross 404 wetlands and meet NCDOT road design standards g. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed on highground? X Yes No If yes, (1) Length of area to be filled 40' (2) Width of area to be filled 32' (3) Purpose of fill To elevate road base above the proposed culverts 4. GENERAL a. Will the proposed project involve any mitigation? X Yes No If yes, explain in detail The purchase of wetland Credits from NCEEP and conservation of wetlands onsite. b. Will the proposed project any existing utility lines? If yes, explain in detail _ c. Will the proposed project require the construction of any temporary detour structures? Yes X No If yes, explain in detail d. Will the proposed project require any work channels? Yes X No If yes, complete Form DCM-MP-2 require the relocation of _ Yes X No e. How will excavated or fill material be kept on site and erosion controlled? Any excavated or fill material will be stabilized as stated in the Sedimentation and Erosion control plan submitted to the state. f. What type of construction equipment will be used (for example, dragline, backhoe or hydraulic dredge)? Excavator, backhoe and grader g. Will wetlands be crossed in transporting equipment to project site? Yes X No If yes, explain steps that will be taken to lessen environmental impacts. h. Will the placement of the proposed bridge or culvert require any shoreline stabilization? Yes X No If yes, explain in detail yii&.50w"'o Applicant or Project Name Signatu e Date Revised 03/95 Form DCM-MP-5 ?R I D", Gff -- vn' S A N D CULVERTS Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. (4) Will all, or a part of, the existing culvert be removed? (Explain) N/A Section I 1. BRIDGES a. Public Private X b. Type of bridge (construction material) Wood c. Water body to be crossed by bridge N/A d. Water depth at the proposed crossing at MLW or NWL N/A e. Will proposed bridge replace an existing bridge? Yes X No If Yes, (1) Length of existing bridge N/A (2) Width of existing bridge N/A (3) Navigation clearance underneath existing bridge N/A g. Length of proposed bridge 50' h. Width of proposed bridge 18' i. Height of proposed bridge above wetlands j. Will the proposed bridge affect existing water flow? Yes X No If yes, explain N/A k. Navigation clearance underneath proposed bridge N/A 1. Will the proposed bridge affect navigation by reducing or increasing the existing navigable opening? Yes X No If yes, explain (4) Will all, or a part of, the existing bridge m. Will the proposed bridge cross wetlands containing be removed? (Explain) bridge N/A no navigable waters? Yes X No f. Will proposed bridge replace an existing culvert(s)? If yes, explain Yes X No If yes, n. Have you contacted the U.S. Coast Guard concerning (1) Length of existing culvert N/A their approval? N/A (2) Width of existing culvert N/A Yes X No (3) Height of the top of the existing culvert above If yes, please provide record of their action. the MHW or NWL N/A 2. CULVERTS a. Water body in which culvert is to be placed Tributary of Middleton Creek and Yeopim River Revised 03/95 Form DCM-MP-5 Section I b. Number of culverts proposed N/A c. Type of culvert (construction material, style) N/A d. Will proposed culvert replace an existing bridge? Yes X No If yes, (1) Length of existing bridge N/A (2) Width of existing bridge N/A (3) Navigation clearance underneath existing bridge N/A (4) Will all, or a part of, the existing bridge be removed? (Explain) N/A e. Will proposed culvert replace an existing culvert? Yes _ No N/A If yes, (1) Length of existing culverts N/A (2) Width of existing culvert N/A (3) Height of the top of the existing culvert above the MHW or NWL No NWL, N/A (4) Will all, or a part of, the existing culvert be removed? (Explain) N/A £ Length of proposed culvert N/A g. Width of proposed culvert N/A h. Height of the top of the proposed culvert above the MHW or NWL N/A i. Will the proposed culvert affect existing water flow? Yes X No If yes, explain Will the proposed culvert affect existing navigation potential? Yes X No If yes, explain 3. EXCAVATION AND FILL a. Will the placement of the proposed bridge or culvert require any excavation below the MHW or NWL? _ Yes X No If yes, (1) Length of area to be excavated N/A (2) Width of area to be excavated N/A (3) Depth of area to be excavated N/A (4) Amount of material to be excavated in cubic yards N/A b. Will the placement of the proposed bridge or culvert require any excavation within: No _ Coastal Wetlands - SAVs _ Other Wetlands If yes, (1) Length of area to be excavated N/A (2) Width of area to be excavated N/A (3) Amount of material to be excavated in cubic yards N/A c. Will the placement of the proposed bridge or culvert require any highground excavation? _ Yes X No If yes, (1) Length of area to be excavated N/A (2) Width of area to be excavated N/A (3) Amount of material to be excavated in cubic yards. N/A d. If the placement of the bridge or culvert involves any excavation, please complete the following: (1) Location of the spoil disposal area N/A (2) Dimensions of spoil disposal area N/A (3) Do you claim title to the disposal area? N/A _ Yes No if no, attach a letter granting permission from the owner. (4)Will the disposal area be available for future maintenance? _ Yes No N/A (5)Does the disposal area include any coastal wetlands (marsh), SAVs, or other wetlands? Yes No N/A If yes, give dimensions if different from (2) above. (6)Does the disposal area include any area below the MHW or NWL? _ Yes _ No N/A If yes, give dimension if different from No. 2 above. e. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed below MHW or NWL? _ Yes X No If yes, (1) Length of area to be filled N/A (2) Width of area to be filled N/A (3) Purpose of fill N/A Revised 03/95 Form DCM-MP-S Section I f. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed within: _ Coastal Wetlands _ SAVs - Other Wetlands If yes, N/A (1) Length of area to be filled N/A (2) Width of area to be filled N/A (3) Purpose of fill N/A g. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed on highground? X Yes No If yes, (1) Length of area to be filled 20' (2) Width of area to be filled 20' (3) Purpose of fill To elevate road base for the approach to the bridge. GENERAL a. Will the proposed project involve any mitigation? X Yes No If yes, explain in detail The purchase of wetland Credits from NCEEP and conservation of wetlands onsite. b. Will the proposed project any existing utility lines? If yes, explain in detail c. Will the proposed project require the construction of any temporary detour structures? Yes X No if yes, explain in detail d. Will the proposed project require any work channels? Ye- X No If yes, complete Form DCM-MP-2 require the relocation of _ Yes X No e. How will excavated or fill material be kept on site and erosion controlled? Any land disturbance or fill material will be stabilized as stated in the Sedimentation and Erosion control plan submitted to the state. f. What type of construction equipment will be used (for example, dragline, backhoe or hydraulic dredge)? Excavator, backhoe and grader g. Will wetlands be crossed in transporting equipment to project site? X Yes No If yes, explain steps that will be taken to lessen environmental impacts. Wooden mats will placed over wetland crossing if needed during construction. h. Will the placement of the proposed bridge or culvert require any shoreline stabilization? Yes X No If yes, explain in detail '(Z'-'XZv Applicant or Project Name signa Date Rc? ise,l 13195 N N W y? 3 0 O 0 Ul 0 w -0 O 0 0 0 w ti w m -C I 0 w I- . O Nb? N NA? O N 3 -i O O Ul 0 w .n 0 0 O C3 w ru w O ni ?n m (1 a O u fi A fJ []? Ps 013 13 0m M w _. J H ry? N O © o d D ' co (p m ' ° Er g 30.0 co rVol a -0. w 0- CL 2.? m co ATLANTIC ENVIRONMENTAL CONSULTANTS, LLC P.O. Box 3266, Kitty Hawk, NC 27949 (252) 261-7707 fax (252) 261-2965 July 17, 2006 Lesley L. Kersey P.O. Box 623 Edenton, NC 27932 Dear Mr. Kersey, CERTIFIED MAIL RETURN RECEIPT REQUESTED This letter is with reference to the enclosed CAMA Major Permit Application and plats for the Waterfront Group NC, LLC who own property adjacent to your property on the Yeopim River in Chowan County, North Carolina. The Waterfront Group NC, LLC is proposing to improve their property for a 224 Lot residential subdivision (Riversound Phase 1). The proposed project includes: a boating facility to access the Yeopim River; shoreline stabilization within the proposed boat ramp area; a pavilion and parking for the boat ramp, three community piers with gazebos, a subdivision road and central wastewater system. This letter serves as notification to you of the proposed activity for this project adjacent to your waterfront property. If you have no objection to our client's proposal, please sign and date the bottom of this letter and return it to our office. I have also enclosed a copy of this letter for your records. If we have not heard from you within 30 days it will be considered that you have no comments to this project. If you have any questions please do not hesitate to call me at 252-261-7707 or contact the NC Division of Coastal Management. Sincerely, Douglas A. Dorman /I ,Lv SIG ATURE DATE ATLANTIC ENVIRONMENTAL CONSULTANTS, LLC P.O. Box 3266, Kitty Hawk, NC 27949 (252) 261-7707 fax (252) 261-2965 CERTIFIED MAIL RETURN RECEIPT REQUESTED July 17, 2006 Lesley L. Kersey P.O. Box 623 Edenton, NC 27932 Dear Mr. Kersey, This letter is with reference to the enclosed CAMA Major Permit Application and plats for the Waterfront Group NC, LLC who own property adjacent to your property on the Yeopim River in Chowan County, North Carolina. The Waterfront Group NC, LLC is proposing to improve their property for a 224 Lot residential subdivision (Riversound Phase 1). The proposed project includes: a boating facility to access the Yeopim River; shoreline stabilization within the proposed boat ramp area; a pavilion and parking for the boat ramp, three community piers with gazebos, a subdivision road and central wastewater system. This letter serves as notification to you of the proposed activity for this project adjacent to your waterfront property. If you have no objection to our client's proposal, please sign and date the bottom of this letter and return it to our office. I have also enclosed a copy of this letter for your records. If we have not heard from you within 30 days it will be considered that you have no comments to this project. If you have any questions please do not hesitate to call me at 252-261-7707 or contact the NC Division of Coastal Management. Sincerely, Douglas A. Dorman SIGNATURE DATE ATLANTIC ENVIRONMENTAL CONSULTANTS, LLC P.O. Box 3266, Kitty Hawk, NC 27949 (252) 261-7707 fax (252) 261-2965 CERTIFIED MAIL RETURN RECEIPT REQUESTED July 17, 2006 Gretchen Byrum 1929 North Road Street Elizabeth City, NC 27909 Dear Ms. Byrum, This letter is with reference to the enclosed CAMA Major Permit Application and plats for the Waterfront Group NC, LLC who own property adjacent to your property on the Yeopim River in Chowan County, North Carolina. The Waterfront Group NC, LLC is proposing to improve their property for a 224 Lot residential subdivision (Riversound Phase 1). The proposed project includes: a boating facility to access the Yeopim River; shoreline stabilization within the proposed boat ramp area; a pavilion and parking for the boat ramp, three community piers with gazebos, a subdivision road and central wastewater system. This letter serves as notification to you of the proposed activity for this project adjacent to your waterfront property. If you have no objection to our client's proposal, please sign and date the bottom of this letter and return it to our office. I have also enclosed a copy of this letter for your records. If we have not heard from you within 30 days it will be considered that you have no comments to this project. If you have any questions please do not hesitate to call me at 252-261-7707 or contact the NC Division of Coastal Management. Sincerely, Douglas A. Dorman SIGNATURE DATE CHOWAN COUNTY, NORTH CAROLINA EDENTON, NORTH CAROLINA 27932 August 14, 2006 Larry Bragg RiverSound Development 17505 W Catawba Avenue Suite 350 Cornelius, NC 28031 Dear Larry: Chowan County has agreed to provide water supply to the RiverSound Development with the developer being responsible for the construction of the maii distribution lines to the subdivision. RiverSound Engineers have discussed the design with the County Engiieer and the design being proposed is in complete compliance with County and State standards. IfI can provide any further information, please do not hesitate to give me a call. Sincerely, CA/Copeland Luther.County Manager. ebb FROM :RTLANT[C ENVIRONMENTAL CONSULT FAX NO. :2522612965 Jul. 28 2006 12:3691 P2 Elliot Harwell Waterfront Croup NC, LLC 17505 West Catawba Ave. Suite 350 Cornelius, NC 20031 f, Elliot Hamel] authorize Atlantic Environmental Consultants, LLC (AEC) to ripply for environmental permits on behalf of the Waterfimt Group NC, LLC for the Riversound Project IS Chowan County, North Carolina. ?. ?l• ??p AuthorQation Date ENVIRONMENTAL SERVICES, INC- 524 New Hope Road Raleigh, NC 27610 919-212-1760 / Facsimile 919-212-1707 www.esinc.ce MEMORANDUM TO: Josh Witherspoon FROM: Scott Seibel DATE: 11 April 2006 RE: Norcum-Hughes Cultural Resource Assessment Research was conducted at the North Carolina Office of State Archaeology (OSA) and the North Carolina State Historic Preservation Office (NCSHPO) Survey and Planning Branch to determine if any previously recorded cultural resources occur within the boundaries or in the vicinity of the Norcum-Hughes property in Chowan County, North Carolina. This research occurred on 31 March 2006 and 11 April 2006, respectively. Research revealed that no previously recorded archaeological sites are located within the boundaries of the property and that no previously recorded historic buildings or structures are located within a 0.75-mile radius of the property. If federal permitting, such as from the United States Army Corps of Engineers (ALOE), is necessary for the proposed project, regulatory coordination with the NCSHPO is required. Any comment by the NCSHPO on the proposed project would apply only to the permit areas as defined by the permitting agency. If no federal permitting is required for the proposed project, no further cultural resource work is necessary. .... _ ......... .................... SITE z SNH ET 4 SHOWS SOT RAMP. PARKING AND RIVER HOUSE ALUEMAr&E SOUND ?. •?? mo:-........? VICINITY MAP o i ? 