HomeMy WebLinkAbout20080189 Ver 1_Approval Letter_20080313Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
March 13, 2008
Mr. Mike Winstead, Jr. Member/Manager
Empire Group, LLC
500 Spring Garden Street
Greensboro, NC 27401
Coleen H. Sullins, Director
Division of Water Quality
Chuck Wakild, P.E., Deputy Director
Division of Water Quality
DWQ Project # 08-0189
Craven County
Subject Property: West Crossroads Apartments, Hwy. 55 west of New Bern
Neuse River
APPROVAL of Isolated Wetlands Permit
Dear Mr. Winstead:
You have our approval, in accordance with the attached conditions, to place permanent fill in 0.41 acre of
isolated wetlands in order to construct the proposed apartment complex in Carven County, as described in
your application dated January 14, 2008, and received by the Division of Water Quality on February 6,
2008. After reviewing your application, we have determined that this fill is covered by the State General
Permit for Impacts to Isolated Wetlands and Isolated Waters (IWGP 100000). In addition, you should get
any other federal, state or local permits before you go ahead with your project including (but not limited
to) Sediment and Erosion Control, Non-Discharge and Water Supply Watershed regulations. Also, this
Permit will expire upon the expiration date of IWGP100000 (September 30, 2008) or unless
otherwise rescinded by the Director of the Division of Water Quality.
This approval is for the purpose and design that you described in your application. If you change your
project, you must notify us and you may be required to send us a new application. If the property is sold,
the new owner must be given a copy of this Permit and approval letter and is thereby responsible for
complying with all conditions. If total fills for this project (now or in the future) exceed one acre of
wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A
NCAC 2H .0506 (h). This approval requires you to follow the conditions listed in the attached Permit
and any additional conditions listed below.
The Additional Conditions of the Certification are:
1. Impacts Approved
The following impacts are hereby approved as long as all of the other specific and general
conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are
approved including incidental impacts:
Amount Approved (Units) Plan Location or Reference
Stream (feet)
Isolated Wetlands 0.41 (acres) Site 1
Waters (acres)
North Carolina Division of Water Quality Internet: h2o.enr.state.nc.us
943 Washington Square Mall Phone: 252-946-6481
Washington, NC 27889 FAX 252-946-9215
An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper
NorthCarolina
Naturally
Mr. Mike Winstead, Jr.
Page 2 of 3
March 13, 2008
Buffers (square ft.)
2. Erosion & Sediment Control Practices
Erosion and sediment control practices must be in full compliance with all specifications
governing the proper design, installation and operation and maintenance of such Best
Management Practices in order to protect surface waters standards:
a. The erosion and sediment control measures for the project must be designed, installed,
operated, and maintained in accordance with the most recent version of the North Carolina
Sediment and Erosion Control Planning and Design Manual.
b. The design, installation, operation, and maintenance of the sediment and erosion control
measures must be such that they equal, or exceed, the requirements specified in the most
recent version of the North Carolina Sediment and Erosion Control Manual. The devices
shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects,
including contractor-owned or leased borrow pits associated with the project.
c. For borrow pit sites, the erosion and sediment control measures must be designed, installed,
operated, and maintained in accordance with the most recent version of the North Carolina
Surface Mining Manual.
d. The reclamation measures and implementation must comply with the reclamation in
accordance with the requirements of the Sedimentation Pollution Control Act.
3. No Waste, Spoil, Solids, or Fill of Any Kind
No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond
the footprint of the impacts depicted in the Pre-Construction Notification. All construction
activities, including the design, installation, operation, and maintenance of sediment and erosion
control Best Management Practices, shall be performed so that no violations of state water quality
standards, statutes, or rules occur.
4. No Sediment & Erosion Control Measures w/n Wetlands or Waters
Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum
extent practicable. If placement of sediment and erosion control devices in wetlands and waters
is unavoidable, they shall be removed and the natural grade restored within six months of the date
that the Division of Land Resources has released the project.
5. Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable
Buffer Rules, and any subsequent modifications, the applicant is required to return the attached
certificate of completion to the 401/Wetlands Unit, North Carolina Division of Water Quality,
1650 Mail Service Center, Raleigh, NC, 27699-1650.
Violations of any condition herein set forth may result in revocation of this Permit and may result
in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to
conduct impacts to waters as depicted in your application and as authorized by this Permit, shall
expire upon expiration of IWGP100000 (September 30, 2008) or unless otherwise rescinded
by the Director of the Division of Water Quality.
Mr. Mike Winstead, Jr.
Page 3 of 3
March 13, 2008
If you do not accept any of the conditions of this Permit (associated with the approved wetland or stream
impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that you
receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the
North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center,
Raleigh, N.C. 27699-6714. This Permit and its conditions are final and binding unless you ask for a
hearing.
This letter completes the review of the Division of Water Quality under the Isolated Wetlands Rules as
described within 15 NCAC 2H, Section 0.1300. If you have any questions, please telephone Roberto
Scheller of the Washington Regional Office at 252-948-3940 or Ian McMillan of the 401
Oversight/Express Unit at 919-715-4631.
Sincerely,
I Ho?gup?r
ON A
Division of Water Quality
Surface Water Protection
Washington Regional Office
Enclosures: IW GP 100000
Certificate of Completion
cc: Corps of Engineers Washington Field Office
DWQ 401 Oversight/Express Unit
CAMA, Morehead Office
File copy
Central Files
Filename: 08-0189