Loading...
HomeMy WebLinkAbout20080194 Ver 1_More Info Received_20080318v M~KIM~CREED v ENGINEERS SURVEYORS PLANNER 5 March 14, 2008 Mr. Chad Coburn NC Dept. of Environmental & Natural Resources 127 Cardinal Drive Extension Wilmington, NC 28405-3845 RE: B-Var road Lot /Red Apple Group, LLC DWQ # 08-0194 Dear Mr. Coburn, CPR~~RS pFOpCF s ,.- ~Ki W ~ t 2 ~~ ~,y ~ ~ ao ~~ a~ln$ ~ 243 North Front Street M&C 3058-0003 ~ l~ ~~~ ~ ~~ D ~j~ MPR 1 $ 2Q~~ WPZER~p~~~~H v~SSOR In response to your letter, dated February 27, 2008, requesting additional information, we offer the following: 1. The location of the Normal High Water line flagged by Debra Wilson of the Division of Coastal Management (DCM) IN July of 2007 differs from the one illustrated on the State Storm Water permit SW8061034 issued from the DWQ on April 18, 2007. Submit a revision to permit SW8061034 to the DWQ to relocate the level spreader outside of the 30-foot buffer to the Normal High Water line. Response: We have revised the design to locate the level spreader outside the 30' buffer. With the attachments to Rhonda Hall, we are submitting as a revision. 2. The application states that mitigation for the 590 square feet of Coastal Wetland impacts will consist of 600 square feet of replanting and restoration in section D of drawings E4 and E9. Iri addition, 255 square feet will be replanted to the original state in section B. However, these sections are included in the area to be dredged per the application. Submit a more thorough description of the mitigation plan for the site. W i l m i n g t o n, N C 2 8 4 0 1 Response: Per your site visit, you could determine that dredging those areas is required to create a suitable substrate for plantings. Presently those areas are covered with inorganic debris. 910.343.1048 Fax 910.251.8282 w w w, m c k i m c r e e d. c o m S:\3058\0003\ 10-Comm\031408 NCDENR Coburn response Itr.doc March 14, 2008 Page 2 3. The application states that the proposed docking facility will contain 5 boat slips. However, the design as submitted will potentially accommodate up to 10 boat slips. This discrepancy could potentially lead to further shellfish closures per 15A NCAC 18A. 0911 as mentioned in the February 20, 2008 memorandum by Jeremy Humphrey of the North Carolina Shellfish Sanitation and Recreational Water Quality Section. Explain the facility design as submitted. Response: Based on water depths, mooring for 10 slips is not possible. However, as a deterrent, a 36"rail will be added along the western side of the floating dock. If you have any furthers questions, please contact me at 910-343-1048. Sincerely, McKI & CREED, P.A. Marga et G /hdb Enclosures: CSl -Rev D Mailing Notation: AS NOTED cc: Rich Weaver, DCM Morehead City w-enc (U5 Mail) Ian McMillan, DWQ 401 Oversight & Express Unit, w/5 (UPS) Rhonda Hall, DWQ, Wilmington, w/2 (Deliver) Troy Hudson, Red Apple Group w-enc (US Mail) File, McKim & Creed, PA, w-enc S:\3058\0003\10-Comm\031408 NCDENR Coburn response Itr.doc ~ v~M~MM~CREED