16 NTS ?' i •\ 'Q f1 +' LETS Or WIAM I NOTE: SHEET 5 SHOWS THE 1ST OF 3 COMMUNITY ACCESS EASEMENTS AND GAZEBO AD,TACANT PROP \ r;* { ,. ?• s ^? LESLIE L. s 1w ?. r. .A L"m ULLAMM NQ: SHEET 6 SHOWS THE 2ND OF 3 COMMUNITY ACCESS EASEMENTS AND GAZEBO' NOTE: s a? a i a'i ±tl SHEET 7 SHOWS THE 3RD OF 3 COMMUNITY` ; - ACCESS EASEMENTS AND GAZEBO NOTE: AREAS LABLED AS A-•1 INDICATE CROSSINGS Y DETAI ON SWE LAN S jS SHOWN IN - ;S a.Y oars ar WRAWS O(1lEASK)N ? ? iJ4?' { _ ?+[ coq J - - 140.00, ID z ?l - "ACANMOOF ROPER TY N T II d? ffOOJ SHEET 1 OF 17 WATERFRONT GROUP RIVERSOUND PROJECT CHOWAN COUNTY - NORTH CAROLINA ,4TL,4NT/C EN11NONMENT4L CONSULTANTS, LLC GRAPHIC SCALE 1 = 1 0 0 0 A0. 90.r 9266, K/TTY /1.4jYf(, AC. 27949 ?252)261-7707, email roMomam®ao1. cam DATE: 7/27/06 REVISED: 8/25/06 FILE: 06-015 DRAWN BY: DOUG D r •, • • / aaf LOT So LOT LOp LAM 47 LOT 36: Y C?j PROPOSED S PONDS (0.74 ACRES) LOT 48 LOT• ' LOT IAT 4 LOT 33 .' = 0 40. LOT 50 i' LOT 3 f 30 .? / :; •:: ?+ LOT 51 LOT J LOT 1? /? /;. .;4?.• ;:•: ? ? LOT 29 LOT 14 :.? . u' a, LOT 28 4;?''..; : ::;;::•:::. Ltd •.. ;: u? 13 z 4 ?:t:• ? ••? ,? 0 LOT 69 WK 41 LoT 1 Q I ` O O °a P? ?? LOT 7o LOT 20 LOT 1 t '?'••? J Q1 `?, LOT 71 LOT 10 ?, ; • •:',? °ir 6' ' ,, LOT Q LOT 9 ..• ;. .: wr L, LOYT .•.;...? LOT 7 t . O cn Lx .9° LOT 91 r w o LOT 90 Z ro U F- LOT 73 LOT5? L > LOT 09 LOT 4 0 m LOT 74 to w Z .r' .y`: ? : :•: •:. ':5}' r LoT aQ ? C7 . T? :1 •: -'L :: ?j, oit - n• LOT 76 LoT 3 fn .Z. 40 1- ~ \ N •? • M N • V'?'Y.-:s:U P,. a •? • :•: i i :.;? ?5 + J LOT 10 J r 4 . LOT 7Q WT Z LOT 110 •` ?; `Oa WT 08 ?,r • LOT 119 LOT 10:1 ,? ' •• '' r t • T 79 LDT 77 85 LOT j LOT 135 LOT 134 LOT 120 LOT 123 ` LOT y LOT 81 70 LOT 1 r LOT 82 _:?• IDT 83 LOT IAT 138 LOT 121 124 LOT 04 LOT 137 LOT 122 L, /ao W N LOT 1 r +? t?T •+,i? .tom t.? f•:- .rj? 1 ?•;:; LOT 139 ? ? ? ? - ;•,:• ?..;.;.;•;';:;:;a?' ::' :;:...; C??T ?;? LOT 140 LOTik?3$S? N rr -•`i.;1?• •?rf'°? ?,. `; tar 14s r: LIMITS OF CONFIRMED 404 WETLAND SIGNED BY THE USACOE 5/31/06 X. . 1 %• Iar 147 I OT 188 LOT 220 I .•? 1 LOT 148 LOT 1 L'!??'? i • ?' I= 149__ LOT 103 • . r: T- •? i.' IAT 221 ?. I • :•.': ~ LOT 171 % LOT 160 LOT 182 PROPOSED STORMWATER r +': ?. ..,::• : ' ,Iar 161 LOT 172 •::;: POND (1 ACRE) T=: :•` LOT lb4`?'\:•;'• •?, LOT 222 N??.1 LOT 162 LOT 173 LOT 181 C :::::::.::::::::; :;C'• ?'i LOT 165 ?.;. LOT 153 LOT 174 y :• LOT 150 LOT 180 LOT 223 ;F t ?. PARKING LOT 175 LOT 167 AREA E1 GEND: LOT 178 i° LOT 179 F `.. ,? ?•LOT IbQ?°. -' 4• ;.:1l ': '•.•; : •': • a UMITS OF CONFIRMED 404 WETLAND SIGNED OY THE USACOE 5/31/06 LOT 159 '•j "? ° y LOT 187 - • - • - • - EXISTING 404 WETLAND UNE 44 is _ :.:?:? ?, ,? ? ? .,.•:`,'..? N ti '':. •« LOT 184 LOT 185 VACUUM STATION FOR LOT 194' WASTEWATER TREATMEN • LOT 195 1 L.IAT 108 .:•: .. PARKER LO? 180 g?ti?e tst =? LOT 196 rr¢¢ LOT 217 -t C t i,t ! i 1Zi j'r l t'ftitt?TtfitTtit• • j+?L01. 197 I'OT 214 LOT z16 PROPOSED STORMWATER POND (0.4 ACRES) LOT 198 LoT 216 SHEET 2 OF 17 LOT 209 - w- WATERFRONT GROUP RIVERSOUND PROJECT CHOWAN COUNTY - NORTH CAROLINA . A7LAN7/C ENl10?0Nti1EN7AL CONSUL7ANTS, LLC GRAPHIC SCALE 1 400' PO BOX 3266, KITTYHQIyff, NO.. 27949 (252)261-7707, email roxdormam®ad com DATE: 7/27/06 REVISED: FILE: 06-015 DRAWN BY: DOUG D LOT 108 LOT 200 ?p ?j. LOT ? } . LOT 201 LOT 205 POO ?' LOT 211 AT 20 f IA T 212 LIMITS OF CONFIRMED 404 WETLAND SIGNED BY THE USACOE 5/31/06 his AL A. A. A AL AL AL Ati Iv--? ?AL _ LIMITS OF CONFIRMED 404 WETLAND SIGNED BY THE USACOE 5 31 O6 A4 WASTE WATER TREATMENT A, AL n FACILITY AX CL A AL AL A6 AL _\,`A, g AL ^INF1U?y= 11 Plo -? - TEMPORARY SOIL STOCKPILE AREA 2 ACRES ?t? At A. AL A. m :7 zg IN A -c7 AL \ 'P_ONt? IL rte A. i PROPOSED FLAT WOODEN BF OVER 404 WETLANDS (18' x - AL \ m AL 1 AL AIL AIL 1 A, AL A. AL NOTE: THE 404 WETLANDS LINES OUTSIDE THE AREA SIGNED ON 5/31/06 BY THE USACOE HAVE BEEN CONFIRMED BY THE USACOE IN THE FIELD BUT A SIGNED PLAT IS NOT AVAILABLE. Ol? ? j1 oO LEGEND: WAITS OF CONFIRMED 404 VvETLAND \ •,:.°,°.:,:.:, SIGNED BY THE USACOE 5/31/0 31/06 THE 404 WETLANDS LINES OUTSIDE THE AREA SIGNED ON 5/31/06 BY THE USACOE HAVE \ BEEN CONFIRMED BY THE USACOE IN T11E FIELD \ BUT A SIGNED PLAT IS NOT AVAILABLE. S'A IEET 3 OF 17 WATERFRONT GROUP RIVERSOUND PROJECT CHOWAN COUNTY - NORTH CAROLINA 99 .4TL.4NT/C ENI?/RONMENTAL CONSULTANTS, LLC GRAPHIC SCALE 1 400' P.O. BOX 3266, K/TTY NA{f?itr IV. 0. 2799 (252)261-7707, email mdorman®aol com DATE: 7/27/06 REVISED: FILE: 06-015 DRAWN BY: DOUG D LIMITS OF CONFIRMED 404 WETLAND SIGNED BY THE USACOE 5/31/06 v ., MAGNET]C •- CY) N W lu \• - o 0) 1 PE D C N :\ 0 D r m •.•\ rn n '?. 0 m 6-W o >U) 00 011 c?cn r- i'? b N Z ^ Cm 05! 0c) I>Iar rn 0 NZ Z- N0 O \ F ?y T \ , :1 zN vm o? Z C / ' nn o ?? 4 v V l1 \ tq r5 x aN Pzz> rP W °- \ En °: rm NCO-% v= k Z v & o A ox I ? \ m m r '\ Z -p ° Ju O \? \ N =tiG7C \ \ 0 nn „ b .0 ch 'v O N o \ ` •• \ 20 N N? N 0 77 P_ O r C ?ru F m ^1a c? Z T o 1 M V N m X -,x 4; p cn st 44, s C40 rri l 1 0 v / / w rQ4. ,t m t. o `? / n ;u-u 00 PI-I N-R / Ro U) / om D'v 1 A O c Ln >Z v oo '\ D % T a m '*? cNn m r D -? z \. D J n ,< :,; papa Fp ?o 4 t_ .?o,A \ ••? cu 114 75 o Gaya ?_ ° a y N ° o C ,? x . v Itxi o' f' \ \MAGNETIC rn m ----------- w Z A ?'\ Al rn .\ x x U) U) z z -\ O -?\ j:j m rn zZ? 9m z-U m? m D z Z G1 -p ?;u D O r i0 0m 0 m W rnW = o 9),- 0 v n 01 5 In m v N i n D Z r -p ? . m / \ G7 D -o n U) 0 D r m 0 r m o = ?oz o? o ? N3a c 0 (A \ v ^ 0 1 I !11 7- O z --< o X m ? D z 0 0 o -? () ? o V) 3: ? c- 0 O D X -? o z C ? D D N m . ao / . 0 y \ oN M \ (Ap-\ ••• Z Z v 5 rn0 tQ \ Ui O x O m UO O O p N 1\.. \ \ U I \ '. N I^ F' v II ?I /I ?I t I J? 91 0 0 N a 1 N N v r`n o o u M rq 00 N r-q0 1 /W>, 01 yy y U) c O •`\?? FR -4 0 CA O ?\ \ o I \? rn cn N 6 U , A n i0 H \ N. \ _ _ fa y \ ? f9 ? I ? Iu) • \ Ii ?• MAGNETIC 'U z z ;i ti I W V N czi czi ? } o i v i G D ' _O ` C7 (n ? 0_ r 9u) r? m'V f m Q Q;' O A K'l Ohm N { s O N n C O ? Gs m p o - = 0 ::E Z OD N y Z > < m o ;u X ?' C7 ° a z 0 - Z m cry a o u V! 0 O k > z ?? >y D 1 1 C O ? 4 m N ' N ? q b: cn ? 0 N mWA U oa 3'? O \a N ?D ? N ? A m C3 m ° CA En 00 1?-? x \? 1= m Z ? . o• M -4 ? EY, I -? I K r F ! I= ? I I ? I Y I 1= 1 F _ toy . a0v ; o D m 0 I ? Icn ? 1 I m .. N I 1 m zg? 0 ?Q+ m orv ZZN H ?;4 I z K rn W W K l `. J I G m? AZ Z Q -u ° A - ? 50 °v al to cD O = v m W 0 v N 0) 0 rn 0 I I a _ z z ? ? o 0 O p D l J 0 r m O ?3 o? c ?' r Fri s o N f = C Z 00 1- D K 1 0 < m ? 0 X D OO C V 0 a Z o m cn o (f) 1 0 U) N l m V n? o p 0 y 3 1 ' 1 o .? o n j nC v o n c? ?IM 0 ,4 1 ? 1 I 1 I I I ? I I ? I b ? I • o I I I 1 1 ? ? N I I I 1 ? I o N I I ^A m too°v a? I N m w r l n m i l o ! MAGNETIC 1 xo o? = ' = cnm o I o v vi ?I ?? - -4 1 `tea ( 1__ O v 5 - ? i Z I C LI1-al N z v U! sn I 1 Ww U i ?I ? I Q ( i I I to v \ loo I= J I ID '. m -? co N to a m p rn m l ` 1z I ..` i I l ?I ` f~ K 1A'S' z 1 N v D r?* V N rn ;t7 D C-) U D r O m Ily z s U 0 C m N = ?z 03 D -I ' o ; D C7 zo o ? C: n z0 m O ~ O -? = L. 0 0 D o-'0z o c zD o w O ? G7 3?? N 0 o . t? o??Z 0 n Z m 0 Z a A O "U O N m v a 0 N 8 10 5 0 4 z W IU Z a i - NOR -CULVUU- TO BE I N iL WA NY Bi5 I-TAL ED ' o* Q' y 0 OR _ _WA r _ _ _1.OYB W NWL_ ? ?_ --I -W O f7 O U u 1* PIt o MLIE ° It GAD C I OSS M AREA "'N' A/ ? I 1 I •' 1 1 1`_ 8 pOPHA ASLT R I _ 2 . N 1 1 co 1 1 1 1 1 CUL NOTES 404 ATM&W LMW ANY ADDITIONAL UTILITY LINES SUCH AS ELECTRIC. CABLE, TELEPHONE. EEC. WILL BE WITHIN THE UM(TS $ OF THE R/W AND THE PROPOSED FILL AND THERE WILL BE NO ADDIITONAL WETLAND IMPACTS CORRUGATED ALLUMINUM PIPE (CAP) 3 O 51', 24' OIA. '11? \ 404 MUMD L= Ak PROPOSED 404 WETLAND FILL 210 SF 1 i PROPOSED 404 WETLAND . i i FILL 208 SF 1 . i i ? L _. _? 1 ?.t? alp XIIISR 1 ' ilk !! 3 E TT ' f i t2' 1 El GE NA• 1 I MKE PROPOSED FILL AREA (418 Sr) 1 , 1 EXISTING 404 %%ETLAND LINE MUS771VG 404 i LTUND LTNE 1 1 -$ --- EXISTING CONTOUR LINES ONFHE O 5131106 BY 771E 1 ; -9 - PROPOSED CONTOUR LINES -12' %W- PROPOSED 12' WATER MIAII P L.AM MEW o G°30D AD Cf°30o SS MG AREA "M `- 6-' -- SHEET 9 OF 17 404 WETLAND CROSSING - AREA A WATERFRONT GROUP RIVERSOUND PROJECT CHOWAN COUNTY - NORTH CAROLINA 99 9 47L-4N71'0 EN11f0N?ENTAL CONSULTANTS, LLC GRAPHIC SCALE 1 2 P.O. BOX 3266, ff/TTY NAMff, N.C. 279-9 (252)2,61-7707, a -mall roxdo1-inan®ao1.com DATE: 7/26/06 REVISED: 8/25/06 FILE: 06-015 DRAWN BY: DOUG D. ` U F W Z Q 404 W17S7Z= t i JL I PROPOSED 404 WERAND FILL 1.178 SF alliC l{Q]?; ANY ADDRIONAL U1ILTTY LINES SUCH AS ELECTRIC. CABLF- TELEPHONE, ETC WILL BE WITHIN THE LIMITS OF THE R/W AND THE PROPOSED FILL AND THERE W1LLE3E NO ADDITIONAL WETLAND IMPACTS ZUSMG 404 WMAND LINE CONFRA(M 5191106 BY THE USACOE 1 f 1 ; 1 ; 1 ; f ? 1 ; i i r i i i A m; RW -+- 20• i 1 ' 1 1 ' 1 1 I ; I 1 ' 1 ' 1 r -10-- 1 ? I / EXIST; G 1 ?Lc 1r ; i'1 1 I •? 404 II -nAAV LWZ 'r`` I?. ic. J?k .dL 4L NOTES ANY DITION& UTILITY LINES SUCH AS ELECTRIC. OCFB E ND E, THE PROOPPOSED FILL ?AND E LIMBS T1iERE WILL BE NO ADDMO14AL WETLAND IMPACTS 1EGEND: PROPOSED FILL AREA (1.178 SF) EXISTING 404 VWVLAND LINE ----$ -- EXISTING CONTOUR UNES -12' WM- PROPOSED 12' WATER MIAN SHEEN' 10 OF 17 404 WETLAND CROSSING - AREA B WATERFRONT GROUP RIVERSOUND PROJECT CHOWAN COUNTY -NORTH CAROLINA .23 ATLANT/C ENl?/IRONS ZN- TAL CONSULTANTS, LLC GRAPHIC SCALE 1 202 PO 90X 3266, K/TTYH.4{Yf, &C. 279,9 (252)261-7707, email Ioxdannan®aol com DATE: 7/26/06 REVISED: 8/25/06 FILE: 06-015 DRAWN BY: DOUG D. - - -- - - - - --•O .74.: v M p. -PA OP. ADE-0-CL -Pi G O Ex. GRAD O C PI _ - - ----- TQ•_TjE_t S[All E9_ _ _ _ o? _?_ _ _- ?__ pG3OME ° ROAD CROSJM AREA uncn / v f / /• /• I % y ! A?Ftq? m % /ry / 20' I • ? /`•{!?-r` •• tit t'k ANY?ADDTTIONAL UTILITY LINES SUCH AS ELECTRIC. CAUZ NE, ETC WILL DE WITHIN THE UUITS OF THE R/W D THE PROPOSED FILL AND THERE WILL QE NO ADDITIONAL WETLAND WPACfS CORRUGATED ALLUUINULI PIPE (CAP) 5 O 54'. 3C DIA yk 4 tkt tart 404 TT'SII. iND ZXM PLAN V? tLt 1 G SO" PROPOSED 404 IVETUINDI I FILL 1.306 SF tJt' % f \ 404 WMAND LU / q c)y r / 12'??J ? / ? N/ 41 1 CRGSS?M(G Al SHEET 11 OF 17 404 WETLAND CROSSING - AREA C WATERFRONT GROUP RIVERSOUND PROJECT CHOWAN COUNTY -NORTH CAROLINA 41UNT/C EN!/LRON1WSNTAL CONSULTANTS, LLC GRAPHIC SCALE 1 20' P.0. 90,r 3266, K/TTY 11M M, N.0.. 279 9 (252)261-7707, a -mail Ioxdorman®ool com DATE: 7/26/06 REVISED: 8/25/06 FILE: 06-015 DRAWN BY: DOUG D. EXISTING 404 WL77 ND LINE CONFmim 513ilo6 BY TIC USACOE LEGEND: PROPOSED FILL AREA (5.144 ST) EMSTINO 404 WETLAND LINE ---2- EXISTING CONTOUR LINES -4- PROPOSED CONTOUR LINES -8" WN - PROPOSED 8" WATER MAN -SS- PROPOSED SANITARY SEWER LINE ?o - - Da. D 00 9=0 K01 f? Q 4 o ?? 'Y Sni ' IF ROHL E ° ROAD lei Il OSSM A uLA nnDaa r U F W U t 1 f % 1 PRO POSED ? ' i DIRT t t \ ROAD J 3 AIL 111 ZO, \ ? ? ^ 1 3:Jc ? - 1 1 3't 1 i - 3L':t. FlLLPt SF WETLAND , Y 1 1 ?C:c l': CORRUGATED ALLUMINUM PIPE " j (CAP) 3 O W. 36 OIA :? 1 1 3'} 311 V.? \ r " AIL / 1 1 { 404 wMUNDS 1 , 404 WB7rAl c ` rJ 'yam!y 1 E73=G10" CUM= F if j ' PROPOSED 404 WETLAND • FILL 1.341 SF 1 j i , ` 31v?t 3? ? _ ? 31L 1 3? ANY ADDITIONAL UTILITY UNES SUCH AS ELECTRIC. / EXISTING 404 WPIS ZAND LINE comm 3f o 5/31/08 BY THE j .: CABLE. TELEPHONE. ETC. WILL DE WITHIN THE LIMITS 1 Ak OF THE R/W AND THE PROPOSED FILL AND \ THERE WILL BE NO ADDITIONAL WETLAND IMPACTS USACOE 1 ''I 3WL 1 iL a t' 1D R LEGEND: j >Ir • ? ? PROPOSED TILL AREA (2.664 SF) j EXISTING 404 WETUIND LINE all - EA III) ID 4- ? M MEE i6AD CRO P S (G _ OPOSED CONTOUR LINES G?1p?1 L5/i-dil V V c? SHEET 12 OF 17 -12" %VM- PROPOSED tr WATER MIAN 404 WETLAND CROSSING - AREA D WATERFRONT GROUP RIVERSOUND PROJECT CHOWAN COUNTY - NORTH CAROLINA 4TLANT/C E?1/v//?ON#ENT,4L CONSULTANTS, LLC GRAPHIC SCALE 99 ! 1 = 20 P.O. 90X 3266, f(/TTYHA1yi,, N.0 279V (252)261-7707, e moil rordolman®oolcom DATE: 7/26/06 REVISED: 8/25/06 FILE: 06-015 DRAWN BY: DOUG D. ?o 0 A - '- -- -- ROP G -- _ EX .GRAD r i ' t 'C• ,; u - - AP . LOC tLow M 0 _ Ana ?-• _ _ro p _ L4 U + ROAD CROSSM AREA A F 404 MUM LM ?. / PROPOSED' fir . 1 ASPHALT ! ROAD arJt PROPOSED 404 WMMD FlLL 371 SF / ilk 6 • , 404 Ah77AND LlNF, ALL r ) 1 CORRUGATED ALLUMINUM PIPE ?; :{? f"x 1 (CAP) 3 O 50'. 24' DU1 ANY CABLE. TELFPHONEUTILITY LINES EfCUWILL ?MIfTF?i1N T?HEC LIMITS z ? ,??i f:3ry 1 I OF THE R W ND THE PROPOSED FILL AND THERE WILL DE NO ADDITIONAL WERAND 11tPACfS .ik PROPOSED 404 WERNJD 1 FILL 1,133 SF , ? ^ h co ,111c col EXL=G 404 WMMAND LANE ~ USACNFIIWO 5131106 BY THE ` i oZG 1 I El ENA. \ I 1t R I ; 12' ! ® PROPOSED FILL AREA (1.504 SF) I ; - EXISTING 404 WETLAND LINE I J i 1 •--6---- EXISTING CONTOUR LINES 1 -9- PROPOSED CONTOUR LINES ! -8' WM - PROPOSED W WATER IRAN AL IL -SS- PROPOSED SANITARY SEWER LINE PLAN MEW o ROAD CROSSM AREA °°Fl°°° . ? SHEET 13 OF 17 r 404 WETLAND CROSSING - AREA E WATERFRONT GROUP RIVERSOUND PROJECT CHOWAN COUNTY - NORTH CAROLINA 99 ,,47Z'-4N71'0 ENVh?ONMENTAL CONSULTANTS, LLC GRAPHIC SCALE 1 = 20' P.O. BOX J2, 6, /(/TTY HA{yif, N.C. 279 9 (252)291-7707, e-mail I-oMormamlaol.com DATE: 7/26/06 REVISED: 8/25/06 FILE: 06-015 DRAWN BY: DOUG D. fA ?? PIPf? _, - - -' SRADFQ_ GI -P.IP.E_ 10 W N N O c? 'n I (L O + + P-ROME ROAD CROSSM AREA OF" 1 1 ? 1 t z 1 1 U F ILA 1 ? ' 1 PROPOSED. c? g \ DIRT ROAD 1 3 ; 20' CORRUGATED ALLUMINUM PIPE (CAP) 3 O 45'. 15' DUl PFR`OO OS 404 WE AND I!L c{ ? y i 1ti 9Jc ` ; ! 140TES: ANY ADDITIONAL UTILITY LINES SUCH AS ELECTRIC, I, 1 1 ,r CABLE. TELEPHONE, ETC. WILL BE WITHIN THE LIMITS ' OF THE R/W AND THE PROPOSED FILL AND 1 THERE WILL BE NO ADDITIONAL WETIAND IMPACTS PROPOSED 404 WETLAND FILL 645 SF ,O ? OAADD - N ?- ; 12' LEGEND: PLAN M V EW ROAD CROSS M ADt?(i?1 PROPOSED FILL AREA (1.200 SF) EJOSTING 404 WETLAND LINE ' - -- 2-.-- EXISTING CONTOUR LINES E7a5=G 404 WETLAND LINE r -4 - PROPOSED CONTOUR LINES CONFRZAM 5/31/08 BY 77ZE -12' WM- PROPOSED 12' WATER MIAN USACOE SHEET 14 OF 17 404 WETLAND CROSSING - AREA F WATERFRONT GROUP RIVERSOUND PROJECT CHOWAN COUNTY - NORTH CAROLINA .4TL4NT/C ENI?/RONYZNTAL CONS11ZR /TS, LLC GRAPHIC SCALE 1 = 20" P.O. BOX 3266, KITTY 11,41 K A.C. 279 9 (252)261-7707, email i-omdorman0ao%com DATE: 7/26/06 REVISED: 8/25/06 FILE: 06-015 DRAWN BY. DOUG D. in 5 O ?kQE C P1P.C7?. - DCs G1?AD O CL P1P _ - . *2 -IRI GOP o_D Y- -te r d' "O U ¢ `ll + PG° OMLIE ° ROAD CROSSING AREA IIIGO v F l 1 I t.j ? a I 1 j j ? 1 1 i 1 ? 1 1 3 rn • w ? I PROPOSED "••__ 1 ROAD , 6 ' I 20 DRIONAL Uf1UTY UNES SUCH AS ELECTRIC. ~ CABLE. TELEPHONE. ETC. WILL 13E WMM THE UMITS I I OF THE PAY AND THE PROPOSED FILL AND _ L_ THERE WILL BE NO ADDTRONAL WERAND IMPACTS ` 1 CORRUGATED AU.UMINUU PIPE (CAP) 3 O 52'. 18• DIA. AIL 3rlt a'o'L t H ?,.r?zA-rS}r r w(lr"w...? K S iii PROPOSED 404 WETLAND ` 1 FILL 2.302 SF k' I 404 UETL&W LM / c, . ,trk PROPOSED F111. AREA (2,302 5F 404 Tfb7Ti1ND IlNE i 1 DaSTING 404 MMAND UNE ?- _ . IX15T1 G - -- 6---- EMSTING CONTOUR UNES KOAD N / --9- PROPOSED CONTOUR UNES l iD 12'??? -6' WM- PROPOSED V WATER WAN -SS- PROPOSED SANITARY SEWER UNE/ - ?- - ra r ''r EXISTING 404 YETL4ND LINE I i CONFm mo 5131106 BY THE ! IISACOE i / 11 1 PLAN VEEW ° ROAD CROSSM AR FA vaG>ra SHEET 15 OF 17 404 WETLAND CROSSING - AREA G WATERFRONT GROUP RIVERSOUND PROJECT CHOWAN COUNTY - NORTH CAROLINA ATLANT/C Z 11111PON?f?1ENTAL CONSULTANTS, LLC GRAPHIC „ SCALE 1 20' P.O. 90,r 3266, K/TTY IMH/f, N.C. 27.90 (25,2)261-7707, e mall Ioxdorman&?aol corn DATE: 7/26/06 REVISED: 8/25/06 FILE: 06-015 DRAWN BY: DOUG D. X100 777 ` y ?JJ 0 y`n' u" ROlRLCCU RGAD (CROSSING AREA UuHua / 404 iEls7Z4ND LINE VERr posv l I 'f la, l f '''° CULV1sTtT ` 404 T/h97JT1YD Lfzva CORRUGATED ALLUMINUM PIPE / (CAP) 3 0 52'. 18' DIA. / PROPOSED 404 WETLAND / FlLL 1,308 SF ; 111STI G DR , IEGEND: tr \ \ PROPOSED FILL AREA (1.308 SF) t ?1 \ EXISTING 404 WETLAND LINE -6--- EXISTING CONTOUR LINES NOTES ANY ADDITIONAL UTILITY LIVES SUCH AS ELECTRIC, •? .1 .? -9 PROPOSED CONTOUR LINES CABLE, TELEPHON ETC. WILL BE WTIM THE LIMITS TH OF THE R/W AND E PROPOSED FILL AND f \ -8' WM- PROPOSED W WATER MIAN THERE WILL BE NO ADDITIONAL WETLAND IMPACTS -SS- PROPOSED SANITARY SEYJER LINE 1 EXISTING 404 WL77AM LMT CONFDWD 51,31108 BY THE p paa USACOE SACOE PLAN V ?W ? nEW ROAD CROSS M AREA aow SHEET 16 OF 17 404 WETLAND CROSSING - AREA H WATERFRONT GROUP RIVERSOUND PROJECT CHOWAN COUNTY - NORTH CAROLINA 9 ATL?INT/C ENy/I?O1j1#ENT?IL CONSULTANTS LLC GRAPHIC SCALE 1 20 , P.O. BO.r3266, ffITTYH,4fY1(, N.C. 279,0 252)261-7707, e snail noxdorman®aol com DATE: 7/26/06 REVISED: 8/25/06 FILE: 06-015 DRAWN BY: DOUG D. 5 ' 0 FILL FOR APPROACH TO BRIDGE FILL FOR APPROACH TO BRIDGE - _-! T=11-11 l? ? I?_ -- i = _- _ -_? I ? I _ ? ?= --- . . 1 I.1= 1 I_ r i-i I I -- - -! ?-f ; I' ICI ?I 1 , j # NO WETLAND FILL ASSOCIATED WITH BRIDGE BRIDGE SIDE VIEW N TS 18' DRZGE DECK CURB 12" WOOD PILE BRIDGE CROSS SECTION N TS i i AL i •_ AL 404 METLAND LINE 404 WETLANDS v FILL FOR B RIDGE APPROACH 50' FILL FOR BRIDGE APPROACH PROPOSED SOIL ROAD PROPOSED SOIL ROAD 18' i i AL i i i PROPOSED BRIDGE i 404 WE, TLA1VDS ? (18' x 50') A AL BRIDGE PLAN VIEW N TS SHEET 17 OF 17 NATIONWIDE #14 FILL PERMIT - SECTION I WATERFRONT GROUP RIVERSOUND PROJECT CHOWAN COUNTY - NORTH CAROLINA A UNNC ENY/1'ONXN- 7XZ CONSULRKS, LLC GRAPHIC SCALE 1 NTS P.O. 90X 3266, f(/Tl 11,41K, N.C. 2790 (252)261-7707, email roxdorinan®aofcotn DATE: 7/26/06 REVISED: FILE: 06-015 DRAWN BY: DOUG D. 11 Curve Radius Tangent Length Delta Chord Chord Bear. 600 0 600 1200 1800 SCALC 1' - 800' Q MD8 2 6 PAGE 663 4111 ? L98 PIN / 7845-00-77-8942 l' L 61,91 L95 LESLEY L KERSEY. ET AL LIT 4 7i, 00 219 PACE 99 L92 \. PC I SLIDE 1348 ??0 PIN / 7845-00-79-4027 130 7 L90 NOTE: FROM POINT 'Y TO POINT 7' THE L91 CENTERLINE OF THE CREEK IS THE PROPERTY LINE L89 Ak BEARINGS & DISTANCES AS SHOWN HEREON ARE t84 c`j L6 w FOR COMPUTATION OF AREA ONLY. L Lai - L87 A. 0 L7 Lob" L83 L7 T T AL, A L77 K10 wo iz L7L79 12 20 40 M s WLW W550 K790 2 L13 'tIG-1 M1 v?OWJWO 0 W7100 L72 m 0W720 a? 71 60 7L6w 68 70\ ?o L67 N°;o AA fF •?. N12 L115 BaMT VnT, 9n - ?? LIM ?w a ,1116 / 17 ` L119 L720 MO L121 ait ? 122 L126 T1 L127 Iv4. HARk ,TO - 03D 129 VICRM MAP 12b 41050 L 125 z ' (NOT TO SCALE) /L124LIJ LJ T/ L7 I G w a9a ( / 0 L1J4 r1 L135 ,S\Ak LJ3 L140 L139 Ll 2 L144 L146 lam. M200 n + ij ULt1NE?ATIOH- .i. 210• 1? REf. 9 i2'E ••- - z e L150 H a u o? ? P ni - L151 0519 7R71 t: N IO s? ar W21 ALL DISTANCES SNOUN L49 90 HEREON ARE U4 L4 L4 70 HaVZONTAL asrANCES L4 60 L4 L46 Ak W150 42 Mi L41 n;12 Q? J90 W1J W90 L36 8 re a L35-%- 7 L34 Wt 10, 00 u6 LZ8 9 REF 7! 2 n; tit ??" L31 (/ v ? L25 AND v C E3 ?Y N J2J953'W iP 384.12' -°2 I ?? Z7 L15 INSET 'A' SEE SHEET 2 0 v N: 654592.26' E. 2743184.34 7270 12' MARKED- 1ICKORY FOUND 1 257.69 ACRES PHASE I INSET '8' +705.93 ACRES REMAINING TRACT SEE SHEET 2 963.620 ACRES TOTAL (ACREAGE TOTAL EXCWSNE OF LAucia DLANCI=D IIEIRS LOT) MALACHI "CHARD HEIRS PIN / 7845-00-J4-1451 PIN p' 7845-00-J4-5126 D' G F. I !?? REF. TIE N 241251071C 54..84' EDWARD C. OVERTON OB 120 PAGE 21 PIN $ 7845-00-32-6900 Course Bearing Distance A N 2173 07 E 293 49 9 C S 34_24 S.S S 133.5 07 W 276.54 H?_ 6 0 S .3 07 W 125.40 E F S 59 5ti 07 S 0354 :i3'E 135.96 26- - W O tO09 LO-6 GREENFIELD FARMS. LLC PD TO PAGE 09 Oil 241 PACE 30 PIN 17845-00-64-0531 a LEGEND S C, 1 O N - LEN7ERUNE ORU yM V es L158 I' a - CONCRETE' MONUMENT FOUNOSTq CNp ?? y 69 q2 O - SON PIN FOUND R S PCB B 7Y 7 30.0' N: 852129.57 5 S6 fi o - LRON PLN SET 112" REDAR UTf 1jT R0 ?'tsg CSF:20.99997911 1257'9 DO 16 P GE 35 0. CSF - COMBINED SCALE FACTOR OO qQ PB 1 PAGE 90 Course Bearing Distance ' L1 N 67J953 W 232.98- L2 N 0335 07 f 202.62. L3 N 6774 53 W -i3'596 L4 S 24-05'07' W 203.94 L5 N 6871 T6 W 200.90 L6 N 695203 W 90.2 L7 N 2635 07 E 124.08 L 8 N 207453 W 12738'- L9 N 13315-0'C 197.34 L 10 N 14-3,507 E 132.00 L II N 06 35 O7 E 188.76 L12 N 14'5453 IV 146.52 L13 N 445453 IV 120.12 04 =W54"-IF 2 9.88 L15 S 7720 67 W 110.22 L16 N 3774 53 W 124.74 L17 N 293953 W 149.02 08 N 6239 53 W 97.02 L 19 N 72 54 53 W 128.04 L20 N 2670 07 27 38 L2! OJY7307 737.78 22 N 3374'53'-W- 166.98 _L? L24 ,T N 3 W N N 35*05 . 66.00 L15 N 535453 W 9.G L28 N 1074 5T W 126.06 L27 N 4230 05 E 200.77 L23 N 615419 E 198.35 L29 N 5873 45 E 101.88 L30 N 653505 E 14283 1,31 s 823124 E 106.28 02 N 560548 E 131.20 L33 N 3479J2 F_ 126.02 L34 N 177141 E 108.99 L35 N 145044 E 9855 L36 N 2278'00' E 88.15 L37 N 474316 f 87.43 08 N 570858 E 102.77 LJ9 N 457602 E 104.59 L40 N 487136 E }13.48 L41 N 17J026 E 119.94 1.42 N 070535 E 702.69 L43 N 150943 E 61.40 L44 N 864157 66.69 L45 S 857223 E 98.55 L46 N 832408 E 19322 L47 N 070758 E 3_5,00 L48 N 07'0758 E 111.22 L49 N 090743 W 10R10 L50 N 07'0346 W 106.30 L51 N 035328 W 9461 L52 N 15'4058 E 93.52 L53 N 130050 E 183.89 L54 N 19'40 57 W 86.82 L55 N 023020 W 79.15 L56 N 057014 E 76.45 L57 N 25.0715 £ 76.84 L58 N 31'4341 E 96-16 L59 N J4-55'18' E 100.65 L60 N J34600 E 707.81 L61 N 265804 E 110.03'- L62 N 23-54'J8" E 103.03 L63 N 280332 E' 17236 L64 N 7141 I6 E 138.02 L65 N 085204 W 139.41 1,66 N 27-3.955' W 123.67 L67 N 337220 W 11544 LG8 N 42 57 09 W 137.15 L69 N 63'48'07' W 127.80 L70 N 694146 W 106-01- L71 /J 6248 j4 W 101.26 L72 I T'65-2920 W -OS.31 L73 N 654157 E 15814 L74 N 610047 E 148.90 L75 N 440606 E 156.49 L76 N 510134 E 9719 L77 N 513538 E 94.15 L78 N 575401 F_ 162.99- L79 N 717312 E 86.28 L80 N 79 SO 06 E 100 80 L61 N 73'J652- E 119 99 L82 N 58'4304 E 130.57 L 83 N 42 53- 03 £ 109.74 L84 N 48-167W9 'E 89.90 L85 N 562538 E 136.94 L86 N 120243 F 16566 L07 N 35770 E 73.88 L83 N 41 41 J9 E 93,44 L89 N 433225 E 69.96 L90 _ - N 777506 E 184.21 F9 I N 100945 E 14892 L92 N 270818 E 80.44 L93 N 4239 51 E 92.30 L94 N 37'4932 E 103-50 L95 N 395626 E 6.04 L96 N 544856 E 8636 L97 N 595405 E 175.24 L98 N 570215 E 10248 L99 N 524739 E 160.28 J 4 - ITE7ZANOS PIN I 7844-00-J7-6492 ( SEE EJff FOR BOUNDARY \ A - SURVEY POINT NEITHER SET NOR FOUND IT Or WAY LINE TAUABLE) RlC \ -- WETLANDS PHASE UNE 19THIN PHASE / RIWR50UND r SEE PB 1 PC 86 NOTE ,17 O- SEILANDS' DATA POINT FLAG" WITHIN PHASE I RIVFRSOUND (T)P) 1. THIS SURVEY HAS BEEN PREPARED WITHOUT THE BENEFIT OF A TITLE REPORT (SEE SHEET 4 FOR SPECIFIC LOCAPONS) AND DOES NOT NECESSARILY INDICATE ALL ENCUMBRANCES UPON THE TITLE. I, FRED C. HOWELL. CERTIFY THAT THIS PLAT WAS DRAWN UNDER MY 2. ACCORDING TO THE FEDERAL EMERGENCY MANAGEMENT AGENCYS FLOOD SUPERVISION FROM AN ACTUAL SURVEY MADE UNDER MY SUPERVISION, - INSURANCE. RATE.MAP_ (COMMUNITY?PANEL.NO-370301.0155. 0). EFFECTIVE. DATE-_ DEED DESCRIPTION' RECORDED IN DO '320"FIG 149-THAT THE BOUNDARIES 404 CERTIFICATION: JULY 3, 1985, A PART OF THIS PROPERTY FALLS WITHIN "ZONE A4", AREAS OF NOT SURVEYED ARE PLOTTED FROM INFORMATION HEREON, THAT THE RATIO 'THIS CERTIFIES THAT THIS COPY OF THIS PLAT ACCURATELY DEPICTS 100-YEAR FLOOD. OF PRECISION AS CALCULATED IS 1: 10,000 + & THAT THIS PLAT WAS THE BOUNDRY OF THE JURISDICTION OF SECTION 404 OF THE CLEAN 3. THIS PLAT DOES NOT PURPORT TO ADDRESS THE EXISTENCE, DETECTION OR PREPARED IN ACCORDANCE WITH G.S. 47-30 AS AMENDED. WITNE MY ORIGINA ATURE REGISTRATION NUMBER AND SEAL THIS ` -DAY WATER ACT FOR PHASE I OF 'RIVERSOUND'. AS DETERMINED BY THE OTHER AREAS OF JURISDICTION MAY DE UNDERSIGNED ON THIS DATE DELINEATION OF ANY ENVIRONMENTALLY SENSITIVE AREAS OR ANY ENVIRONMENTAL PROBLEMS LOCATED WITHIN THE PERIMETER OF THE PROPERTY SHOWN. W- OF A.D.. 2004 . U L SS THIS PLAT HAS BEEN PREPARED FROM AN ACTUAL FIELD SURVEY DONE AS PER 4 ' q N E PRESENT ON THIS SITE BUT HAVE NOT BEEN DELINEATED. . ND THERE ARE NO VISIBLE ENCROACHMENTS OR EASEMENTS S PL T 0 ? Q ,,.... ?•,, !. ?N - THERE IS A CHANGE IN THE LAW OR OUR PUBUSHED REGULATIONS. 04 JURI THIS SECT MINATI N E S I D R O DATE OF THI A A t O? ?0* F OM THIS OATE YEARS EXCEED fNE R?OD OT TO ALL ACREAGE FIGURES WERE COMPUTED BY COORDINATES. 5 VEYOR LICENSE NUMBER L-1483 Q SUR j UPON FO A PE . UMBERS 7845-00-47-4097 G I SEAL THIS DETERMINATION WAS MADE UTILIZING THE 1987 CORPS OF . 6. THIS IS A RESURVEY OF P N N THIS PLAT IS OF A SURVEY OF AN = l ' - L 1483 i ENGINEER WETLAND DE N TIMAN UAL" 78 45-00-35-8443. & 7845-00-14-6463. THIS PLAT DEPICTS THE WETLANDS IN PHASE I OF "RIVERSOUND". THE TOTAL 7 EXISTING PARC0. OR P 0.S OF LAND. e t NA . TRACT (INCLUDING PHASE 1) IS 963.62 ACRES.. AND PHASE I IS 257.69 ACRES. ti U?'?`,v: 0 TITLE WETLANDS IN PHASE I OF "RNERSOUNO' CONT/JNS APPROXIMATLY 133.01 ACRES SEE'SHEETS' 3 & 4. D: FOR WETLANDS DELINEATION BEARINGS-AND DISTANCES T VEYOR LICENSE NUMBER L-1483 C' 1,1 S DATE , ? 1 COW BY DA 1£ REVISION:: WERLANDSOUNDARYSURVEYPLAT FcF/ 11/17 2005 ADDED 7 MEAN SEA LEVEL DATA ' ON PHASE/OF RIVERSOUND' TENNESSEE LAND SURVEYING CO. 0511912006 02 02 2006 MEAN SEA LEVEL DATA Ripwow 7 OFTHEPROPERTYOF BY DR WL*rr & ADD WETLANDS DEUN£A7701V FOR ' ' ' INTERNATIONAL PAPERREALTYCORP. . . R/VE RSOUNO . F'NASE / 085 02 02 7006 ADD SHEET 2 & . FOR 140 HIGHLAND AVE PHONE: 615-597-4 ?EH 1 OF 4 . 04 13 00s ADD I1E'TLANDS PHASE CALLS AND L L C wA TERFRONT GROUP NC SCALE.• ?OB NO. N07ERENSIO S ' , YFOP/?Lf TOVYNSH/P SMITHVILLE, TN 37166 FAX: 615-597-4091 ' OS 76/7006 LOCATIONS ADD "DATA POINT FLAG 1 _600 050011 10511912006 ADDED 47H SHEET (INSETS 'A a) CHOWAN COUNTY, NORTH CAROLINA E 115.88 N 4735 30 L100 INSET 'A' SCALE 1" = 200' wl W1385 V11398 W1384 W1397 W1380 W1379 W1383 P5 v W1378 2 / W1382 P6 W1381 n I$ DEUNEATION ! 'u Q XIST(,NR,& ?STMC; ROAD P9 C E as / EDUS77NG ROAD P28 1 r 1 . t 1 _al n'1 ? la 1 W1372 1 1 W1371 I ( W1377 W1370 W1376 P11 .6 W1375 W1369 P26 W1374 W1368 ( W1373 1 1 1 W139G I r 1 ? ( 1 ( 1 I- CI NSTI" LANE ( 1 OF DITCH ' 1 1 1 ( NI ? IN a 1 Iq 1 I r , 1 r r 1 r I 1?1 1 I r r r 1 W1359 ?W13GO W1360 366 N P13 W1367 W1357 I ry P24 W1358 ( 1 W1362 ( 1 W1361 W13G3 A 1 , I W1364 N 1 I 1 of I C1 I h al Iry 1 (a 1 E>dsR1NG r CENTERLINE 1 1 1 1 -o P15 ?P21 N: 852129.57 ??! 4s a E: 2742808.06 1 W1351 CSF: 0.99997911 \p1e P20 ORU \Pts M Mp s _ s STATE RS ?°0/N???7y 8j?z?. 30.01 p ' U / 000AD ?,A98 INSET 'B' SCALE 1 " = 50' 4( EXISTING ROAD CENTERLINE 1 Io Iw W1394 I W1395 W1393 v ' rJ W1391 W1392 (OW' W1389 W1390 W1388 P35 W1386 P34 W1387 / EXISTING CENTERLINE OF DITCH O• vk C41",, ? ??Q ° Ess/° - ' ?? 9 s SEAL _ L- 48 LEGEND OUR '' 03.?? ''•;cOC - cEN7ERUN£ ,H o - CaYG4£7P MaVUMENr FOUND S?gr6 O - /RaV PW SET 1/7- RL714R G - SW WY PaVr NWH£R SET NOR FODND CSF - COU&W SAME FACT04 ---- K£RANDS MAX UN£ WMIN PH" I RIEFR=WD 46 - fs£RANDS COMP ar oATE REVLSLONS.• - WETLAND BDUNDARYSURVEYPLAT 7 2005 71/1 ADDED 7' M£AIV S£A IEYEL DAM ON PHASE/ OFWIVERSOL/ND' FCH 0511912005 02 02 2006 11 REM W 7' MEAN SEA LEVa OATH OFTHEPROPE/?rYOF TENNESSEE LAND SURVEYING CO &ADD AERANDS D£L/N£AAON FOR APER REALTYCORP DR. ay SHCEr. %'NA5E/' R/ V£RSOUND: . /NTERNAT/ONALP 1/£H 2 OF 4 02 02 2006 ADD SHEET 2 3 FOR 140 HIGHLAND AVE PHONE: 615-597-4085 0411312005 ADD A RANDS PHASE CALLS ANO LLC WATERFRONT GRDUPNC SCAM 1/019 NO. No W1 IoNS , TN 37166 FAX 615-597-4091 SMITHVILLE ' ' OS 16 2006 ADD -DATA PO/NT FLAG- LOCAAONS yEOP/M TOHNSHfP : , L = 200 050011 05/19/2006 ADD£O 47H SH££r AvsvS :1 a- 20 CHOWAN COUNTY, NORTH CAROL/NA WETLANDS DELINATION LINE TABLE Course Bearing wl N 19'0042 E Dlltonc. 51.98 Coons I B^ori^9 Dlalanca Couna Oco7in 9 Dbloncs CnunO Baoring Dlato... N 041314 W t�J WI58 80157 N 74.4049 w N 517209 W _V61 -2 7281 281 Coura4 Bearin9 Dlatmcs Coons DeoAn 9 OlnlaOcs W} N 183509 E 27.75 WI SB N 062132 W 25.05 37.59 N 715030 W 20:3 W4G7 N 5047 iu E 80621 Yg:z2 N 564956 E 776 S 515054 W 2'1 ws WS N 14'.;019 w 1 ,0-46 WI59 1'1087906 8031 73.90 WJI! N E•_25229 W N 7z9 J5 W 72.13 w4FB N O1R7 4 E 21_59 YI623 5 41244) E N 73'71'25 E 7316 2406 4.08 77 S 4871 5�W '16.30 806 N 72'4926 W N 1000 72 37.38 w160 N 072031 E 19.03 W)15 N 120231 E 15.91 19.(50 W46Y N w 27_32 80624 N 012'58 44.25 28.71 d N 78'1727780 74.33 WI W N 181380 W 79.75 3 .20 80161 WI62 N 31_31 0 N Z "4174 17.21 80316 N U)�0 W IU_5p WI 70 80471 5735 H 57'/H 16 W N 893332 W 10.52 29.21 80625 W626 54'4411 E 26.28 Y[J79 W/BO N 11'5 37780 N 2421 76 C 38.92 27.27 WA w9 N 4 8134 W 077731 76.90 WI6} N 111614 W 23.60 W}I7 15.52 W)IB N 512807,rE $ 79"4125 2�...�''6 80'472 N f.0U124 W 15,31 80627 N W"56EE SJ N 04 021 1V N 2108 0 N W N .55 w16 N 713055 W 2}.I8 80319 27 5 WT3 N 659 �b`�W W6�0 06734'037 2506 24.4- W7P2 144 718'16 E 721 62 `2 �, ± •665 6 6 25 W 1], 3 W32 *-S614101-51 Z 12.17 1 8017 8047 N 7 370 W N ' 516 4440 S W 1 80783 52931 E 26.61 Wl2 NSI 29 .89 7 N 5 7(w 2945 �I10IA E 1 .OS Wil 42 W 171175 Js 74.65 �jt_56 801130 44 W W7a4_ 9781W78 07 a 44 /t �O 41.60 Wt w s f BYZ5 IIS W S 81 555 W 74.63 WIGS N 181611 W 3.51 21.76 80722 23 491648 $ 743112 E 26.79 17.7E 80377 W N 096557 W 17.9 W'83f W6J2 ';1 S 65`16 Tt N 611234 W 30.01 31.08 WIB7 N JIRD W N 527679 YA S 76'4915 W 49,16 19_3% WI69 80170 N 23820 E N 1651 7991 W}24 5 8634 51 E 7255 78 80179 4_S';H 33 E N 7J1J 55 E_ 31.91 W }J N 185844 E 21.0 8 W N 875115 w 26.9 26-47 WI6 N 057558 E 77.09 WI71 52 S 874303 E 1.15 19.76 WJ25 4470 ]3 F 18.50 W UD S 425 23'� 19.15 30.05 w63{ w63 N 7-42 JB N 45'57 55 37 J1 w7n9 N 5205 JiSW Si7_7 8077 W19 N 871057 3 .% 422452 E 80172 N 79�J 07 E 24.55 80328 W327 $ 605014 E S SV5 J7 E 23_76 17.60 W4f)I S 75121♦ E 29.62 WtiJ6 N 38'4823 E 29.11 78.27 80790 80791 N 532440 W N 232718 4095 8019 N 37'4)04 2 25.04 7 YV1JJ N 720626 24.6h W32tl S 451809 E W/tl 7.50 80483 N HAIti SJ E S 718647 22.09 80637 N 44'4104 E 31.3 Yl192 W N 71.5 E- 77.58 74.10 1420 N 151 55 E .85 20.8 M774 YA 75 N 8 3844 E N 11tl 13 W 1 ltl 17.Gfi 80329 803.70 $ 7d' S}9 --+1T 14,34 w161 E S btl2o 4) 22.X3 12.04 80639 80637 N 347926 E N 45'4405 24.71 80)93 N 342749 W 32.51 8021 8022 N 20191 W 1..02 80178 JO 2 52 W 0.27 WJ31 $ 191414 E 26.71 WINS S P26J 05 C 11.30 W640 E N 353648 E 3277 9t S 7711 J9 W JJ.6♦ 802} 5771633 W S 57'1815 W 1 .� 77 N 04'1907 W 1.29 W,f32 5 262310 W 5 1155'56 E 15.31 7.44 IYIt16 8 N 53'16 J7 E 15'77 W5a1 N 301406 E 27.16 73.41 7$ 80796 5 B7'4W 5 N 59'9538 W 27.48 W21 $ 5tl3537 W 35.47 35.1.3 WI 78 80179 N 345222 N 01'41 3U 1 .97 Y7S3} S 051921 W 19_51 80 W4(i8 N X2411 E N 73_2232 E 71.48 11.80 80642 N 387303 E 37.68 80 9 4536 W N 20.03 43.80 8025 S 6711 l5 W .20 WItlO E N 391948 24.3. 1 W3�4 WS.7. S 30381 W 10.91 W4139 $ 55_7905 E M41 N 55'3558 E 52'859 17.95 V g6 N 667,614 W 13.01 8026 8027 $ 754212 W N 292732 38.29 WIHI N 605350 E 56.99 Vf3.S6 $ 72•N 130 E $ 051322 E 18.17 29_79 80190 S 52_38 1 E 18.tl19 80614 N 5350 S5 E 30.22 1242 99 80800 N 7J7fi x0 W N 0747 23 41.50 W2tl W N 401425 E 1 .59 21.77 WIB2 WI83 N 495 4, 0 3,76 WJJ7 $ 1'4655 E 18.12 W491 W19I S 407212 E N S8V0'SS E 21.67 WT45 N 701843 E 21.46 N�101 W N 223 56 E 20.06 47.51 8029 N 2'4426 E 37.57 N_181 N 682122 E $ 349905 19.61 WJ78 N 73'7834 7241 W493 S .8'4935 E 30.22 35.77 80617 N 450005 E 29.59 YASO S 01150 E 43.65 W31 wJl N 437820 E 40.49 W185 9 25 917 19.40 19.97 W339 W340 N 53'4330 E 75.5.1 80194 S 4tl131T E 76.38 W6I8 M48 N 45'x052 E S 6240'34 22.51 80'1103 S 05'4407 E 34,72 WJ2 N 455165 E 3 ,37 WIe6 $ 51'1 51 29.04 WSII N 171805 E 221T 80190 S 44'Otl 17 E 28.91 Nti50 E S 7955225 E 11.14 17.77 Wtj04 S 441/28-E: 50_93 WSJ N 2821 D4 E N 357836 =M -m- WItl7 5 48'4G 12 E 77_18 80142 N 0127 W 78_05 37.14 80496 $ 31'27.57 E 19.71 1V65 N 5011377E 2200 �[) wt3D1 162545E N 101636 16.16 ,34 E N 39'2 E 29_99 3 W1HB WI89 S HI57 <7 E N 7624 21,80 w3x3 N 753814 W 29.67 80497 80490 $ /16)'Js E S 700122 E 10,92 W6S2 N 54'4121 E 23.26 07 W N 02'41 S8 E 3.JY 10.itl NSS N 1561 30 .91 33.72 w190 b5 E N 30'0635 W 12.28 7P.SI WJ41 N 542152 W 30.{SrT W499 N 0038'52 E 17,9 20.91 W65] w4 S! N ?615 Z6 E N 1071 20.62 08 N 110250 E X5.70 vne 8037 N 105037 E N 787005 33.72 80191 N 141018 W 27.98 80345 W54G N 17'4559 W N 309138 W 24.75 4 80500 N 0335'211 E 22X4 1µ,5S 54 E N 12'40?0 E 25.24 7232 _ D9 10 N 2722 I0 S 4309 111.04 80]8 N 411217 E 70,75 J7i WI92 WI91 N 1008 36 $X71245 E 23.59 80147 N 65260 W 29.16 80:,01 W50 N 0454'14 E N 46'4115_ F. ;0.31 18.X4 wG:,6 N1f57 N 155904 E 17.64 80011 J5 E S 716455 E 4B. 4217 W39 N OOYI 10 E 7635 WI94 S 55912 E 25.80 W548 N 605.59 W 29.79 WGOJ S BSU74 E 24.55 WL StS 5 722744 E $ 335446 23.64 wall �13 S 473433 37.17 8040 N UI J5 2369 Wf95 N 611818 E 33.51 3255 80319 80350 5 BIUJ 5G W N 66'4110 25 76 VISb4 S 69'18 2H E 21.42 807159 E S 80'40 02 E 10.08 18.55 S 193001 E 70.04 WII W42 N 1952 20 E N 4189 SJ E 17.03 19.74 80196 N 0039 03 E 27_05 WSSI W S B7S6 45 W 22.27 2GUtl 80`,05 WS06 S 38'4212 E 5 612118 19.64 W660 N 577111 E 37.X0 Wn14 15 S 15'45 27 E S 58336 W 34.12 78,72 Wt3 N 511343 709 WI97 80198 N 071613 E _ N 477909 2.41 W352 N 843903 W 27.19 NSIJ7 F. N 51•/;5il 26.10 21.93 w661 Wt,62 N 1051 J2 E 77,0] 80818 005908 E 7274 44 N 19'4100 E 7.46 WI99 N 81155 E 26.03 23.54 8035} 801245 W 34'01 w508 fl 316141 W 19.92 W66J N 255735 E N 57203) 20.29 wu S 8'4844 E 21.03 8045 WI6 N ,7819 07 E N tl1U058 E 34_26 4.34 W2.00 80201 5 7 3 47 E 27.75 80754 WJ55 N 7714 33 W N 262834 25.55 76.11 80509 80510 N g64P K W N /7`�OIn 23.11 W1i64 N (5659 46 14.19 28.97 We1B 116324 E N 1619'09 E 19,95 1255 W17 N 537229 E W202 S 153502 E S 712804 E 21.55 21.16 8055 N 69'I�JO E 51.27 WS11 w S 11331 W 73.13 16.01 W6G5 MTiC•6 N 7529`06 $ 5211521 2274 .]YFtl9 WO O N Ef8'4307 70.40 W W4B N 41%37 E 201 fol 80203 N 591232 E 25.93 W757 W1S8 N B1�307 E N 6§4,141 57.99 Yi517. N 7051N W 18.?tl WT67 E 5 f1d503 E 2299 7244 W 25.34- 9 �� W50 W5(I N 416(175 N OBI I E 26.75 250 w20! S 707346 E 15.06 WSS9 N 82'12 0 E It,}1 58.15 WSIJ 1YS 4 N 197224 C N 27.05 W56B N 7J2tl'S5 E 21.5 Vj(1�2 w8 3 N 2{2147 H IH"11 Je E 79.35 8051 N 3715 W 75.67 W2U5 V2o6 35 E S x0'1914 Jl.7J'- 80360 N 15'5756 E 47.91 80515 62.15''10 E N 11125 ba W 15.76 17.73 W56B rti 770 $ 7315 3 5165115 21_50 Wtl2! N 45.4722 7270 8052 WS S 2/'18 111 W S 12.23 80207 S 40"4159 E 21_52 WJGI 26.46 W362 N 735430 N 68'1 52 E 40.48 75.59 80516 N 70 372 W 19.04 801171 E N X8'4204 E 29.54 T3.HA w825 8086 N 11'3115 E N 171111 W NO 8054 865932 W $ 743718 W 223 21.1 W20B S 48'12 i0 E 227 80363 S 871743 E 40.04 8051% N 6677/9 W 5 34'02 11.40 WU 72 $ 716534 E 24.47_ WN27 N 1482 J9 E 27.119 Z4. W;S S 322425 W 1. W2W 80210 S 332103 E N 80364 N 751]921 E 45.99 M51H W;i9 87.1914 W H 891909 w 80671 6654759 E 20.5 Y/e A S .`r.Sa Tl E J2J WSG S 742141 W 1 21.7 80211 156048 N 083846 W N-tli tj�N 813833 E 28.67 WSZO N 4668571 W 19.20 23.37 80674 80875 N bH'x9(73 S 4030'11 124{ M@_2? 5 7366 J7 E 25.70 8057 8058 $ 6779 2/ W 1 fl. B 80112 N 555 3b W 25_20 2±3 98 WM6 80367 S 75•5fi 4J N 071)4 J3 79.33 80521 N 26'42 25 E 19.96 lhfi78 E N ]316 4o E 30,18 24.9 y6m Wd31 S 747917 E S 6228 J3 3229 8054 $ 376035 W S 3729915 W 17.39 19.73 WZt3 8021/ N 232tl13 W N 25.71 W369 N 027219 W 11.51 30.25 - - WS'1J N G924'f2 C N 533205 E 26.29 }5.9 v1 N 823945 E 16,2 80832 E S 533224 E 4Y_u 25.13 wU0 S 5 1052 W 29.6 W2i5 227705 W S 069 09 E 33.04 80369 N 752449 E 26.71 WS_24 N 563101 F 38.71 W67N w577 N 802226 E 17.38 11'8},1 S 501902 E 2026 8061 S 63'x003 W 34.40 w216 $ 192151 E 46.1 12.48 W}7o N 81'1954 E 17.18 8052 N 5725'55 E 21.69 w680 S 16'1933 S B76ti 0S E w52 7-§-14 3019 W 31.9 80217 S 4016 21 E 1.116 WS71 WJ72 S 712551 E N 037507 29.81 80576 N 0525'ltl E 70.17 WG81 N 4713 i7 E 16.55 15.51 801135 4/636 S HTg12♦ E N 722-T- W6S 4/61 S 347541 W S 175208 W 20, W21B S 303117 J9.5B 80373 w 5 4053/0 W 176.81 29_62 4+52 W;ZB N 75101 43 t 21.1 w60 S 37�S 077E 1178 W8J7 X117450 E N 703133 E 26.71 18.30 WGS S 2]R 30 W 4 20.64 31.52 80219 80120 S 7712 ZO E S 6431 44 36.69 WJ74 $ 0173'09 E 23,4() WSj9 S671B 1313 F. N 090512 E 16.81 21.16 WUOJ M64 5 482114 E N 1238 W81B S 798940 21.84 Wt�fi S 406110 W 14.69 8022/ E S 635104 E 15.75 27.3 W375 WJ76 S 671716 W N 871604 38.76 w9:A H 84481.4 u E G ?4.08 Wti05 421005 E N 111912 W 16.45 23.5 80839 MN10 5 fS02753 E 19.1 WO7 wO8 S 48'74 Sti W S 15'1 46 W 10.9 14. ) 80222 N 776610 E 40.84 80377 w N 86'1613 W 3268 29_- W931 8057 N 59011 E 5 73".7003 0_76 W[ n5 N 8034 24 E 16.52 1 $ 78 E N 877812 E 37.46 40.92 Wog S 247178 W 29.6 WT23 W224 $ 710856 E S 121127 }493 W37H S 766667)01 W 38.26 WS'_3 E N B6'IG O/ F 16.27 7808 Wb67 Yr6 t1q N 7tiU{29 E 19 .di 80842 N 7515515 �1 E 39.24 80)0 S 4251 Jam♦ W 31.9 80225 E 5 253716 E 36,20 21.02 W]79 $ 412701 W 25.06 W534 N 672}35 1974 Wb89 N 23Vtl S0 W N 595470 W 15.54 Wtl43 N 825455 E 49.99 8071 W7I S 3051332 W $ 4 .5q 4228 S 657401 E 2),20 W1W 80381 S 714012 W S 79'4950 W 4 .J5 4 St1 W535 X75 S 7772`21 E 31.21 W59D S 1X7210 E 27,)2 15.18 Vrt144 80845 N 763056 E N 572955 E 49.77 IN.4 8073 471230 W 5 6950 22 w 3 .6 J7. J 80227 B N 704701 E N 6068 38_99 80382 5 72191 w 6.2 N51) N 61757r, E N Bo3J 07rE 27.55 16.88 Y.cyl W69T W69 N 765410 w 2'175 Wpxs N 591515 E 20.54 8074 N 25'4216 W 40.35 80129 27 E N 625929 E 20.09 20.81 80383 S 726131 W 31.65 WS}B N 6716 59 E 21.94 N tl25�50 W 244 07 W 4' W84T WJ N 2202 5 W 2 S 51'2257 E IJ.S� w194 W3s5 S 842907 W S 21_)301 76.OG 80539 $ 86'4575 E 21_22 w'491 N 37`16'09 W 113 4.50 11.74 W848 WH19 S 2 2515 E 13'8 40 7270 8076 - 7 N 046962 W S 7251 5 30.6] 80231 W231 S 4 2417 31.64 W3U6 W $ 2969 M W 20_16 290(1 M,40 W5_N N 6716'24 E N Jl 2194 N'1,95 N 477659 W 22.72 80850 5 O7W 31 E 39.'0 YT -06 8078 W $ IOIU 15 W 15.9 36.5 W?32 80133 S 57602] E S 27.98 80387 S 5 1229 W 29.65 � 1741 E S 7(1'18WE 7216 25.40 w696 80647 S 35'.0 0l W ?0.24 W8S1 S 2T 13N W 31.13 8079 S W2&it - 28.11 w2J! 65'4531 E N 4815 J2 E J7.tl4 29.19 W1B8 80369 S 82221) W 7653'18 .70 W54 N 33'4813 E 19.09 1\698 N 48822 W N 217�027�w 76.64 1801 80(15 Wj153 S 61'3N3 E S 2132'02 E 45.98 wtt0 Wet S 0119 AO W S 47179 W 40.84 W2J5 N 80022 E 18.72 W39D w N 73'167 W 13.57 5279 wS44 80515 N 18'1242 E S de'2749 E '10.5{ WL79 S 778007 W S 171552 E 47.66 76.83 WN2 N 4531'21 W 76.0' 75.76 WZJe 80237 S 782175' E S 27.6 -- 80391 N 7432J -i -W ?tl.T4 WSa5 5 W1c 22 14.71 20.74 WI01 88tiL802 W S 79.8150 80'7156 S 361512 E 59.43 N J9�f 01 W 32.55 W239 25583 E S SHU 14 IJ.31 24.N5 80392 W3o3 N 83'4729 W N 7131 46.91 W517 N 2417'78 E 21.15 W702 57791)�W N 13'1423 W 17.4 15.94 W'ft W(SS S 20'4150 E S H6V452 E 11.7tl 8081 1V05 N 1560 J2 W N 39'14'39'W 16.80 80239 $ 737614 E .3.95 11'391 y1 W N 817909 W 27.19 35.40 80549 80549 N 65'..N'OS E 11.79 80703 S 691510 W 23.5 was 49.43 Yn16 N 275' 3 W 76.1 47.5' 14240 80241 S 16'4828 W S 701 tl7999 W 19.80 30.80 80395 N'1e762z W 24.4+ w5' $ 796530 E S Sc:e o4 E 17.15 17.84 WJ01 w'7t75 N 7Y2_t'09 W N 62717/75 W 15.74 1 74 WB! N 150]26 W 30.08 N'87 N 00 752 W 3201 W2lZ $ 17'330 w 80396 20.64 WJ97 N 69'0240 W N 577 37.81 80551 S 72'45'01 W 16.53 -17,29 W7U6 5 X9500} W 1465 WJ76 N 08094_1 W N 21132 W 53_03 51_00 W- 9 Wtl9 S 8539'02 W 5 05741 14.44 8021) 505'35 24 W 14.91 W396 8 w S 079 59 W 461511 39.94 80;52 $ 71'43$7 14 -E- w553 S 1Y?Q! S 07'33 so W 8090 E S 261829 E 31_2 55.1 Wla4 80215 S 092411 E $ 596080 10.11 80399 S 862 01 W 33.11 80554 03,13F48 $471542 E 15.32 11.St�- W70N 80709 S 1852 39 W N N51 5B W 1869 V7116 N O�'S5 54 W 3,i.lu w9i S 1 6125 E 27_56 80146 E S 77171} E 11.19 76.21 804( W401 N 9816 W 75.59 8055 S BT3144 E 16.65 80710 N 40'411 U! W 151ti 24. Wt}fi WtlG N 0529'111 W N 72'4111 W 85.35 M92 W94 S 1153!) W S 04412 36.40 W247 S 262508 E 16.69 w402 464914 w N 68'7216 W 51,x0 2F.95 W5`r5 w•��i7 55380B 22.65 80711 S 7451'37 W 21.[70 M N 377211 W 31,70 37.02 1434 E $ 7X'3033 W 3110 2171 W24d 49 S 271428 E 5 O3 17_80 W1N N 41'1855 W 77.10 Y' .'1 N 812111 E tl GD`aI4NE 25.79 'L 1.12 80712 W71J 5 7072'13 W S�9'tUi9 7266 W66T N 54'N 7d W 3132 W95 W9B S HOl75U W Tt�OS 80250 )2o w S 0}1103 E 73.6 7.7.1 wx04 80405 N 392602 w N 44'3906 W ZA.OB :>J`.51 WSS9 wSFo it 7tl`.N'U0 W 2256 80714 W $ 19'4455 W 34.44 20.79 WrG ) W<) 4 237 s6 E 011451 E 38.x9 24.32 w97 S 62'21 23 W S 61'410 W 65.5 80251 $ 2590 OB 14.10 80406 N 881752 W 49.40 W'Al S 7935 277 W N W 20.27 15.44 80115 W116 S 6951 02 W 21,6 _ rt 22. E 49.74 YNB S HB'31 JJ9 W 30.01 16.3tl 8025 5 } 1257 W 21.26 80107 N 817309 W 30_79 Wr62 4315'02 H 4676'25 W 19.71 8071 N 1117121 W ±633 tA.2S 8087 N 13'1001 E 42,91 N Otl_46 79 E 36.9 N25 WZ51 S 512079 W $ 09'45 59 W 17.55 37.14 W408 80109 N 691838 W 58.54 W'S67 N 4130'80 E 17.90 14719 N 200 W S 2473'09 W T3_OS 20;36 1807 8007 N 413041 E 51.70 l0 W1W N 055101/780 30,6- 80255 S 20'4437 W 29.87 80110 S 8402 32 W .JG w561 N 0572'25 W 11.50 W119 S 1124'53 W 10_4fi W874 N 523319 E N 501812 E 50.65 54.03 80101 02 N 31'3113 W 35.21 N2S6 5 1234 W E 17 W411 S 40'3730 W S 645435 W J7.7tl 34.01 80565 W56fi 5 G2"49'22 E N 1819'53 23.76 w1 N 84'46 U] E 2259 Yl67 N 75'4tl 40 E 4 52.56 WI03 S 3535 38 W S TbR317 W 15.A3 35.60 80257 W25B S 6682 5/ E W 725 80112 S 69 29 5tl W 27.2(7 80567 E S 68'3859 11.X3 10.20 80721 80722 S 3),1016 W=009111r- $ 1514 02 W 25.08 W07tl S 8111 E 44. 1. W104 S 40.3006 W 41.60 80259 5 20'1127 $ 27'1054 W 24.28 80413 N 5-4109 2229 7151,8 S 38714'40 75.96 80773 N 77;223 W 229N iN 42 Wtl77 Wd7H S 515559 E 0.72 OS S 4015'77 W 23.3{ 80160 S 24'41 19 W 3207 30.23 80414 80115 N 406331 W N 407 10 W 80.27 79.87 80.,59' WWW N 795513 E 4 20.6 80129 N 632319 W 17.14 Wtl79 S 372917 E S 476801 E 57_50 IB.J7 WI06 WI01 N 57zle4 W 71_61 80261 $401601 E 21.04 W416 S 69'1939 E 27.22 80571 N 3375 W N 14'3214 2819 80725 S 25'40 34 W 27.72 w8 5 4303 30 E 83.Jtl WIOB N 171811 W N 49712{ 2226 19.21 80262 $ 8{3509 E 26.16 80417 S 647551 E 76_09 80572 W N 614313 W 75.72 19.09 W726 47727 S 730"1 ttl W S S2v1 1353 WH0 N 614516 E 56.71 WI09 $ 1 1557 w --15 4-'P-- WI63 80154 N X87149 S 702107 27.x3 W41A N 131605 E 22.26 8057} S 826916 W 19_.(19 807281. 24 W S 7µ3S SN W 14.32 27.46 801162 801413 N SZ7 S9 W 71.24 will 40,61 80265 $ 723712 E 2..82 18.83- 80417 80470 N 491554 E 17.01 8051 N-3J5N33W 73.07 80729 17'11 W 29-2-7-808114 49'4408 W N 60'45 U0 W 44.45 47.75 WI11 S 6377 is W 20,71 65 S 833506 E 25.41 W4ZI N 4174 I2 E N 121028 6.35 20.39 w575 80576 N 453002 W 32.00 W130 S 631637 W 25.51 Wt1PS N 367232 W 20.19 WI11 W114 N 635 W 22]2 W267 S 41460 E 24.79 80422 N Ol'N J9 E 20.48 W577 333(136 E S 075501 E 2250 W731 N 752412 W 17.2E 8011116 N 03'12 T8 E 0,66 Wllq N 10561tl W 16 N 11'4555 E 17.15 31.15 66 W2G9 N 60'0815 E N 86691) 21.00 W42} N 9 40.14 WS78 S 02$3UT E 20.92 31.06 w/JZ W731 S 006004 E S 15'S40N W 16.5tl 21.69 wtl67 Mao N 76 2'52 W 33.7tl WIl N YOy4 W 45.50 80270 E N 79381 E 21.07 33_2 W424 79-11 S 7911 U2 E 2219 ws 19 �W560 S 751351 E 26.59 80734 S 121215 W 26.01 vmtie N 151426 E N 314858 E 49.21 4016 40-1-7-4i; N 481 4b W 47.6 W2I1 N 2336 41 E 26.98 80425 W425 S 661351 E S 491)5 O E 18.46 0.09 wSBI $ 082115_ ] ?0_92 Vg7S 5 F9•�S`2a W 2_1.7_4 806 0 N 4071'59 E 38.72 49.0 17 WI18 S U5.0 W N 3'12 JJ9 JI.BJ W 72 N 40216 31.78 W477 5 465621 E 20.61 80582 N 6834 W N 767 57 W 10.62 711.94 W136 7J S 34`1 i 5o W 20 Ztl.9 W8 N mV601 E 3ri.6 w119 W N 162014 W 30,18 20:%6 W273 80271 N 7950 31 E N 053215 E 25.03 80420 S 81'01 15 E 25.91 W583 N 3i;6 �3 W 28.26 M7 S 5r15J W S 69'42 )7 W 2221 14.50 WV72 wV9} S X070 15 E N 46'41 E 27.1 V1170 N 11'3212 W 7S N 34'0 52 E 51.22 37.32 W4Y9 80130 S 761918 31.21 �fl4 N 6055'00 W 23_25 80733 $'706708 W 25.01 w0.4 N OJLi 05 w 50.04 26.25 wt21 T] 0'oB E _03 25,119 80178 $852239 W 19.80 80131 H x,11 S6 E N 715028 E 20.06 30.1 wS65 S 81',3 73 W 11.19 W740 5 48711.2 W - TJ.22 w635 H 0]36 J1 E 35.85 WIT2 8012] 43R1µ f N 453915 p.4G W277 N 760953 W 18.87 W432 N 51781 E 2952 W58B W387 S 1tl'48 J7 E S 351544 W 76.70 17.3 80)41 80)12 S 54171 W 25.70 801198 N 877740 E 47.95 80174 W N tlJU12} W 11.70 336 W27B WT 79 H 0919 4U 2295 80433 S BT19 3B 13.13 WS68 S 216- ti SSW 19.r,5 w743 S 325716 W $ 551252 W 31.6 27.4 Vm97 W!)9tl N 271301 E N 57.01 WI25 S 65'4440 W 4J.� 117780 N 29'N 59 W N SDYJ 27 W 1296 W4J4 5 673215 E 20.14 W',U9 N 7730'16 W 17.66 W744 S 52'0353 W 25.54 NtiY9 47.1tl57 N 131'45'0 4 E 3095 48.04 WI26 772919 39.86 W281 -NO3-i6'-'-AE 10.97 11.08 80135 180SG H 49'4854 W N 521333 W 4.73 15.40 80570 W591 S 0551'311 W 71'1421 11U10 _W745 _S 6533 S4 W -356 '16.22 w900 S 76'1 4J E 53,14 W117 WI2B N 23'3510 W N 082911 36.56 W2tl2 N 113{56 W 10.09 8043 N 731450 W 18.51 WS'J2 $ E S 311230 W 18.96 16.73 W146 80747 S 6 NI W $ 59'1219 36.36 27.29 W�o1 N X52332 F, 41.81 WIT9 W N 2]'3104 JI�O 4(1.7(1 80103 80161 N 173612 E O566µ W 15.37 W1JH N x140 J9 W 24,76 W59J H 80-26'54 W 25.(6 W74H W N 871306 W 30.84"801103 Wipe N 548516 E N %52414 E 19.06 WIJU 015457 J7, 0 W2B5 N 173913 W 15.80 15.52 W439 W440 N 81'4249 W N 88'4115 W 19.8 10.99 80591 W;vS N 4311048 VI 9.50 V1749 `11750 N 40240tl W 35..16 Wd 4 S BG�Sr23 E 16.65 ZO.W M3f W132 N 01'4852 E N -()61)7-.-7-W- 34.1 80286 S 622840 W 7.85 W441 N 702556 W }7.70 596 S 558921 W S 623509 W 17.41 25.79 80751 14 451756 w N 178440 W 27.67 WYS 5 00'53 U6 E 19.40 WISS 147336 1787 J0. 9 80297 WltlB S 51'4841 W S 78'4346 12.15 80442 N 31'5102 W J4. 8 80597 S 76'4052 W 14.40 80752 N 751413 W 1).94 33.93 W'906 W96 S 764474 E $ 833570 E 63 _94 Wt 34 N 575115 E 19.2 IY2B9 E 5 122102 W 17.17 11.0 8041} 80444 N 27'4 ZI W N 076515 W 26.71 17.15 80_;99 '17 S 791536 W S 21.4 W753 N 575}�1 W 10.72 WJB $ 85'4141 E 30.59 25,15 wl 35 W136 !6'22 32 89211 4 69 X90 S 7856 01 W 11.90 WY N 171940 W 23`75 µGW H9*3900 W S 09'30 32 E 18.91 23.5 80154 80155 508'36 J� W N 6061 50 W J(S.}t 4273 YNG9 80910 N 138123 W p.94 WI]7 N 7tl'SS 22 E 70.0.9 7/192 58'4713 W N 2676 J8 E 16.95 W446 N 20'M 45 W 76.]8 Wbol --N-)-k-2126-Yr- S 783236 W ye.7-''- 80755 N (10'4956 W 79-28 S 892034 371.68 W1JB N 73 '40 E 19.99 w293 N 8436 57rW 11.82 B.JS 80447 W448 N 756 b4 W 16.54 02 28.47 80757 N 1731 W 12.47 W1J9 644440 27.5 80294 S 101775 W 11.02 80449 N 4,33 06 W N 40RS W 14.1 15.76 O3 01 S 713N 7B W 26.26 W75H N WJS 19 W 21.76 80140 WWI N SU22M E 707718 7.50 80295 802 $ 712205 W 22.35 80450 N Sf 4115 W 1231 WGOS N X756'01 w S 607438 w 25.90 76.45 W7S9 W760 45_3775 E N 7b'2 -r21 E 35.N 30_03 /2 N 6757IS W 17.5 1_27 8 80297 N tlS572I W N 7212 Jl W .p4 18.78 804 W452 N 613700 W N 2701 07 W 1455 17.30 GD6 07 S N21458 W 7971 52 27.84 80761 80122 1I4tl 20 E 17.W /4411111 1E7E7,'' �N CARP YOIJ 80744 55'32 51 W N 25'4 40 W 31.20 16.(j2 80298 Yi199 N 37'41'09 W N 203 1277 80453 N 617615 W 18.12 0 W $ 81'4tl 22 W 23.74 46.44 80763 N 44'3301 E N 301907 E }o.a3 23.74 ��`Q;:'' � -�'• �7 8011 022647 E Itl. W3W OS N BS'45 J6 =1.14 15.3n' WI54 80/55 N 681556 H x3.08 wti09 S 581931 W 16.63 W7B4 N OS3909 E T4.08 ` OFESStp�•;!Ji a;? WI48 N 053318 33.79 80301 N 501617 E 11.17 80456 6961 59 W N 21.50 10 S 750908 W 15.21 8076 N 525644 27.15 WI4 N I1V506 E 27_67 W70T N TJ149 W 10,31 80457 33'4006 W N 127505 E 27.06 25.N W611 �12 5 65_34 SI W S BWO1B 25.06 21.80 80766 N 37'3777 E 24.22 - Si. W149 80149 80150 N 511258 E N 522} 79 E N 765112 E 21.16 28.67 15,42 W30J WJ04 WSOS N 374375 E N 1955 0 W 9,62 11.1 W458 80459 N 045 /J E N 1618 14 E 17,46 23.11 - I] 14 W N N83553 W S 672Z yaw 24.72 31.10 80767 80748 80789 N 575914 N 31050 E N 55'5937 E 19.85 23.58 26.7] { `.14 j ' WI51 N 85450 70.4! 80706 N 10'04608 W N 277522 W 13.59 18.16 80460 W461 N 621049 E S 0318 Z8 29.14_IS 78.11 15 S 66'50'1380 S 2 -to W 75.09 34.11 W770 80771 N 833613 W 58-11'1 8.68 29.11 ' gVRH�.•' 80152 WI N 6411 55 E N85'23'33 W 27.Utl J7.4Y 80307 47300 N 39_1717 W N 5.B W462 N b9R 16 25.84 -17 N 91916 W 24.19 W772 $ W S 691{ 27780 15_46 i � C •�-{Q;,`� � wl54' W'IS 'S' 853i3'2{rTY tl42 1B W 79.03 4.ti9 WJ09 W}10 201725 W 7573'06 -' W 402944 11.4 13.80 18.06 W483 8046♦ WIGS N 761734 $ 1929 26 W S 50105 E 71.2 20.04 39.81 7B 80519 �20 N 531753 W N 5N'16 27 W N 0512'19 W 35.05 21.78 2271 W77y 80774 80775 S 2727.6 W $ 542751 W S JB3B 03 W -21.72'rr 26.34 23,29 It ✓ COMP Or DAX REVi5'0'VS BOUNDARYSUR!/EYPLAT 11 1712005 ADDED 7' MEAN SEA L£VEZ DATA FCH 05/19/2006O? OFTHEPROPERTYOF TENNESSEE LAND SURVEYING C O . 02 2006 REMOVE 7' MEAN SEA LEI2Z. DATA OR. DY SHEET.• ADD 13E7CANDS OEC/NE-A710N FOR INTERNATIONAL PAPER REAL TY CORP, PHASE I' R/V£RSOUND' 1 s 4 FOR 140 HIGHLAND AVE PHONE: 615-597-40£35 OT 02 2006 ADD SI/EET 04 1J zoos ADD wf7cANDs PHA cads AND WATERFROW GROUP AV LLC SCALE.•X103 NO. IVOX '?Fvvtwz 1'> 500' 0511612006 ADD -DATA PO/NTfL90'L0C47/aVS YEOP/M TOWNSH/P SMITHVILLE, TN 37166 FAX: 615-597-4091 050011 CHOMAN COUNTY, NORTH CAROL/NA 0511912006 ADDED 47H SHEET (/NSE7S A' & 27) WETLANDS DELINATION LINE TABLE WETLANDS PHASE LINE TABLE Coosa 84alnq Ol.t-- 14 PT S 89'3232 5 61.37?2 E 966.51 866,05 P3 P4 S 71'!2'.18 W 21_42 JL W 820 77,10 5 116 - 521'42'38 W S 21'42 311 W {7,65 226 pi S 23001 W 9 . 5 re s 7CT 4; w 403.16 P9 PIO S 15362110 W S 0461 W 110.3 343.5 PI P72 5 Oti7 G Il W 5 06'4611 W 96.25 F.97,4 P13 5 06_46 t1 W 13.95 P14 S 08'46 I1 W 615, YIS 5 72U55i W 94.56 P17 S UGV611 W 12756 P1 6 560222/1 E 14628 P19 06'46 11 23.46 P20 N 06'4ti 11 E 9251 r21 N ti6'4e It 54.03 P22 N 08'3330 W 94.5 YT3 N 06'451 E 96. OS P24 N OG-,4 75 E 70 98 P2 117 06'46'7 N 06'4611 E 861_58 128.61 P21 N OG'4611 E 3,9.4 P28 N IS-326- E 8295 P29 N 241 T41 4U3.1 PM N 23U01 E 102 P]I N 21'4238 E 197.18 P32 N 1'47313- E 244.1 P33 N 21'42 J8 E 1515.1 P34 N I n544- F 13.1 J N 16'4 51 E 30.43 PM N D 546 F 53.5 P37 N 0w 716 E 39.16 !'J9 N 0132 04 W 9266 P39 P40 N 53'5534 N 721240 E 439.3 340. P41 N 16?,?ri Ot W 665.24 P42 P41 N 323153 W N BIV3S-W E 625.75 1149.35 P44 P45 5 46 43 N 875339 E 17716 453.73 46 y0?412 E N5.3J 14 N 1033 5N W 876. 46 N 18"4 49 6026 WETLANDS COUP BY DATE FCH 0511912006 OR. 6Y SHEET.- JEH 4 OF 4 SCALE: ?OB NO. /' = 600' 050011 'DATA POINT FLAG' TABLE (see line tables for bearings and distances defining locations of flags located in this table) FLAG Northing Easting Line Table Intersectlon NA-56 860468.374 2743260.930 W931 - W932 NG-17 858907.479 2742030.004 W785 - W786 WCC-17 859987.082 2743602.609 W915 - W916 ND-6 857392.363 2743341.839 286 - W1287 QA-6 861569,377 2744339.75 W994 - W995 WBB-21 859614.904 2743331.863 15'884 - W885 C-7 855688.978 2742554.563 WG - W7 KR =!? 856072481 2742367.921 W75 - W76 R K -17 857100.698 2742777.020 W388 - W389 K8-96 857868.635 2741991.522 W471 - W472 REVISIONS BOUNDARYSURVEYPLA T 7' MEAN SEA LEt2Z DATA REF. TIE TABLE Come 0awing Wane 1 441. Oft 9.46' 1 T N7i'231 7906 25.3 18.00 74 N 73'36'52' E 49.5 - TS 42,3951 41.5 Tfi N 3]4-932 .6 N 2765 U3 44.80 T N 6415 3 7 1 ,99 9 1.9 N 647531 E 55.36 "0 1 S 6759 'OS E S :?vu6 68.3 3%,9 T12 S 541416 E 53.16 113 S 54]46 14.6 1? 1.15 S 130501 E 5 ?2V001 11.1 165.69 1.6 5 54122E 407.04 1.17 18 N 91335 W N 41 TJ84 r 214,50 622 BOUNDRY LINE TABLE Course Dewing Distance L IM N 3979 48 E 176.22 110 N 3473 03 E 113.01 1.10 N 270303 £ 213.66 L 104 N 26 36 15 E 65.67 L105 N 163945 E 80,67 L 106 N 5633 46 E 145.73 L107 N 6475'31' E 132.21 1.108 N 7277 02 E 55.92 L109 S 693151 E 111.27 1.110 S 7735'01 E 133.25 L111 S 57 59 O5 E 155.24 L112 S 15 35 4 f 226.36 1.113 S 03'35'42" E 51.83 L114 S 547416 £ 200.90 L 115 S 6339 59 f 78.56 L 116 S 5333 43 E 59.18 L117 S 4800 30 E 171.52 L 118 S 68'54'32'-E- 69.95 L119 S 694601 E 4525 L120 S 0827103' E 83142' L121 S 130501 E 71.34' 1 L122 S 22023 W 42.60 L123 S 353104 f 164.78 L124 N 264053 E 11072 L 125 N W-20 E -7-1-77"- L128 N 65'01'45' £ 2J 20 L 127 N 8756 08 E 22236 L128 S 574603 f 96.82 1.129 S2 779 19 E 55 48 L130 S 395148 E 80.01 1.131 S 73,55,01- 27.43- L112 S 493203 E 161.00 L 133 S &1X060 E 257.71 L134 S 320941E 12382 1. 135 S 430712 E 29.96 LIM S 324917 E 107,93 037 S 5775 48 E 267157 1.138 S 8974 '37E 16119 L 139 N 68 J2 44 E 66.22 L140 N 745717 E 65.84 L 141 S 8575 21 E 76.68 L 142 N 6555 '08E 141.92 L 143 S 6077 46 f -Y6-.-6 L 144 S 8776 27 E 106.61 L 145 N 83 46 27 E 76.44 L 146 N 8676 42 E 68.93 L147 S 080824 E 192.00 L148 S 06V724- E 398.90 L 149 S 145724 E 292.40 L 150 S 0158 24 E 189.90' L151 S 0653 24 E 37.80 L 152 S 0235 24 E" 550.24 L153 S 0043 '03W 209.18 L154 S 01'1043 E 62.23 L155 S 107405 E 222.42 L156 N 695222 E 26000 1.757 N 145420 409,86 L 158 N 87'35'00- E 209.20 L1.59_ M 7 ,.,111,1,1••••. `'qN C14Rp ,'o 'OQ oFESS1???y . SEAL 5/Ly REMOVE7',V4EX11SEALE1n DATA OFTHEPROPERTYOF TENNESSEE LAND SURVEYING CO. & ADD 6£77-ANOS DEUNEAnON FOR /NTERNAT/ONAL PAPER REALTYCORP. PRASE 'l' RivERSDONO- FOR ADD SN£ETz2 & ®3 140 HIGHLAND AVE PHONE: 615-597-4085 ADD AFIZANDS PHASE CA115 AND WATERFRONT GROUP NC, L L C ffox R R-,"RONIS, ADD IVATAPaNTRAG' LOCAnONS YEOPW TOWNSHIP SMITHVILLE, TN 37166 FAX: 615-597-4091 ADDED 4 n! SH£fr (INSETS :4' & 0) CHOWAN COUNTY, NORTH CAROLINA W AT ?AQG 6 Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality August 15, 2006 CERTIFIED MAIL: RETURN RECEIPT REQUESTED Cert. # 7006 0100 0000 8384 4289 Doug Dorman Atlantic Environmental Consultants, LLC P.O. Box 3266 Kitty Hawk, NC 27949 Subject Property: Riversound Development Off NCSR 1100, Chowan County REQUEST FOR MORE INFORMATION Dear Mr. Dorman: DWQ Project # 2006-1245 Chowan County D AEG ? ? X006 DENR ?D STQR` nAZER? 3:CN wE?"??DS At On August 7, 2006, the Division of Water Quality (DWQ) received your application dated August 1, 2006 to impact 0.36 acres of wetlands and 0 feet of streams to construct the proposed development roadways. The DWQ has determined that your application was incomplete and/or provided inaccurate information as discussed below. The DWQ will require additional information in order to process your application to impact protected wetlands and/or streams on the subject property. Therefore, unless we receive the additional information requested below, we will have to move toward denial of your application as required by 15A NCAC 2H .0506 and will place this project on hold as incomplete until we receive this additional information. Please provide the following information so that we may continue to review your project. Additional Information Requested: 1. Impact Justification (Avoidance and Minimization) Under Section VII of your application you did not provide a "justification" for the impacts as requested within this section. Application should show justification for installation of cross pipes in permitted areas. 2. Application should demonstrate avoidance and minimization. Cross pipes installed in permitted areas, up to 48 inches in diameter, shall be buried 20% below streambed elevation. Pipes 48 inches or greater in diameter shall be buried 1 foot below stream bed elevation to allow for aquatic passage during low flow conditions. Plan drawings should detail pipe burial with a cross section drawing and related elevations. It should be demonstrated that pipe placement does not result in aggradation, degradation, or significant changes in hydrology of wetlands or streambeds or banks adjacent to or upstream and down stream of structure. North Carolina Division of Water Quality Internet: www,ncwaterquality.org 943 Washington Square Mall Phone: 252-946-6481 One Washington, NC 27889 FAX 252-946-9215 NorthCarolina An Equal Opportunity/Affirmative Action Employer- 50% Recycled/10% Post Consumer Paper Awwrally 3. Application should provide information on slope of fill at stream and wetland crossings. Methods of stabilization of fill slopes, such as seeding and mulching, should also be included. 4. Application should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey Map with property boundaries outlined. 5. Under Section VI of your application temporary and permanent stream impacts should be accounted for along with cumulative impacts to all streams on site. It is necessary that a stream determination be made at sites A, C, E, H, and D to properly identify streams in these areas. 6. Please provide the 25% additional information fee associated with the Express 401 Permitting Program of $250.00 by check made payable to "NC DENR". The above requested information must be received in this Office prior to August 29, 2006 or your application will be returned as incomplete. The return of this project will necessitate resubmittal of all required items including the application fee. If you need additional time to submit the required information, please mail or fax your request for time extension to this Office at the Letterhead address. This letter only addresses the application review and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application are not authorized (at this time) by the DWQ. Please call Roberto Scheller at 252-948-3940 if you have any questions regarding or would like to set up a meeting to discuss this matter. incerely, A- L- L AI Hodge/Supervisor Division of Water Quality Washington Regional Office cc: Cyndi Karoly, DWQ Central Office File Copy Filename: wArF9 a o ? August 7, 2006 Please return check # 1695 to: Doug Dorman Atlantic Environmental Consultants LLC PO Box 3266 Kitty Hawk, North Carolina 27949 Doug Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality This is for the Riversound project. Please contact Lyn Hardison at (252) 948-3842 should you have any questions. Laurie Dennison Administrative Assistant DENR - DWQ Wetlands/401 Unit 2321 Crabtree Blvd Raleigh, NC 27604 Enclosure: Check #1695 for $200 cc: File copy + check copy N?oy,?` Carolina ?vaturallU 401 Oversight/Express Review Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone (919) 733-1786 / Fax (919) 733-6893 Internet: http://h2o.enr.state.nc.us/ncwetlands An Equal Opportunity/Affirmative Action Employer- 50% Recycled/10% Post Consumer Paper -. USACE Action ID No. DWQ No. O h -- 1'A ? S If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than leaving the space blank. 1. Processing 1. Check all of the approval(s) requested for this project: ® Section 404 Permit ? Section 10 Permit ® 401 Water Quality Certification ? Riparian or Watershed Buffer Rules 2. Nationwide, Regional or General Permit Number(s) Requested: Nationwide 14 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? N/A 4. If payment into the North Carolina Wetlands Restoration Program (NCMW) is proposed for mitigation of impacts (see section VIII - Mitigation), check here: ? II. Applicant Information - I IM 17 1?_l i] L; 1. Owner/Applicant Information "`? C 0 'L006 Name: The Waterfront Group Mailing Address: c/o Elliott Harwell 17505 West Catawba Avenue VV_EJUai Fd.J STU;Z r? %T E: +t BU,'CH Suite 350 Comelius, NC 28031 Telephone Number: see agent info. Fax Number: see agent info. E-mail Address: see agent info. 2. Agent Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Roxanne D. Dorman Company Affiliation: Atlantic Environmental Consultants, LLC Mailing Address: P.O. Box 3266 Kitty Hawk, NC 27949 Telephone Number: 252-261-7707 Fax Number: 252-261-2965 E-mail Address: RoxDormannaol.com Page 1 of 8 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than I 1 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: AEC 1106-015A 2. T.I.P. Project Number or State Project Number (NCDOT Only): N/A 3. Property Identification Number (Tax PIN) #7845-00-47-4097 #7845-00-35-8443 & #7845-14-6463 4. Location County:_ _Chowan County Nearest Town: Edenton Subdivision name (include phase/lot number): Riversound Subdivision Phase I Directions to site (include road numbers, landmarks, etc. Heading south on Hwy 17/37 from Elizabeth City take a left on Haut hton Road (Hwy 37) then a right on Dnimmonds Point Road (SRI 100) subiect tract is located approximately three miles down Dnimmonds Point Road (SRI 100) on the left side of SRI 100. The west side of the site is bordered by Middleton Creek, the eastern and southem sides of the site are bordered by privately owned parcels (residential and farmland) and the north side by the Yeopim River. 5. Site coordinates, if available (UTM or Lat/Long): 3604'36"N 7629'02"W (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Describe the existing land use or condition of the site at the time of this application: Subiect tract is currently undeveloped forested land previously used for silviculture purposes. There is an existing dirt road (logging road) with existing dilapidated culverts. 7. Property size (acres): 963.62 acres 8. Nearest body of water (stream/river/sound/ocean/lake): Yeopim River 9. River Basin: Pasquotank River Basin Page 2 of 8 (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.) 10. Describe the purpose of the proposed work: Fill in Section "404" wetlands to prepare the site for subdivision road construction, replacing existing dilapidated and nonfunctioning culverts (previously constructed for a logging road) with upgraded culverts and one new road crossing that does not exist at this time. 11. List the type of equipment to be used to construct the project: Dump truck, frontend loader 12. Describe the land use in the vicinity of this project: Residential and agricultural IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. A wetland delineation was completed for the subiect tract and approved by USACOE, Tracey Wheeler June 6, however, no Action ID number available at this time. A grubbing and clearing permit was issued to the Waterfront Group obtained March 31", 2006 for 4.5 acres of disturbance. V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application: Future permits anticipated for the subdivision: Stormwater Permit, CANIA Major Pen-nit, Sedimentation Erosion Control, 401 Certification. This project will go through the Fast Tract therefore applications will be in the state office at the same time or prior to this application request. VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a Page 3 of 8 delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Wetland Impacts Wetland Impact Area of Located within Distance to Site Number Type of Impact* Impact 100-year Floodplain** Nearest Stream Type of Wetland*** (indicate on ma) (acres) (es/no) (linear feet) A Wetland fill 0.01 ac. yes 955+ feet from Forested Wetland Middleton Creek B Wetland fill 0.03 ac. yes 1,220+ feet from Forested Wetland Yeopim River D Wetland fill 0.06 ac. yes 3,492+ feet from Ycopim River Forested Wetland F Wetland fill 0.03 ac. yes 2.703+ feet from Ycopim Rivcr Forested Wetland G Wetland fill 0.05 ac. yes 548+ feet from Forested Wetland Ycopim River H Wetland fill 0.03 ac. yes 1,494+ feet from Ycopim Rivcr Forested Wetland * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. ** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local Floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online at http://www.fema.p-ov. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) List the total acreage (estimated) of existing wetlands on the property: 134 acres Total area of wetland impact proposed: 0.36 acre 2. Stream Impacts, including all intermittent and perennial streams Stream Impact Site Number (indicate on ma) Type of Impact* Length of Impact (linear feet) Stream Name** Average Width of Stream Before Im act Perennial or Intermittent? (please secif C Culvert and assoc. rip rap darn 72 Tributary of Middleton Creek , 140 intermittent E Culvert and assoc. rip rap dam 30, Tributary of Middleton Creek , 65 intermittent Page 4 of 8 * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. ** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps arc available through the USGS at 1-800-358-9616, or online at www.usas.eov. Several internet sites also allow direct download and printing of USGS maps (e.g., www.topozone.com, www.ma12quest. coin, etc.). Cumulative impacts (linear distance in feet) to all streams on site: no strewn impacts 3. Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any other Water of the U.S. Open Water Impact Site Number (indicate on ma Type of Impact* Area of Impact (acres) (if applicable) Name Wat) Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc.) N/A N/A N/A N/A N/A i i i i i * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging, flooding, drainage, bulkheads, etc. 4. Pond Creation N/A If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. N/A Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): N/A Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): N/A Size of watershed draining to pond: N/A Expected pond surface area: N/A VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. The proposed impact was limited to a total of 0.36 acre to stav within the General Permit. Wetland fill proposed is necessary to upgrade existing culverts, excluding one new crossing (G), by replacing the existing nonfunctioning culverts with new and improved culverts. The existing dirt road was constructed in the early 40's Page 5 of 8 for silviculture purposes and existing culverts have failed. The replacement and fill is necessary to construct a subdivision road according to state and coup requirements. VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at littp:Hli2o.enr.state.nc.us/ncwetIands/strmgide.html. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. Mitigation proposed for this project is a conservation easement to preserve the remaining wetlands within Riversound Phase 1, excluding easements to the shoreline and a 20 foot buffer from the wetland alignment to allow the property owner to only clear and maintain vegetation. A copy of this application package will be submitted to NCEEP as well for the approval letter to accept responsibility for the conservation easement. 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that - you would like to pay into the NCWRP. Please note that payment into the NCWRP must be reviewed and approved before it can be used to satisfy mitigation requirements. Applicants will be notified early in the review process by the 401/Wetlands Unit if payment into the NCWRP is available as an option. For additional information regarding the application process for the NCWRP, check the NCWRP website at http://1,20.enr.statc.nc.tis/wrp/index.htm. If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: Page 6 of 8 Amount of stream mitigation requested (linear feet): N/A Amount of buffer mitigation requested (square feet): N/A Amount of Riparian wetland mitigation requested (acres): N/A Amount of Non-riparian wetland mitigation requested (acres): N/A Amount of Coastal wetland mitigation requested (acres): N/A IX. Environmental Documentation (DWQ Only) Does the project involve an expenditure of public funds or the use of public (federaUstate/local) land? Yes ? No If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No X. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 213 .0233 (Meuse), 15A NCAC 213 .0259 (Tar-Pamlico), 15A NCAC 213 .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify N/A )? Yes ? No ® If you answered "yes", provide the following information: Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact (square feet) Multiplier Required Mitigation 1 N/A 3 N/A 2 N/A 1.5 N/A Total N/A N/A * Zone I extends out 30 feet perpendicular from near bank of channel; Zone 2 extends If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment Page 7 of 8 into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B.0242 or.0260. No buffer mitigation required for this project since disturbance/fill is not within the buffer. XI. Stormwater (DWQ Only) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. Impervious surfaces are not proposed for this project however, future impervious surfaces will include subdivision roads houses driveways and parking. Silt fence will be placed along the fill/wetland interface to prevent fill material from impacting the adjacent wetlands not permitted for fill. Stormwater and Sedimentation Erosion Control Plan applications will be submitted by Shield Engineering for subdivision purposes. XII. Sewage Disposal (DWQ Only) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Sewage disposal is not part of the road construction project, however, a central wastewater system will be constructed for the proposed subdivision outside of Riversound Phase 1. XIII. Violations (DWQ Only) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes ? No Is this an after-the-fact permit application? Yes ? No XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). No constraints are currently associated with this project 15,11 Applidfa?ht/Agenfs Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 8 of 8 Point CSC rtfo He rd Crow o Point C. ;' } ---` i - I - • e o 41 is Hartford •cA '?/s? / / s Sotrt r. WAIAP b " Burgess 14 ixon ?' P.Aadw ? ? ?? =lgwet O Afill "`°d` a A? Water Snug Harbor 00 s ; 7 reapln, 1 to -RIVER --? - y Ed" on it - ---?" o° `' Ore man c 'i / / \\ Greenne CusPn ? ? ? \? Edenton Boy ." I Point o St Johns IN N b I \ t1 \ N1 PAL AIRPORT Bluff Point /N1N Nions Cape 32 Beach Colorry I / HOmiDlow l S O U N D Pont ' 32 • ?O $oui ? \w?i, , - o U N r _ IND _ -- Leon:ro, - _ e--_ _ i Pea ?` - ..?: *• _,s_-----ws-=- '- --- -- Copyright (C) 1998, Maptech, Inc } I; ALBEMARLE SOUND ST 3 SHOWS THE 1ST OF 3 COMMUNITY- NHE ACCESS EASEMENTS AND GAZEBO SHEET 4 SHOWS THE 2ND OF 3 COMMUNITY All- HEE ACCESS EASEMENTS AND GAZEBO 177- I 5 SHOWS THE 3RD OF 3 COMMUNITY \ • ACCESS EASEMENTS AND GAZEBO ri z 0 w I~ z 0 Q VICIN NTl MAP S I X04 e r y??' 11. ?l ADJACANN ROPERTY N DOT OT d,Q Q fM1 ??° 4 D Ll WATERFRONT GROUP RIVERSOUND PROJECT CHOWAN COUNTY - NORTH CAROLINA ATLQNT/C ENVIRON?l1ENTAL CONSULT,4NTS, LLC GRAPHIC SCALE 1 =- 1000, P.O. BOX 3266, K/T7YHAfff, /Y. C. 27949 (252)261-7707, e-moil rordormon®aol. cam DATE: 7/27/06 REVISED: FILE: 06-015 DRAWN BY: DOUG D SSHEEET 2 SHOWS BOT RAMP, PARKING AND RIVER HOUSE , , p, tlL7l- OfLE r- • ?' r X LESLIE L. aMw oa Erna n'' ;.r AREAS LABLED AS A-G INDICATE CROSSINGS OVER 404 WETLANDS AS SHOWN IN DETAIL ON SHEETS 6-13 D RAP: E`O?C- _^ _DS GRAD ?I plpr ___. --'NOR ___.__.1:lN. AE-WAID Or M t 1 ? + 1 on _ o `¢' + PROMS ° ROAD C G°3OMM AREA "N' z PROPOSED I SPFUy T 1 CORRUGATED ALLUMINUM PIPE (CAP) 3 O 51', 24' OL ---- 404 WMAND L= AL I ` A R . ?? /r 404 nTuND LLNN PROPOSED 404 WETLAND "" -- •-._ _," 1 FlLL 210 SF AL AL i PROPOSED 404 WETLAND FILL 208 SF Alit L I I LEGEND: AL \ E2 PROPOSED FILL AREA (418 SF) ZUSTM 404 WE77:AND LINE ? ? - . - EXISTING 404 WETLAND UNE COA TMJfED 816106 BY THE -- 6---EXISTING CONTOUR UNES USACOE 1 \-9- PROPOSED CONTOUR UNES PLAN VEW ROAD CROSSM AREA "A" e NATIONWIDE #14 FILL PERMIT - AREA A WATERFRONT GROUP RIVERSOUND PROJECT CHOWAN COUNTY - NORTH CAROLINA ' ,47ZOT/C ENVI ONNN- 4L CONSULTANTS LL C GRAPHIC SCALE 1 20 , A0.. 90X 3266, K/TTYHAffr, AC. 2790 (252)261-7707, e-mail roxdolman0oo%com DATE: 7/26/06 REVISED: FILE: 06-015 DRAWN BY: DOUG D. •\ U ILJ 2 \\ Q \ U 404 WMAND . I PROPOSED 404 WETLAND FILL 1,178 SF JkL tic IL ? ? EXISTING 404 WETLAND LINE ? CONMYED 818106 BY THE USACOE I PROpOS ROgp" 20' J N AL 404 WATL4ND LAYS ? I . ? ! JL ? ? I ? ? I ? ? ? AL I \ JL tlk LEGEND : PROPOSED FILL AREA (1,178 SF) - - EXISTING 404 WETLAND UNE --$--- ED EXISTING CONTOUR ONES PLAN A EW o ROAD C ROSS M AREA 0590 NATIONWIDE #14 FILL PERMIT - AREA B WATERFRONT GROUP RIVERSOUND PROJECT C OWAN COUNTY - NORTH CAROLINA „ ,4TL,4NT/C ENV/rfONMENTAL CONSULTANTS, LLC GRAPHIC SCALE 1 = 20' P.O. 90.Y -3266, K/TTY N.4WK, N. C. 27949 252)261-7707, o -mall roMorman0ao%com DATE: 7/26/06 REVISED: FILE: 06-015 DRAWN 8Y: DOUG D. 54'-36- -40 _ P3QP??. _Q E1P_C7 -- .-1DS jc M UNL.- _.- p6°3OME o ROAD C°30oSSM AREA Dacca z U F lw ?J / ,I c? f I Rgb?CT /N ti 20' ? 3?Ic ?Elfc I .. t ? /. P FILL ROPOSED 404 WETLAND CORRUGATED ALLUMINUM PIPE // //'/ f ' ' //i' • // ,? slk (CAP) 5 O 54'. 36" DIA. ?,.O// ii , A.. AL rf/f ?? /• f ? ? .f JIL EXISTING 404 WE77 AND LINE CONF11 R0 6/6/08 BY THE / . USACOE AL AL ? i AL / PROPOSED 404 KETLAND FILL 1,308 SF SF AL 1EGEND; PROPOSED FlLL AREA (5,144 SF) 404 WZYLAND IBM - EXISTING 404 WETLAND UNE N ---2---EXISTING CONTOUR UNES -4- PROPOSED CONTOUR UNES 00?0D P LAM VUEW GOAD CG°30SSM AREA NATIONWIDE #14 FILL PERMIT - AREA C WATERFRONT GROUP RIVERSOUND PROJECT CHOWAN COUNTY - NORTH CAROLINA ATLANT/C ENIi/RON Z-NrAL CONSUL WNTS, LLC GRAPHIC „ SCALE 1 = 20' P.O. BOX 3266, OW 11,01K, N.C. 279 9 252)261-7707, e-mail roxo'onmanWaol. com DATE: 7/26/06 REVISED: FILE: 06-015 DRAWN BY: DOUG D. An u? -3. X?FUI.I. o? - O - n + ¢ lf'ROME ° ROAD CROSS M AREA 90099 4 z W I" a F -? L f i r r _ 1 1 L PROPOSED DIRT ROAD 1 20' tltc 1 404 WERAND . SF . / ,I8 It 314 ;%?i ?J 404 22 < ?1ltc AIL ?11fc ? A: AL Ji L r 1L 31c ?f 114. .,L CORRUGATED ALLUMINUM PIPE L (CAP) 3 O 54'. 36' DIA. a,L AIL 4U4 WETWW AL JIL PROPOSED 404 FlLL 1.341 SF l6!L / L A,L AL iltc ?- ?` I 1L r f LEGEND: E7a5TNG 404 WETLAND LINE f \co M PROPOSED FlLL AREA (2,664 SF) CONFRUM 816106 BY THE i - -EXISTING 404 WETLAND UNE USA COE M ? UNES PLAN V V E W - ROAD CR ll OSS ? IlM V ? G?1RL?- A _4_ PROPOSED CONTOUR R UNES ?? DD ?? - PROPOSED NATIONWIDE #14 FILL PERMIT - AREA D WATERFRONT GROUP RIVERSOUND PROJECT CHOWAN COUNTY - NORTH CAROLINA ATLAN7/C ENV/?ONMENTAL CONSUL l4NTS, LLC GRAPHIC SCALE 1 = 20' P.O. 90/Y 3266, /(/TTY H,4#/,, N. C. 27949 (252)261-7707, e-mail rordorman0aol. com DATE: 7/26/06 REVISED: FILE: 06-015 DRAWN BY: DOUG D. en UV 3-50'-24' _?OS FULL -- __.__ __ ? --_ - - - --._ - .._._., - - ------- --- -- - - - •- - ------ . v ? `- - ? 0 i AP FtOX. -_ - _ --- _- -- -i= - - -1$- - -- - --- -- - _- _' JNJ ? + PROH LE o ROAD C ROSSM AREA °°[E°° Z I U I F / W !/ U Q AL / ~?• 404 MrLAND L1NS C C AL AL ?I{fL AL ? IPROPOSED 404 WERAND FILL 1,133 SF JL IkL Milt. AUL JUL A , ""Z jL I / AL 1L ` 404 AS77?ND LllYB tJL PEED WLT ROAD AL 20' I i RLL371 SF - - - I ? _ / - 6 IL CORRUGATED ALLUMINUM PIPE / ? (CAP) 3 O 50'. 24' DIA. I ?,r i co co V I I E.I WWG 404 IFEMAND LWE 1L I CONFRUM 818108 BY THE I 1EGEND: USACOE ?x? ?J PROPOSED FILL AREA (1,504 SF) ?AL EXISTING 404 WETLAND LINE '? ?r - --6-EXISTING CONTOUR LINES -9 PROPOSED CONTOUR LINES AL PLANVEEW ROAD CROSSM AREA Too NATIONWIDE #14 FILL PERMIT - AREA E WATERFRONT GROUP RIVERSOUND PROJECT CHOWAN COUNTY -NORTH CAROLINA A7LAKY L"Nll/RONNN- 7,4L CONSUL 7AN7S, LL C GRAPHIC SCALE 1 = 20' P.O. BOX .3266, !(/TTY NAYff, N.C. 27949 (252)291-7707, email roxdorman®aol. com DATE: 7/26/06 REVISED: FILE: 06-015 DRAWN BY: DOUG D. z W I" Z a 11\ PLAN ME ° ROAD C OoMM AREA CUP / / EXISTING 404 WEMAND LINE CONMOM 616106 BY THE USACOE IEGEND PROPOSED FILL AREA (1,200 SF) - EXISTING 404 WETLAND LINE --- 2----- EXISTING CONTOUR LINES -4- PROPOSED CONTOUR ONES NATIONWIDE #14 FILL PERMIT - AREA F WATERFRONT GROUP RIVERSOUND PROJECT CHOWAN COUNTY -NORTH CAROLINA ,4714N7/C ENV11f0N1f1EN74L CONSULTANTS, LL C GRAPHIC SCALE 1 20' P.0. BOX .266, K/TTY 11,40, N.C. 279 9 252)261-7707, email i-o rdorman®aol. com DATE: 7/26/06 REVISED: FILE: 06-015 DRAWN BY: DOUG D. _ ? ._ PROHLE o ROAD COMM AREA CUT z U F w a z PROPOSED - ?6_ 20' AL --? .inc. CORRUGATED ALLUTAINUM PIPE (CAP) 3 O 52', Is, DIA A L r? yr AL AL AL ALL AL JL AL ; ,t, AL PROPOSED 404 WETLAND : i -''l' y ? /J r C r c ° 3?L AL AL FlLL 2,302 SF -:k •` f K ? r 404 DATUND Ilia / AL AL ; / 1 AL JIL AL AL AL 404 WEYLtND LM / 6 / IEGEND : PROPOSED FILL AREA (2,302 SF) J/ - - EXISTING 404 WETLAND LINE EXISTING 404 WETL ND LINE JJ / COjVFIRMED USACOE 818108 BY THE " ---- 6- EXISTING CONTOUR LINES / -9- PROPOSED CONTOUR LINES l ? PLAN VEW o ROAD C ROSSM AREA gaGoll NATIONWIDE #14 FILL PERMIT - AREA G WATERFRONT GROUP RIVERSOUND PROJECT CHOWAN COUNTY - NORTH CAROLINA ' A7LAN7/C ZN- V1R0N#Z-N7QL C0NSUL 74N7S LL C GRAPHIC SCALE 1 20 , A0.. BOX J 2M, K/TTY H,4`YK,, N.0, 279,0 (252)261-7707, e mail Io rdolman®aol. com DATE: 7/26/06 REVISED: FILE: 06-015 DRAWN BY: DOUG D. 0 - N - 19 _ co . l IA .4 h ._..__ "-_-......._ ._... . ty + ' i lJ ll / JLL IL W /Z ? s 404 WZOT LWZ AL I JIL L A IL / r + 404 WETLWD ZRX - / 6--- A L / AL CORRUGATED AL LUMINUM PIPE ?J (CAP) 3 O 52', 18' DIA. ALL / / / PROPOSED 404 WERJWD FILL 1,308 SF IEGEND: PROPOSED FILL AREA (1,308 SF) - - EXISTING 404 WETLAND UNE -- 6--- EXISTING CONTOUR UNES -9- PROPOSED CONTOUR UNES 6 BY G? n PLAN VEW o ROAD C ROSSM AREA B/e10 CO USACOE NATIONWIDE #14 FILL PERMIT - SECTION H WATERFRONT GROUP RIVERSOUND PROJECT CHOWAN COUNTY - NORTH CAROLINA ATL,4NT/C ENV11f0NMEN7AL CONSM 74N7S, LL C GRAPHIC „ SCALE 1 = 20' P.O. 9OX J266, /(/TTY 114l K, N. C. 279,0 ?252)261-7707, a -mall i-oxdorman0ao%com DATE: 7/26/06 REVISED: FILE: 06-015 DRAWN BY: DOUG D. USACE Action ID No. DWQ No. 0 Lo - S If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than leaving the space blank. 1. Processing 1. Check all of the approval(s) requested for this project: ® Section 404 Permit ? Section 10 Permit ® 401 Water Quality Certification ? Riparian or Watershed Buffer Rules 2. Nationwide, Regional or General Permit Number(s) Requested: Nationwide 14 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? N/A 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (see section VIII - Mitigation), check here: ? , - - II. Applicant Information D AUr L3 ; 2006 I. Owner/Applicant Information Giavi(..,,-?;; cF"t QJRLITY Name: The Waterfront Group Yvc7l rr_ srr.? ;. Mailing Address: c/o Elliott Harwell 17505 West Catawba Avenue Suite 350 NC 2 Telephone Number: see agent info. Fax Number: see agent info. E-mail Address: see agent info. 2. Agent Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Roxanne D. Dorman Company Affiliation: Atlantic Environmental Consultants, LLC Mailing Address: P.O. Box 3266 Kittv Hawk. NC 27949 Telephone Number: 252-261-7707 Fax Number: 252-261-2965 E-mail Address: RoxDorman(a?aol.com Page t of 8 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: AEC 06-015A 2. T.I.P. Project Number or State Project Number (NCDOT Only): N/A 3. Property Identification Number (Tax PIN) #7845-00-47-4097 117845-00-35-8443 & #7845-14-6463 4. Location County: Chowan County Nearest Town: Edenton Subdivision name (include phase/lot number): Riversound Subdivision Phase I Directions to site (include road numbers, landmarks, etc. Heading south on Hwy 17/37 from Elizabeth City take a left on Haughton Road (Hwy 37) then a right on Dnimmonds Point Road (SRI 100) subiect tract is located approximately three miles down Drummonds Point Road (SRI 100) on the left side of SRI 100. The west side of the site is bordered by Middleton Creek, the eastern and southern sides of the site are bordered by privately owned parcels (residential and farmland) and the north side by the Yeopim River. 5. Site coordinates, if available (UTM or Lat/Long): 36.04'36"N 7629'02"W (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Describe the existing land use or condition of the site at the time of this application: Subiect tract is currently undeveloped forested land previously used for silviculture purposes. There is an existing dirt road (logging road) with existing dilapidated culverts. 7. Property size (acres) 963.62 acres 8. Nearest body of water (stream/river/sound/occan/lake):_ Yeopim River 9. River Basin: Pmquotank River Basin Page 2 of 8 (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http:Hii2o.enr.state.nc.us/admin/maps/.) 10. Describe the purpose of the proposed work: Fill in Section "404" wetlands to prepare the site for subdivision road construction, replacing existing dilapidated and nonfunctioning culverts previously constructed for a logging road) with upgraded culverts and one new road crossing that does not exist at this time. 11. List the type of equipment to be used to construct the project: Dump tnick, frontend loader 12. Describe the land use in the vicinity of this project: Residential and agricultural IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. A wetland delineation was completed for the subject tract and approved by USACOE, Tracey Wheeler June 6, however, no Action ID number available at this time. A grubbing and clearing permit was issued to the Waterfront Group obtained March 31", 2006 for 4.5 acres of V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application: Future permits anticipated for the subdivision: Stormwater Permit, CAMA Major Permit, Sedimentation Erosion Control, 401 Certification. This project will go through the Fast Tract therefore applications will be in the state office at the same time or prior to this application request. VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a Page 3 of 8 (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://l12o.enr.state.nc.us/admin/maps/.) 10. Describe the purpose of the proposed work: rill in Section "404" wetlands to prepare the site for subdivision road construction, replacing existing dilapidated and nonfimctioning culverts (previously constructed for a logging road) with upgraded culverts and one new road crossing that does not exist at this time. 11. List the type of equipment to be used to construct the project: Dump (nick, frontend loader 12. Describe the land use in the vicinity of this project: Residential and agricultural IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. A wetland delineation was completed for the subject tract and approved by USACOE, Tracey Wheeler June 6, however, no Action ID number available at this time. A grubbing and clearing, permit was issued to the Waterfront Group obtained March 31", 2006 for 4.5 acres of disturbance. V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application: Future permits anticipated for the subdivision: Stormwater Permit, CAMA Major Permit, Sedimentation Erosion Control, 401 Certification. This project will go through the Fast Tract therefore applications will be in the state office at the same time or prior to this application request. VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a Page 3 of 8 delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Wetland Impacts Wetland Impact Area of Located within Distance to Site Number "Type of Impact* Impact 100-year Floodplain** Nearest Stream Type of Wetland*** (indicate on ma) (acres) (yes/no) (linear feet) A Wetland fill 0.01 ac. yes 955+ feet from Forested Wetland Middleton Creek B Wetland fill 0.03 ac. yes 1,220+ feet from Forested Wetland Yeopim River D Wetland fill 0.06 ac. yes 3,492+ feet from Ycopim River Forested Wetland F Wetland fill 0.03 ac. yes 2,703+ feet from Yeopim River Forested Wetland G Wetland fill 0.05 ac. yes 548+ feet from Ycopim River Forested Wetland H Wetland fill 0.03 ac. yes 1,494+ feet from Ycopim Rivcr Forested Wetland * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. ** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps arc available through the FEMA Map Service Center at 1-800-358-9616, or online at http://www.feina.gov. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, ctc.) List the total acreage (estimated) of existing wetlands on the property: 134 acres Total area of wetland impact proposed: 0.36 acre 2. Stream Impacts, including all intermittent and perennial streams Stream Impact Site Number (indicate on ma) Type of Impact* Length of Impact (linear feet) Stream Name* * Average Width of Stream Before Impact Perennial or Intermittent? (please secif C Culvert and assoc. rip rap dam 72 Tributary of Middleton Creek , 140 intermittent E p d assoc. rip Culvert 30, Tributary Cofek iddleton 65' intermittent Page 4 of 8 * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. ** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at www.usPs.£oy. Several internet sites also allow direct download and printing of USGS maps (e.g., www.topozone.com, www.mapquest.com, etc.). Cumulative impacts (linear distance in feet) to all streams on site: no stream impacts 3. Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any other Water of the U.S. Open Water Impact Site Number (indicate on ma Type of Impact* Area of Impact (acres) Name of Waterbod (if applicable) y Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc.) N/A N/A N/A N/A N/A * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging, flooding, drainage, bulkheads, etc. 4. Pond Creation N/A If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. N/A Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): N/A Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): N/A Size of watershed draining to pond: N/A Expected pond surface area: N/A VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. The Proposed irnnact was limited to a total of 0.36 acre to stav within the General Permit. Wetland fill proposed is necessa to upgrade existing culverts, excluding one new crossing (G), by replacing the existing nonfunctioning culverts with new and improved culverts. The existing dirt road was constructed in the early 40's Page 5 of 8 for silviculture purposes and existing culverts have failed. The replacement and fill is necessary to constnict a subdivision road according to state and county requirements. VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at littp://h2o.enr.state.nc.us/ncwetIands/stnrtgide.htmi. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. Mitigation proposed for this project is a conservation easement to preserve the remaining wetlands within Riversound Phase 1, excluding easements to the shoreline and a 20 foot buffer from the wetland alignment, to allow the property owner to only clear and maintain vegetation. A copy of this application package will be submitted to NCEEP as well for the approval letter to accept responsibility for the conservation easement. 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that - you would like to pay into the NCWRP. Please note that payment into the NCWRP must be reviewed and approved before it can be used to satisfy mitigation requirements. Applicants will be notified early in the review process by the 401/Wetlands Unit if payment into the NCWRP is available as an option. For additional information regarding the application process for the NCWRP, check the NCWRP website at http://li2o.enr.state.nc.us/wrp/index.htm. If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: Page 6 of 8 Amount of stream mitigation requested (linear feet): N/A Amount of buffer mitigation requested (square feet): N/A Amount of Riparian wetland mitigation requested (acres): N/A Amount of Non-riparian wetland mitigation requested (acres): N/A Amount of Coastal wetland mitigation requested (acres): N/A IX. Environmental Documentation (DWQ Only) Does the project involve an expenditure of public funds or the use of public (federal/state/local) land? Yes ? No If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No X. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 213 .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify N/A )? Yes ? No ® If you answered "yes", provide the following information: Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone' Impact (square feet) Multiplier Required Mitigation 1 N/A 3 N/A 2 N/A 1.5 N/A Total N/A N/A s Zone i extends out 30 feet perpendicular from near bank of channel; Zone 2 extends If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment Page 7 of 8 into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or .0260. No buffer mitigation required for this project since disturbance/fill is not within the buffer. XI. Stormwater (DWQ Only) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. Impervious surfaces are not proposed for this project however, future impervious surfaces will include subdivision roads houses driveways and parking. Silt fence will be placed along the fill/wetland interface to prevent fill material from impacting the adjacent wetlands not permitted for fill Stormwater and Sedimentation Erosion Control Plan applications will be submitted by Shield Engineering for subdivision purposes. XII. Sewage Disposal (DWQ Only) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Sewage disposal is not part of the road construction project, however, a central wastewater system will be constructed for the proposed subdivision outside of Riversound Phase I. XIII. Violations (DWQ Only) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes ? No Is this an after-the-fact permit application? Yes ? No XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). No constraints are currently associated with this project e; ApplidEnt/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 8 of 8 i ?. .. _ _ _ ., Hertfiord - -?, Pvtor _ , ono, crow PG4Af r, IT r/ ` Q za Hanford 84-1 Z southern WAMP F ,p '?-, , >r 1 ! wort, IF ---}-'? ! <?>=-- ---? ., _"' `•? ?L L39ht Von J ? (` . ? [suiyc++ Tit y o l0 S - _ ,?, .l r Bet I urcocSr \`?} Afi// • ti.. ? CrPP'F ' • P Water //??? T Snug Harbor St P's a '1? 7 Yevirn "---'--RIVER ---? ` t J I ton -?^ HOC I D- -on Poi e¢n ?? Edenton Boy \ y ?jl I. Chary Point o i ,\ , ohns \. S1J I E N N b r M N1 PAL AIRPORT t31uN Point I _ 5 NIJw" Colony 31 ueach / ? HovniDlow San S 0 U N D Point Pont / 32 / pPRV / ?. • a°-?/ P N ----- - Untp Leonard, ~ - _ - .-`- - POW Pea Copyright (C) 1998, Maptech, Inc •?EpEN7101V ?`'- VITE 11 ri SNHE T 2 SHOWS BOT RAMP, PARKING Z AND RIVER HOUSE t? jJf I / \ NARL E SOUND / • - VICINITY MAP N TS `?P \ \: Or PKASE NOTE; .. u ti SHEET 3 SHOWS THE 1ST OF 3 COMMUNITY` 4. ACCESS EASEMENTS AND GAZEBO ADJACANT PROP f N/F LESLIE L. KERSEY NOTE: SHEET 4 SHOWS THE 2ND OF 3 COMMUNITY ACCESS EASEMENTS AND GAZEBO .. f t SHEET 5 SHOWS THE 3RD OF 3 COMMUNITY \ f `;i t y' `"` r '' T ACCESS EASEMENTS AND GAZEBO NOTE: AREAS LABLED AS A-G INDICATE CROSSINGS f OVER 404 WETLANDS AS SHOWN IN w DETAIL ON SHEETS 6-13 .b ?/ • • • / • • xf??.Al? OFlIFJnpl ? L Z ADJACANT7ROPERTY N DOT f? i l,? I o Ap -; C •y. U + I WATERFRONT GROUP RIVERSOUND PROJECT CHOWAN COUNTY - NORTH CAROLINA AT ANT/G' ENI?/RONMENr4L CONSULTANTS, LLC GRAPHIC SCALE 1 = 1000 P.0. 90.r 3266, K/TTY 11,4` r, N.C. 2790 (252)261-7707, e-mail roxdormon0aol. com DATE: 7/27/06 REVISED: FILE: 06-015 DRAWN BY: DOUG D gip: ? E?`ai'? fP - - -- -- - - _EX -GWE-c ^ .DL_PJP 'r - _ _-FiOR UN A , APPROX. - f-- OR` WXiR O ?7 - O PROMLE ° ROAD C ROSS M AREA "'N' z , { U ? I W Q I 1 I PRO SED ASPHgLT I 1 CORRUGATED ALLUMINUM PIPE (CAP) 3 O 51', 24' DW. -- - `~? 9 6 7 / 404 WETLAND LUd ?o jL AL 404 AETLMlm x ? PROPOSED 404 WETLAND ... ?' -- -- - `" - - ? 4 AL FILL 210 SF ,a -l/ AL (?(X i PROPOSED 404 WERNJD FILL 208 SF . ?tlfc r LEGEND: AL m PROPOSED FILL AREA (418 SF) KUSTING 404 WE77AND ? CONFIIWO 818106 BY THE \ 1 - - EXISTING 404 YETLAND UNE USACOE \\-- --6--EXISTING CONTOUR ONES 9 PROPOSED CONTOUR UNES PLAN V GW ° ROAD C ROo SS NG AREA °°A°° - --- 6-_- _- NATIONWIDE #14 FILL PERMIT - AREA A WATERFRONT GROUP RIVERSOUND PROJECT CHOWAN COUNTY - NORTH CAROLINA ' ,4TG4fVT? LLC /?ONMENTQL CONSULTQiVTS ? GRAPHIC SCALE 2 0 , P o BO X 3266, K/77Y HA`Yf,, AC. 279,9 (252)261-7707, 9 -mall toxdorman0aof. com DATE: 7/26/06 REVISED: FILE: 06-015 DRAWN BY: DOUG D. -- z F w lz 404 WEMAND m .,L PROPOSED 404 WETLAND FILL 1,178 SF .AL AL PROpOS RENAL7 20' i J EXISTING 404 WETLAND LINE I CONFIRMED 616106 BY THE USACOE I i AL 404 WHAM LM I AL I ? i AL ED I . I ! AL 1 I ? I I 'L I 1 I AL 1 I AIL N AL I I I? I I \ 1DGENA: PROPOSED FILL AREA (1,178 SF) - EXISTING 404 WETLAND LINE --8 - - EXISTING CONTOUR UNES PLAN V? E V V - ROAD C DOSS U V VJ AREA U D ua NATIONWIDE #14 FILL PERMIT - AREA B WATERFRONT GROUP RIVERSOUND PROJECT CHOWAN COUNTY -NORTH CAROLINA „ QTLANT/C ENV/r?ON -N7,4L CONSULTANTS, LL C GRAPHIC SCALE 1 = 20' A0. 90,r 3266, AVW NA`f'K AC. 27949 (252)261-7707, e-malli-ardonnum9do/com DATE: 7/26/06 REVISED: FILE: 06-015 DRAWN 6Y: DOUG D. ? 40 --- 4 8 O - m ? mt . r OR WATFR-u ¢ O oacoa OL?L_, ROAD C OM?? AREA l!?11 Z AL / :. F ILI :I.. Q l i AL , ?I 1 W ti zo' ? AL JIL AL JUL s ?. A` rl AL PROPOSED 404 WETLAND AL FILL 3.838 SF t{fc / % ; 111 CORRUGATED ALLUMINUM PIPE AL (CAP) 5 O 54'. 36- DI.A. AL aL ? AL AL 'uL , EXEMG 404 WETLAND LINE 616106 BY THE G AL USA E a. r< / / j L / PROPOSED 404 WETLAND FILL 1,308 SF AL AL AL ,I {? ( 4N WMILIND LINE 3JIL ?, ?! ' \/ LEGEND: ? ALAL PROPOSED FILL AREA (5144 SF) l/E7LdND LINE 404 - EXISTING 404 WETLAND LINE N - -- 2 - - EXISTING CONTOUR UNES / -4- PROPOSED CONTOUR UNES PLAN MW ° ROAD CROSSM AREA oocoo NATIONWIDE #14 FILL PERMIT - AREA C WATERFRONT GROUP RIVERSOUND PROJECT CHOWAN COUNTY - NORTH CAROLINA ATLANT/C ENl11,?0N -NT,4L CONSUL TAMS, LL C „ GRAPHIC SCALE 1 = 20' P.O. 90X 3266, K/TTY HANK MC. 279,9 252)261-7707, e-mail i-oxdonnan0aol. com DATE: 7/26/06 REVISED: FILE: 06-015 DRAWN BY: DOUG D. A ON uv PROF . GRADE 0 AD - 4 z W IU a r I PROPOSED 404 FlLL 1.323 SF JILL ! 1 JNL ; PROPOSED ROIAD AD - 20' 11 ? JILL i Ile J'jc / ` ALL 404 1L AL ?o .&L CORRUGATED ALLUMINUM PIPE (CAP) 3 O 54', 36' DIA. i4. .,L JILL 404 NA7ZAhW J$L 1L ,L PROPOSED 404 FILL 1,341 SF i L. L ;tl{c J? AFL ,,LL /! JI(? .AL '4 LEGEND. EXOMG 404 WETUND LINE = PROPOSED FILL AREA (2,664 SF) CONFIRMED 818106 BY THE ?? - -EXISTING 404 WETLAND UNE PLAN ?) `V- ARE D -_,_ EXISTING CONTOUR LINES USACOE EXISTING (? MEW ° ROAD ?('ROSSO IlM VG ?( PROPOSED CONTOUR UNES 0 NATIONWIDE #14 FILL PERMIT - AREA D WATERFRONT GROUP RIVERSOUND PROJECT CHOWAN COUNTY - NORTH CAROLINA „ , ATLANT/C ENV/,fONMENTAL CONSULTANTS, LLC GRAPHIC SCALE 1 = 2 A0.. BOX 3266, K/T7r H,4`K, N.C. 27949 .a& 254261-7707, e-mail roxdorman®aol. com DATE: 7/26/06 REVISED: FILE: 06-015 DRAWN BY: DOUG D. A /nl uv F ' _ O .G '- --- ----------- 0 ?- Mf 1 0 PROHLE o ROAD COMM AREA Too z I U I W i i \ X. I AL / 404 WMAND LUtT l talc 404 SF AL AL AL AL I 1L Aita / ?Jc 404 WMLAND L.M Alts 3Vc 2 -- /r AASPFW-? I ROAD 20' 1 FILL 371 SF------ - AL / / Y AL %. / CORRUGATED ALLUMINUM PIPE I (CAP) 3 O 50', 24' DLk co (O E%ISTMG 404 WMAND LINE CONFRMED 816106 BY THE 1EGEND: IISACOE m PROPOSED FILL AREA (1,504 SF) - EXISTING 404 WETLAND UNE ---- 6------ EXISTING CONTOUR UNES? / --Q-- PROPOSED CONTOUR UNES _ 114. / . oa?oo / PLAN MEW o ROAD COMM AREA NATIONWIDE X14 FILL PERMIT - AREA E WATERFRONT GROUP RIVERSOUND PROJECT CHOWAN COUNTY - NORTH CAROLINA AUNT /C ENV/RONMENTAL CONSULTANTS, LLC GRAPHIC SCALE 1 = 20' P. 0. BO,Y 3266, K/TTY HA{f1K, NO. 27949 252)261-7707, a-mail m raolman®aol. com DATE: 7/26/06 REVISED: FILE: 06-015 DRAWN BY: DOUG D. z ?r F I" zz ca a PLAN MEW o ROAD CG°30oSSM AREA °°G a f E UMNG 404 NETLdND LINE CONFIRA O 616106 BY THE USACOE z LEGEND: PROPOSED FILL AREA (1,200 SF) -- EXISTING 404 WETLAND UNE ----2------ EXISTING CONTOUR UNES -4-- PROPOSED CONTOUR UNES NATIONWIDE #14 FILL PERMIT - AREA F WATERFRONT GROUP RIVERSOUND PROJECT CHOWAN COUNTY -NORTH CAROLINA ,4TG4N7I'C Z-MIRONMENTAL CONSUL74NTS, LLC GRAPHIC SCALE 1 20' P.O. 9OX 3266, K/TTY H,4Yff, 1Y. 0. 27949 (252)261-7707, & -mall roxdormalWaol. com DATE: 7/26/06 REVISED: FILE: 06-015 DRAWN BY: DOUG D. 1 0 _ ra- PROo HLE o ROAD CROSSM AREA CUT z U F w z a P?P 1 ROAD 6 ` 20' ' >V4 CORRUGATED ALLUMINUM PIPE (CAP) 3 O , 52', 18' DIA. A ..\ r AL AL r v? JAIL 1L AL AIL JAIL JAIL t{ r: ti } ysK + w`s a r ' 1 St 7?'H?K r r "LS'1.'S AL w PROPOSED 404 WETLIND Y ?, ` r . , +r x y,, AIL AL AL AL AL FlLL 2,302 SF 404 WA7L4iVD LASS / ]A{L JAtL (? t h j( .4 . t .! C / / I / f? M• ,1i JAIL •. ,'V?„Y? ? :?J, . ? ' \ JAIL / 404 WS LAND LV& lam. LEGEND : m PROPOSED FlLL AREA (2,302 SF) ?' - - - EXISTING 404 WETLAND LINE EXISTING 404 IFETLAND LINE i CObTRUM USACOE 616106 BY THE ?- --- 6 --- EXISTING CONTOUR UNES ` -9- PROPOSED CONTOUR UNES PLAN VEW o ROAD C ROSSM AREA OUG09 NATIONWIDE #14 FILL PERMIT - AREA G WATERFRONT GROUP RIVERSOUND PROJECT CHOWAN COUNTY - NORTH CAROLINA ' ,47Z,4N71C ENi111?ONMZN' 74L CONSUL 7,WS LL C GRAPHIC SCALE 1 20 , P.O. BOX 3266, K/TTY H,4`YK, N. C. 27949 (252)261-7707, email m rdonmanWaol. coin DATE: 7/26/06 REVISED: FILE: 06-015 DRAWN BY: DOUG D. - -PR O-M691 _ 9 1. P!P --E7C-G -6cL TPE-`"- ?_ - - _ - - _ _ -_ _ -APPRO IAA= 4 -- - - - '- -?? ? - ___ -- - -_E)Gr-16' --- GRIP...:.. ?\ ._. - - _ _ ---- - _ - ---- - ~- L =-- _?" __ - Oo - U - +Q - 1 w + + PROME ROAD . C ROSSM AREA 99HOU ? ?AL L r A L U iLz A z I - -. r° 404 WMLAND LUM , • ?i AL AL 404 I MAND ZZW IL r P / CORRUGATED ALLUMINUM IPEJ (CAP) 3 O 52'. 18' DIA. ' AL / / PROPOSED 404 MfEiLMID FILL 1,308 SF / IEGEND : r ,,? • Y PROPOSED FILL AREA (1,308 SF) , - - EXISTING 404 WETLAND UNE -- 6 --- EXISTING CONTOUR UNES -9- PROPOSED CONTOUR UNES 404 WEMAIM LIME PLAN VEW o ROAD C ROSSM AREA °°?1°° CONFIRbfED 618108 BY THE USACOE NATIONWIDE #14 FILL PERMIT - SECTION H WATERFRONT GROUP RIVERSOUND PROJECT CHOWAN COUNTY - NORTH CAROLINA ATL,4NT/C ENV/?ONMENTAL CONSULTANTS LLC GRAPHIC 99 SCALE 1 = 20' , P.O. 90X .f266,' K/TTY //,4` X, AC. 27949 252)261-7707, 6 -mall roxo'orman®aol. com DATE: 7/26/06 REVISED: FILE: 06-015 DRAWN BY: DOUG D.